Loading...
HomeMy WebLinkAbout20200021 Ver 1_Year 0 Monitoring Report_2022_20220808Mitigation Project Information Upload ID#* 20200021 Version* 1 Select Reviewer: * Erin Davis Initial Review Completed Date 08/08/2022 Mitigation Project Submittal - 8/8/2022 .................................................................................................................................................................................................................................................................. Is this a Prospectus, Technical Proposal or a New Site? * 0 Yes O No Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name: * Matthew Reid Project Information ID#:* 20200021 Existing ID# Project Type: Project Name: County: • DMS Mitigation Bank Bull Chute Randolph Document Information Mitigation Document Type: * Mitigation Monitoring Report File Upload: Signature ............................................ Print Name: * Signature:* Email Address: * matthew.reid@ncdenr.gov Version:* 1 BullChute_100137_MY0_2022. pdf Existing Version 19.82MB Please upload only one PDF of the complete file that needs to be submitted... Matthew Reid MVO FINAL MONITORING REPORT Bull Chute Stream and Riparian Wetland Mitigation Site Randolph County, NC Yadkin River Basin Cataloging Unit 03040103 DMS Project ID No. 100137 Full Delivery Contract No. 7878-01 RFP#16-007878 (Issued: 5/6/2019) USACE Action ID No. SAW-2020-00049 DWR Project No. 20200021 Data Collection: March - May 2022 Submission: July 2022 4 y �q .' w . Prepared for: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF MITIGATION SERVICES 1652 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1652 7,a Mitigation Services ENVIRQNMENTALQ UAL ETY CLEARWATER MITIGATION SOLUTIONS July 31, 2022 Mr. Matthew Reid NCDEQ Division of Mitigation Services Western DMS Field Office 5 Ravenscroft Drive, Suite 102 Asheville, NC 28801 Re: Bull Chute — MY-0 As -Built Report (DMS Project No. 100137) Response to Comments Dear Mr. Reid, Please find below the response to comments on the Bull Chute As -Built Report provided by DMS, dated July 25, 2022: 1) Please add Table 1, Table 2, and Table 3 to Table of Contents. Re: Tables 1-3 were added to the table of contents. 2) Monitoring Table Summary and 4.2 Hydrology Assessment indicates that 9 groundwater gauges were installed. The CCPV and soil boring logs show 10 ground water gauges. Please review and revise as necessary. Re: The table was revised to reflect the 10 groundwater gauges installed throughout Site wetlands. 3) Table 8: Vegetation Plot Data Table: There are several species included on the vegetation table under the "species included in approved mitigation plan" section that were not part of the approved list (Catalpa sp., Quercus lyrate, Quercus pagoda and Viburnum dentatum). Any species not included in the approved mitigation plan should be in the "post mitigation plan species" section (see DMSMonReportTablesOct2020.xls). These species should be counted in the "total" column and not in the "planted" column. Please revise table and update report to reflect any changes. Re: The Quercus lyrata and Quercus pagoda were likely misidentified. These have been revised to Quercus sp. and will be identified to species during MY1 monitoring. The Catalpa sp. was a data entry error and has been corrected to Carpinus caroliniana. The Viburnum dentatum in Random Plot 10 was misidentified and has been revised to Cornus amomum. All identifications will be confirmed during MY1. 4) Several species from the approved mitigation plan do not appear in the table. Carya tomentosa, Salix nigra and Carpinus caroliniana. Revise as necessary. Re: Carya tomentosa and Carpinus caroliniana were identified on Site. Salix nigra was planted in the streamside assemblage and was not captured in the vegetation plot data. Clearwater Mitigation Solutions 604 Macon Place Raleigh, NC 27609 919-624-6901 clearwatermitigation©gmail.com CLEARWATER MITIGATION SOLUTIONS Bull Chute As -Built Report Response to Comments Page 2 5) Several Quercus sp. were counted in the vegetation plot data. Please identify in the MY1 report. If these are planted species, they should be either Quercus nigra or Quercus phellos. Re: These will be identified to species during MY1 when leaves are present. 6) There was one Carya sp. identified in VP21. Should this be Carya tomentosa? Review and revise as necessary. Re: Yes, this specimen has been revised to Carya tomentosa. 7) Record Drawing: Please add call outs to changes in red with short description (ex. log cross vane added, cross vane not constructed). Re: All redline changes now have call outs. 8) Record Drawing: Hard copy was not printed in color. Red line markups were indiscernible as a result. Please revise for final submittal. Re: The hard copy was printed in color for this submittal. 9) Record Drawing: Ironwood (Carpinus caroliniana) was the only species not planted. Please include a red line strike through since it is a deviation from the original design. Re: Ironwood in design planting list has a line strike through. Digital Deliverable Review: 10) Digital deliverables have been reviewed and are complete. Please provide an updated digital deliverable submittal based on comments above when submitting the revised final MVO report. Re: The digital deliverables have been updated based on the DMS comments. Please do not hesitate to contact me with questions at 919-624-6901. Sincerely, "4:41 Kevin Yates Clearwater Mitigation Solutions 604 Macon Place Raleigh, NC 27609 919-624-6901 clearwatermitigation@,gmail.com MVO FINAL MONITORING REPORT Bull Chute Stream and Riparian Wetland Mitigation Site Randolph County, NC Yadkin River Basin Cataloging Unit 03040103 DMS Project ID No. 100137 Full Delivery Contract No. 7878-01 RFP #16-007878 (Issued: 5/6/2019) USACE Action ID No. SAW-2020-00049 DWR Project No. 20200021 Data Collection: March - May 2022 Submission: July 2022 Prepared For: Mitigation Services ENVIRONMENTAL (RIALUTY Prepared By: And CLEARWATER MITIGATION SOLUTIONS Clearwater Mitigation Solutions 604 Macon Place Raleigh, North Carolina Contact: Kevin Yates Phone: 919-624-6901 Axiom Environmental. Inc. Axiom Environmental, Inc. 218 Snow Avenue Raleigh, North Carolina 27603 Contact: Grant Lewis Phone: 919-215-1693 TABLE OF CONTENTS 1.0 PROJECT SUMMARY 1 1.1 PROJECT BACKGROUND, COMPONENTS, AND STRUCTURE 1 TABLE 1. PROJECT COMPONENTS AND MITIGATION CREDITS 2 TABLE 2. SUMMARY: GOALS, PERFORMANCE, AND RESULTS 3 TABLE 3. PROJECT ATTRIBUTE TABLE 4 1.2 SUCCESS CRITERIA 5 2.0 AS -BUILT CONDITION (BASELINE) 5 3.0 PROJECT MONITORING — METHODS 6 3.1 MONITORING 6 4.0 MONITORING YEAR 0 — DATA ASSESSMENT 8 4.1 STREAM ASSESSMENT 8 4.2 HYDROLOGY ASSESSMENT 8 4.3 VEGETATIVE ASSESSMENT 8 4.4 MONITORING YEAR O SUMMARY 8 5.0 REFERENCES 9 MYO Monitoring Report (Project No. 100137) Bull Chute Stream and Riparian Wetland Mitigation Site Randolph County, North Carolina Table of Contents page i Clearwater Mitigation Solutions July 2022 APPENDICES Appendix A. Visual Assessment Data Figure 1. Current Conditions Plan View Table 4A-H. Visual Stream Morphology Stability Assessment Table Table 5. Vegetation Condition Assessment Table Vegetation Plot Photographs Permanent Photo Points (Bridge Crossings) Appendix B. Vegetation Plot Data Table 6A. Planted Bare -Root Woody Vegetation Table 6B. Permanent Seed Mix Table 7. Vegetation Plot Counts and Densities Table 8. Vegetation Plot Data Table from Vegetation Data Entry Tool Appendix C. Stream Geomorphology Data Cross -Sections with Annual Overlays Longitudinal Profile Table 9A-F. Baseline Stream Data Summary Tables Table 10A-E. Cross -Section Morphology Monitoring Summary Appendix D. Hydrologic Data Groundwater Gauge Soil Profiles Appendix E. Project Timeline and Contact Info Table 11. Project Timeline Table 12. Project Contacts Appendix F. Record Drawings (As -Built Survey) MY0 Monitoring Report (Project No. 100137) Bull Chute Stream and Riparian Wetland Mitigation Site Randolph County, North Carolina Table of Contents page ii Clearwater Mitigation Solutions July 2022 1.0 PROJECT SUMMARY Clearwater Mitigation Services has established the North Carolina Division of Mitigation Services (NCDMS) Bull Chute Stream & Wetland Mitigation Site (hereafter referred to as the "Site"). The Site includes Unnamed Tributaries (UTs) to Caraway Creek in the Southern Outer Piedmont ecoregion of North Carolina. The Site is located in the Yadkin River Basin, cataloguing unit 03040103 and Targeted Local Watershed and Local Watershed Plan Area (Caraway Creek) 03040103050040 and North Carolina Division of Water Resources (NCDWR) subbasin number 03-08-38. Site watersheds range from approximately 0.008 of a square mile (5.4 acres) on UT2 to 0.19 of a square mile (120.9 acres) at the Site's outfall. 1.1 Project Background, Components, and Structure Located in Randolph County, less than one -mile northwest of New Market and 4.5 miles northwest of Randleman, the Site encompasses 31.7 acres. Restoration activities within the Site included the construction of meandering, E/C-type stream channel resulting in 6974 linear feet of Priority I stream restoration, 617 linear feet of stream enhancement (Level I), 833 linear feet of stream enhancement (Level 11), 450 linear feet of stream enhancement (Level 11 with an adjusted ratio), 3.13 acres of riparian wetland re-establishment, 0.114 acres of riparian wetland rehabilitation, and 1.462 acre of riparian wetland enhancement. The site is expected to provide 7742.933 warm water stream credits and 3.937 riparian wetland credits by closeout (Table 1, page 2). A conservation easement was granted to the State of North Carolina and recorded at the Randolph County Register of Deeds on April 9, 2021. Prior to construction, the Site was characterized by disturbed forest and livestock pasture. Site design was completed in May 2021. Construction started on September 6, 2021 and ended within a final walkthrough on March 8, 2022. The Site was planted on March 18, 2022. Completed project activities, reporting history, completion dates, and project contacts are summarized in Tables 11-12 (Appendix E). MY0 Monitoring Report (Project No. 100137) Bull Chute Stream and Riparian Wetland Mitigation Site Randolph County, North Carolina page 1 Clearwater Mitigation Solutions July 2022 Table 1. Bull Chute Mitigation Site (ID-100137) P oject Mitigation Quantities and Credits Project Segment Original Mitigation Plan Ft/Ac As -Built Ft/Ac Original Mitigation Category Original Restoration Level Original Mitigation Ratio (X:1) Credits Stream UT 1 Reach A UT 1 Reach B UT 1 Reach C UT 1 Reach D UT 1 Reach E UT 2 UT 3 Reach A UT 3 Reach B UT 3 Reach C UT 4A UT 4B UT 4C 173 468 68 149 2164 592 418 306 1137 410 295 180 187 456 68 149 2168 592 423 303 1119 402 290 175 Warm Warm Warm Warm Warm Warm Warm Warm Warm Warm Warm Warm El El El El El EII* No Credit 2.50000 1.50000 2.50000 1.50000 1.00000 2.50000 1.00000 7.50000 1.00000 1.00000 1.00000 0.00000 69.200 312.000 27.200 99.333 2,164.000 236.800 418.000 40.800 1,137.000 410.000 295.000 0.000 UT 4 2482 2492 Warm R 1.00000 2,482.000 UT 5A UT 5B UT 6 UT 7 37 38 121 68 36 38 130 77 Warm Warm Warm Warm No Credit R No Credit EII* 0.00000 1.00000 0.00000 5.00000 Total: 0.000 38.000 0.000 13.600 7,742.933 Wetland Wetland Reestablish Wetland Rehabilitation Wetland Enhancement 3.13 0.114 1.462 3.13 0.114 1.462 R R R REE RH 1.00000 1.50000 2.00000 3.130 0.076 0.731 Total: 3.937 Comments Approx. 30 If (approx. sta. 10+11 to 10+41) was realigned during construction to avoid damaging mature trees. This resulted in an increase of stream restoration footage along this reach at MYO. However, no change to crediting is proposed for MYO. Project Credits Restoration Level Stream Riparian Non -Rip Coastal Warm Cool Cold Wetland Wetland Marsh Restoration 6,944.000 0.000 0.000 0.000 0.000 0.000 Re-establishment 3.130 0.000 0.000 Rehabilitation 0.076 0.000 0.000 Enhancement 0.731 0.000 0.000 Enhancement I 411.333 0.000 0.000 Enhancement II 333.200 0.000 0.000 Enhancement II* 54.400 0.000 0.000 Creation 0.000 0.000 0.000 Preservation 0.000 0.000 0.000 0.000 0.000 Totals Total Stream Credit 7,742.933 7,742.933 Total Wetland Credit 3.937 3.937 Wetland Mitigation Category Restoration Level *Enhancement Level II with an adjusted ratio (based on IRT comment and review). CM Coastal Marsh HOP High Quality Preservation R Riparian P Preservation NR Non -Riparian E Wetland Enhancement-Veg and Hydro Ell Stream Enhancement II El Stream Enhancement I C Wetland Creation RH Wetland Rehabilitation -Veg and Hydro REE Wetland Re-establishment Veg and Hydro R Restoration Table 2. Summary: Goals, Performance, and Results Goals Objectives Success Criteria (1) HYDROLOGY • Minimize downstream flooding to the maximum extent possible. • Construct new channel at historic floodplain elevation to restore overbank flows • Plant woody riparian buffer • Deep rip floodplain soils to reduce compaction and increase soil surface roughness • Protect riparian buffers with a perpetual conservation easement • Construct channels with proper pattern, dimension, and longitudinal profile • BHR not to exceed 1.2 • Document four overbank events in separate monitoring years • Continuous intermittent surface flow for at least 30 days • Livestock excluded from the easement • Attain Wetland Hydrology Success Criteria • Attain Vegetation Success Criteria • Conservation Easement recorded • Increase stream stability within the Site so that channels are neither aggrading nor degrading. • Construct channels with proper pattern, dimension, and longitudinal profile • Remove livestock from the property • Construct stable channels with appropriate substrate • Upgrade existing piped channel crossings and install piped crossings at existing forded crossings • Stabilize stream banks • Plant woody riparian buffer • Cross-section measurements indicate a stable channel with appropriate substrate • Visual documentation of stable channels and structures • BHR not to exceed 1.2 • < 10% change in BHR in any given year • Livestock excluded from the easement • Attain Vegetation Success Criteria (1) WATER QUALITY • Remove direct nutrient and pollutant inputs from the Site and reduce contributions to downstream waters. • Remove agricultural livestock and reduce agricultural land/inputs • Install marsh treatment areas • Plant woody riparian buffer • Restore/enhance jurisdictional wetlands adjacent to Site streams • Provide surface roughness and reduce compaction through deep ripping/plowing • Restore overbank flooding by constructing channels at historic floodplain elevation • Livestock excluded from the easement • Attain Wetland Hydrology Success Criteria • Attain Vegetation Success Criteria (1) HABITAT • Improve instream and stream - side habitat. • Construct stable channels with appropriate substrate • Plant woody riparian buffer to provide organic matter and shade • Construct new channel at historic floodplain elevation to restore overbank flows • Protect riparian buffers with a perpetual conservation easement • Restore/enhance jurisdictional wetlands adjacent to Site streams • Stabilize stream banks • Install in -stream structures • • • • • Cross-section measurement indicate a stable channel with appropriate substrate Visual documentation of stable channels and in -stream structures. Attain Wetland Hydrology Success Criteria Attain Vegetation Success Criteria Conservation Easement recorded MYO Monitoring Report (Project No. 100137) Bull Chute Stream and Riparian Wetland Mitigation Site Randolph County, North Carolina page 3 Clearwater Mitigation Solutions July 2022 Table 3. Project Attribute Table Project Name Bull Chute Stream and Riparian Wetland Mitigation Site County Randolph County, North Carolina Project Area (acres) 31.7 Project Coordinates (latitude and longitude decimal degrees) 35.8325, -79.8879 Project Watershed Summary Information Physiographic Province Southern Outer Piedmont River Basin Yadkin USGS Hydrologic Unit 8-digit 3040103050040 DWR Sub -basin 03-07-09 Project Drainage Area (acres) 218.5 Project Drainage Area Percentage of Impervious Area <2% Land Use Classification Managed Herbaceous Cover & Hardwood Swamps Reach Summary Information Parameters UT 1 UT 2 UT 3 UT 4 UT 4A/B UT 4C UT 5 UT 6 UT 7 Pre -project length (feet) 3022 592 1861 2482 705 180 75 121 68 Post -project (feet) 3149 592 1907 2558 693 175 75 130 77 Valley confinement (Confined, moderately confined, A, C A, C A, C A, C A, C A, C A, C A, C A, C Drainage area (acres) 97.6 48.1 48.1 120.9 10.2/8.9 8.3 12.5 5.4 16 Perennial, Intermittent, Ephemeral Int/Per Int Int/Per Per Int Int Int Int Int NCDWR Water Quality Classification C Dominant Stream Classification (existing) G5 --- GS Fg/GS Eg/Cf5 Dominant Stream Classification (proposed) Ce 3/4 --- Ce 3/4 Ce 3/4 Ce 3/4 Ce 3/4 Ce 3/4 --- Ce 3/4 Dominant Evolutionary class (Simon) if applicable IV IV IV IV IV III III III III Wetland Summary Information Parameters Wetlands Pre -project (acres) 3.130 acre drained & 1.576 acre degraded Post -project (acres) 3.206 restored & 0.731 enhanced Wetland Type (non -riparian, riparian) Riparian riverine Mapped Soil Series Mecklenburg, Wynott-Enon Complex, and field identified Wehadkee Variant Soil Hydric Status Non-hydric, Non-hydric, and Hydric Regulatory Considerations Parameters Applicable? Resolved? Supporting Docs? Water of the United States - Section 404 Yes Yes Section 404 Permit Water of the United States - Section 401 Yes Yes Section 401 Endangered Species Act Yes Yes CE Document Historic Preservation Act Yes Yes CE Document Coastal Zone Management Act (CZMA or CAMA) No N/A N/A Essential Fisheries Habitat No N/A N/A 1.2 Success Criteria Monitoring and success criteria for stream restoration should relate to project goals and objectives identified from on -site NC SAM and NC WAM data collection. From a mitigation perspective, several of the goals and objectives are assumed to be functionally elevated by restoration activities without direct measurement. Other goals and objectives will be considered successful upon achieving success criteria. The following summarizes Site annual success criteria. Success Criteria Streams • All streams must maintain an Ordinary High -Water Mark (OHWM), per RGL 05-05. • Continuous surface flow in intermittent streams must be documented each year for a minimum of 30 consecutive days. • Bank height ratio (BHR) cannot exceed 1.2 at any measured cross-section. • BHR at any measure riffle cross-section should not change by more than 10% from baseline condition during any given monitoring period. • The stream project shall remain stable and all other performance standards shall be met through four separate bankfull events, occurring in separate years, during the monitoring years 1-7. Wetland Hydrology • Saturation or inundation, measured annually, within the upper 12 inches of the soil surface for, at a minimum, 12 percent of the growing season*, during average climatic conditions. Vegetation • Within planted portions of the site, a minimum of 320 stems per acre must be present at year 3; a minimum of 260 stems per acre must be present at year 5; and a minimum of 210 stems per acre must be present at year 7. • Trees must average 7 feet in height at year 5, and 10 feet in height at year 7 in each plot. • Planted and volunteer stems are counted, provided they are included in the approved planting list for the site; natural recruits not on the planting list may be considered by the IRT on a case -by -case basis. • Any volunteer species on the approved planting list must be established for at least 2 years to count towards success and will be subject to the average height standard. *Growing season for this site is to start no earlier than March 1 and range through November 13 as verified by soil temperature and bud burst 2.0 AS -BUILT CONDITION (BASELINE) Construction started on September 6, 2021 and ended within a final walkthrough on March 8, 2022. The Site was planted on March 18, 2022. As -built and MYO data collection occurred between March and May 2022. In general, no significant issues arose during the construction of the Site. A sealed half-size set of record drawings are provided in Appendix F, which includes the post -construction survey, alignments, structures, and monitoring features. These include redlines for any significant field adjustments made during construction that differ from the design plans. Where needed, adjustments were made during construction based on field evaluations and are listed below. MYO Monitoring Report (Project No. 100137) Bull Chute Stream and Riparian Wetland Mitigation Site Randolph County, North Carolina page 5 Clearwater Mitigation Solutions July 2022 Location Deviation Explanation UT-1 sta. 0+19 Log cross vane added Slope in field conditions required a structure UT-1 sta. 26+75 Log cross vane added Slope in field conditions required a structure UT-1 sta. 30+43 Cross vane not constructed Slope in field conditions did not require a structure UT-3 sta. 8+88 Log cross vane added Slope in field conditions required a structure UT-4 sta. 10+11 to 10+41 Alignment altered To avoid damage to existing mature trees UT-7 sta. 0+80 Cross vane not constructed Property line in conflict with vane arm All Easement Crossings Culverted crossings replaced with bridge crossings Improvement of crossings for landowner use, hydraulics, and aquatic life passage Additional activities that occurred at the Site included the following. • Planting 28.5 acres of the Site with 31,620 stems (planted species are included in Table 6A [Appendix B]). • Treating Chinese privet (Ligustrum sinense) mechanically and with herbicide prior to planting. • Treating fescue (Festuca sp.) with herbicide prior to planting. • Applying a temporary seed mix consisting of grain rye (Secale cereale) and Brown Top Millet (Urochloa ramosa) primarily on disturbed or stockpiled areas, and Orchard Grass (Dactylis glomerata) and German Millet (Setaria italica) along stream channels and banks. • Applying sitewide and streamside/wetland permanent seed mixes across the Site. Species lists are included in Table 6B (Appendix B). 3.0 PROJECT MONITORING — METHODS Monitoring will be conducted in accordance with 2016 NCIRT Guidelines. Monitoring will be conducted by Axiom Environmental, Inc based on the schedule below. A summary of monitoring is outlined in Section 3.1. Annual monitoring reports will be submitted to the NCDMS by Clearwater Mitigation Solutions no later than December 1 of each monitoring year data is collected. Monitoring Schedule Resource Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Streams Wetlands Vegetation Visual Assessment Report Submittal 3.1 Monitoring The monitoring parameters are summarized in the following table. MYO Monitoring Report (Project No. 100137) Bull Chute Stream and Riparian Wetland Mitigation Site Randolph County, North Carolina page 6 Clearwater Mitigation Solutions July 2022 Monitoring Summary Stream Parameters Parameter Method Schedule/Frequency Number/Extent Data Collected/Reported Stream Profile Full longitudinal survey As built (unless otherwise required) All restored stream channels Graphic and tabular data. Stream Dimension Cross -sections Years 1, 2, 3, 5, and 7 Total of 26 cross sections on restored channels Graphic and tabular data. Channel Stability Visual Assessments Yearly All restored stream channels Areas of concern will be depicted on a plan view figure with a written assessment and photograph of the area included in the report. Additional Cross -sections Yearly Only if instability is documented during monitoring Graphic and tabular data. Stream Hydrology Continuous monitoring surface water gauges and/or trail camera Continuous recording through monitoring period 6 surface water gauges on UT 1, UT 2, UT 3, UT 4A, UT 4B, and UT 7 Surface water data for each monitoring period Bankfull Events Continuous monitoring surface water gauges and/or trail camera Continuous recording through monitoring period 3 crest gauges on UT 1, UT 3, and UT 4 Surface water data for each monitoring period Visual/Physical Evidence Continuous through monitoring period Periodic Site visits throughout the year. Visual evidence, photo documentation, and/or rain data. Wetland Parameters Parameter Method Schedule/Frequency Number/Extent Data Collected/Reported Wetland Restoration Groundwater gauges Years 1, 2, 3, 4, 5, 6, and 7 throughout the year with the growing season defined as March 1-November 13* 10 gauges spread throughout restored wetlands Soil temperature at the beginning of each monitoring period to verify the start of the growing season**, groundwater and rain data for each monitoring period Vegetation Parameters Parameter Method Schedule/Frequency Number/Extent Data Collected/Reported Vegetation establishment and vigor Permanent vegetation plots 0.0247 acre (100 square meters) in size; CVS-As-built, EEP Protocol for Recording Vegetation, Version 4.2 (Lee et al. 2008) Years 1, 2, 3, 5, and 7 21 plots spread across the Site Species, height, planted vs. volunteer, stems/acre Annual random vegetation plots, 0.0247 acre (100 square meters) in size As -built, Years 1, 2, 3, 5, and 7 10 plots randomly selected each year Species and height *The growing season will be verified by soil temperature and bud burst of more than one species (excluding Sambucus and red maple.) **Growing season for the Site is to start no earlier than March 1 and will be verified by soil temperature and bud burst. The growing season will end November 13. Note: Photo points will be taken at all cross sections and at vegetation plot origin points. In addition, photo points will be located at all culverts and crossings. MYO Monitoring Report (Project No. 100137) Bull Chute Stream and Riparian Wetland Mitigation Site Randolph County, North Carolina page 7 Clearwater Mitigation Solutions July 2022 4.0 MONITORING YEAR 0 — DATA ASSESSMENT Site visits were conducted between March and May 2022 to collect as -built and annual monitoring data for the project. Stream, wetland, and vegetation monitoring for the Site follow the approved success criteria presented in the Mitigation Plan and summarized in Section 1.3; monitoring methods are detailed in Section 3.0. 4.1 Stream Assessment Geomorphology surveys for MY0 were conducted between May 18 - 26, 2022. All streams within the Site are stable and functioning as designed. Refer to Appendix A for the Visual Stream Morphology Stability Assessment Table. Refer to Appendix C for Stream Geomorphology Data. No stream areas of concern were identified during MYO. 4.2 Hydrology Assessment ITen groundwater monitoring gauges were installed throughout the Site's wetlands. Hydrologic data will be collected and reported during MY1 (2023). 4.3 Vegetative Assessment The MY0 vegetative survey was completed on April 4, 2022. Vegetation monitoring resulted in a sitewide stem density average of 778 planted stems per acre, above the interim requirement of 320 stems per acre required at MY3. All 21 fixed vegetation plots and 10 random transects met the interim success criteria. Please refer to Appendix A for Vegetation Plot Photographs and the Vegetation Condition Assessment Table, and Appendix B for Vegetation Plot Data. No vegetation areas of concern were identified during MYO. 4.4 Monitoring Year 0 Summary In summary, the site streams are stable and performing as intended and vegetation establishment across the site appears to be on target to meet success criteria for permanent and random plots. Periodical monitoring will continue to be conducted to identify any areas of concern in the future. MY0 Monitoring Report (Project No. 100137) Bull Chute Stream and Riparian Wetland Mitigation Site Randolph County, North Carolina page 8 Clearwater Mitigation Solutions July 2022 5.0 REFERENCES Lee, M.T., R.K. Peet, S.D. Roberts, and T.R. Wentworth. 2008. CVS-EEP Protocol for Recording Vegetation. Version 4.2. North Carolina Department of Environment and Natural Resources, Ecosystem Enhancement Program. Raleigh, North Carolina. North Carolina Division of Mitigation Services (NCDMS). 2014. Stream and Wetland Mitigation Monitoring Guidelines. North Carolina Department of Environmental Quality, Raleigh, North Carolina. North Carolina Ecosystem Enhancement Program (NCEEP). 2005. Local Watershed Plan for the Upper Yadkin River Basin: Upper Uwharrie River Watershed (online). Available: https://ncdenr.s3.amazonaws.com/s3fs- public/Mitigation%20Services/Watershed_Planning/Yadkin_River_Basin/Upper_Uwharri e/Upper_Uwharrie_PFR_aug%2705.pdf (July 30, 2019). North Carolina Ecosystem Enhancement Program (NCEEP). 2009. Lower Yadkin Pee -Dee River Basin Restoration Priorities (online). Available: https://files.nc.gov/ncdeq/Mitigation%20Services/Watershed_Planning/Yadkin_River_B asin/Lower%20Yadkin_Pee_Dee_RBRP_2009_FinaI092010.pdf (July 30, 2019). North Carolina Stream Functional Assessment Team. (NC SFAT 2015). N.C. Stream Assessment Method (NC SAM) User Manual. Version 2.1. North Carolina Wetland Functional Assessment Team. (NC WFAT 2010). N.C. Wetland Assessment Method (NC WAM) User Manual. Version 4.1. MY0 Monitoring Report (Project No. 100137) Bull Chute Stream and Riparian Wetland Mitigation Site Randolph County, North Carolina page 9 Clearwater Mitigation Solutions July 2022 APPENDIX A Visual Assessment Data Figure 1. Current Conditions Plan View Tables 4A-H. Stream Visual Stability Assessment Table 5. Visual Vegetation Assessment Vegetation Plot Photographs Permanent Photo Points (Bridge Crossings) MY0 Monitoring Report (Project No. 100137) Appendices Bull Chute Stream and Riparian Wetland Mitigation Site Clearwater Mitigation Solutions Randolph County, North Carolina July 2022 0 250 500 1,000 Feet Note: Basemap is drone imagery from April 2022 on top of 2018 aerial orthoimagery from NC OneMap N Legend Bull Chute Site Easement = 31.7 ac Asbuilt Structures Stream Restoration Stream Enhancement (Level I) Stream Enhancement (Level 11) Stream Enhancement (Level 11, 5:1) Stream Enhancement (Level 11, 7.5:1) Stream Generating No Credit Wetland Reestablishment Wetland Rehabilitation Wetland Enhancement * Photo Points (Bridge Crossings) 'r Vegetation Plot Origins • Groundwater Gauge • Rain Gauge/Soil Probe O Stream Crest Gauge A Stream Flow Gauge Cross Sections Permanent Vegetation Plots 2x50 m Random Vegetation Transect 4x25 m Random Vegetation Transect Axiom Environmenlai, inc. CLEARWATER MITIGATION Project: BULL CHUTE MITIGATION SITE Randolph County, NC Title: CURRENT CONDITIONS PLAN VIEW Drawn by: KRJ Date: JUL 2022 Scale: 1:3500 Project No.: 20-006 FIGURE 1 Table 4A. Visual Stream Stability Assessment Reach Assessed Stream Length Assessed Bank Length UT 1 3149 6298 Survey Date: May 13, 2022 Major Channel Category Metric Number Stable, Performing as Intended Total Number in As -built Amount of Unstable Footage %Stable, Performing as Intended Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% Totals 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 46 46 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in DMS monitoring guidance document) 46 46 100% Table 4B. Visual Stream Stability Assessment Reach UT 2 Assessed Stream Length 592 Assessed Bank Length 1184 Survey Date: May 13, 2022 Major Channel Category Metric Number Stable, Performing as Intended Total Number in As -built Amount of Unstable Footage %Stable, Performing as Intended Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% Totals 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 0 0 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in DMS monitoring guidance document) 0 0 100% Table 4C. Visual Stream Stability Assessment Reach Assessed Stream Length Assessed Bank Length UT 3 1907 3814 Survey Date: May 13, 2022 Major Channel Category Metric Number Stable, Performing as Intended Total Number in As -built Amount of Unstable Footage %Stable, Performing as Intended Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% Totals 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 30 30 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in DMS monitoring guidance document) 30 30 100% Table 4D. Visual Stream Stability Assessment Reach Assessed Stream Length Assessed Bank Length UT 4 2558 5116 Survey Date: May 13, 2022 Major Channel Category Metric Number Stable, Performing as Intended Total Number in As -built Amount of Unstable Footage %Stable, Performing as Intended Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% Totals 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 27 27 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in DMS monitoring guidance document) 27 27 100% Table 4E. Visual Stream Stability Assessment Reach Assessed Stream Length Assessed Bank Length UT 4A 401 802 Survey Date: May 13, 2022 Major Channel Category Metric Number Stable, Performing as Intended Total Number in As -built Amount of Unstable Footage %Stable, Performing as Intended Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% Totals 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 17 17 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in DMS monitoring guidance document) 17 17 100% Table 4F. Visual Stream Stability Assessment Reach UT 4B Assessed Stream Length 290 Assessed Bank Length 580 Survey Date: May 13, 2022 Major Channel Category Metric Number Stable, Performing as Intended Total Number in As -built Amount of Unstable Footage %Stable, Performing as Intended Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% Totals 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 10 10 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in DMS monitoring guidance document) 10 10 100% Table 4G. Visual Stream Stability Assessment Reach UT 4C Assessed Stream Length 175 Assessed Bank Length 350 Survey Date: May 13, 2022 Major Channel Category Metric Number Stable, Performing as Intended Total Number in As -built Amount of Unstable Footage %Stable, Performing as Intended Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% Totals 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 4 4 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in DMS monitoring guidance document) 4 4 100% Table 4H. Visual Stream Stability Assessment Reach UT 5 Assessed Stream Length 75 Assessed Bank Length 150 Survey Date: May 13, 2022 Major Channel Category Metric Number Stable, Performing as Intended Total Number in As -built Amount of Unstable Footage %Stable, Performing as Intended Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% Totals 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 0 0 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in DMS monitoring guidance document) 0 0 100% Table 4H. Visual Stream Stability Assessment Reach UT 7 Assessed Stream Length 77 Assessed Bank Length 154 Survey Date: May 13, 2022 Major Channel Category Metric Number Stable, Performing as Intended Total Number in As -built Amount of Unstable Footage %Stable, Performing as Intended Bank Surface Scour/Bare Bank Bank lacking vegetative cover resulting simply from poor growth and/or surface scour 0 100% Toe Erosion Bank toe eroding to the extent that bank failure appears likely. Does NOT include undercuts that are modest, appear sustainable and are providing habitat. 0 100% Bank Failure Fluvial and geotechnical - rotational, slumping, calving, or collapse 0 100% Totals 0 100% Structure Grade Control Grade control structures exhibiting maintenance of grade across the sill. 1 1 100% Bank Protection Bank erosion within the structures extent of influence does not exceed 15%. (See guidance for this table in DMS monitoring guidance document) 1 1 100% Table 5. Visual Vegetation Assessment Planted acreage 28.5 Vegetation Category Definitions Mapping Threshold Combined Acreage % of Planted Acreage Bare Areas Very limited cover of both woody and herbaceous material. 0.10 acres 0.00 0.0% Low Stem Density Areas Woody stem densities clearly below target levels based on current MY stem count criteria. 0.10acres 0.00 0.0% To . 0.00 0.0% Areas of Poor Growth Rates Planted areas where average height is not meeting current MY Performance Standard. 0.10 acres 0.00 0.0% Cumulative Total 0.00 0.0% Easement Acreage 31.7 Vegetation Category Definitions Mapping Threshold Combined Acreage % of Easement Acreage Invasive Areas of Concern Invasives may occur outside of planted areas and within the easement and will therefore be calculated against the total easement acreage: Include species with the potential to directly outcompete native, young, woody stems in the short-term or community structure for existing communities. Species included in summation above should be identified in report summary. 0.10 acres 0.00 0.0% Easement Encroachment Areas II 0 Encroachments noted Encroachment may be point, line, or polygon. Encroachment to be mapped consists of any violation of restrictions specified in the conservation easement. Common encroachments are mowing, cattle access, vehicular access. Encroachment has no threshold value as will need to be addressed regardless of impact area. none Bull Chute Mitigation MYO(2022)Vegetation Monitoring Photographs(taken April 4, 2022) Ngfill Il goln, , P Plot 1 ' � A �I�g ��/ Plot 2 A,., `. —..; 1. rM'%..a ` 4it, � .;,,� y '..,,.....P. „. ..,y l 5'+a _ tr't''� ---n=: � - 4 It 4 l _ - ; :ate - 'z r , 1 . s �. y �,a �-'4 3 wa , �� r{d - .-2 - 1,.; Sv z'4'�`1 ' ''AF "�� F - _ r. fix' -. -,� s 3 a �,. u} �E��i;��� �I� s�r1.::6a�.a i�� �a�µ- `�: a z�.ax';�m�ri'��� ` . .�� :� .,�:y. i' Mzk,,,s<�'��.!I:�� c Plot 3 `.', r y Plot 4 ga_ d ���I I 1 ��, 5 1� r .a N AF , i �1 I I�I , _ V�� a 1 !„ _I J I: 1- ts' 1 -, -: 1. . - ` q. ter e x r . w'„2t ,, t:. -- '+ ' _ie'4- . tam%.: Irtety -.# •t i'y yr ": l l),'tis. z., .�, ✓;� � ':i fir- 1 ;:.: Plot 5 Plot 6 ., r ai j a v - '.x ` a ''''.':_.,.:,:;'''';.:1,,',,,,,,,,.,,,e...t4 1°4': •-,;-'3.=:,"'--' ' ' '%' -.'- Plot 7 Plot 8 g,i r r .,. ,-- ,.-...,•.::„.1..4,.„ti-_,E,-;,.7.'*-:; _,-,.,, -....; 4,_ -- .,..______ _� r mr h ' $ �"," Sy ' � �. .. it ram, 'fit_ , .„may re..p '.-':;, -f?.. - ,i ,,,,,:„,,,-„,,i,,,,,,,, „,,,-,,,-- MYO Monitoring Report(Project No.100137.) Appendices Bull Chute Stream and Riparian Wetland Mitigation Site Clearwater Mitigation Solutions Randolph County,North Carolina July 2022 Bull Chute Mitigation Site MVO(2022)Vegetation Monitoring Photographs(taken April 4, 2022) Plot 9 Plot 10 rah ass=Nopuirpr' - `'� .sae-. "&t ta, ;- usa, I '-. x � �0�2 � 04'-j r r; 022/04/04 hula .' H< #" L �,- a ''' I Plot 11 • " V'�., k �' r �, ,AAAAkkkk Plot 1• ft r i 1 3 Y� 4 lll��.�r TPA ' x (7AI K t # A ter —' Ski y - rr ,fir, e a � �,a i Plot 13 Plot 14 f z111114 v n �'7 o ,Ar on '� 41 7T:L �y t 4Vw,1 YN :1f.' 4b, n�7�h �I. F f },- ,erg ,r^r ' r Plot 15 Plot 16 1 (' ' 1 r.nit '"yam * 1 `�' '-ii t., a@ �' �' ,as \t`a ,, N MVO Monitoring Report(Project No.100137) Appendices Bull Chute Stream and Riparian Wetland Mitigation Site Clearwater Mitigation Solutions Randolph County,North Carolina July 2022 Bull Chute Mitigation Site MYO (2022) Vegetation Monitoring Photographs (takewn April 4, 2022) Plot 17 ?11' Plot 18 �> y Kec w f ^�`'� ��- '"=tit i,�,,a'> to taken 51141„0,...:,,,,:c. /13/22 t�'� �� tt 4x � as Plot 19 " 4 , q 4 lt,,, Plot 20 t fit.. " -✓ t«u _s -_ m `-f ``� • y0",.� '" fa '� � er rt '' ri„/ t`*` Z ` ` . a "� ` • '' � .� ¢g'us . �' ^ ,- r '� gp ;` • Plot 21 • sl t., e..-, :ce, i � z n V ti:, a° :. MYO Monitoring Report(Project No.100137) Appendices Bull Chute Stream and Riparian Wetland Mitigation Site Clearwater Mitigation Randolph County,North Carolina JulySolutions 2022 Bull Chute Mitigation Site MYO (2022) Permanent Photo Points (taken July 8, 2022) MYO Monitoring Report (Project No. 100137) Bull Chute Stream and Riparian Wetland Mitigation Site Randolph County, North Carolina Appendices Clearwater Mitigation Solutions July 2022 Appendix B Vegetation Data Table 6A. Planted Bare -Root Woody Vegetation Table 6B. Permanent Seed Mix Table 7. Vegetation Plot Counts and Densities Table 8. Vegetation Plot Data Table from Vegetation Data Entry Tool MY0 Monitoring Report (Project No. 100137) Appendices Bull Chute Stream and Riparian Wetland Mitigation Site Clearwater Mitigation Solutions Randolph County, North Carolina July 2022 Table 6A. Planted Bare Root Woody Vegetation Bull Chute Stream and Riparian Wetland Mitigation Site Species Total Acres 28.5 Alnus serrulata 2,500 Betula nigra 4,000 Cercis canadensis 600 Carya tomentosa 200 Cornus amomum 5,000 Diospyros virginiana 420 Liriodendron tulipifera 1,700 Nyssa sylvatica 600 Platanus occidentalis 5,500 Quercus nigra 5,500 Quercus phellos 4,000 Salix nigra 1,600 TOTALS 31,620 Average Stems/Acre 1,110 MY0 Monitoring Report (Project No. 100137) Appendices Bull Chute Stream and Riparian Wetland Mitigation Site Clearwater Mitigation Solutions Randolph County, North Carolina July 2022 Table 6B. Permanent Seed Mix Bull Chute Stream and Riparian Wetland Mitigation Site Species Percent of Total Mix Redtop (Agrostis gigantea) 10% VA Wild Rye (Elymus virginicus) 15% Switchgrass (Panicum virgatum) 15% Eastern Gammagrass (Tripsacum dactyloides) 5% PA Smartweed (Polygonum pensylvanicum) 5% Little Bluestem (Schizachyrium scoparium) 5% Soft Rush (Juncus effusus) 5% Bur Marigold (Bidens cernua) 10% Lance -leaved Tickseed (Coreopsis lanceolata) 10% Deertongue (Dichanthelium clandestinum) 10% Big Bluestem (Andropogon gerardii) 5% Indiangrass (Sorghastrum nutans) 5% TOTAL 100% MYO Monitoring Report (Project No. 100137) Appendices Bull Chute Stream and Riparian Wetland Mitigation Site Clearwater Mitigation Solutions Randolph County, North Carolina July 2022 Table 7. Planted Vegetation Totals Bull Chute Stream and Riparian Wetland Mitigation Site Plot # Planted Stems/Acre Success Criteria Met? 1 1538 Yes 2 972 Yes 3 648 Yes 4 688 Yes 5 1012 Yes 6 891 Yes 7 1255 Yes 8 1295 Yes 9 729 Yes 10 607 Yes 11 607 Yes 12 1579 Yes 13 850 Yes 14 688 Yes 15 891 Yes 16 810 Yes 17 648 Yes 18 607 Yes 19 607 Yes 20 972 Yes 21 1376 Yes Transect 1 (4x25 m) 324 Yes Transect 2 (2x50 m) 445 Yes Transect 3 (4x25 m) 648 Yes Transect 4 (4x25 m) 405 Yes Transect 5 (2x50 m) 364 Yes Transect 6 (2x50 m) 567 Yes Transect 7 (4x25 m) 324 Yes Transect 8 (2x50 m) 405 Yes Transect 9 (2x50 m) 445 Yes Transect 10 (2x50 m) 931 Yes Average Planted Stems/Acre 778 Yes MY0 Monitoring Report (Project No. 100137) Appendices Bull Chute Stream and Riparian Wetland Mitigation Site Clearwater Mitigation Solutions Randolph County, North Carolina July 2022 Table 8. Vegetation Plot Data Table from Vegetation Data Entry Tool Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Plot size (ACRES) 28.5 2022-04-01 NA NA 2022-04-04 0.0247 Scientific Name Common Name Tree/S hrub Indicator Status Veg Plot 1 F Veg Plot 2 F Veg Plot 3 F Veg Plot 4 F Veg Plot 5 F Veg Plot 6 F Veg Plot 7 F Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Species Included in Approved Mitigation Plan Alnus serrulata hazel alder Tree OBL 11 11 1 1 Betula nigra river birch Tree FACW 2 2 2 2 27 27 Carpinus caroliniana American hornbeam Tree FAC Carya tomentosa mockernut hickory Tree Cercis canadensis eastern redbud Tree FACU 1 1 3 3 Cornus amomum silky dogwood Shrub FACW 19 19 2 2 1 1 7 7 Diospyros virginiana common persimmon Tree FAC 3 3 Liriodendron tulipifera tuliptree Tree FACU 4 4 10 10 1 1 Nyssa sylvatica blackgum Tree FAC Platanus occidentalis American sycamore Tree FACW 8 8 3 3 4 4 8 8 1 1 Quercus nigra water oak Tree FAC 6 6 10 10 5 5 1 1 3 3 2 2 Quercus phellos willow oak Tree FAC 5 5 7 7 1 1 2 2 1 1 1 1 2 2 Quercus sp. 10 10 8 8 1 1 Sum Performance Standard 38 38 24 24 18 18 17 17 25 25 22 22 39 39 ■ Mitigation Plan Performance Standard Current Year Stem Count 38 24 18 17 25 22 39 Stems/Acre 1538 972 648 688 1012 891 1255 Species Count 4 5 4 6 4 6 7 Dominant Species Composition (%) 50 42 61 41 40 36 69 Average Plot Height (ft.) 1 1 1 2 1 1 2 % Invasives 0 0 0 .] 0 0 0 0 Post Mitigation Plan Performance Standard Current Year Stem Count Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) Invasives 38 24 972 5 42 18 11111 648 r 1 17 688 25 1012 4 40 1 L 22 891 6 36 1 0 AIL 39 1255 7 69 2 -0 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Table 8. Vegetation Plot Data Table from Vegetation Data Entry Tool (continued) Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Plot size (ACRES) 28.5 2022-04-01 NA NA 2022-04-04 0.0247 Scientific Name Common Name Tree/S hrub Indicator Status Veg Plot 8 F Veg Plot 9 F Veg Plot 10 F Veg Plot 11 F Veg Plot 12 F Veg Plot 13 F Veg Plot 14 F Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Species Included in Approved Mitigation Plan Alnus serrulata hazel alder Tree OBL 1 1 4 4 Betula nigra river birch Tree FACW 7 7 3 3 3 3 2 2 6 6 Carpinus caroliniana American hornbeam Tree FAC Carya tomentosa mockernut hickory Tree Cercis canadensis eastern redbud Tree FACU 1 1 Cornus amomum silky dogwood Shrub FACW 5 5 12 12 14 14 6 6 5 5 Diospyros virginiana common persimmon Tree FAC 5 5 Liriodendron tulipifera tuliptree Tree FACU 3 3 3 3 2 2 4 4 Nyssa sylvatica blackgum Tree FAC Platanus occidentalis American sycamore Tree FACW 8 8 6 6 1 1 5 5 5 5 2 2 Quercus nigra water oak Tree FAC 1 1 3 3 3 3 5 5 6 6 Quercus phellos willow oak Tree FAC 3 3 1 1 6 6 1 1 4 4 1 1 Quercus sp. 6 6 4 4 2 2 1 1 Sum Performance Standard 32 32 18 18 15 15 18 18 39 39 21 21 17 17 ■ Mitigation Plan Performance Standard Current Year Stem Count 32 18 15 18 39 21 17 Stems/Acre 1295 729 607 607 1579 850 688 Species Count 6 6 4 5 8 6 4 Dominant Species Composition (%) 25 33 40 67 36 29 35 Average Plot Height (ft.) 1 1 2 1 2 2 2 % Invasives 0 0 0 .] 0 0 0 0 Post Mitigation Plan Performance Standard Current Year Stem Count 32 18 15 18 39 21 17 Stems/Acre Species Count Dominant Species Composition (%) Average Plot Height (ft.) Invasives 729 6 33 607 1 607 1579 8 36 2 0 850 6 29 2 0 AIL 688 4 35 11111.02 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Table 8. Vegetation Plot Data Table from Vegetation Data Entry Tool (continued) Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Plot size (ACRES) 28.5 2022-04-01 NA NA 2022-04-04 0.0247 Scientific Name Common Name Tree/S hrub Indicator Status Veg Plot 15 F Veg Plot 16 F Veg Plot 17 F Veg Plot 18 F Veg Plot 19 F Veg Plot 20 F Veg Plot 21 F Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Planted Total Species Included in Approved Mitigation Plan Alnus serrulata hazel alder Tree OBL 1 1 Betula nigra river birch Tree FACW 1 1 2 2 5 5 Carpinus caroliniana American hornbeam Tree FAC 1 1 Carya tomentosa mockernut hickory Tree 1 1 Cercis canadensis eastern redbud Tree FACU Cornus amomum silky dogwood Shrub FACW 11 11 4 4 3 3 1 1 Diospyros virginiana common persimmon Tree FAC 1 1 1 1 Liriodendron tulipifera tuliptree Tree FACU 1 1 2 2 1 1 1 1 Nyssa sylvatica blackgum Tree FAC 9 9 Platanus occidentalis American sycamore Tree FACW 9 9 7 7 4 4 5 5 11 11 Quercus nigra water oak Tree FAC 2 2 1 1 1 1 2 2 2 2 Quercus phellos willow oak Tree FAC 4 4 4 4 2 2 5 5 4 4 8 8 Quercus sp. 4 4 2 2 3 3 3 3 6 6 2 2 9 9 Sum Performance Standard 22 22 20 20 16 16 15 15 15 15 24 24 34 34 ■ Mitigation Plan Performance Standard Current Year Stem Count 22 20 16 15 15 24 34 Stems/Acre 891 810 648 607 607 972 1376 Species Count 5 5 6 5 5 7 7 Dominant Species Composition (%) 50 45 44 33 40 33 32 Average Plot Height (ft.) 2 2 31 90 2 2 1 % Invasives 0 0 0 .] 0 0 0 0 Post Mitigation Plan Performance Standard Current Year Stem Count 22 20 16 15 15 24 34 Stems/Acre 891 810 648 Species Count 5 Dominant Species Composition (%) 45 Average Plot Height (ft.) Invasives 2 31 607 MET 607 5 40 2 0 972 7 33 2 0 AIL 1376 7 32 1 -0 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Table 8. Vegetation Plot Data Table from Vegetation Data Entry Tool (continued) Planted Acreage Date of Initial Plant Date(s) of Supplemental Plant(s) Date(s) Mowing Date of Current Survey Plot size (ACRES) 28.5 2022-04-01 NA NA 2022-04-04 0.0247 Scientific Name Common Name Tree/S hrub Indicator Status Veg Plot 1 R Veg Plot 2 R Veg Plot 3 R Veg Plot 4 R Veg Plot 5 R Veg Plot 6 R Veg Plot 7 R Veg Plot 8 R Veg Plot 9 R Veg Plot 10 R Total Total Total Total Total Total Total Total Total Total Species Included in Approved Mitigation Plan Alnus serrulata hazel alder Tree OBL Betula nigra river birch Tree FACW 7 2 3 2 1 1 Carpinus caroliniana American hornbeam Tree FAC Carya tomentosa mockernut hickory Tree Cercis canadensis eastern redbud Tree FACU 1 1 Cornusamomum silky dogwood Shrub FACW 1 7 Diospyros virginiana common persimmon Tree FAC Liriodendron tulipifera tuliptree Tree FACU 6 7 4 7 7 Nyssa sylvatica blackgum Tree FAC Platanus occidentalis American sycamore Tree FACW 3 8 3 3 8 1 2 6 Quercus nigra water oak Tree FAC 3 1 1 Quercus phellos willow oak Tree FAC 3 3 5 1 2 1 4 1 2 Quercus sp. 1 1 4 2 1 1 Sum Performance Standard 10 13 16 10 9 14 11 10 12 23 I Mitigation Plan Performance Standard Current Year Stem Count 10 13 16 10 9 14 11 10 12 23 Stems/Acre 324 445 648 405 364 567 324 405 445 931 Species Count 2 3 5 4 6 4 3 4 5 5 Dominant Species Composition (%) 70 62 38 50 33 50 73 40 58 30 Average Plot Height (ft.) 2 2 1 2 1 1 1 2 1 1 Invasives 0 0 0 0 0 0 0 0 0 0 Post Mitigation Plan Performance Standard Current Year Stem Count 10 13 16 10 9 14 11 10 12 23 Stems/Acre 324 445 648 405 364 567 324 405 445 931 Species Count 2 3 5 4 6 3 4 5 5 Dominant Species Composition (%) 70 62 38 50 33 50 73 40 58 30 Average Plot Height (ft.) 2 2 1 2 1 1 1 2 1 1 Invasives 0 0 0 0 0 0 0 0 1). Bolded species are proposed for the current monitoring year, italicized species are not approved, and a regular font indicates that the species has been approved. 2). The "Species Included in Approved Mitigation Plan" section contains only those species that were included in the original approved mitigation plan. The "Post Mitigation Plan Species" section includes species that are being proposed through a mitigation plan addendum for the current monitoring year (bolded) , species that have been approved in prior monitoring years through a mitigation plan addendum (regular font), and species that are not approved (italicized). 3). The "Mitigation Plan Performance Standard" section is derived only from stems included in the original mitigation plan, whereas the "Post Mitigation Plan Performance Standard" includes data from mitigation plan approved, post mitigation plan approved, and proposed stems. Appendix C Stream Geomorphology Data Cross -Sections with Annual Overlays Longitudinal Profile Table 9A-F. Baseline Stream Data Summary Tables Table 10A-E. Cross -Section Morphology Monitoring Summary MYO Monitoring Report (Project No. 100137) Appendices Bull Chute Stream and Riparian Wetland Mitigation Site Clearwater Mitigation Solutions Randolph County, North Carolina July 2022 Site Bull Chute Site r . e►'. Watershed: Yadkin River Basin,03040103 . , ±. XS ID UT1,XS-1 $'' Feature Riffle - st - .1 ' 1 . Date: 5/11/2022 T • y '1 4 'Field Crew: Lewis . ' k - Station Elevation SUMMARY DATA ,l 0.0 714.0 Bankfull Elevation: 713.54 �---�. ' -. S 4.3 713.7 Bank Hieght Ratio: 1.00 - - s 7.5 713.7 Thalweg Elevation: 712.66 8.4 713.6 LTOB Elevation: 713.54 _ ._,.:_' . �'• 9.6 713.2 LTOB Max Depth: :. �� ' = -.,i j 10.1 712.8 LTOB Cross Sectional Area: 5.7 y % 4 10.6 712.7 = ` 12.3 712.8 .. d : : : . . _ i 13.4 712.8 ", # 14.9 712.8W.A _ ' . 16.2 712.8 'J ten= '4 '' 16.7 713.0 Stream Type E/C 4 17.5 713.3 18.2 713.5 19.9 713.5 Bull Chute,UT 1,XS - 1,Riffle 22.2 713.5 24.2 713.5 25.5 713.5 o) 0 713 - a o) ti W \a . / Bankfull MY-00 5/1122 712 , 0 10 20 Station (feet) Site Bull Chute Site - P''u Watershed: Yadkin River Basin, 03040103 ;- -4', h XS ID UT1,XS -2 `. `'' ; ', ' '■ .r. Feature Pool '' '' .• ��'i 4- ' .. „ ... Date: 5/11/2022 ,4 �'? r Field Crew: Lewis 1 F - = r•', • • Station Elevation SUMMARY DATA s .:.r . } ,F .� 0.0 714.9 Bankfull Elevation: 714.80 1 F 3.4 714.7 Bank Hieght Ratio: 1.00 i . 'tir. 5.5 714.9 Thalweg Elevation: 712.56 .... 7.1 714.8 LTOB Elevation: 714.80 • f -,. '; 8.3 714.3 LTOB Max Depth: 2.24 • ' ��. .,;; 9.1 713.7 LTOB Cross Sectional Area: 11.7 4 ram; s '.L k, 9.7 713.5 • : i.'.110.2 713.0 • 11.1 713.0 ,} _ '.~ ''t4 11.5 712.8 11.7 712.6 12.3 712.6 • .�3 .. �r ' 4-. r .r , ,;,. G . . ,. ' .. 12.7 712.7 Stream Type E/C 4 13.1 713.1 13.6 713.2 14.2 713.3 Bull Chute, UT 1,XS - 2, Pool 14.8 713.5 15.3 714.1 15.7 714.4 16.4 714.7 16.9 714.88 17.6 714.9 ---- ---- 18.9 714.9 715 20.5 714.9 22.0 714.9 0 22.8 714.8 W 713 Bankfull MY-005/11/22 712 , I I 0 10 20 Station (feet) Site Bull Chute Site Watershed: Yadkin River Basin, 03040103 XS ID UT1, XS -3 Feature Riffle Date: 5/11/2022 Field Crew: 6 Lewis Station Elevation 0.0 727.7 3.6 727.7 5.6 727.7 6.5 727.8 7.6 727.4 8.3 727.2 8.6 726.7 9.7 726.9 10.4 726.8 11.3 726.8 12.3 726.8 13.5 726.6 14.3 726.8 15.1 727.1 15.9 727.6 16.5 727.6 18.8 727.6 21.1 727.6 22.4 727.7 SUMMARY DATA Bankfull Elevation: 727.56 Bank Hieght Ratio: 1.00 Thalweg Elevation: 726.64 LTOB Elevation: 727.56 LTOB Max Depth: 0.91 LTOB Cross Sectional Area: 5.5 Stream Type E/C 4 Site Bull Chute Site f. - �- -- . Watershed: Yadkin River Basin,03040103 4' : • _ { - A. 7 XS ID UT1,XS-4 :-.- - �y JY . Feature Pool • - - - _ Date: 5/11/2022 a i = ,- . Field Crew: Lewis • • Station Elevation SUMMARY DATA - • w 0.0 727.8 Bankfull Elevation: 727.84 �� .: _ ' 3.0 727.9 Bank Hieght Ratio: 1.00 • E. • . • • 5.5 727.8 Thalweg Elevation: 726.21 • 7.1 728.0 LTOB Elevation: 727.84 8.0 727.5 LTOB Max Depth: 1.64 8.8 726.9 LTOB Cross Sectional Area: 9.4 • • • 9.6 726.6 • . 10.5 726.4 • 11.4 726.3 ` 11.4 726.2 Y :_•.. . 12.4 726.3 t - .t '•. . 13.3 726.4 ?r".. • 14.0 726.6 Stream Type E/C 4 14.0 726.6 14.6 727.1 15.5 727.5 Bull Chute,UT 1,XS - 4,Pool 17.2 727.8 19.8 727.9 22.0 728.0 1 c 727 a Wti Bankfiill MY-00 5/11/22 726 , I I 0 10 20 Station (feet) Site Bull Chute Site Watershed: Yadkin River Basin, 03040103 XS ID UT1, XS -5 Feature Riffle Date: 5/11/2022 Field Crew: 6 Lewis Station Elevation 0.0 739.8 4.3 739.8 6.0 739.9 7.5 739.5 8.3 739.1 9.1 738.9 11.0 738.8 12.2 738.7 13.8 738.8 14.8 738.9 15.3 738.9 16.0 739.4 16.5 739.8 19.1 739.8 22.4 739.6 SUMMARY DATA Bankfull Elevation: 739.80 Bank Hieght Ratio: 1.00 Thalweg Elevation: 738.69 LTOB Elevation: 739.80 LTOB Max Depth: 1.11 LTOB Cross Sectional Area: 8.1 Stream Type E/C 4 Site Bull Chute Site Watershed: Yadkin River Basin,03040103 w.£� ;,,"' r,, x XS ID UT1,XS-6 '�c : Feature Pool , . Date: 5/11/2022 S '`- , < i Field Crew: Lewis ; T____ ` � ' •�,r;-"'"'" L Station Elevation SUMMARY DATA F r' !�^ 0.0 740.1 Bankfull Elevation: 739.99 2.3 740.0 Bank Hieght Ratio: r r • \ 738.45 3.2 739.8 Thalweg Elevation: 739.99 5.3 739.9 LTOB Elevation: 7.0 739.5 LTOB Max Depth: 1.54 8.0 738.9 LTOB Cross Sectional Area: 11.9 x 10.0 738.5 . O , 11.5 738.5 _: ` ti, ' 13.1 738.5 ,s:. 14.1 738.7 +'. , ' >' 14.9 739.2 16.2 740.0 Stream Type MlimI E/C 4 17.4 740.3 20.1 740.3 23.2 740.1 Bull Chute,UT 1,XS - 6,Pool 741 - r 0 739 a ti W BanMall f MY-005/11/22 738 , I 0 10 20 Station (feet) Site Bull Chute Site a y� °-` , , Watershed: Yadkin River Basin, 03040103 ,f " p ,i 1 XS ID UT1,XS -7 o 4 I ( ',' '' k +; '' Feature Riffle Date: 5/11/2022 -,,,e* a Field Crew: Lewis ' •.r i k l4 1. Station Elevation SUMMARY DATA , -..i 4 4, 0.0 747.6 Bankfull Elevation: 747.73 2.3 747.6 Bank Hieght Ratio: 1.00 4.2 747.7 Thalweg Elevation: 746.66 r 6.4 747.8 LTOB Elevation: 747.73 'r , (!.1' ' 7.8 747.5 LTOB Max Depth: 1.07 8.8 746.9 LTOB Cross Sectional Area: 6.9 , "" 9.6 746.7 .,a . OPP . � 10.3 746.7 s � . 10.9 746.8 ,r4 {der' .,;. ,t. ,„, '� 1 , ,,oi t 11.5 746.7 it 14 :1, - 2022/05/12 12.0 746.7 r ' 1 1 r 12.4 746.7 12.9 746.9 Stream Type E/C 4 13.5 746.7 14.0 746.7 14.6 747.0 Bull Chute, UT 1,XS - 7, Riffle 15.3 747.4 16.3 747.7 748 - 18.2 747.7 20.8 747.7 24.0 747.54 4 0 747 W Bankfiill f MY-005/11/22 746 , I I 0 10 20 Station (feet) Site Bull Chute Site ,`1`" , N. ,t ' , . 7' Watershed: Yadkin River Basin,03040103 ;w�� * , , 0,; XS ID UT1,XS-8 : `'., , Feature Pool ' Date: 5/11/2022 leers N' Field Crew: Lewis ` Votr, Station Elevation SUMMARY DATA . _ ,-....�., 0.0 747.9 Bankfull Elevation: 747.94 _ , ,t'.,,,7 - 1.8 747.9 Bank Hieght Ratio: 1.00 4.1 748.0 Thalweg Elevation: 746.29 6.3 747.9 LTOB Elevation: 747.94 7.4 747.7 LTOB Max Depth: 1.64 „ ,,.,.. 8.8 747.1 LTOB Cross Sectional Area: 10.3 �. 9.7 747.0 10.2 747.1 10.8 746.8 11.6 746.4 12.4 746.3 13.0 746.3 13.9 746.4 Stream Type E/C 4 14.5 746.5 15.7 747.1 17.2 748.1 Bull Chute,UT 1,XS - 8,Pool 20.5 748.0 23.1 748.0 748 • r----ram z_ - o) 0 747 a o) Wti Bankfiill f MY-00 5/11/22 746 , I I 0 10 20 Station (feet) Site Bull Chute Site ----- - «��� Z Watershed: Yadkin River Basin,03040103 a 4° "" ".t. •., � , A •+. i XS ID UT1,XS-9 0,4 , Feature Riffle Date: 5/11/2022 Field Crew: i Lewis 'o` Z.... . Station Elevation SUMMARY DATA w.:ipc. 0.0 764.5 Bankfull Elevation: 763.66 , ��� 1.3 764.5 Bank Hieght Ratio: 1.00 3.1 764.4 Thalweg Elevation: 763.30 v 4.0 764.0 LTOB Elevation: 763.66 4.7 763.6 LTOB Max Depth: 0.36 5.6 763.6 LTOB Cross Sectional Area: 1.3 , � ? 5.7 763.4 ' ",/,- - S 6.2 763.4 I � • 6.9 763.3 �� y -•t s, i 7.8 763.3 „ 4,.', "2Q22/05/12 8.5 763.4 9.4 763.4 10.0 763.7 Stream Type E/C 4 11.0 763.7 11.9 763.8 12.8 763.6 Bull Chute,UT 1,XS -9,Riffle 13.9 763.7 15.6 763.5 765 16.9 763.6 18.1 763.9 o) 0 764 a Wti Bankfiill MY-00 5/11/22 763 7 I I 0 10 20 Station (feet) Site Bull Chute Site '„ '. . 'x -`._ . . Watershed: Yadkin River Basin,03040103 rt XS ID UT1,XS-10 - = - •-" Feature Pool - - ' ,~ Date: 5/11/2022 - rill '_ igitField Crew: Lewisi. h Station Elevation SUMMARY DATA -.. .-. 0.0 765.6 BankfullElevation: 764.42 , :`F:=' 1.3 765.4 Bank Hieght Ratio: 1.00 :` . 2.1 764.9 Thalweg Elevation: 763.33 '�€ 3.1 764.6 LTOB Elevation: 764.42 k. ,. , 4,'.:. . 4.0 764.2 LTOB Max Depth: 1.09 4.7 763.7 LTOB Cross Sectional Area: 6.3 ;5 5.7 763.4 • 5.9 763.3 I. :,. 6.5 763.4 y� 7.1 763.4 , •8.3 763.4 : es{p5wY4� ^�' , 'n 9.5 763.6 10.5 763.8 Stream Type E/C 4 11.6 764.2 12.4 764.4 14.3 764.5 Bull Chute,UT 1,XS - 10,Pool 15.8 764.4 16.5 764.5 767 - I765 764 Bankfiill f MY-00 5/11/22 763 , I I 0 10 20 Station (feet) Site Bull Chute Site '` •• • :"'-; Wit q': _T Watershed: Yadkin River Basin,03040103 {`' ¢ #"' XS ID UT3,XS-13 Feature Riffle y\ . Date: 5/11/2022 '. . Field Crew: i Lewis A. Station Elevation SUMMARY DATA •..• ��d 0.0 722.6 Bankfull Elevation: 722.63 2.2 722.6 Bank Hieght Ratio: 1.00 4.4 722.6 Thalweg Elevation: 721.62 6.0 722.6 LTOB Elevation: 722.63 6.6 722.5 LTOB Max Depth: 1.02 ' . =_ 6.9 722.2 LTOB Cross Sectional Area: 6.3 ,u ; +1* 1. ' r = 7.4 721.9 ,�tIt �- ,. .- 7.9 721.9 `? ��� tk ., 4 � Cj r 9.1 721.7 l � � 9.8 721.9 i "-L A 1. 10.4 721.7 10.9 721.6 Stream Type E/C 4 11.5 721.7 12.3 721.7 13.1 721.9 Bull Chute, UT 3,XS - 13,Riffle 14.0 722.1 14.7 722.3 724 - 15.3 722.6 16.5 722.7 18.4 722.66 20.3 722.7 21.7 722.6 I 722 Bankfiill f MY-00 5/11/22 721 , 0 10 20 Station (feet) Site Bull Chute Site ,� �,' Watershed: Yadkin River Basin,03040103 ���a ��'= ° r s s �xx�, r d" ai I �, XS ID UT3,XS-14 �� Feature Pool ���„�I�.. P.i 4 Date: 5/11/2022 R Field Crew: 1 Lewis Station >Mition SUMMARY DATA 0.0 723.2 Banlull Elevation: 722.98 , `,, 2.7 723.2 Bank Hieght Ratio: 1.00 r �: . 4.9 723.1 Thalweg Elevation: 720.98 ' ' 5.8 722.4 LTOB Elevation: 722.98 6.3 722.0 LTOB Max Depth: 2.00 ` 6.8 721.8 LTOB Cross Sectional Area: 10.4 7.4 721.5 , 8.1 721.3 �' :6'471121,-1_ 8.7 721.1 �_ ��_ 9.1 721.0 9.5 721.0 t � I I`'' r��, 1 a' 10.1 721.1 10.5 721.3 Stream Type E/C 4 11.2 721.8 11.8 722.1 12.3 722.3 Bull Chute,UT 3,XS - 14,Pool 13.0 722.5 13.7 722.6 724 - 14.5 722.9 15.3 723.0 ■- 16.7 722.96 - 18.5 722.9 722 z 0 a o) ti 721 W B.kfiill f MY-00 5/11/22 720 , I I 0 10 20 Station (feet) Site Bull Chute Site ,': w ,y v ,- , C 1 *, Watershed: Yadkin River Basin,03040103 '� XS ID UT3,XS-15 P / / /t A. Feature Pool ' >9 ` Date: 5/11/2022 � Field Crew: Lewis Station Elevation SUMMARY DATA 0.0 734.2 Bankfull Elevation: 734.17 1.4 734.2 Bank Hieght Ratio: 1.00 3.4 733.9 Thalweg Elevation: 732.78 71� / ;' , ., 4.3 733.9 LTOB Elevation: 734.17 5.0 733.5 LTOB Max Depth: 1.39 7, 7�� , 5.6 733.2 LTOB Cross Sectional Area: 7.0 4'' ','. 6.2 733.0 /�� ,')4,r 6.7 732.9 ����, ���� l��' 7.2 732.8 - 7.7 733.0 14 ���., .�,. � 8.3 733.2 i ei?k\044: 8.9 733.2 0;6 1.`, -,,,;N 9.4 733.3 Stream Type E/C 4 10.0 733.4 11.0 733.6 11.8 733.9 Bull Chute,UT 3,XS - 15,Pool 12.5 734.3 13.3 734.2 14.4 734.1 16.0 734.1 17.5 734.18 0 I a Wti Bankfiill MY-00 5/11/22 , I I 0 10 20 Station (feet) Site Bull Chute Site Y , ' I' /` / Watershed: Yadkin River Basin,03040103 I L /r'?• it!l,'r 't lI silo l , .� XSID UT3,XS-16 f' l/ Feature Riffle �, d , / , r" Date: 5/11/2022 f4 � �� : pj, ,. Field Crew: i Lewis = :1 .y' Station Elevation SUMMARY DATA 0.0 734.9 Bankfull Elevation: 734.92 2.4 734.8 Bank Hieght Ratio: 1.00 I 4.9 734.8 Thalweg Elevation: 733.97 ., �� x- ; .� 5.5 734.9 LTOB Elevation: 734.92 - - t 6.2 734.7 LTOB Max Depth: 0.95 � � 6.8 734.4 LTOB Cross Sectional Area: 4.7 ig* - .. "� A:� i_j ',tr, 7.3 734.10. '%i°"r .7 , ,1 8.5 734.0 ,7.8 734.0 9.4 734.2 . , ,. ss ;�®�5 . < �. l-�i 10.3 734.1 ° �.` el:' ,/) \ ,'4 4-1 11.2 734.3 11.8 734.4 Stream Type E/C 4 12.6 734.6 13.2 734.8 14.2 735.1 Bull Chute, UT 3,XS - 16,Riffle 15.2 735.1 16.9 734.9 18.6 735.0 20.0 735.0 o) 0 735 • a o) ti W Bankfiill f MY-00 5/11/22 734 0 10 20 Station (feet) Site Bull Chute Site - '" -. - Watershed: Yadkin River Basin,03040103 ih�` `. XS ID UT3,XS-17 Feature Riffle owe. Date: 5/11/2022 ' Field Crew: i Lewis Station Elevation SUMMARY DATA i 1 0.0 763.6 Bankfull Elevation: 763.55 AV1.7 763.7 Bank Hieght Ratio: 0.98 1'p'� 2.6 763.5 Thalweg Elevation: 762.51 3.2 763.3 LTOB Elevation: 763.52 d. i 3.8 762.9 LTOB Max Depth: 1.01 -10Ca 4.5 762.7 LTOB Cross Sectional Area: 4.9 - .4w _ 5.1 762.5 -- , , ,'' --- ---°\ s, 5.8 762.5 6.3 762.6 ,f. ��A 6.7 762.8 .�, ,,--or.--- A �c v-, l 8.1 762.8 8.9 762.8 Stream Type E/C 4 9.6 763.0 9.8 763.2 10.4 763.5 Bull Chute, UT 3,XS - 17,Riffle 11.3 763.7 12.2 763.7 764 - 13.5 763.6 14.6 763.6 a 0 763 a Wti Bankfiill f MY-00 5/11/22 762 , I I 0 10 20 Station (feet) Site Bull Chute Site « t 7'' ' `t' - Watershed: Yadkin River Basin,03040103 ,� � XS ID UT3,XS-18 r - a ' Feature Pool Date: 5/11/2022 Field Crew: Lewis Station Elevation SUMMARY DATA 0.0 764.0 Bankfull Elevation: 763.85 1.5 764.0 Bank Hieght Ratio: 1.00 2.6 763.8 Thalweg Elevation: 762.31 3.5 763.5 LTOB Elevation: 763.85 4.2 763.4 LTOB Max Depth: 1.55 4.7 763.1 LTOB Cross Sectional Area: 6.6 5.1 762.7 5.8 762.6 I 6.3 762.5 /, ' X 6.5 762.5 6.9 762.4 J' 7.4 762.3 ®-�%`� , .vim, ` 4 7.6 762.5 Stream Type E/C 4 8.0 762.8 8.4 763.1 9.2 763.2 Bull Chute,UT 3,XS - 18,Pool 9.6 763.3 10.4 763.6 764 11.1 763.9 12.2 763.8 r 13.2 763.81 - - -- 14.7 763.7 I 763 Bankfiill MY-00 5/11/22 762 , I I 0 10 20 Station (feet) Site Bull Chute Site -w -- � _: - . i " " P-'' " - Watershed: Yadkin River Basin,03040103 /f XS ID UT 4 Downstream,XS-11 `�' '.„. k i `,.* `' _� Feature PoolEti' .Y E R -a , ,.s, Date: 5/11/2022 •`' � '`- + Field Crew: Lewis k _ _ =.- ,�: , 014 4! -0 i 10 0. :. a , Station Elevation SUMMARY DATA 0.0 715.4 Bankfull Elevation: 714.76 - -- i 3.0 715.1 Bank Hieght Ratio: 1.00 _ 5.0 714.9 Thalweg Elevation: 713.25 ,;\-- r 'c = 6.1 714.8 LTOB Elevation: 714.76 6.8 714.2 LTOB Max Depth: 1.51j 7.6 713.8 LTOB Cross Sectional Area: 7.9 k!' .a 8.5 713.3 9.4 713.7 - � 10.3 713.3 12.7 713.8 - "f r,---. 11.6 713.5 i ., __ a ,�+ `"4 .1► .y{ `' 06/1 1 13.3 714.1 14.0 714.6 Stream Type ] E/C 4 15.0 714.9 16.3 714.9 18.3 715.1 Bull Chute, UT 4 Downstream,XS - 11,Pool 20.1 715.0 20.8 714.9 716 - 715 z 0 ti W 713 \/NY . Bankfiill f MY-00 5/11/22 712 , I I 0 10 20 Station (feet) Site Bull Chute Site . - ` • •r y ' Jh.S4.4 r. I r+ Watershed: Yadkin River Basin, 03040103 , . XS ID UT4,XS -12 t , {'= ` { Feature Riffle • ' ' '' " .�• �• ' • Date: 5/11/2022 • # ,„ ` ,'•.' ,� ; ., *:�' 17 Field Crew: Lewis '1: ;i'',''i. \:' '1 •':' .. i A , • ;_,tit• ,y. n ,,,.). v‘i. .. ...-....... Station Elevation SUMMARY DATA • • - - . . -. G. M!;.r,.,a � , .1. • •. , •° •:' ',1; 0.0 715.5 Bankfull Elevation: 715.38 ' '• ,. 'tt .)- ,.r. ,'j• 2.3 715.6 Bank Hieght Ratio: 1.00 ,- . ._w,`�.-•- . .• '�: 4.6 715.5 Thalweg Elevation: 714.22 } .7. . * ¢* -}*.. • z 6.2 715.4 LTOB Elevation: 715.38 r y ' �y 7.4 714.9 LTOB Max Depth: 1.15 * •• _ 8.1 714.7 LTOB Cross Sectional Area: 8.5 iF . * + ' 9.1 714.6 ,� i. • - '�, 10.9 714.6 i 5 .S -j'' ; ;I F ' y . 12.0 714.4 le ti A.• r. 4 R ;; • ` 13.2 714.2 , ' .� a4 h R „* 'ir ... 14.4 714.3 - - 15.5 714.4 Stream Type E/C 4 15.9 714.6 16.6 715.1 17.5 715.6 Bull Chute, UT 4 Downstream,XS - 12, Riffle 20.3 715.3 23.7 715.4 717 27.0 715.4 716 o 0 W 715 ■ Bankfull f MY-00 5/11/22 713 , I I 0 10 20 Station (feet) Site Bull Chute Site F` F' �' �'' i - .1._ ' a.Watershed: Yadkin River Basin,03040103 "}� XS ID UT4 Upstream,XS-19 Feature Pool ba -, Date: 5/11/2022 Field Crew: Lewis rt* `•~ f ' ' Station Elevation SUMMARY DATA 0.0 732.9 Bankfull Elevation: 732.43 . 2.3 732.9 Bank Hieght Ratio: 1.00 . . . . 3.2 732.6 Thalweg Elevation: 731.14 - �- - _ - 4.8 732.4 LTOB Elevation: 732.43 - - , 5.7 732.2 LTOB Max Depth: 1.29 _. -•,. 6.3 731.7 LTOB Cross Sectional Area: 6.7r :; � y 7.1 731.3 t. 8.0 731.1 4 r, 8.9 731.2 9.7 731.2 .. - 10.6 731.5 `'+ 11.9 731.7 12.4 732.1 Stream Type E/C 4 13.3 732.4 15.1 732.5 17.3 732.5 Bull Chute,UT 4 Upstream,XS - 19, Pool 18.6 732.6 734 - ■ 733 A t -a, .........1("ua 731 Bankfiill f MY-00 5/11/22 730 , I I 0 10 20 Station (feet) Site Bull Chute Site r 4"- Watershed: Yadkin River Basin,03040103 - '- ' :F! XS ID UT4 Upstream,XS-20 = • -; Feature Riffle ;"�Y l.c Date: 5/11/2022 `'' _ x ' . . Field Crew: i Lewis _. : .. • r Station Elevation SUMMARY DATA - - i 0.0 733.7 Bankfull Elevation: 733.76 _ _ _ . . -.". 2.7 733.7 Bank Hieght Ratio: 1.00 T �. 4.5 733.7 Thalweg Elevation: 732.93 -+ ., 6.0 733.8 LTOB Elevation: 733.76 t v, ;.. . r 6.8 733.5 LTOB Max Depth: 0.84 7.3 733.3 LTOB Cross Sectional Area: 5.2 , - 7.8 733.0 w ker _ x 9.0 733.0 x ' } 9.9 733.0 M1 i fad} � 11.4 733.0 � ' ,;:,s.r6 12.9 732.9 .��. : k:, , .�-T . 13.5 733.5 13.9 733.5 Stream Type E/C 4 14.4 733.7 14.8 733.8 16.8 733.7 Bull Chute, UT 4 Upstream,XS - 20,Riffle 18.3 733.9 19.6 733.8 o) I 734 ------- Bankfiill AML..... ........,/7 "' MY-00 5/11/22 733 , I I 0 10 20 Station (feet) Site Bull Chute Site Watershed: Yadkin River Basin,03040103 _ . XS ID UT4 Upstream,XS-21 - ". . r . - ' , Feature Riffle t --' - Date: 5/11/2022 1 ,; Field Crew: i Lewis . . _ Station Elevation SUMMARY DATA . 0.0 750.3 Bankfull Elevation: 750.00 - _ _ _ 2.3 750.2 Bank Hieght Ratio: 1.00 k . . . . - 3.9 750.2 Thalweg Elevation: 748.99 .. ?.. . 4.8 749.9 LTOB Elevation: 750.00 -_ . 5.4 749.7 LTOB Max Depth: 1.00 x- -- , - 6.0 749.4 LTOB Cross Sectional Area: 5.7 . 6.8 749.3 - 7.5 749.1 .. •8.7 749.1 #__ ,:4 --sue 9.7 749.0 ,� .; .; . srh y , 9.7 749.0 f--1. M1 ..- i'- , 10.7 749.3 11.1 749.2 Stream Type I E/C 4 11.5 749.2 12.2 749.5 12.7 749.8 Bull Chute, UT 4 Upstream,XS - 21,Riffle 13.4 750.0 14.5 750.1 751 - 16.0 750.0 18.1 750.1 0 750 1 0) ti W Bazikfiill f MY-00 5/11/22 748 , I I 0 10 20 Station (feet) • Site Bull Chute Site {: Watershed: Yadkin River Basin, 03040103 TM , XS ID UT4 Upstream,XS-22 Feature Pool - ' -;;; '_•:. ;= ,►, :-477.ti .. ? . .•'• ' .Y'•', Date: 5/11/2022 k_ .ti { • r Field Crew: Lewis ..4. ., ;4.• r ... .. ",.�F Y . . '' , =..#'f:-..f = '':,bk ,_r.: 'a • `' -- • Station Elevation SUMMARY DATA _ .Y„ < • _ ` " �' 0.0 750.2 Bankfull Elevation: 750.27 bt•. .'r'i' Y, _ piste's '' y`i. : • f5:• d x' • 2.2 750.4 Bank Hieght Ratio: 1.00 f't. :;: 3.0 750.3 Thalweg Elevation: 748.69 = : 3.7 750.0 LTOB Elevation: 750.27 , ' ' k •• { `ffi 4.3 749.8 LTOB MaxD tiY.. - .• '� • •..r}4..: #s. O a Depth: 1.58 ;#.` :,, .„4 �,; , 4.8 749.7 LTOB Cross Sectional Area: 8.3L..�{" f � 5.3 749.5 .. • . . - . 74 5.7 749.3 • r¢ • 6.6 748.9 7.3 748.8 Sy: rye.: 1�� G- • • i4. '. 8.1 748.9 8.7 ,' '� ' 1 • ` • _ :tea. I•I .I, : . ;lt. - • • •• , t *`. *i' ;;�s. 8.7 748.7 9.2 748.9 Stream Type E/C 4 9.7 749.1 10.1 749.4 10.6 749.5 Bull Chute, UT 4 Upstream,XS -22, Pool 11.2 749.8 11.5 749.8 751 12.1 750.1 12.9 750.3 13.7 750.28 _ ___ __ 15.8 750.2 0 750 W Bankfiill f MY-005/11/22 748 , 0 10 20 Station (feet) Site Bull Chute Site "'` : -:r-r... '.44,114 Watershed: Yadkin River Basin, 03040103 "a XS ID UT4B,XS-23 Feature Pool Date: 5/11/2022 Field Crew: Lewis ._ , a r_ _ _. .., Station Elevation SUMMARY DATA '�' ti' ;8 . v ;:: ��.. 0.0 758.1 Bankfull Elevation: 757.88 '{ y .` 1.5 757.9 Bank Hieght Ratio: 1.00 _ Y ' • 3.4 757.9 Thalweg El '., �. a weg Elevation: 756.83 ' : : " 4.6 757.9 LTOB Elevation: 757.88 � * '� � ' "ry��?.. ``- �ti. ,' � 4.9 757.8 LTOB Max Depth: 1.05 '-..: n;.}":A ' ' . 5.2 757.6 LTOB Cross Sectional Area: 3.4 x. A` i 5.5 757.3 s `4 'f 5''.k , 5.9 757.0 r s',..'•-., _. y'. . - 6.6 756.8 1.-....z:::!.....:-..&•,0.• t{M1 4 x_ {', .n. r • 7.3 756.8 *=. 'rw +� • '?. .,. , . . ' •. r �� 7.7 757.1 ', J' . °p " a,.. . r t w' f. 8.0 757.3 8.5 757.5 Stream Type E/C 4 9.1 757.6 10.0 757.7 10.6 757.4 Bull Chute, UT 4B,XS -23, Pool 11.4 757.9 12.4 757.9 759 13.8 757.8 14.8 757.9 av 0) •0 758 W Bankfiill f MY-00 5/11/22 756 , I I 0 10 20 Station (feet) Site Bull Chute Site Watershed: Yadkin River Basin,03040103 XS ID UT4B,XS-24 ' Feature Riffle Date: 5/25/2022 Field Crew: Lewis , Station Elevation SUMMARY DATA �y•�_ 0.0 758.0 Bankfull Elevation: 758.07 2.7 758.1 Bank Hieght Ratio: 0.52 3.5 758.1 Thalweg Elevation: 757.50 4.1 758.0 LTOB Elevation: 758.07 4.9 757.8 LTOB Max Depth: 0.57 5.5 757.5 LTOB Cross Sectional Area: 1.6 ,, 1' :':',1 6.4 757.5 6.9 757.7 7.5 757.9 � 7.9 757.8 / - '.A 8.8 758.1 a s :fi`► 9.3 758.0 10.5 758.0 Stream Type E/C 4 12.6 758.1 Bull Chute, UT 4B, XS -24, Riffle 0 758 a a Wti Bankfidl MY-00 5/11/22 756 , I 0 10 20 Station (feet) Site Bull Chute Site - -• - Watershed: Yadkin River Basin,03040103 XS ID UT4A,XS-25 , t. Feature Pool Date: 5/11/2022 I Field Crew: Lewis • ., Station Elevation SUMMARY DATA . -- 4;#. ... . . 0.0 758.3 Bankfull Elevation: 758.11 :_�-^': -, ' . . x.. - • 1.7 758.2 Bank Hieght Ratio: 1.00 • . . , 3.5 758.5 Thalweg Elevation: 757.29 4.5 758.3 LTOB Elevation: 758.11 .. - - ' 5.0 758.4 LTOB Max Depth: 0.82 `' 5.4 758.2 LTOB Cross Sectional Area: 1.5 - . - . . 6.0 758.1 , ,.. . . . 6.3 757.8 6.7 757.5 - - .', - : ' 6.9 757.4 . . 7.2 757.3 • .;;% 1,..,I'. ,,# a {`,, z• .4; �tr 7.6 757.5 '.; , .��[ fir: . �� _ � •�' .'=: .: , .' 7.8 757.5 Stream Type E/C 4 8.3 757.7 8.7 757.9 9.3 758.1 Bull Chute, UT 4A,XS- 25,Pool 10.0 758.1 11.3 758.3 11.3 758.3 V....wiee....-I 0 758 a Wti Bankfiill f MY-00 5/11/22 756 , I 0 10 20 Station (feet) Site Bull Chute Site . , " - "1°`v". . - . Watershed: Yadkin River Basin,03040103 1 !„ . XS ID UT4A,XS-26 f . Feature Riffle ,: -- Date• 5/11/2022 - Field Crew: i Lewis - _ - -- Station Elevation SUMMARY DATA 0.0 758.6 Bankfull Elevation: 758.57 0.9 758.9 Bank Hieght Ratio: 1.00 ,. 3.2 758.8 Thalweg Elevation: 757.79 4.8 758.6 LTOB Elevation: 758.57 .. 6.0 758.6 LTOB Max Depth: 0.78 `` = �;- = _.. 6.4 758.5 LTOB Cross Sectional Area: 1.6 - - _ __'-': %..= _ `' ' .; fig,•.... . 7.0 758.4 `" .. ` - u _ ;: :'- =?c 7.3 758.4 =. : . . <>; ; tr 7.8 758.2 ; ` _ 8.4 758.0 * .. .' - ;-, . '._ 9.7 758.2 10.0 758.3 Stream Type E/C 4 11.0 758.5 11.7 758.6 12.4 758.6 Bull Chute, UT 4A,XS -26,Riffle 14.0 758.5 15.8 758.2 0 759 _ __ a Wti Bankfiill f MY-005/11/22 758 , I I 0 10 20 Station (feet) Project Name Bull Chute - Baseline (2022) Profile Reach UT 1 (Sta 00+00 to 10+00) Feature Profile Date 5/ 11 /22 Crew Lewis Station 2022 Baseline Survey Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB Station As needed Bed Elevation Water Elevation TOB 0.0 38.3 70.0 100.0 110.6 137.6 139.2 144.3 147.5 168.8 169.7 172.4 173.8 194.9 703.92 705.62 707.17 708.50 708.32 708.68 708.40 708.21 709.13 709.08 708.87 708.46 709.89 709.88 703.94 705.72 707.30 708.55 709.07 708.59 708.99 709.92 708.96 708.97 709.17 709.46 710.52 709.43 709.38 709.96 710.09 725 720 4-1 W 715 710 705 700 0 100 200 300 Bull Chute, UT 1 (Sta 00+00 to 10+00) Baseline Profile 2022 400 500 Distance (feet) 600 -Bed Baseline 5/11/2022 Water Surface Baseline 5/11/2022 TOB 5/11/2022 700 800 900 1000 (-FV1.J 475.5 4//.6 4?$U.0 481.5 497.3 498.4 502.2 502.8 5L4.5 5L5.0 532.7 537.9 540.0 / 19F. LO 714.64 /13.93 /14.1U 714.98 715.07 714.46 714.20 715.64 / 15.61 /15.Ui 715.62 715.52 715.65 / 1'-F.'-F1 714.75 /14. /6 /14. /5 715.04 715.33 715.32 715.31 715.71 /15.yj /15.9L 715.92 715.92 715.92 /"1/.UU Project Name Bull Chute - Baseline (2022) Profile Reach UT 1 (Sta 10+00 to 20+00) Feature Profile Date 5/ 11 /22 Crew Lewis Station 2022 Baseline Survey Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB Station As needed Bed Elevation Water Elevation TOB 976.1 977.2 1004.5 1028.2 1031.1 1040.3 1048.9 1053.0 1071.4 1074.0 1080.1 1090.5 1091.5 1109.9 723.09 724.63 724.66 725.01 724.92 725.10 725.00 725.31 725.56 725.17 725.38 725.33 726.18 726.13 723.97 724.67 725.01 725.49 725.50 725.50 725.48 725.60 725.95 725.95 725.91 725.97 726.09 726.36 726.57 727.21 727.31 745 - 740 4-1 735 W 730 725 - 720 Bull Chute, UT 1 (Sta 10+00 to 20+00) Baseline Profile 2022 1000 1100 1200 1300 1400 1500 Distance (feet) 1600 1700 1800 1900 2000 -Bed Baseline 5/11/2022 Water Surface Baseline 5/11/2022 TOB 5/11/2022 14dU.b "I4bb.0 "I4r1..5 1480.0 1483.9 1504.7 1525.0 1527.0 10,5 .,5 0,5L. 1544.5 1547.3 1553.9 / G‘J. / V idU.1 1 r.SU.0"I 730.50 730.69 730.98 731.81 731.26 r.�I.Iy 732.13 731.75 731.52 / L7.71 730.37 /31.UL /31.uu 730.95 731.00 731.45 732.03 732.05 /3L.U4 /jL.LS 732.56 732.53 732.57 . /4 732.95 733.61 Project Name Bull Chute - Baseline (2022) Profile Reach UT 1 (Sta 20+00 to 30+00) Feature Profile Date 5/ 11 /22 Crew Lewis Station 2022 Baseline Survey Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB Station As needed Bed Elevation Water Elevation TOB 1983.7 2001.5 2003.4 2013.4 2014.3 2026.7 2030.7 2035.9 2041.3 2043.9 2066.7 2070.0 2077.2 2087.0 741.13 741.50 741.25 741.44 741.86 742.13 741.86 741.41 741.71 742.24 742.93 742.15 742.03 742.35 741.19 741.77 741.77 741.91 742.36 742.34 742.34 742.33 742.34 743.15 743.16 743.15 743.13 742.62 742.96 743.52 770 - 765 Bull Chute, UT 1 (Sta 20+00 to 30+00) Baseline Profile 2022 760 CIJ 755 ,0 ct W 750 J � 745 740 735 2000 1 2100 1 2200 1 2300 2400 2500 Distance (feet) 2600 2700 2800 2900 3000 Baseline 5/11/2022 Water Surface Baseline 5/11/2022 TOB 5/11/2022 -Bed G`rVG.I 14:ib.b L4by.:i L4b.S.0 2469.8 2470.9 2480.1 2482.7 2490.5 L4y.S.�S LOU I . 2503.0 2506.9 2507.8 JV.JJ (5U.bb b] .4b b i .4L 751.05 751.95 751.54 751.06 751.35 rb1.04 tbL.b.S 752.27 751.33 753.23 / JV.9-J 750.97 /51.61 /51./1 751.71 751.92 751.87 751.93 751.90 752.56 752.57 753.21 Project Name Bull Chute - Baseline (2022) Profile Reach UT 3 Downstream from EI I Reach (Sta 00+00 to 12+00) Feature Profile Date 5/ 11 /22 Crew Lewis Station 2022 Baseline Survey Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB Station As needed Bed Elevation Water Elevation TOB 0.0 25.5 29.8 35.3 39.3 56.0 61.1 63.3 66.9 70.9 90.6 91.6 94.1 96.7 719.06 719.39 718.95 718.55 720.00 719.84 719.47 719.59 719.57 720.25 720.79 720.05 720.13 720.74 719.28 719.66 719.66 719.68 720.07 720.28 720.28 720.30 720.28 720.36 720.80 720.81 720.84 720.83 720.11 720.99 721.61 745 - 740 735 4-1 w 730 725 720 715 Bull Chute, UT 3 Downstream from EII Reach (Sta 00+00 to 12+00) Baseline Profile 2022 0 200 400 600 800 Distance (feet) -Bed Baseline 5/11/2022 Water Surface Baseline 5/11/2022 TOB 5/11/2022 1000 1200 JOV.7 384.6 385.1 3y25. "1 399.8 404.8 408.8 413.4 430.5 434. / 44U.b 448.7 453.3 480.7 / LJ.JV 724.98 /26.4/ /Lb.54 726.01 725.60 725.98 726.60 727.02 /Lb.b"1 /Lb.4b 726.57 727.55 728.08 / LV.1O 726.19 /26.59 /Lb.?$5 726.84 726.86 726.85 726.86 727.34 /L /.33 /L /.jj 727.35 727.61 728.39 /L/.4i 728.08 Project Name Bull Chute - Baseline (2022) Profile Reach UT 3 Upstream from EIII Reach (Sta 00+00 to 04+10) Feature Profile Date 5/ 11 /22 Crew Lewis Station 2022 Baseline Survey Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB 0.0 13.9 15.1 17.6 19.3 32.0 34.2 38.0 39.4 57.0 59.2 67.7 69.1 84.6 754.05 753.95 753.61 753.64 754.19 754.65 754.00 754.25 754.98 755.61 754.97 755.28 756.21 756.25 754.10 754.15 754.16 754.15 754.27 754.67 754.67 754.69 755.07 755.73 755.75 755.85 756.24 756.47 755.21 755.45 768 766 764 a4 4 762 0 Ct W 760 758 756 754 752 - Bull Chute, UT 3 Upstream from EII Reach (Sta 00+00 to 04+10) Baseline Profile 2022 1 0 50 1 100 1 150 1 200 Distance (feet) I 250 I 300 I 350 I 400 Baseline 5/11/2022 Water Surface Baseline 5/11/2022 TOB 5/11/2022 -Bed J�FV.J 356.4 35 /.6 3b5.Z 365.9 380.4 385.0 387.9 389.1 409.8 / VJ.VV 763.95 /63.35 /b3. 35 764.50 764.37 763.96 763.94 765.21 765.59 / VJ.71 764.13 /64.1/ /b4.15 764.52 764.69 764.71 764.71 765.28 765.83 765.08 765.93 766.79 Project Name Bull Chute - Baseline (2022) Profile Reach UT 4 (Sta 00+00 to 10+00) Feature Profile Date 5/ 11 /22 Crew Lewis Station 2022 Baseline Survey Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB Station As needed Bed Elevation Water Elevation TOB 0.0 5.2 15.8 19.3 21.0 46.2 51.5 59.1 63.7 84.2 86.8 93.3 99.0 123.9 708.20 708.29 707.98 707.58 708.49 708.53 708.08 708.16 708.54 709.12 708.40 708.47 709.13 709.56 708.57 708.58 708.59 708.57 708.59 708.86 708.88 708.90 708.93 709.35 709.37 709.39 709.40 709.99 709.84 710.35 730 - 725 4-1 720 W 715 710 705 Bull Chute, UT 4 (Sta 00+00 to 10+00) Baseline Profile 2022 �V v V 0 100 200 300 400 500 Distance (feet) 600 700 800 900 1000 -Bed Baseline 5/11/2022 Water Surface Baseline 5/11/2022 TOB 5/11/2022 �FV7.L 420.9 426.5 4L?$.1 432.4 450.9 456.5 458.0 460.0 4?$4.b 46 / . 5 489.7 493.7 518.8 / 19-.JL 715.00 /14.2U /14..L 714.78 715.27 714.51 714.87 715.34 /15.?$L /15.Ly 715.31 715.94 716.16 /1'-F./1 715.21 /15.21 /15.1 715.21 715.53 715.52 715.55 715.55 /1b.Uy /1b.U25 716.10 716.12 716.46 715.94 716.56 717.47 Project Name Bull Chute - Baseline (2022) Profile Reach UT 4 (Sta 10+00 to 20+00) Feature Profile Date 5/ 11 /22 Crew Lewis Station 2022 Baseline Survey Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB Station As needed Bed Elevation Water Elevation TOB 991.2 1008.4 1012.5 1014.1 1015.9 1033.0 1035.6 1046.7 1049.7 1067.8 1069.9 1074.8 1080.8 1096.1 722.50 722.87 722.36 722.38 723.23 723.63 723.37 723.35 723.54 723.95 723.41 723.47 723.85 724.46 722.74 723.15 723.15 723.15 723.27 723.86 723.86 723.88 723.86 724.16 724.18 724.15 724.21 724.60 723.70 724.25 724.72 725.30 4> \-; .o Ct W 745 - Bull Chute, UT 4 (Sta Baseline Profile 10+00 to 20+00) 2022 740 735 730 • • Vim_ 725 720 1000 1 1100 1 1200 1 1300 1 1400 1 1500 Distance (feet) I 1600 I 1700 I 1800 I 1900 2000 Baseline 5/11/2022 Water Surface Baseline 5/11/2022 TOB 5/11/2022 -Bed I J / V.G 1d/U.2 dUb.b 14Ub.b 1409.8 1414.6 1431.0 1435.8 1439.1 144U.b 14b / .0 1461.7 1465.5 1468.6 GV.V I i LtS.1 b 728.44 728.89 729.43 729.07 729.14 (iU.Ub t iU. 14 729.56 729.70 730.21 / LO.JV 728.85 /29.21 /L:LLL 729.21 729.23 729.70 729.73 729.69 /iU.U6 /iU.ib 730.36 730.36 730.37 Project Name Bull Chute - Baseline (2022) Profile Reach UT 4 (Sta 20+00 to 27+00) Feature Profile Date 5/ 11 /22 Crew Lewis Station 2022 Baseline Survey Bed Elevation Water Elevation TOB 1998.9 2014.0 2019.3 2026.2 2031.5 2045.4 2049.8 2052.6 2055.4 2068.9 2072.9 2074.8 2077.1 2093.6 740.31 740.71 739.64 740.25 740.87 741.47 740.81 740.75 741.43 741.83 741.07 741.18 741.95 742.44 740.37 740.92 740.90 740.93 741.04 741.58 741.60 741.60 741.60 741.99 742.02 742.01 742.00 742.69 741.92 742.06 742.56 743.08 As needed Station Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB Station As needed Bed Elevation Water Elevation TOB 754 - 752 Bull Chute, UT 4 (Sta Baseline Profile 20+00 to 27+00) 2022 750 ,-, 4> 748 z 0 ., VI 746 W 744 742 740 738 2000 1 2100 1 2200 1 2300 I 2400 Distance (feet) I 2500 I 2600 2700 Baseline 5/11/2022 Water Surface Baseline 5/11/2022 TOB 5/11/2022 -Bed JJJ`t.J Lddb.b L.S40. 2353.2 2355.8 2357.9 2368.1 2371.0 L.Srb.b 2388.1 2391.6 2395.6 I `t I . I �J /4 ( . /4 � 40.0U 748.24 748.25 748.61 748.90 748.03 r40:I "1 r4.Ub 749.23 748.67 748.68 I `t I . c, . (4ZS.4b 748.84 748.83 748.87 749.07 749.07 r4y.U�S r4.1 Z 749.53 749.51 749.53 4.b4 749.73 750.21 Project Name Bull Chute - Baseline (2022) Profile Reach UT 4A (Sta 00+00 to 05+00) Feature Profile Date 5/ 11 /22 Crew Lewis Station 2022 Baseline Survey Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB 0.0 5.5 8.3 10.5 12.2 27.1 30.9 34.6 36.3 46.0 58.1 63.5 66.8 72.7 752.25 752.28 752.00 751.91 753.14 753.39 753.20 753.00 753.70 753.70 754.43 753.28 753.28 754.83 752.48 752.75 752.74 752.74 753.20 753.58 753.52 753.57 753.76 753.90 754.49 754.49 754.46 754.02 a) ct a) W 768 766 764 762 760 758 756 754 752 750 - Bull Chute, UT 4A (Sta Baseline Profile 00+00 to 05+00) 2022 I 1 0 50 1 100 1 150 1 200 1 250 Distance (feet) I1 300 350 1I 400 450 500 Baseline 5/11/2022 Water Surface Baseline 5/11/2022 TOB 5/11/2022 -Bed L�F7.J 253.3 256. / 159.3 261.0 269.6 275.7 278.5 279.9 Z65.3 291.8 293.9 298.2 / VV.LV 760.26 /59.63 /5 3. 35 760.90 761.11 761.37 760.41 761.86 /b1.bU /b1.19 761.27 762.43 762.44 /VV.LJ 760.42 /60.41 /bU.41 760.87 761.25 761.47 761.43 761.87 /b1.64 /b1.tSb 761.84 760.59 761.76 762.82 762.82 Project Name Bull Chute - Baseline (2022) Profile Reach UT 4B (Sta 00+00 to 05+00) Feature Profile Date 5/ 11 /22 Crew Lewis Station 2022 Baseline Survey Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB As needed Station Bed Elevation Water Elevation TOB 0.0 4.0 9.4 13.2 15.1 25.1 39.8 43.5 45.6 52.0 56.1 58.2 70.3 74.1 752.25 752.74 752.51 752.24 753.12 753.06 753.54 752.66 754.25 754.38 754.37 754.63 755.19 754.64 752.48 752.92 752.90 752.89 753.15 753.38 753.78 753.79 754.45 754.57 754.57 754.58 755.96 a) ,0 Ct a) W 764 762 760 758 756 754 752 750 - Bull Chute, UT 4B (Sta Baseline Profile 00+00 to 05+00) 2022 1 0 50 1 100 1 150 1 200 I 250 Distance (feet) I1 300 350 1I 400 450 500 Baseline 5/11/2022 Water Surface Baseline 5/11/2022 TOB 5/11/2022 -Bed Li-FO.O 262.9 1/6.1 L/y.L 281.9 282.4 297.0 303.0 / VV.VV 760.63 /61.06 /b"1.U5 761.01 761.85 762.10 762.96 /61.9 / Table 9A. Baseline Stream Data Summary Bull Chute - UT 1 Parameter Pre -Existing Condition (applicaple) Design Monitoring Baseline (MY0) Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft) 5.6 8.5 16 8.5 9.8 5.5 10.2 5 Floodprone Width (ft) 10 14 100 50 150 25 100 5 Bankfull Mean Depth (ft) 0.4 0.7 1.1 0.6 0.7 0.2 0.8 5 Bankfull Max Depth (ft) 0.6 1.1 1.4 0.8 1.1 0.4 1.1 5 Bankfull Cross Sectional Area (ft2) 6 6 6 6 6 1.3 8.1 5 Width/Depth Ratio 5.1 12.1 40 12 16 12.8 22.9 5 Entrenchment Ratio 1.1 1.4 15.9 5.9 15.3 4.6 11.4 5 Bank Height Ratio 1.3 2.8 5 1 1.3 1 1 5 Max part size (mm) mobilized at bankfull Rosgen Classification G 5 Ce 3/4 Ce 4 Bankfull Discharge (cfs) 22.9 22.9 22.9 Sinuosity (ft) 1.03 1.15 1.15 Water Surface Slope (Channel) (ft/ft) 0.0211 0.0189 0.0197 Other Table 9B. Baseline Stream Data Summary Bull Chute - UT 3 Parameter Pre -Existing Condition (applicaple) Design Monitoring Baseline (MVO) Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft) 3.3 5.1 7.1 6.7 7.7 8.0 10.0 2 Floodprone Width (ft) 7 9 50 50 100 75 75 2 Bankfull Mean Depth (ft) 0.5 0.7 1.1 0.5 0.6 0.6 0.6 2 Bankfull Max Depth (ft) 0.8 1 1.7 0.6 0.8 0.9 1.0 2 Bankfull Cross Sectional Area (ft2) 3.7 3.7 3.7 3.7 3.7 4.8 6.4 2 Width/Depth Ratio 3 7.3 13.5 12 16 12.4 15.6 2 Entrenchment Ratio 1.1 1.5 13.5 7.5 13 7.5 9.4 2 Bank Height Ratio 1.5 2.5 4 1 1.3 1 1 2 Max part size (mm) mobilized at bankfull Rosgen Classification G 5 Ce 3/4 Ce 4 Bankfull Discharge (cfs) 13.7 13.7 13.7 Sinuosity (ft) 1.02 1.15 1.15 Water Surface Slope (Channel) (ft/ft) 0.0254 0.0225 0.0199 Other Table 9C. Baseline Stream Data Summary Bull Chute - UT 4 Upstream Parameter Pre -Existing Condition (applicaple) Design Monitoring Baseline (MY0) Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft) 5 8.3 10.4 7.2 8.3 8.5 8.9 2 Floodprone Width (ft) 6 11 24 50 100 75.0 75.0 2 Bankfull Mean Depth (ft) 0.4 0.6 0.9 0.5 0.6 0.6 0.6 2 Bankfull Max Depth (ft) 0.5 1.1 1.2 0.7 0.9 0.8 1.0 2 Bankfull Cross Sectional Area (ft2) 4.3 4.3 4.3 4.3 4.3 5.1 5.8 2 Width/Depth Ratio 5.6 15.4 26 12 16 13.7 14.1 2 Entrenchment Ratio 1.1 1.3 2.6 7 12.1 8.4 8.8 2 Bank Height Ratio 2.5 3.1 5.4 1 1.3 1.0 1.0 2 Max part size (mm) mobilized at bankfull Rosgen Classification Fg 5 Ce 3/4 Ce 4 Bankfull Discharge (cfs) 16.1 16.1 16.1 Sinuosity (ft) 1.06 1.15 1.15 Water Surface Slope (Channel) (ft/ft) 0.212 0.0196 0.0182 Other Table 9D. Baseline Stream Data Summary Bull Chute - UT 4 Downstream Parameter Pre -Existing Condition (applicaple) Design Monitoring Baseline (MYO) Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft) 7.8 9.2 10 9.1 10.5 11.0 11.0 1 Floodprone Width (ft) 9 11 14 50 150 100.0 100.0 1 Bankfull Mean Depth (ft) 0.7 0.8 0.9 0.7 0.8 0.8 0.8 1 Bankfull Max Depth (ft) 0.9 1 1.1 0.8 1.1 1.2 1.2 1 Bankfull Cross Sectional Area (ft2) 6.9 6.9 6.9 6.9 6.9 8.5 8.5 1 Width/Depth Ratio 6.8 9.7 12.6 12 16 14.0 14.0 1 Entrenchment Ratio 1.1 1.2 1.4 5.5 14.3 9.1 9.1 1 Bank Height Ratio 4.7 5.3 5.9 1 1.3 1.0 1.0 1 Max part size (mm) mobilized at bankfull Rosgen Classification G 5 Ce 3/4 Ce 4 Bankfull Discharge (cfs) 26.7 26.7 26.7 Sinuosity (ft) 1.02 1.15 1.15 Water Surface Slope (Channel) (ft/ft) 0.0165 0.0146 0.01484 Other Table 9E. Baseline Stream Data Summary Bull Chute - UT 4A Parameter Pre -Existing Condition (applicaple) Design Monitoring Baseline (MY0) Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft) 2.3 3.3 4.5 3.9 4.6 4.7 4.7 1 Floodprone Width (ft) 6 8 12 20 50 35 35 1 Bankfull Mean Depth (ft) 0.3 0.4 0.5 0.3 0.3 0.3 0.3 1 Bankfull Max Depth (ft) 0.6 0.6 0.9 0.4 0.5 0.7 0.7 1 Bankfull Cross Sectional Area (ft2) 1.3 1.3 1.3 1.3 1.3 1.4 1.4 1 Width/Depth Ratio 4.6 8.3 15 12 16 15.5 15.5 1 Entrenchment Ratio 1.3 3.5 3.6 5.1 11 7.5 7.5 1 Bank Height Ratio 1.7 3 3.9 1 1.3 1 1 1 Max part size (mm) mobilized at bankfull Rosgen Classification Eg 5 Ce 3/4 Ce 4 Bankfull Discharge (cfs) 4.3 4.3 4.3 Sinuosity (ft) 1.02 1.1 1.1 Water Surface Slope (Channel) (ft/ft) 0.0444 0.0336 0.0356 Other Table 9F. Baseline Stream Data Summary Bull Chute - UT 4B Parameter Pre -Existing Condition (applicaple) Design Monitoring Baseline (MVO) Riffle Only Min Mean Med Max n Min Max Min Max n Bankfull Width (ft) 3.1 5 6.9 3.9 4.6 5.3 5.3 1 Floodprone Width (ft) 9 14 18 20 50 35 35 1 Bankfull Mean Depth (ft) 0.2 0.3 0.4 0.3 0.3 0.3 0.3 1 Bankfull Max Depth (ft) 0.3 0.6 0.8 0.4 0.5 0.6 0.6 1 Bankfull Cross Sectional Area (ft2) 1.2 1.2 1.2 1.3 1.3 1.6 1.6 1 Width/Depth Ratio 7.8 21.1 34.5 12 16 17.5 17.5 1 Entrenchment Ratio 1.3 3.6 5.8 5.1 11 6.6 6.6 1 Bank Height Ratio 1.3 4.3 7.3 1 1.3 1 1 1 Max part size (mm) mobilized at bankfull Rosgen Classification Cf 5 Ce 3/4 Ce 4 Bankfull Discharge (cfs) 4.3 4.3 4.3 Sinuosity (ft) 1.03 1.1 1.1 Water Surface Slope (Channel) (ft/ft) 0.0359 0.0336 0.034 Other Table 1OA. Monitoring Data - Cross Section Morphology Monitoring Summary (Bull Chute/ DMS:1OO137) UT 1 UT 1- Cross Section 1(Riffle) UT 1 Cross Sectio 2 (Pool) UT 1- Cross Section 3 (Riffle) UT 1- Cross Section 4 (Pool) UT 1- Cross Section 5 (Riffle) MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-Bankfull r Area 713.54 714.80 727.56 727.84 739.80 Bank Height Ratio_Based on AB Bankfull' Area 1.00 1.00 1.00 1.00 1.00 Thalweg Elevation 712.66 712.56 726.64 726.21 738.69 LT0132 Elevation 713.54 714.80 727.56 727.84 739.80 LTOB2 Max Depth (ft) 0.88 2.24 0.91 1.64 1.11 LTOB2 Cross Sectional Area (ftz) 5.7 11.7 5.5 9.4 8.1 UT 1- Cros Section 6 (Pool) UT 1 Cross Section 7 (Riffl ) UT 1- Cross Section 8 (Pool) UT 1- Cros Sectio 9 (Riffle) UT 1- Cros Sectio 10 (P ol) MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-Bankfull r Area 739.99 747.73 747.94 763.66 764.42 Bank Height Ratio_Based on AB Bankfull' Area 1.00 1.00 1.00 1.00 1.00 Thalweg Elevation 738.45 746.66 74629 763.30 763.33 LT0132 Elevation 739.99 747.73 747.94 763.66 764.42 LTOB2 Max Depth (ft) 1.54 1.07 1.65 0.36 1.09 LTOB2 Cross Sectional Area (ftz) 12.0 6.9 10.3 1.3 6.3 The abov resulted in morp ology arameters reflect the 2018 guidance hat arose from the mitigation tech ical workgroup onsisting of DMS, th IRT and ind us ry mitigation provider /practitioners The o tcome the fo us on hree p imary morphological paramet rs of i terest for the purpo es oft acking channel change moving forwa d. The are th bank height r do usi g a constant As -built bankfull area sectional area an max depth based on each ye rs low op of bank. These are calculated as follows: Height Ratio (BHR) to es the As -built bankful area as the ba is for adjusting each subseq ent years bankfull elevation. For example if the As -built bankfull area was 10 ft2, then the MY1 bankfull would be adjusted un it the calculated bankfull area within he MY1 cross section surve = 10 ft2. The BHR would then be calculated with the difference between the low top of bank (LTOB) for MY1 and the thalweg elevation for MY1 in the numerator with the difference between the MY1 bankfull elevation and the MY1 thalweg elevation in the denominator. This same process is then in each successivey ar. Area and Max depth - These are based on the LTOB elevation for each years survey (Th same elevation used for the LTOB in the BHR calculation). Area below the LTOB elevation will be used and each year as above. The difference between the LTOB elevation and the thalweg elev tion (same as in the BHR calculation) will be recroded and tracked above as LTOB max depth. and the cross 1 - Bank elevation elevation carried out 2 - LTOB tracked for Bankfull Elevation (ft) -Based on AB-Bankfull' Area Bank Height Ratio_Based on AB Bankfull r Area Thalweg Elevation LTOB2 Elevation LTOB2 Max Depth (ft) LTOB2 Cross Sectional Area (ftz) Note:The smaller the channel the closer the survey measurements are to their limit of r liable d tection, herefore inter -a nual variation in morphological measurement (as a percentage) is by default magnified as channel size decereases. Some of the variability above is the result of this factor and some is due to the large amount of depositional sediments observed. Table 10B. Monitoring Data - Cross Section Morphology Monitoring Summary (Bull Chute/ DMS:100137) UT 3 UT 3 - Cross Sectio 13 (Riffle) UT 3 - Cross Section 14 (Pool) UT 3 - Cross Section 15 (Pool) UT 3 - Cross Section 16 (Riffle) UT 3 - Cross Section 17 (Riffle) MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-Bankfull' Area 722.63 722.98 734.17 734.92 763.55 Bank Height Ratio_Based on AB Bankfull' Area 1.00 1.00 1.00 1.00 0.98 Thalweg Elevation 721.62 720.98 732.78 733.97 762.51 LTOB2 Elevation 722.63 722.98 734.17 734.92 763.52 LTOB2 Max Depth (ft) 1.02 2.00 1.39 0.95 1.01 LTOB2 Cross Sectional Area (ftz) 6.3 10.4 7.0 4.74 4.94 UT 3 - Cros Sectio 18 (Pool) MVO MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-Bankfull1 Area 763.85 Bank Height Ratio_Based on AB Bankfull' Area 1.00 Thalweg Elevation 762.31 LTOB2 Elevation 763.85 LTOB2 Max Depth (ft) 1.55 LTOB2 Cross Sectional Area (ftz) 6.58 The abov morp ology arameters ref ect the 2018 guidance hat ar se from the mitigation tech ical workgroup onsisting of DMS, th IRT and indus ry mitigation provider /practitioners The o tcome the fo us on hree p imary morphological paramet rs of i terest for the purpo es oft acking channel change moving forwa d. The are th bank height r do usi g a constant As -built bankfull area sectional area an max d pth based on each ye rs low op of bank. These are calculated as follows: Height Ratio (BHR) to es the As -built bankful area as the ba is for adjusting each subseq ent years bankfull elevation. For example if the As -built bankfull area was 10 ft2, then the MY1 bankfull would be adjusted un it the calculated bankfull area within he MY1 cross section surve = 10 ft2. The BHR would then be calculated with the difference between the low top of bank (LTOB) for MY1 and the thalweg elevation for MY1 in the numerator with the difference between the MY1 bankfull elevation and the MY1 thalweg elevation in the denominator. This same process is then in each successivey ar. Area and Max depth - These are based on the LTOB elevation for each years survey (Th same elevation used for the LTOB in the BHR calculation). Area below the LTOB elevation will be used and each year as above. The difference between the LTOB elevation and the thalweg elev tion (same as in the BHR calculation) will be recroded and tracked above as LTOB max depth. resulted in and the cross 1 - Bank elevation elevation carried out 2 - LTOB tracked for Bankfull Elevation (ft) - Based on AB-Bankfull1 Area Bank Height Ratio_Based on AB Bankfull' Area Thalweg Elevation LTOB Elevation LTOB2 Max Depth (ft) LTOB2 Cross Sectional Area (ftz) Note:The smaller the channel the closer the survey measurements are to their limit of r liable d tection, herefore inter -a nual variation in morphological measurement (as a percentage) is by default magnified as channel size decereases. Some of the variability above is the result of this factor and some is due to the large amount of depositional sediments observed. Table 10C. Monitoring Data - Cross Section Morphology Monitoring Summary (Bull Chute/ DMS:100137) UT4 UT 4 - Cross Section 11(Pool) UT 4 - Cross Section 2 (Riffle) UT 4 - Cross Section 19 (Pool) UT 4 - Cross Section 20 (Riffle) UT 4 - Cross Section 21(Rife) MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-Bankfull' Area 714.76 715.38 732.43 733.76 750.00 Bank Height Ratio_Based on AB Bankfull' Area 1.00 1.00 1.00 1.00 1.00 Thalweg Elevation 713.25 71422 731.14 732.93 748.99 LTOBz Elevation 714.76 715.38 732.43 733.76 750.00 LTOB2 Max Depth (ft) 1.51 1.16 1.29 0.84 1.00 LTOB2 Cross Sectional Area (ftz) 7.9 8.5 6.7 5.2 5.7 UT 4 - Cros Sectio 22 (Pool) MVO MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-Bankfull' Area 750.27 Bank Height Ratio_Based on AB Bankfull' Area 1.00 Thalweg Elevation 748.69 LTOB2 Elevation 750.27 LTOB2 Max Depth (ft) 1.58 LTOB2 Cross Sectional Area (ftz) 8.3 The abov morp ology arameters reflect the 2018 guidance hat arose from the mitigation tech ical workgroup onsisting of DMS, th IRT and indus ry mitigation provider /practitioners The o tcome resulted in the fo us on hree p imary morphological paramet rs of i terest for the purpo es oft acking channel change moving forwa d. The are th bank height r do usi g a constant As -built bankfull area and the cross sectional area an max depth based on each ye rs low op of bank. These are calculated as follows: 1 - Bank Height Ratio (BHR) to es the As -built bankful area as the ba is for adjusting each subseq ent years bankfull elevation. For example if the As -built bankfull area was 10 ft2, then the MY1 bankfull elevation would be adjusted un it the calculated bankfull area within he MY1 cross section surve = 10 ft2. The BHR would then be calculated with the difference between the low top of bank (LTOB) elevation for MY1 and the thalweg elevation for MY1 in the numerator with the difference between the MY1 bankfull elevation and the MY1 thalweg elevation in the denominator. This same process is then carried out in each successivey ar. 2 - LTOB Area and Max depth - These are based on the LTOB elevation for each years survey (Th same elevation used for the LTOB in the BHR calculation). Area below the LTOB elevation will be used and tracked for each year as above. The difference between the LTOB elevation and the thalweg elev tion (same as in the BHR calculation) will be recroded and tracked above as LTOB max depth. Bankfull Elevation (ft) - Based on AB-Bankfull' Area Bank Height Ratio_Based on AB Bankfull' Area Thalweg Elevation LTOBz Elevation LTOB2 Max Depth (ft) LTOB2 Cross Sectional Area (ftz) Note: The smaller the channel the closer the survey measurements are to their limit of r liable d tection, herefor inter -a nual variation in morphological measurement (as a percentage) is by default magnified as channel size decereases. Some of the variability above is the result of this factor and some is due to the large amount of depositional sediments observed. Table 10D. Monitoring Data - Cross Section Morphology Monitoring Summary (Bull Chute/ DMS:100137) UT 4A UT 4A - Cross Secti n 25 (Pool) UT 4A Cross ection 26 (Riffle) MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-Bankfull' Area 758.11 758.57 Bank Height Ratio_Based on AB Bankfull' Area 1.00 1.00 Thalweg Elevation 757.29 757.79 LTOB2 Elevation 758.11 758.57 LTOB2 Max Depth (ft) 0.82 0.78 LTOB2 Cross Sectional Area (ftz) 1.5 1.6 Bankfull Elevation (ft) - Based on AB-Bankfull' Area Bank Height Ratio_Based on AB Bankfull' Area Thalweg Elevation LTOB2 Elevation LTOB2 Max Depth (ft) LTOB2 Cross Sectional Area (ftz) The abov morp ology arameters ref ect the 2018 guidance hat ar se from the mitigation tech ical workgroup onsisting of DMS, th IRT and indus ry mitigation provider /practitioners The o tcome the fo us on hree p imary morphological paramet rs of i terest for the purpo es oft acking channel change moving forwa d. The are th bank height r do usi g a constant As -built bankfull area sectional area an max d pth based on each ye rs low op of bank. These are calculated as follows: Height Ratio (BHR) to es the As -built bankful area as the ba is for adjusting each subseq ent years bankfull elevation. For example if the As -built bankfull area was 10 ft2, then the MY1 bankfull would be adjusted un it the calculated bankfull area within he MY1 cross section surve = 10 ft2. The BHR would then be calculated with the difference between the low top of bank (LTOB) for MY1 and the thalweg elevation for MY1 in the numerator with the difference between the MY1 bankfull elevation and the MY1 thalweg elevation in the denominator. This same process is then in each successivey ar. Area and Max depth - These are based on the LTOB elevation for each years survey (Th same elevation used for the LTOB in the BHR calculation). Area below the LTOB elevation will be used and each year as above. The difference between the LTOB elevation and the thalweg elev tion (same as in the BHR calculation) will be recroded and tracked above as LTOB max depth. resulted in and the cross 1 - Bank elevation elevation carried out 2 - LTOB tracked for Bankfull Elevation (ft) - Based on AB-Bankfull1 Area Bank Height Ratio_Based on AB Bankfull' Area Thalweg Elevation LTOB Elevation LTOB2 Max Depth (ft) LTOB2 Cross Sectional Area (ftz) Note:The smaller the channel the closer the survey measurements are to their limit of r liable d tection, herefore inter -a nual variation in morphological measurement (as a percentage) is by default magnified as channel size decereases. Some of the variability above is the result of this factor and some is due to the large amount of depositional sediments observed. Table 10E. Monitoring Data - Cross Section Morphology Monitoring Summary (Bull Chute/ DMS:100137) UT 4B UT 4B - Cross Section 23 (Pool) UT 4B Cross Section 24 (Riffle) MVO MY1 MY2 MY3 MY5 MY7 MY+ MVO MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-Bankfull r Area 757.88 758.07 Bank Height Ratio_Based on AB Bankfull' Area 1.00 0.52 Thalweg Elevation 756.83 757.50 LTOB1 Elevation 757.88 758.07 LTOB1 Max Depth (ft) 1.05 0.57 LTOB2 Cross Sectional Area (ftz) 3.4 1.6 Bankfull Elevation (ft) - Based on AB-Bankfull' Area Bank Height Ratio_Based on AB Bankfullc Area Thalweg Elevation LTOB2 Elevation LTOB2 Max Depth (ft) LTOB1 Cross Sectional Area (ftz) The abov more ology arameters reflect the 2018 guidance hat arose from the mitigation tech ical workgroup onsisting of DMS, th IRT and indus ry mitigation provider /practitioners The o tcome resulted in the fo us on hree p imary morphological paramet rs of i terest for the purpo es oft acking channel change moving forwa d. The are th bank height r do usi g a constant As -built bankfull area and the cross sectional area an max depth based on each ye rs low op of bank. These are calculated as follows: 1 - Bank Height Ratio (BHR) to es the As -built bankful area as the ba is for adjusting each subseq ent years bankfull elevation. For example if the As -built bankfull area was 10 ft2, then the MY1 bankfull elevation would be adjusted un it the calculated bankfull area within he MY1 cross section surve = 10 ft2. The BHR would then be calculated with the difference between the low top of bank (LTOB) elevation for MY1 and the thalweg elevation for MY1 in the numerator with the difference between the MY1 bankfull elevation and the MY1 thalweg elevation in the denominator. This same process is then carried out in each successivey ar. 2 - LTOB Area and Max depth - These are based on the LTOB elevation for each years survey (Th same elevation used for the LTOB in the BHR calculation). Area below the LTOB elevation will be used and tracked for each year as above. The difference between the LTOB elevation and the thalweg elev tion (same as in the BHR calculation) will be recroded and tracked above as LTOB max depth. Bankfull Elevation (ft) - Based on AB-Bankfull' Area Bank Height Ratio_Based on AB Bankfull' Area Thalweg Elevation LTOBz Elevation LTOB1 Max Depth (ft) LTOB2 Cross Sectional Area (ft) Note:The smaller the channel the closer the survey measurements are to their limit of r liable d tection, herefor inter -a nual variation in morphological measurement (as a percentage) is by default magnified as channel size decereases. Some of the variability above is the result of this factor and some is due to the large amount of depositional sediments observed. Appendix D Hydrologic Data Groundwater Gauge Soil Profiles MYO Monitoring Report (Project No. 100137) Appendices Bull Chute Stream and Riparian Wetland Mitigation Site Clearwater Mitigation Solutions Randolph County, North Carolina July 2022 AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 SOIL BORING LOG Date: 4/4/2022 Project/Site: Bull Chute County, State: Randolph County, NC Sampling Point/ Coordinates: Soil Profile GW 1 (35.831389, -79.887733) Investigator: W. Grant Lewis Soil Series: Wynott-Enon Complex Axiom Environmental, Inc. Notes: Location is shown on Figure 4. Depth (inches) Matrix Mottling Texture Color % Color % Type Location 0-20 10 YR 4/2 70 10 YR 4/3 30 C M sandy clay loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 1/( Signature: ' �' -04/t Name/Print: W. Grant Lewis AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 SOIL BORING LOG Date: 4/4/2022 Project/Site: Bull Chute County, State: Randolph County, NC Sampling Point/ Coordinates: Soil Profile GW 2 (35.832431, -79.885531) Investigator: W. Grant Lewis Soil Series: Wynott-Enon Complex Axiom Environmental, Inc. Notes: Location is shown on Figure 4. Depth (inches) Matrix Mottling Texture Color % Color % Type Location 0-2 10 YR 4/1 100 sandy clay loam 2-12 10 YR 5/1 95 10 YR 4/6 5 C M sandy clay loam 12-20 10 YR 4/3 90 10 YR 6/2 5 D M clay loam 10YR 3/3 5 C M 20+ 10YR 5/1 95 10 YR 4/6 5 C M sandy clay loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 1/( Signature: ' �' -04/t Name/Print: W. Grant Lewis AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 SOIL BORING LOG Date: 4/4/2022 Project/Site: Bull Chute County, State: Randolph County, NC Sampling Point/ Coordinates: Soil Profile GW 3 (35.835164, -79.882049) Investigator: W. Grant Lewis Soil Series: Wynott-Enon Complex Axiom Environmental, Inc. Notes: Location is shown on Figure 4. Depth (inches) Matrix Mottling Texture Color % Color % Type Location 0-10 10 YR 5/1 95 10 YR 4/1 5 C M sandy clay loam 10-18 10 YR 6/2 90 10 YR 5/4 10 C M sandy clay loam 18-20 10 YR 5/1 90 10 YR 4/5 10 D M sandy clay loam 20+ Gley 6/1 95 10 YR 4/5 5 D M sandy clay loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 1/( Signature: ' �' -04/t Name/Print: W. Grant Lewis AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 SOIL BORING LOG Date: 4/4/2022 Project/Site: Bull Chute County, State: Randolph County, NC Sampling Point/ Coordinates: Soil Profile GW 4 (35.836123, -79.881328) Investigator: W. Grant Lewis Soil Series: Mecklenburg Clay Loam Axiom Environmental, Inc. Notes: Location is shown on Figure 4. Depth (inches) Matrix Mottling Texture Color % Color % Type Location 0-9 10 YR 4/2 95 10 YR 5/4 5 C M loam 9-14 10 YR 4/2 90 10 YR 5/4 5 C M loam 10 YR 3/2 5 C M 14-20 10 YR 5/1 60 10 YR 3/2 20 C M clay loam Gley 6/1 20 20+ 10 YR 6/1 85 10 YR 4/6 10 D M clay Gley 6/1 5 C M Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 1/( Signature: ' �' -04/t Name/Print: W. Grant Lewis AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 SOIL BORING LOG Date: 4/4/2022 Project/Site: Bull Chute County, State: Randolph County, NC Sampling Point/ Coordinates: Soil Profile GW 5 (35.833120, -79.888360) Investigator: W. Grant Lewis Soil Series: Wynott-Enon Complex Axiom Environmental, Inc. Notes: Location is shown on Figure 4. Depth (inches) Matrix Mottling Texture Color % Color % Type Location 0-10 10 YR 4/1 98 10 YR 4/6 2 C M loam 10+ Gley 1 3/104 100 clay loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 1/( Signature: ' �' -04/t Name/Print: W. Grant Lewis AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 SOIL BORING LOG Date: 4/4/2022 Project/Site: Bull Chute County, State: Randolph County, NC Sampling Point/ Coordinates: Soil Profile GW 6 (35.836651, -79.886569) Investigator: W. Grant Lewis Soil Series: Wynott-Enon Complex Axiom Environmental, Inc. Notes: Location is shown on Figure 4. Depth (inches) Matrix Mottling Texture Color % Color % Type Location 0-3 10 YR 5/1 100 sandy clay loam 3-15 10 YR 5/1 70 10 YR 6/1 20 C M sandy clay loam 10 YR 5/6 10 C M 15-22 10 YR 7/1 60 10 YR 5/6 30 D M clay 10 YR 5/1 10 C M 22+ 10 YR 4/6 90 10 YR 5/1 10 D M clay Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 Signature: &-Cr A Jt-Jr. Name/Print: W. Grant Lewis AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 SOIL BORING LOG Date: 4/4/2022 Project/Site: Bull Chute County, State: Randolph County, NC Sampling Point/ Coordinates: Soil Profile GW 7 (35.833712, -79.889062) Investigator: W. Grant Lewis Soil Series: Mecklenburg clay loam Axiom Environmental, Inc. Notes: Location is shown on Figure 4. Depth (inches) Matrix Mottling Texture Color % Color % Type Location 0-3 10 YR 5/4 100 loam 3-12 10 YR 4/2 80 10 YR 5/6 20 C M loam 12-18 10 YR 4/1 95 10 YR 4/6 5 C M clay loam 18+ Gley 1 5/104 95 10 YR 4/6 5 C M clay loam Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 1/( Signature: ' �' -04/t Name/Print: W. Grant Lewis AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 SOIL BORING LOG Date: 4/4/2022 Project/Site: Bull Chute County, State: Randolph County, NC Sampling Point/ Coordinates: Soil Profile GW 8 (35.834751, -79.889586) Investigator: W. Grant Lewis Soil Series: Mecklenburg clay loam Axiom Environmental, Inc. Notes: Location is shown on Figure 4. Depth (inches) Matrix Mottling Texture Color % Color % Type Location 0-12 10 YR 4/2 95 10 YR 4/4 5 C M sandy clay loam 12-20 10 YR 5/1 80 10 YR 4/3 15 C M clay loam 10 YR 3/2 5 C M 20+ 10 YR 6/1 90 10 YR 5/4 5 C M clay 10 YR 4/6 5 D M Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 1/( Signature: ' �' -04/t Name/Print: W. Grant Lewis AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 SOIL BORING LOG Date: 4/4/2022 Project/Site: Bull Chute County, State: Randolph County, NC Sampling Point/ Coordinates: Soil Profile GW 9 (35.836685, -79.890433) Investigator: W. Grant Lewis Soil Series: Mecklenburg loam Axiom Environmental, Inc. Notes: Location is shown on Figure 4. Depth (inches) Matrix Mottling Texture Color % Color % Type Location 0-10 10 YR 5/1 95 10 YR 5/6 5 C M clay loam 10+ 10 YR 6/5 90 10 YR 5/1 5 C M clay 10 YR 5/4 5 C M Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 1/( Signature: ' �' -04/t Name/Print: W. Grant Lewis AXIOM ENVIRONMENTAL, INC 218 Snow Avenue Raleigh, North Carolina 27603 919-215-1693 SOIL BORING LOG Date: 4/4/2022 Project/Site: Bull Chute County, State: Randolph County, NC Sampling Point/ Coordinates: Soil Profile GW 10 (35.837255, -79.889980) Investigator: W. Grant Lewis Soil Series: Mecklenburg loam Axiom Environmental, Inc. Notes: Location is shown on Figure 4. Depth (inches) Matrix Mottling Texture Color % Color % Type Location 0-13 10 YR 5/1 95 10 YR 5/6 5 C M loam 13-22 Gley 6/5GY 70 10 YR 4/6 30 D M loam 22+ 10 YR 6/1 90 10 YR 4/6 10 D M clay Type: C=Concentration, D=Depletion, RM=Reduced Matrix, MS=Masked Sand Grains. Locaction: PL=Pore Lining, M=Matrix. North Carolina Licensed Soil Scientist Number: 1233 1/( Signature: ' �' -04/t Name/Print: W. Grant Lewis Appendix E Project Timeline and Contact Info Table 11. Project Timeline Table 12. Project Contacts MYO Monitoring Report (Project No. 100137) Appendices Bull Chute Stream and Riparian Wetland Mitigation Site Clearwater Mitigation Solutions Randolph County, North Carolina July 2022 Table 11. Project Timeline Activity or Deliverable Data Collection Complete Task Completion or Deliverable Submission Project Instituted NA Nov-19 Mitigation Plan Approved NA 13-May-21 Construction (Grading) Completed NA 8-Mar-22 Planting Completed NA 18-Mar-22 As -built Survey Completed Jun-22 Jun-22 MY-0 Baseline Report May-22 Jul-22 MY1+ Monitoring Reports Remediation Items (e.g. beaver removal, supplements, repairs etc.) Encroachment Table 12. Project Contacts Project Name/Number Provider Mitigation Provider POC Clearwater Mitigation Solutions 604 Macon PI. Raleigh, NC 27609 Kevin Yates 919-624-6901 Designer Primary project design POC Axiom Environmental, Inc. 218 Snow Ave Raleigh, NC 27603 Grant Lewis 919-215-1693 Construction Contractor KBS Earthworks, Inc. 5616 Coble Church Rd Julian, NC 27283 Kory Strader 336-362-0289 Appendix F Record Drawings (As -Built Survey) MYO Monitoring Report (Project No. 100137) Appendices Bull Chute Stream and Riparian Wetland Mitigation Site Clearwater Mitigation Solutions Randolph County, North Carolina July 2022 DocuSign Envelope ID: 7DF7F384-5229 44F3-936D-33FF129541 C2 QD H N a czA fi 3.5 525 • 1527 Ne 629 NC DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF MITIGATION SERVICES AS -BUILT PLANS BULL CHUTE SITE LOCATION: RANDOLPH COUNTY, NORTH CAROLINA 1525 VICINITY MAP Not to Scale BULL CHUTE SITE SITE #: 100137 YADKIN 03040105 RANDOLPH COUNTY CONTRACT#: 7878-01 LATITUDE: 35.8325 LONGITUDE: -79.8879 (WGS84) GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 1� PROFILE (VERTICAL) ST TYPE OF WORK: STREAM RESTORATION AND ENHANCEMENT (CLEARING, GRUBBING, GRADING, EROSION CONTROL AND PLANTING) I RECORD DRAWING START -UT4B- STA 0+00 W -a O N UT 4B END -UT STA 2 RT -UT4- STA STA 2+88 T -UT4C- C o_i START -194A- il STA 0+00 alla`'�`UT +88 STA END -4+32 UT4A- UT 4 "0 2 Q � \*IP ill N S' � 0 7� .a C m START -UT5- 0 S \ . STA 0+00 UT 5 ? END -UT3- OIL 4 STA /9+32 Q�J UTD = ll 1 AA1S� r 1i END -UT6- EN S � 28+ NOro QS STA /+2/ 4 re : UT 1 0/ U STA 0+00 4C _ END-UT4C�--B START -UT3- STA 0+00 QS��J P STA 1+80 UT 4 START -UT7- 0 UT 7 END -UT7- STA 1+44 STA 0+0gzz„, UT 2 END -UT2- STA 5+92 0 1:6STA T/ UT6- END -UTI- STA 31+69 IO en A = UT 3 STA 0+00 UT 6 NORFOLKISOUTHLI-RN CORPORATION START -UT2- STA 0+00 QS op4 Q` END -UTS- STA 0+8/ LIMITS OF DISTURBANCE: 42.74 AC PROPOSED LENGTH OF -UT 1- = PROPOSED LENGTH OF -UT 2- = 3169 592 1932 2555 432 PROPOSED LENGTH OF -UT 4B- = PROPOSED LENGTH OF -UT4C- = PROPOSED LENGTH OF -UT 5-=81 PROPOSED LENGTH OF -UT 6- = PROPOSED LENGTH OF -UT 7- = 288 180 _ 121 PROPOSED LENGTH OF -UT 3- = PROPOSED LENGTH OF -UT4- = PROPOSED LENGTH OF -UT4A- = 144 TOTAL STREAM LENGTHS (LF) = 9494 RESTORATION LEVEL STREAM (linear footage) RIPARIAN WETLAND (acreage) NON RIPARIAN WETLAND (acreage) RESTORATION 6937 3.130(Reestablishment) 0.000 ENHANCEMENT! 411 0.114(Rehabilitation) 0.000 ENHANCEMENT!! 333 1.4662 (Enhancement) 0.000 ENHANCEMENT!!! 50 0.000 0.000 TOTALS 7731 4.710 0.000 START -UTI- .Z` iX STA 0+00 UT 1 STATB STATE PROJECT REFERENCE NO. SHEET TOTAL SHEETS N.C. BULL CHUTE SITE 1 INDEX OF SHEETS SHEET NUMBER AB-01 AB-02 AB-03 AB-04A THRU AB-04V AB-04W SURVEYORS CERTIFICATION(S SHEET Title Sheet Symbology Easement As -Built Structures As -Built Planting List Surveyors disclaimer: No attempt was made to locate any cemeteries, wetlands, hazardous material sites, underground utilities or any other features above, or below ground other than those shown. However; no visible evidence of cemeteries or utilities, aboveground or otherwise, was observed by the undersigned (other than those shown). I certify that the survey is of an existing parcel or parcels of land or one or more existing easements and does not create a new street or change an existing street. I JOHN A. RUDOLPH , certify that this plat was prepared under my supervision from an actual field survey made under my supervision, of as -built conditions. That the boundaries not surveyed are clearly indicated as such and were plotted from information as referenced hereon; That the ratio of precision as calculated was 1:7,500+ and that the global navigational satellite system (GNSS) was used to perform this survey and the following information was used: Class of Survey: CLASS B (HORIZONTAL( CLASS B (VERTICAL) Positional Accuracy: 0.12 feet (HORIZONTAL) Type of GPS field procedure: RTK Dates of survey: Mav and June 2022 Datum/Epoch: NAD 1983(20111 Published/Fixed Control Use: OPUS Geoid Model: 2012B CONUS Combined Grid Factor: 0.99995565 GROUND TO GRID Units: US SURVEY FEET That this plat meets the requirements of the standards of practice for land surveying in North Carolina. Witness my hand and seal this 12th day of July 2022. 0\11111l//// B30 SEAL .9� ••, L-4194 Qom•, 7/26/2022 L-4194 ti SUR p Professional Land Surveyor License Number /''/�SNLEY \RJ \\ Axiom Environmental, Inc. Axiom Environmental 218 Snow Ave Roleigh, NC 27603 GRANT LEWIS PROJECT DESIGNER Prepared in the Office of: SUNGATE DESIGN GROUP, P.A. •0 905 JONES FRANKLIN ROAD RALEIGH. NORTH CAROLINA 27606 TEL (919) 859-2243 ENG FIRM LICENSE NO. C-890 CLEARWATER MITIGATION SOLUTIONS 4 Clearwater Mitigation Solutions 604 Macon Place Raleigh, NC 27609 KEVIN YATES SITE CONSTRUCTION MANAGER JOSHUA G. DALTON, P.E. PROJECT ENGINEER \/,IllH ll/,// 55/ U CAR 'D�py�,igne �� �i �o/, -. '� 0_7'�9i II 26971 99, O/C I N -- O� /PN ON 7/26/2022 DATE: DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 BOUNDARIES AND PROPERTY: State Line County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Computed Property Corner Property Monument Parcel/Sequence Number Existing Fence Line Proposed Fence Gate 0 EIP ECM X X X Proposed Barbed Wire Fence Existing Wetland Boundary Proposed Wetland Boundary Existing Endangered Animal Boundary Existing Endangered Plant Boundary Existing Historic Property Boundary BUILDINGS AND OTHER CULTURE: Gas Pump Vent or U/G Tank Cap Sign Well Small Mine Foundation Area Outline Cemetery Building School Church Dam HYDROLOGY.- Stream or Body of Water Hydro, Pool or Reservoir 7 Jurisdictional Stream Buffer Zone 1 Buffer Zone 2 Flow Arrow Disappearing Stream Spring Wetland Proposed Lateral, Tail, Head Ditch EAB EPB HPB 0 0 0 t Js BZ 1 BZ 2 RIGHT OF WAY & PROJECT CONTROL: Secondary Horiz and Vert Control Point Primary Horiz Control Point Primary Horiz and Vert Control Point CONVENTIONAL PLAN SHEET SYMBOLS Note: Not to Scale *S. U.E. = Subsurface Utility Engineering Exist Permanent Easment Pin and Cap New Permanent Easement Pin and Cap Vertical Benchmark Existing Right of Way Marker Existing Right of Way Line New Right of Way Line New Right of Way Line with Pin and Cap New Right of Way Line with Concrete or Granite R/W Marker New Control of Access Line with Concrete C/A Marker Existing Control of Access New Control of Access Existing Easement Line New Conservation Easement New Temporary Drainage Easement New Permanent Drainage Easement New Permanent Drainage / Utility Easement New Permanent Utility Easement New Temporary Utility Easement New Aerial Utility Easement m O 0 ® O 0 (A, ROADS AND RELATED FEATURES: Existing Edge of Pavement Existing Curb — Proposed Slope Stakes Cut Proposed Slope Stakes Fill Proposed Curb Ramp Existing Metal Guardrail Proposed Guardrail Existing Cable Guiderail Proposed Cable Guiderail Equality Symbol Pavement Removal VEGETATION: Single Tree Single Shrub Hedge Woods Line Orchard Vineyard EXISTING STRUCTURES: MAJOR: ♦ Bridge, Tunnel or Box Culvert 0 Bridge Wing Wall, Head Wall and End Wall — MINOR: Head and End Wall E CE TDE PDE DUE PUE TUE AUE C F cR TTTT n n n ED CA CA CA 4 Vineyard CONC CONC WW / CONC Hw \ Pipe Culvert Footbridge Drainage Box: Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole Storm Sewer UTILITIES: POWER: Existing Power Pole Proposed Power Pole Existing Joint Use Pole Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer >— CB OO U/G Power Cable Hand Hole H—Frame Pole U/G Power Line LOS B (S.U.E.*) U/G Power Line LOS C (S.U.E.*) U/G Power Line LOS D (S.U.E.*) TELEPHONE: Existing Telephone Pole WATER: Water Manhole Water Meter Water Valve RECORD DRAWING SS Forced Main Line LOS D (S.U.E.*) MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line LOS B (S.U.E.*) U,G Tank; Water, Gas, Oil Underground Storage Tank, Approx. Loc. b AG Tank; Water, Gas, Oil Geoenvironmental Boring U,G Test Hole LOS A (S.U.E.*) © Abandoned According to Utility Records End of Information Water Hydrant U/G Water Line U/G Water Line U/G Water Line LOS B (S.U.E*) LOS C (S.U.E*) LOS D (S.U.E*) Above Ground Water Line GAS: Gas Valve Gas Meter f 0 0 A/C water U/G Gas Line LOS B (S.U.E.*) U/G Gas Line LOS C (S.U.E.*) U/G Gas Line LOS D (S.U.E.*) Above Ground Gas Line SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line A/G Gas OO O Above Ground Sanitary Sewer A/G Sanitary Sewer SS Forced Main Line LOS B (S.U.E.*) SS Forced Main Line LOS C (S.U.E.*) FSS Riffle Rip Rap Log Vane Log Cross Vane Step Pool Structure Stream Plug FSS • O ( us7 ) AATUR E.O.I. �C�oo�C�og�oo�C�oo� Yon�Yon°�on°Yo��� Begin Floodplain Interceptor Proposed Fence Limits of Disturbance AS BUILT Stream Centerline Stream Top of Bank Stream Gauge Groundwater Gauge Benthic & Water Quality Station Origin Point on CVS Plots CVS Plots Cross Section Adjusted Stream Structure Not Constructed 11./- End �A�AAEEE jLIO%l j �ll �i�/Ti_�llll �l �%Ti — LOD — O XS-10R 0 21122 SL'NGATE DESIGN GROUP, P.A. THIS DRAWING AND ALL REPRODUCTIONS OF IT ARE THE SOLE PROPERTY OF SDG. REPRODUCTION OR OTHER USES OF THIS DRAWING WITHOUT WRITTEN CONSENT OF SDG IS NOT PERMITTED a 0 cD CD CO w 0 w Q c_r CO o ,1;' BULL CHUTE RANDOLPH COUNTY, NC SYMBOLOGY PROJECT n DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET NO. AB-02 DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 m 22 09U UT 4B UT4C UT 4 CONSERVATION EASEMENT CE T14 UT 4A _UT 4 c yv c A W UT W U UT 3 14.7 SURVEY INFORMATION EASEMENT PROVIDED BY: K2 DESIGN GROUP, P.A. 5688 U.S. HIGHWAY 70 EAST GOLDSBORO, NC 27534 UT 2 UT 3 / 150' 75' 0 150' 300' TIT TII SCALE: 1"= 300' / a2 j / c n m UT so UT 6 co a Z RECORD DRAWING UT co Mary Viola Rd. 0 21122 SL'NGATE DESIGN GROUP, P.A. THIS DRAWING AND ALL REPRODUCTIONS OF IT ARE THE SOLE PROPERTY OF SDG. REPRODUCTION OR OTHER USES OF THIS DRAWING WITHOUT WRITTEN CONSENT OF SDG IS NOT PERMITTED a 0 cD CD co w 0 w Q C7 o= ;' BULL CHUTE RANDOLPH COUNTY, NC EASEMENT PROJECT +� DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET NO. AB-03 DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 25' 12.5' 0 25' 50' JONES, SUSAN DIANE REDDING BK 001856, PG 02359 EASEMENT FENCE LINE ILLELLE SCALE: 1"= 50' RECORD D p-DocuSigneifAtiy: n 4 lln ASS/ „ �'1089 DAC149 4C3... 0� -17 g-S-AL 2697 I stiO4, 6 o D 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 0 21122 SL'NGATE DESIGN GROUP, P.A. THIS DRAWING AND ALL REPRODUCTIONS OF IT ARE THE SOLE PROPERTY OF SDG. REPRODUCTION OR OTHER USES OF THIS DRAWING WITHOUT WRITTEN CONSENT OF SDG IS NOT PERMITTED Q 0 0 0 cD CD CO w 0 w Q cr CO 1,1;' BULL CHUTE RANDOLPH COUNTY, NC AS -BUILT STRUCTURES PROJECT n DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET NO. AB-04A DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 775 77Q 765 ___ Z 6 0 755 STR TYPE CROSS VANE CROSS VANE CROSS VANE CROSS VANE CROSS VANE CROSS VANE CROSS VANE CROSS VANE -UT 1- AS -BUILT S NORTHING 760,252.03 760,091.55 760,049.78 760,034.58 759,983.76 759,986.14 759,948.26 759,939.15 0 S A RT E A U+UU Ell V=7 a H A 0 JONES, SUSAN DIANE REDDING BK 001856, PG 02359 EASEMENT FENCE LINE ND ENHANCEMENT II START ENHANCEMENT I STA 1+73 -UT 1- EU EN T u TRUCTURE LOCATIONS EASTING 1,738,725.33 1,738,655.86 1,738,627.34 1,738,604.62 1,738,527.23 1,738,516.22 1,738,496.68 1,738,498.81 L AB Survey Prop Elevation Elevation 771.25 764.07 762.75 762.11 759.65 759.47 758.42 757.96 764.10 762.54 762.15 759.53 759.31 758.32 757.67 PROPOSED BANKFULL EASEMENT FENCE LINE S E L AT A E OCS �7 V= ib,1 r GILO T A 8,1 T N ALWE B LT LIMITS OF GRADING E NTE E 25' 12.5' 0 25' 50' IEELLEI SCALE: 1"=50' O,d� =ORD DRAWING • • • • • c.$ [DocuSipgp!d\ /, J,7,91y.\17!..,„, A, /IR/ 0 /// 3/.0 _ = 26971 = _ ,, ,y0q 61 P� 699 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED — — — HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 P R P rH A LW E Er +50 01 +50 02 +50 03 +50 04 +50 05 0 r 775 770 765 760 755 REVISIONS: SHEET NO. AB-04B DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 --- 764- -763- - • ' ,'- 5• 6 • • --- 61----- ♦ J• ti ♦ `` ,♦ 1 I PkQPOSED BAN �JLIa 'ENP _NHA CEIIIEN)TI START 1k HANCEM NTIII SITA6-iM0-j.1T1-' 1 ► 1 1 1 ►1 ♦ ► 1 ► / II 1 / / • I NL �N SEE S S 7-4 760 CN 753 J 750'-t1 UT 2 750 J • 1 , HEET q*00 4 o 0 EXS AT PROP 05 09, , , 4LTMIT3'QP 1 ,GF(A�IG,'I, //- /,/ 6 99 ,7/ / i - / -- --- -- --, , HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 END ETIFIANEEI7EV1vT II ---'-- s aFflEr 1- Nc-E n>'m r --758---- cPeCISS-VANE-(W-P -- OVE-'CCAY PIg — 56 - 1 -'• ------_-16 +ts� - 7 tfri' 's -9-�/-148 747_ 111FECORD DRAWING _ EASE Pt F_ENCE LINE TS _____ ----- _____- __— 7rr"-- - ENDENHA uENTU- -\ STA 5+92 -UT 2-• --STA-7t04----^ /�.-LIMITSGRA1� 1�OFFL ROVE _ • _--•—• .-� _---- -`- -749 �- - C PIPE GROUND TI IALWEG +5 0 3T ART 7 i AS-BUIL CtN I tRLINE END STA EN EN HAN +2-L - 6+40 -LEV 06 CM EN 1 2- 600, - LSL 1! C/ PROPOSED.__-^ _ __ - '--B, N ELL _- _ •-` �END NHAT'C€MEN•T TAR EQ@[TION� -_S-TA8_+-UT 1- ------------------ B7kSEMEN/9ftlq E LINE C9L•--------- .--179L---------------- ---------- --___ JONES,SU7An---__ ------- -L11AIEREDDING ..... ------------ _BK 001856, PG 023S4�� 9 7 3 3 5 0 FNf) F S E F U- 1 in FP IA NC,F -AR1I EN1-1 A 7-09 EV 246 \HAN .M S�A 5� 92-U 1 2 S A 74 04 -UT 1 A LIItT CE AN A+I UT 1 35 T NT CROSS VANE CROSS VANE CROSS VANE CROSS VANE CROSS VANE CROSS VANE CROSS VANE CROSS VANE CROSS VANE CROSS VANE Prop Elevation 756.73 756.20 755.90 755.03 753.07 752.00 749.94 748.69 747.85 746.19 AB Survey Elevation -r ER F L N T NEI oocuSigneed\d):1 ll��� Je3\ �/a�tof,CA,R< 1089Ab8 1 .9 C�� 0 � / 26971 = GI ��� RRq R\\R 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED -UT 1-AS-BUILT STRUCTURE LOCATIONS STR TYPE MET\T IN E 1 NORTHING 759,906.20 759,903.01 759,888.22 759,866.94 759,808.06 759,773.99 759,700.65 759,670.79 759,645.15 759,593.50 END S EL 4 E N T EV- EASTING 1,738,462.97 1,738,451.12 1,738,443.24 1,738,421.87 1,738,367.26 1,738,350.14 1,738,295.33 1,738,248.75 1,738,230.62 1,738,188.44 HANCE RES 5 8-I1 418 39 EN co N 756.73 756.13 755.96 755.17 753.34 751.27 750.02 748.73 747.95 746.18 7610 755 750 745 740 DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 __--95L-------- E SEMENT FENCE LINE -17S`._��L_`` LIMITS OF GRADING SHIPTON, DAVID LEE BK 001713, PG 00504 CROS VANE (TYP) STREAM PLUG • LGL-------' JONES,SUSATI ▪ --- ---- -- -------- __�� n01.a-PE,42.3 9�� `--_---- ---- E S NT FENCE LINE a ---- ---- 25' 12.5' 0 RECORD DRAWINC. OMITS OF GRADING cDocuS�gpcd i, 14" , / / /, Je . oA 1 i � SEAL ': 26971 %y'Uq 610P� 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 -UT 1- AS -BUILT STRUCTURE LOCATIONS STR. TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CROSS VANE 759,548.37 1,738,123.70 744.37 744.53 CROSS VANE 759,532.46 1,738,090.18 743.28 743.47 CROSS VANE 759,476.12 1,738,055.80 741.84 741.84 CROSS VANE 759,451.74 1,738,040.70 741.25 741.16 CROSS VANE 759,433.59 1,738,023.53 740.63 740.38 LOG VANE 759,426.58 1,737,893.32 738.45 738.37 CROSS VANE 759,398.10 1,737,866.61 737.94 738.47 CROSS VANE 759,358.85 1,737,815.88 736.72 736.61 U 750 LI 750 74 C C r AT PRO T R H U ALWEG -r 745 74Q 740 73 z Ror rii WGG — 735 73Q A 4 UI LT C E TERL NE 730 N GROUP, PA. Q 0 o✓ cD CD CO w 0 ' W . QCD -I *1 REVISIONS: 10 +50 11 +50 12 +50 13 +50 14 +50 15 SHEET NO. AB-04D DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 w Nai O � NU 735 725 CATTLE GATE _'--_FZLt�7.'-- -XIJ -GH ---- - % _ —44:,->- i PERMANENT CROSSING \ ` 1@71"x4'7" CSPA 1@lE /CSP FLOODPLA ‘- RIPK EACH SIDE ,/ TOP WIDTH (TyP) BRIDGE ITA PLACE O PIP CATTLE GATE SHIPTON, DAVID LEE BK 001713, PG 00504 EASEMENT FENCE LINE litANKFULL /♦ / // o / i cn / 1� // 18+00/ i< j."00 M / -UT /I • STA 0+00 -UT 5- END RESTORATION STA 0+76 -UT 5- STA 16+78 -UT 1- E .9 ` .9u9 cam`' LIMITS OF GRADING EASEMENT FENCE LINE 25' 12.5' 0 25' 50' TI SCALE: 1"=50' Oa? RECORD DRAWING 0 �DocuSi9���14A�1III 0,„ AR .�osL l�� 0� 2 = 26971 = , 7'Uq 619PA 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 -UT 1- AS -BUILT STRUCTURE LOCATIONS STR. TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CROSS VANE 759,318.86 1,737,775.95 735.28 735.16 CROSS VANE 759,277.20 1,737,689.03 732.84 733.14 CROSS VANE 759,264.29 1,737,670.60 732.23 732.43 -r LJ V) CT{ vIC ATION 5 z z 0 PC 0 0 O 0 0 0 F_ 0 O O H O a 0 0 z PROJECT n DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET NO. AB-04E 15 +50 16 +50 17 +50 18 +50 19 +50 20 0 + 50 0 DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 0 ' W 0� 00 + om N .,r F— Q LU F— LU Lu V) Lu J S 0 F— Q SHIPTON, DAVID LEE BK 001713, PG 00504 STA 0+00 -UT 6- I nc; VANE (TYP) — EASEMENT FENCE LINE -UT 1- AS -BUILT STRUCTURE LOCATIONS STR. TYPE NORTHING EASTING Prop Elevation AB Survey Elevation LOG VANE 759,012.18 1,737,371.17 726.11 BUILT / NS LOG VANE 758,976.28 1,737,358.40 725.69 725.57 CROSS VANE 758,947.39 1,737,296.29 727.81 724.66 CROSS VANE 758,945.75 1,737,267.69 724.16 723.87 CROSS VANE 758,900.75 1,737,215.30 722.65 722.63 CROSS VANE 758,876.87 1,737,166.46 721.32 721.43 CROSS VANE 758,856.99 1,737,123.87 720.38 720.43 CROSS VANE 758,812.65 1,737,053.63 718.58 718.37 73, 72 72. 71 710 -r 1 20 +50 XST G O N 21 +50 22 25' 12.5' 0 'RD DRAWING ---`739* -------' 738 - 737 - ' _—__-735_���_----• -------- ------ EASEMENT FENCE E-------- CROSS VANE (TYP) LIMITS OF GRADING REDDING, CURTIS A BK 001856, PG 02361 i u- STA oTA 22+ 2- T6 +50 PERMANENT CROSSING 1@73"x55" CSPA 1@18" CSP FLOODPLAIN PIPE EACH SIDE 16' TOP WIDTH (TYP) 23 +50 24 727_ CATTLE GATE +50 TC SI 25' 50' SCALE: 1"=50' D n rnz m cp F m D —4 N D � CD + 00 0 0 —4 25 0 222 DoFuSigned-by�. R // Q8 8 14994C3... S -SS 2697 1 2 /�S ''G 11 i��\\\`� O`er �7(1 61 9 P' 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 +50 735 730 725 720 715 01 +50 0 7 0 0 0 0 0 00 0 0 N GROUP z DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 D n v,= mr mz m = c/1 mD DLn OD + 00 0 , EASEMENT FENCE LINE -- CROSS VANE (TYP) LIMITS OF GRADING CROSS VANE_ADD..Q /110 ♦ STREAM PLUG ZR6.17 S.tD � LIMITS OF BAMt FULL` `RADIRG REDDING, CURTIS A BK 001856, PG 02361 ♦ ♦ • • N N N ♦ • ♦ ♦ - • • �z % ♦♦ ♦ •// ♦ --- --EASEMENT FN C NE♦�- ♦ _ kXISTII•tp 01 A3( OSED BANKFULL -UT 1-AS-BUILT STRUCTURE LOCATIONS STR TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CROSS VANE 758,796.15 1,737,017.04 717.73 717.67 CROSS VANE 758,776.30 1,736,961.54 716.66 716.83 CROSS VANE 758,736.64 1,736,902.46 715.63 715.67 ] CROSS VANE 758,716.91 1,736,893.28 714.93 CROSS VANE 758,678.61 1,736,865.13 714.27 714.21 CROSS VANE 758,649.05 1,736,854.80 713.63 713.38 CROSS VANE 758,629.55 1,736,823.19 712.92 712.57 CROSS VANE 758,606.00 1,736,771.07 711.77 711.52 715 71Q 705 W -7 c <1 5 1 AT 5 0 P -PH J ALWEG 2 5 A 0 UILT f EN 2 TE 7 R LI E ♦ ♦ ♦ ♦ GHANNEL + N 1� Cy/ Sc MORD DRAWING ♦• \ rJ r oo k O 0 ♦ FILL EXISTING C T- -- -C+IANNEL -UT 4- AS -BUILT STRUCTURE LOCATIONS STR. TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CROSS VANE 758,639.57 1,736,646.04 710.12 710.15 E 5 1 0 28 L 50 R 0 P THALWEG 29 +50 -7 c rr' Z 25' 12.5' 0 25' 50' SCALE: 1"=50' 1 —DocuS1gil ti I I I/ Je4 direftl 1, �1Q89AD881 94C3...0 `� = 26971 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 UT 4 A S-B UILT E N-R L INE EXST GROI1ND AT PR P THALgEG = c c Ln CN A J -7 J l i 715 710 7 a N GROUP, P., DRAW ING NAME: 2022 DRAWN BY: JRH REV IEWED BY, JGD REV IS IONS: SHEET NO. DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 t/1 m —H m D U1IN) COD m + —� mon —� O z coCm I -H C -UT 1- AS -BUILT STRUCTURE LOCATIONS STR TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CROSS VANE 758,523.24 1,736,664.87 709.12 709.15 CR CC VANE 768,606.00 1,736,632.20 708.37 DROP STRUCTURE 758,499.00 1,736,623.75 708.27 708.48 DROP STRUCTURE 758,419.84 1,736,586.29 704.36 704.53 -UT 4- AS -BUILT STRUCTURE LOCATIONS STR. TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CROSS VANE 758,527.25 1,736,634.01 708.56 708.47 CROSS VANE (TYP) EASEMENLIMITS OFLINE GRADING CRC75 : s ' NE -Id % CON RUCTED 31 + 00 ENI I RESTORATION STA128.±39 -UT 4- STA 30+46 -UT 1- PROPOSED BANKFULL LIMITS OF GRADING F\LL EXISTING CHANNEL REDDING, CURTIS A BK 001856, PG 02361 END RESTORATION STA 31+43 -UT 1- DROP STRUCTURE EASEMENT FENCE LINE 11. RECORD DRAWING 25' 12.5' 0 TI 25' 50' SCALE: 1"=50' Qd? Do7Sjghifi ti C-446W1:440,4 / BAR, 1 94D6 1 94C3...0 2697 1 9 _ 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 UT 1 UT 4 715 F NI) R FST ORATIO S 1 A 28 38 715 SrA30 46 UT 1- PROP THALWE G 71Q a PROP T ALWEG AS B U1LT E NT ERU N AS C UI LT CE E RLI' 710 70 70Q AT EXS PR 1 P G T ROUND HAL EG 1 EMD STA EL E 31 Elf= 7 ST 43 04 DRAT UT 35 XS AT P GR UND R OP THALW EG ENT) I'Z ES STA 28 ELEV- 1 1 +�g CJK U 3y A T 4 1 N 705 700 695 695 7 a 0 0 0 0 00 0 00 z N GROUP, P., z PROJECT n DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET NO. AB-04H DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 0 II AMIN HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 EASEMENT FENCE LINE NEN NON REMOVE PQKJC - 777' / _ -. //,///,7- -776_.-/' / /. ,' 1/11 __ .... ,„.... .... ,.... „ , „ , , , , • 0. 0• . / / / � // /)/ 1 � POND I �� iii,,,,,,.„---- ._ �//// //�0. � // - // • ��' �L�E — -- / / iiiii 1 • — CL • • • „. __..„ ., ,...„„__ _____z9z 0,, --- ____ ____,______ ___ ___ _._, _ ___ .41 4. N /, //---' CO I�Ti I '//�/ _ `• _• LL _` --_ '�\\ `�\\S9L--_ ♦\ ‘ _ _ _7_ _ _._ _ _77 „...„>: r...::- \--.:...�_L //// //-- —• � i' I —�- %� _—_ \�-- — ▪ -'---. -�\``\ \\ `• - `• � � ``- `� `` \\ ♦♦♦—__ ___♦\-19 ♦ - \ \ • ' • \ ` • ( / 1 ♦� • START ENHANCE ENT II \ \ .� _ / 1 \`-- STA0+00-U12- `.-``.�-``.:--- \\ :---—— ----.� `♦ \ --•♦— \ _ EASEMENT FENCE LINE \ \ ♦- • ♦^♦ \ ♦♦ ♦ \ JONES, SUSAN DIANE REDDING \ \ \ 1 1 1 BK 001856, PG 02359 I 1 1 1 25' 12.5' 0 ILLELLE SCALE: 1"= 50' 25' 50' RECORD DRAWING 1 1 /--6LL - 08L - REMOVE CLAY PIPE ♦ ♦ --- - �♦ ♦ ♦ N 6-) 0 ' — + m Q Q• LU - 0 LU V J LU =0 U DocuSign 26971 9 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED UT 2 770 765 760 755 75Q AT P EXST RO GRO ND THALWEG V 7 +50 01 +50 02 +50 03 +50 04 r f 770 765 760 755 750 2 7 7 z H 0 u 0 00 0 00 7 z PROJECT . DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET NO. DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 -UT 4- AS -BUILT STRUCTURE LOCATIONS STR. TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CROSS VANE 760,907.01 1,736,070.30 761.77 761.92 CROSS VANE 760,848.88 1,736,043.28 760.27 BUILT / NS CROSS VANE 760,838.72 1,736,042.06 759.78 759.84 CROSS VANE 760,824.39 1,736,047.63 759.21 759.27 CROSS VANE 760,809.92 1,736,046.94 758.67 758.70 CROSS VANE 760,752.71 1,736,063.38 757.19 757.26 SILL STEP 760,739.66 1,736,066.18 756.60 756.53 CROSS VANE 760,725.04 1,736,063.02 755.78 755.68 SILL STEP 760,709.27 1,736,070.63 755.16 754.99 SILL STEP 760,697.97 1,736,073.60 754.41 754.51 SILL STEP 760,674.66 1,736,090.56 753.41 753.13 I L_B - CROSS SPENCER, BARRY BRUCE BK 002260, PG 00218 APPROXIMATE LOCATION OF SPRING -UT 4- AS -BUILT STRUCTURE LOCATIONS STR TYPE NORTHING EASTING Prop Elevation AB Survey Elevation SILL STEP 760,663.18 1,736,107.94 752.57 752.48 CROSS VANE 760,612.01 1,736,106.18 751.28 751.32 CROSS VANE 760,590.48 1,736,094.17 750.80 750.88 CROSS VANE 760,545.86 1,736,099.74 749.96 749.91 CROSS VANE 760,501.69 1,736,079.94 749.09 749.11 EASEMENT FENCE LINE A P' \3-\ RE- EN I SLORATION k50 AP A 4+28 -UT 3 P� 0 STAz+93 -UT 4- PROPOSED BANKFULL EASEMENT FENCE LINE / / / / k00 z • TO RAT!O NV ZJT B ♦♦• ♦ 25' 12.5' 0 ILLELLE SCALE: 1"= 50' 25' 50' B8 avN RECORD DRAWING' / PROPOSED BANKFULL / LIMITS OF /kiRADING / 4 START RESTORATION STA 2+95 -UT_4 SILL STEP (TYP) Docuigii& byI Ili/ v C.W \,,,,--\41., A R 0 /// •*ADG:cc4.9 4 .0 ' ; =Z SAL 7 _ = 26971 = _ 9696609 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 -UT 4A-AS-BUILT STRUCTURE LOCATIONS STR. TYPE NORTHING EASTING Prop Elevation AB Survey Elevation SILL STEP 760,734.86 1,736,111.78 754.86 754.92 CROSS VANE 760,703.01 1,736,100.80 753.79 753.71 CROSS VANE 760,679.25 1,736,100.09 753.29 753.16 T4 765 START REST FA N UT 4A I STA +C T 4 z 765 760 EXS P P G T R U J AT 4W G R H 755 75 0 745 PROP THALWE AS Byl gNl E D RE S7 RA- Ink STA 4+23 -U AA / END REST pATI 0 STA 2- 5 4UT 4 - N / S I AR I RES JRA I !ON f STA 2 I. ,UT 4- ti f Q - Q r R AT r PR T RO UND I- HA 760 AS -B EV= LT 2 C€ J ATION - 4A- 0,4 755 750 -ERLINE 745 STA 2+93 -,,T 4 0 +50 01 +50 02 +50 03 +50 04 +50 05 3 + 50 04 + 50 SENT OF SDG IS NOT PERMITTED 0 21122 SL'NGATE DESIGN GROUP, P.A. THIS DRAWING AND ALL REPRODUCTIONS OF IT ARE THE SOLE PROPERTY OF SDG. REPRODUCTION OR OTHER USES OF THIS DRAWING WITHOUT WRITTEN CO Q a 0 IY O CD C/) w 0 w cr up iro BULL CHUTE RANDOLPH COUNTY, NC AS -BUILT STRUCTURES PROJECT n DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET NO AB-04J 0 DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 -UT 4C- AS -BUILT STRUCTURE LOCATIONS STR TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CROSS VANE 760,412.52 1,736,054.25 747.30 747.29 SILL STEP 760,404.05 1,736,061.52 747.16 BUILT/NS SILL STEP 760,391.91 1,736,070.92 746.30 746.48 CROSS VANE 760,382.39 1,736,073.63 745.61 745.70 ' - - -I�fr.'.'' - - - 747 00154EASEMENT FENCE / RQSS�VAN (TYBr'�3'�' LI�41'fS OF::::::4 -- ------RG MMMMMMM '-"GRADII -�" -''PROPOyrED- - - - 7 43• J '' 42_ ..' i�� 00 E0 Q HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 25' 12.5' 0 ILLELLEI 25' 50' SCALE: 1"= 50' C, ,, e., ' \__----_---,....AN\ \ %.000 ,V1.11-11# �'�--z / -- Pt, ___ �-, -- Q \ - -- STA 1+71 -UT 4C- \ / BANKFUL STA 6+35 -UT 4- \ -crThn ` - STA 1+20 -UT 4C- Tcnn- -UT 4- AS -BUILT STRUCTURE LOCATIONS STR TYPE NORTHING EASTING Prop Elevation AB Survey Elevation SILL STEP 760,465.76 1,736,065.81 748.30 748.51 SILL STEP 760,423.72 1,736,102.15 746.83 746.95 SILL STEP 760,395.95 1,736,090.11 745.96 746.01 SILL STEP 760,368.77 1,736,087.71 745.06 745.09 CROSS VANE 760,330.29 1,736,108.30 743.70 743.75 CROSS VANE 760,313.02 1,736,122.72 743.16 743.16 CROSS VANE 760,304.88 1,736,140.57 742.74 742.88 CROSS VANE 760,273.67 1,736,151.67 742.07 741.97 CROSS VANE 760,206.95 1,736,169.90 740.46 740.41 CROSS VANE 760,174.41 1,736,170.89 739.64 739.65 CROSS VANE 760,129.49 760,129.49 738.65 738.61 75 75Q 745 74Q J 73 05 +50 06 r A S 41 6 +50 EXST (;ROIIINI' PROP IHALNEG 71 U 4C 35 -U- � 07 LIMITS O nn-) GRADING 4 +50 A B 08 L T P C E NT 9tP4 Q.PIIS D REMOVE DAM AND PIPES EASEMENT FENCE LINE TH E R A LI LWBG E +50 09 tiI +50 10 -DocuSignd b A 1os9A� S S/ 14994C3... 2697 1 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED L RECORD DRAWING i== _... i.._. .__ - .__ =.. ■ aA..� --- =o ■ ov iuo olE7 ,W■Rlii== =.. ■ ...N.1 i■iY i...Wll.== .M. ■ WI =MN Mg,.'.iOE Sia__.. ice___.. _. _.._..__ ei__...=M.==ono== ....41. =r onc�,a�+■ ono== wRY- ... i•T-EN M== ...... magi. iigi. =W1 NMI U■II .__ r=6 ,3.L1 .1 _9 i79.1�.1 .}9.nI' NPR r■.7 0I117-II.1112 .-- _....ii=... i_..I_■-- so� • PIRIWVIMHE=MINE= -- ....t_ -- ��:�:� -- . ^P.\.1 . �i C.�7. A� ■ ter.... _ .r._ ■ - . H�' �t7Lfi71I1.M..� ■ �� .. • __..._ 01 +50 DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 -UT 4- AS -BUILT STRUCTURE LOCATIONS STR TYPE CROSS VANE NORTHING 759,983.37 EASTING 1,736,263.17 AB Survey Prop Elevation Elevation 735.15 735.09 CROSS VANE 759,953.84 1,736,272.42 734.44 734.52 CROSS VANE 759,932.41 1,736,283.88 733.82 734.05 LOG VANE 759,776.05 1,736,318.22 730.79 730.64 CROSS VANE 759,745.49 1,736,366.18 729.99 730.25 CROSS VANE 759,711.42 1,736,408.70 728.84 728.56 CROSS VANE 759,698.35 1,736,425.81 728.37 728.45 'e CE PERMANENTCROSSINGU, 1@64"x43" CSPA 1 18" CSP FLOODPLAIN PIPE EACH SIDE 16' TOP WIDTH (TYP) 74 74 73 73 72 STTLE GATE HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 REDDING, CURTIS A BK 001416, PG 00154 BRIDGE INSTALLED IN PLACE OF PIPES LE LIMITS OF GRADING STR M LUG —_/*-- K '' -44L144.7 ,�1 — .1444,, .._._.__--,... .4,1 ..........., ,, ...., „TO. A 77•E‘. - — — — -- M4T�]RE�:EES ,UND€PtIROUND LOCATION --L174 CATTLE GATE EASEMENT FENCE LINE FILL EXISTING CHANNEL 1 . __L- 2 s .t 13+00 -UT 4- cLu EASENT FENCE LINE MM PS=I.1u111 ■UR!UI•I UU•I�1UI\INUr u� 25' 50' ILLELLE SCALE: 1"= 50' DocuSjg dtiII11����/ .�as ra111/A S/ ---- 1089A 11 994C3...0� _ = 26971 = _ 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED &RECORD DRAWING MMM --RRRP SED— -- BANI<FULL_ _ _ 25' 12.5' 0 REDDING, CURTIS A BK 001447, PG 00980 LIMITS OF GRADING REDDING, CURTIS A BK 001187, PG 02018 10 +50 11 +50 12 +50 13 +50 14 +50 15 DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 25' 12.5' 0 25' 50' 1 I r / REDDING, C RTIS A / BK 001447, /G 009£�) EASEMENT FENCE J D CD +O � O }. o \w� I � L �_ • // _ —I\av' '— 11111111111040.40- .:0-' rot - / ------------------ __ BANKFULL - 3 GRADING / / / / / / / / / / / / / / / / / / HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 LIMITS OF GRADINJG— / VROPO�/ ED / KFULL / / / / / ; / ♦ r _./ //13 , \cis LIMITS OF 19+00 NI -UT -UT 4/N • • -. -- — ��� I. //ST AM-PL G ' � �_ -- Aft L£L- q -- CROSS NNE TYP) NT FENCE LINE DDING, CURTIS A BK 001187, PG 02018 UT 4 LLELLEI SCALE: 1"= 50' D gtiSignedbyy i/[4\ iiii‘c_11//z/ Q60 C14994C30j; 26971 FA, �, Go DPI-\�� 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ■ RECORD DRAWING -UT 4- AS -BUILT STRUCTURE LOCATIONS STR TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CROSS VANE 759,619.83 1,736,415.50 727.16 727.09 CROSS VANE 759,519.80 1,736,460.50 725.28 725.29 CROSS VANE 759,445.98 1,736,545.63 723.40 723.32 735 735 73Q AT P S7 ROP Nn z G 00 -r 730 725 72Q Pd 1 LT EN 1 LERL P ROP T A LW 6 725 720 715 715 15 +50 16 +50 17 +50 18 +50 19 +50 20 0 21122 SL'NGATE DESIGN GROUP, P.A. THIS DRAWING AND ALL REPRODUCTIONS OF IT ARE THE SOLE PROPERTY OF SDG. REPRODUCTION OR OTHER USES OF THIS DRAWING WITHOUT WRITTEN CONSENT OF SDG IS NOT PERMITTED Q a 0 O CD CO w 0 w Q cr CID �o _w BULL CHUTE RANDOLPH COUNTY, NC AS -BUILT STRUCTURES PROJECT n DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET NO. AB-04M r f ALW DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 730 725 720 .\ 2C 1_ 715 1 71Q -UT 3- AS -BUILT STRUCTURE LOCATIONS STR. TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CROSS VANE 759,209.75 1,736,611.53 720.01 720.07 E S� \a P M P� cNSEE I����� • REDDING, CURTIS A BK 001187, PG 02018 EDDING, CURTIS A 001447, PG 00980 721\- EASEMENT FENCE LINE -------------- D RESTORATION HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 sTA 19+2 ZIT 3C= — — — — 722EASEMENT-FENCE LINE - STA 21+30 -UT 4- - -REMOVE. CLAY_EIEE ______ QIL� PARTIALLY -U 4_ — - - - \ -�� - 2a- O0 - - ♦ • '\_— ♦ I I I i `� �� o C — ���\ __ACROSS VANE (TYP) 1 i 1 _ A STRE4M PLUG LIMITS OF I I GRADING I REDDING, CURTIS Ann BK 001856, PG 02361 r�l-> _r LIMITS QE —GRADING // / / / , // / , / . 25' 12.5' 0 SELLS SCALE: 1"= 50' °- sa 25' 50' DocuSiined b. A 1089AI3614994C3...�i� SSSS�= _ = 26971 = _ 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED RECORD DRAWING InI1III I ' II AS -BUILD II " III 1 I I .I�� IIII1 CENTERLI : 1111i .. ■ r . IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII..IrrII1111r/Illllldi�..n■■■,■r.= - n■111111111111111■■1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 nn ., 1 -- 11 1 1 -111 ii 1 riiiiiie�1='-!■,�U��1111111111111111�IIII/iii1minnimminnummumminiminnimminnummumminimmllllllllllllllllllllllmin IiIIiiiIIIIIIII�ii111111111iIIIIIIIIIIIIIIIIIIIIIIIIIRII.RIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIII�III�■.Ill�li��lllr■■■■■■■■nrr1111II..rn- ��11����11r.1�111 11�!I,111;;:I!11!!!!l1111 I IIi111::111i 111111�1E �iui:; •GIs-•■■■ P IIII■11!IIIIIMIIIIIIIIIIIIIIIIIIIIIIIIIIIII • — -- ^r.11 �I.- 111111IIiIII11111111111111111111111114111111111111111;IIIII!I 11.'}.-II■IIII■■■I■-I \■■7I a■I 4II-■---- 11111111111111111111111111111111111E111111111111111111111 111111111■C91J■\Is,;,.Jus:wDLILM91111111111111111111jj1111 I, .IILGa7iL1r1IIIIi.F -I I-J�earc r u P -Son IIIIIIIIIIIIIIIIIIiIiii1111Fi1iiIIIIIIIIIIIIIIIIIIIIIII!1111 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII -UT 4- AS -BUILT STRUCTURE LOCATIONS AB Survey STR TYPE NORTHING EASTING Prop Elevation Elevation CROSS VANE 759,155.54 1,736,588.87 718.80 718.82 759,110.05 1,736,595.33 718.14 718.18 CROSS VANE CROSS VANE 759,058.88 1,736,599.88 717.44 717.45 CROSS VANE 758,993.93 1,736,588.73 716.58 716.70 758,855.94 1,736,596.88 714.50 714.50 CROSS VANE CROSS VANE 758,828.36 1,736,603.14 713.96 713.87 I 10111111 I I1111 ! ' I1;1 S 725 0 r _n Q ✓4 L 720 715 710 705 2 7 7 a 0 u 0 F 0 00 0 0 N GROUP, P., z PROJECT n DRAINING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET NO. ems +50 19 +50 20 +50 21 +50 22 +50 23 +50 24 + 50 25 AB-04N DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 /'0'v ,EASEMENT // / - FENCE LINE , i .' / -,�5`b/ .i .. .. i i • �\� i I i POSED ,' ANKFULL/ •` 26 .v, A I ♦ ♦� w ♦ ♦ ♦ zw ♦ ♦ I —w LOG CRc SS I = ♦cam �- VANE ( ')♦ / OMITS OF a GRADING FILL EXISTING CHANNEL REDDING, CURTIS A BK 001856, PG 02361 • i EASEMENT FENCE LINE UT 4 25' 12.5' 0 25' 50' 1111111111 SCALE: 1"=50' es OVN 440/1 O CY4 9 C3..O� S-55 26971 = F2\-� 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED RECORD DRAWING -UT 4- AS -BUILT STRUCTURE LOCATIONS STR. TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CROSS VANE 758,773.81 1,736,601.36 712.84 712.82 CROSS VANE 758,692.57 1,736,621.45 711.26 711.20 725 725 72Q z a c c -r -r 720 715 A EXST �'kCY GRO WI HALALw • 715 71Q 705 AS-8 ILT PRo CENTERLI THA NE WE t 710 705 7 0 0 0 0 0 00 0 0 N GROUP z PROJECT n DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BYr JGD REVISIONS: SHEET NO. 25 +50 26 +50 AB-040 DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 770 765 760 75 75Q START STA 0+00 -UT 4A- START RESTORATION STA 0+18 -UT 4A- EASEMENT FENCE LINE .<( \ \ LIMITS OF \ \ GRADING ST R LE v- A— ON LIMITS OF GRADING _ — n r n-, ram-, — - — 1 \ V `BARR\ BR*E SILY) STEA (TIP) PE \ B\ oog265., PG 00 ROSS�/ANFE ( P) \ \ \ \ \ \ N . \ \ \ \ \ \ \ \\ \ \ \ 1. \ I \ ‘PROPOSED AI{MF U LL\\ \ I:XS P1i GR U THA ND M_EG AS-B LT CE 1" TE L E U 4 A 18 HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 PR OP PROPOSED BANKFULL THAI.WE STR TYPE CROSS VANE SILL STEP SILL STEP SILL STEP SILL STEP SILL STEP CROSS VANE SILL STEP CROSS VANE SILL STEP CROSS VANE SILL STEP CROSS VANE SILL STEP 1111111111 25' 12.5' 0 SELLS SCALE: 1"= 50' 25' 50' FDo4Sig nd br, A R /i,, ii,;,,,t4-i:;;;1/411, , , ,,, </ 1089A*14994C3... 1, R -� S-SS - _ = 26971 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED RECORD DRAWING -UT 4A-AS-BUILT STRUCTURE LOCATIONS 1111111111 NORTHING 760,983.07 760,954.77 760,944.24 760,918.13 760,907.49 760,898.44 760,880.97 760,869.80 760,847.53 760,819.33 760,790.24 760,770.84 760,756.77 760,741.02 IIII~IIII L ✓r 1111111111 EASTING 1,736,216.46 1,736,208.36 1,736,204.22 1,736,199.74 1,736,197.75 1,736,187.99 1,736,183.47 1,736,177.10 1,736,170.65 1,736,176.11 1,736,170.29 1,736,156.55 1,736,152.03 1,736,122.67 1111111111 1111111111 Prop Elevation 765.54 764.87 764.11 763.04 762.30 761.59 760.84 760.43 759.30 758.74 757.62 756.85 756.17 755.58 1111111111 1111111111 AB Survey Elevation 765.71 765.08 764.27 763.07 762.43 761.93 760.95 760.27 BUILT / NS 758.75 BUILT / NS 756.88 756.14 755.66 1111111111 770 765 755 750 a 0 z 0 0 z 7 z 0 7 a 5 E- H 0 0 0 a 0 0 z 0 F 0 0 0 0 0 u 00 a u 0 0 0 0 z PROJECT n DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET NO. AB-04P DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 EASEMENT FENCE LINE SPENCER, BARRY BRUCE BK 002260, PG 002'9 W HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 25' 12.5' 0 ILLELLE SCALE: 1"= 50' 25' 50' STA 0+00 -UT 4C- \ARC 1049& @8V 4g54e3. = JJ269771 = yUq 6 �Pv- 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED RECORD DRAWING UT 4 760 755 750 745 74Q E S R UN AT RDOU THAIWEG 1 r t 7A0 755 750 745 740 c� 7 H O H O 0 0 0 O 0 O z PROJECT n DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET NO. DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 -UT 7- AS -BUILT STRUCTURE LOCATIONS STR. TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CR 33 VANE 7C0,50C.34 1,737,233.22 7✓J.25 — CROSS VANE 760,577.35 1,737,202.79 759.10 758.95 2-99 CROSS VAN START RESTORATION STA 0+00 -UT 3A- EASEMENT FENCE LINE S- N ♦ ♦ 0 PROPOSED BANKFULL LIMITS OF GRADING SPENCER, BARRY BRUCE BK 002260, PG 00218 HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 MILLBROOK TRUST BK 002571, PG 00308 START ENHANCEMENT III aTItOSS) E NOT CONSTRUCTED DUE TO PROPERTY LINE CONFLICT SILL STEP (TYP) REMOVE DAMS END RESTORATION STA 4+18 -UT 3A- START ENHANCEMENT II STA 4+18 -UT 3B- -UT 3- AS -BUILT STRUCTURE LOCATIONS STR TYPE CROSS VANE NORTHING 760,739.57 EASTI NG 1,737,111.71 Prop Elevation 765.07 AB Survey Elevation 765.20 CROSS VANE 760,718.31 1,737,118.46 764.34 764.51 SILL STEP SILL STEP 760,673.48 760,630.25 1,737,162.00 1,737,172.83 762.73 762.78 END ENHANCEMENT III STA 1+36 -UT 7- STA 2+31 -UT 3A- PROPOSED BANKFULL EASEMENT FENCE LINE DROP STRUCTURE X REDDING, CURTIS A K 001447, PG 00980 cF n t/1 = F, F- M z m cn = LT) rn -1 mLP + CD Q a LP REDDING, CURTIS A BK 001416, PG 00154 761.18 761.25 730 SILL STEP CROSS VANE 760,592.08 760,544.29 1,737,185.73 1,737,176.68 759.67 758.10 759.78 757.81 AR -EMI A N Ct vrt.NT r1 SILL STEP 760,488.83 1,737,119.05 756.15 756.20 A Pi+ U J • q PA 77 71 WAIM 25' 12.5' 0 ILLELLE SCALE: 1"= 50' 25' 50' S8 CNN 10/ DocuSig d ti 1,1 1 L,A� .firs ,a111/A ' i I i , T 1 9A 1 994Cnq3... LI = 26971 ( s��c Q- o�\\\ /y'Uq 1 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED RECORD DRAWING -UT 3- AS -BUILT STRUCTURE LOCATIONS AB Survey STR TYPE NORTHING EASTING Prop Elevation Elevation SILL STEP 760,461.65 1,737,118.47 755.09 755.23 760,443.28 1,737,114.89 754.10 754.04 SILL STEP SILL STEP 760,421.43 1,737,120.43 753.06 753.99 DROP STRUCTURE 760,410.60 1,737,119.64 752.46 DROP STRUCTURE 760,399.36 1,737,113.44 750.98 752.48 N, 770 MJN r S 710 - CT-(' i 1 J nJ E T LE`./ 7 UT 'A 58J 760 755 AS-B W LT E E RL E T A 1 U T 7 1 CI I I J II i CGICII T — &OP THALWEG s S T TA 1 2 33 +3 UT U fi 3A- NU YESIOPAIICN STA 4+ 3 -UT 3A- STA- T ENHANCEMENT II STA 4+ 3 -UT 3B- 750 +50 01 +50 0 +50 01 +50 02 +50 03 +50 04 +50 05 T OF SDG IS NOT PERMITTED. 22 SL'NGATE DESIGN GROUP, P.A. THIS DRAWING AND ALL REPRODUCTIONS OF IT ARE THE SOLE PROPERTY OF SDG. REPRODUCTION OR OTHER USES OF THIS DRAWING WITHOUT WRITTEN CO PROJECT . DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET NO. AB-04R DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 -UT 3-AS-BUILT STRUCTURE LOCATIONS STR. TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CROSS VANE 760,118.82 1,736,981.57 741.82 742.14 CROSS VANE 760,089.87 1,736,967.76 741.23 BUILT /NS CROSS VANE 760,065.16 1,736,947.51 740.56 740.62 1 CROSS VANE 760,022.32 1,736,923.46 739.34 r CROSS VANE 759,993.32 1,736,917.71 738.99 739.08 C'y S �2\ y�2 _- O b9L—__ s. s__ L,.. O —_ - -. CATTLE GATE END ENHANCEMENT II STA 7+24 -UT 3B- START RESTORATION EASEMENT FENCE LINESTA 7+24 -UT 3C- BRIDGE INS LED-i --- PLACE CF11RZ,S sss CATTLE GATE HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 REDDING, CURTIS A BK 001447, PG 00980 FROSS VANE (GYP) 25' 12.5' 0 ILLELLE SCALE: 1"= 50' �JI1NITS'5F-'-�� - -IA -- �- ' - REDDING, CURTIS A BK 001416, PG 00154 EASEMENT FENCE LINE -Gf pIW�/ ' -- - off - -�/ � '' -- -- i- off-. 25' 50' -off DocuS Reed b�: 1,1 i i/ i T C.SOLP.A.IVI 141 /// iosiApdcc<4494-6O = 26971 = _ ,7(1 61 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED RECORD DRAWING UT 3 75 750 • 745 0 745 740 r u 735 — 1 73Q E ND EN STA HA NCEMENT S,TA"n 24 T ST A UT3b .STORATI.iN 141-'11 Ulf C EIJEV=742.99 AT r AS —B EXST PROP G R PROP UILT CE UN D T H EG ALWEG TE RUNE v7-----.\ - /\ C_ r f 740 735 730 c 7 a 0 0 P 0 0 0 0 o z PROJECT n DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET NO. AB-04S DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 -UT 3- AS -BUILT STRUCTURE LOCATIONS STR TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CROSS VANE 759,936.81 1,736,864.49 737.15 737.33 CROSS VANE 759,822.33 1,736,856.80 734.75 734.88 CROSS VANE 759,754.48 1,736,844.82 733.19 733.13 CROSS VANE 759,704.27 1,736,827.61 731.98 732.10 CROSS VANE 759,628.21 1,736,824.97 730.23 730.27 CROSS VANE 759,599.83 1,736,786.35 729.13 729.14 CROSS VANE 759,532.58 1,736,793.78 727.61 727.63 eN __ . _ __738___ 1'_/, -/ O Px LO-\\_I✓ _ i — - _ x __ _UT -L ``` `` - w U LIMITS OF GRADING HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 REDDING, CURTIS A BK 001447, PG 00980 25' 12.5' 0 ILLELLE SCALE: 1"= 50' 25' 50' RECORD EASEMENT FENCE LINE PROPOSED BANKFULL CROSS VANE (TYP) 3 Do w / '♦ .. ��ST'QM PLU-_� �NLL EXISTI CHANNEL ROPOSED BANKFULL EASEMENT FENCE LINE I UM!AT&T-MI /A RYFA Cf, ROCK OUTCROP 3 IMITS OF GRADING H DocuSiTdliDY:I III J3�1d ARoz 1 RD8 .149&166./ = 26971 = _ 9696609 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 730 10 +50 11 +50 12 +50 13 +50 14 +50 15 PROJECT n DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 NS C ♦ d�dLL EXISTING �• .♦A. x CHANNEL ♦ ` i ♦♦ A ' LIMITS OF/ ♦• ♦♦ �♦ ♦A GRADII EASEMENT FENCE LINE LOG VANE (TYP) • ♦ ♦ ♦ ♦ , ♦ ��• ♦ ` ♦ �X ♦ ♦ ♦ ♦ X \ X ) ♦ ♦ REDDINGCURTIS R ♦ ♦ \ BK 001447XPG 00980 X ♦•♦♦ ♦♦♦ 0 A. EASEMENT FENCE♦`LINE �♦ ` SEE HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 CROSS VANE (TYP) �►- PROPOSED B, ,NI(FULL qM xcJ 25' 12.5' 0 LEILLED SCALE: 1"= 50' 25' 50' DocuSiTv&I iyI I Al I RO /'�, ios aQBb1 94 3s - , ,0 S -QL ' i 26971 = ,s 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED MIPRECORD DRAWING _ -UT 3- AS -BUILT STRUCTURE LOCATIONS STR. TYPE NORTHING EASTING Prop Elevation AB Survey Elevation CROSS VANE 759,481.31 1,736,759.89 726.50 726.50 CROSS VANE 759,439.19 1,736,748.95 725.37 725.35 LOG VANE 759,391.08 1,736,730.12 724.25 BUILT / NS CROSS VANE 759,343.33 1,736,702.44 723.46 723.51 CROSS VANE 759,278.39 1,736,656.57 721.70 721.78 UT 3 735 735 730 725 z r AT EXST PR P GR TI OUN ALWC D G x r 72Q r FO r THALWEG J 730 725 720 715 AS B UILT E NTE R L INS 715 7 a 0 0 00 0 0 N GROUP, P., z PROJECT n DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET NO. 15 +50 16 +50 17 +50 18 AB-04U DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 -`\XX�XXX /_ - - XXs MILLBROOK TRUST BK 002571, PG 00308 SPENCER, BARRY BRUCE BK 002260, PG 00218 EASEMENT FENCE LINE STA 0+00 -UT 7- HORIZONTAL DATUM: NAD 83 (2011) VERTICAL DATUM: NAVD 1988 LO X AT P R V 25' 12.5' 0 ILLELLE SCALE: 1"= 50' 25' DoFVSI ned,D I11 /i� SS 108 A68i4994C3Q SsAL _ = 26971 = _ X // osXc ��Q 0 7/26/2022 DATE: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED ■ RECORD DRAWING 0 +50 DocuSign Envelope ID: 7DF7F384-5229-44F3-936D-33FF129541 C2 DESIGN PLANTING TABLE Vegetation Association Piedmont/Low Mountain Alluvial Forest* Dry-Mesic Oak- Mckory Forest* Stream -side Assemblage** TOTAL Area (acres) 163 6.2 6.0 28.5 Species # planted* % of total # planted* % of total # planted** % of total # planted Tag alder (Alnus serrulata) -- -- -- -- 2448 15 2418 River birch (Betula nigra) 1663 15 -- -- 2448 15 4111 S43 20 S113 Red bud (Cercis canadensis) -- -- 632 15 -- -- 632 Silky dogwood (Corpus amomum) 1663 15 -- -- 3264 20 r 4927 Persinmiun (Diospyros virginiana) -- -- 422 10 -- -- 422 Mockemut hickory (Carya tomentosa) -- -- 211 5 -- -- 211 Tulip poplar (Liriodendron tulipifera) 1663 15 -- -- -- -- 1663 Sycamore (Platanus occidental's) 2217 20 -- -- 3264 20 5481 Black gum (Nyssa sylvatica) -- -- 632 15 -- -- 632 Wateroak(Quercusnigra) 2217 20 843 20 1632 10 4692 Willow oak(Quercusphellos) 1663 15 632 15 1632 10 3927 Blackwillow(Salixnigra) -- -- -- -- 1632 10 1632 TOTAL 11084 100 4216 100 16320 100 31620 * Planted at a density of 680 stems/acre. ** Planted at a density of 2720 stems/acre. RECORD DRAWING AS -BUILT PLANTING TABLE Table 6A. Planted Bare Root Woody Vegetation Bull Chute Stream and Riparian Wetland Mitigation Site Species Total Acres 28.5 Alnus serrulata 2,500 Betula nigra 4,000 Cercis canadensis 600 Carya tomentosa 200 Corpus amomum 5,000 Diospyros virginiana 420 Liriodendron tulipifera 1,700 Nyssa sylvatica 600 Platanus occidentalis 5,500 Quercus nigra 5,500 Quercus phellos 4,000 Salix nigra 1,600 TOTALS 31,620 Average Stems/Acre 1,110 Table 6B. Permanent Seed Mix Bull Chute Stream and Riparian Wetland Mitigation Site Species Percent of Total Mix Redtop (Agrostis gigantea) 10% VA Wild Rye (Elymus virginicus) 15% Switchgrass (Panicum virgatum) 15% Eastern Gammagrass (Tripsacum dactyloides) 5% PA Smartweed (Polygonum pensylvanicum) 5% Little Bluestem (Schizachyrium scoparium) 5% Soft Rush (Juncus effusus) 5% Bur Marigold (Bidens cernua) 10% Lance -leaved Tickseed (Coreopsis lanceolata) 10% Deertongue (Dichanthelium clandestinum) 10% Big Bluestem (Andropogon gerardii) 5% Indiangrass (Sorghastrum nutans) 5% TOTAL 100% 0 21122 SL'NGATE DESIGN GROUP, P.A. THIS DRAWING AND ALL REPRODUCTIONS OF IT ARE THE SOLE PROPERTY OF SDG. REPRODUCTION OR OTHER USES OF THIS DRAWING WITHOUT WRITTEN CONSENT OF SDG IS NOT PERMITTED a 0 (D CO w 0 w Q (r BULL CHUTE RANDOLPH COUNTY, NC AS -BUILT PLANTING LIST PROJECT n DRAWING NAME: DATE: 2022 DRAWN BY: JRH REVIEWED BY, JGD REVISIONS: SHEET N0. AB-04W