Loading...
HomeMy WebLinkAboutNCC202835_NOT Closeout Documents_20220803North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 County: Onslow Project: MCB Camp Lejeune Repair Closed River basin: White Oak Person financially responsible: MCB Camp Lejeune - Talia Prendergast Project #: ONSLO-2020-053 Address: 1005 Michael Road, Camp Lejeune, NC 28547 1. Project Location: Sneads Ferry Road, MCB Camp Lejeune Pictures: No 2. Weather and soil conditions: 90 clear dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Mike Taylor Title: Inspection report: Sent Report Date given/sent: August 02, 2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. File closed. Reported by: Brian Lambe Others present: Date of inspection: July 28, 2022 Time arriving on site: 10:30 AM Time leaving site: 10:50 AM cc: