Loading...
HomeMy WebLinkAboutNCC205281_NOT Closeout Documents_20220803North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Forsyth Project: Piedmont Natural Gas Line 328 Person financially responsible: Piedmont Natural Gas Company, Inc. Address: 4720 Piedmont Row Drive, Charlotte, NC 28210 1. Project Location: Hilltop Dr., Winston-Salem Pictures: No 2. Weather and soil conditions: 90's, Clear, Workable 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Yadkin-PeeDee Project #: FORSY-2021-005 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: July 29, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Turney Date of inspection: July 26, 2022 Time arriving on site: 4:00 PM Time leaving site: 4:30 PM