HomeMy WebLinkAboutNC0024872_Compliance Report_20210727NZI
NORTH CAROLINA DIVISION OF WATER RESOURCES
PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT
Water Resources
ENVIRONMENTAL QUALITY
BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)I
1. Control Authority (POTW) Name: Davie County - Cooleemee
2. Control Authority Representative(s): John Grey (Utilities Engineer/Pretreatment Coordinator), Michael Weir (Water Resources
Superintendent), Tim Smith (ORC), Joy Howard (Administrative Coordinator)
3. Title(s): (See above)
4. Last Inspection Date: 09/02/2020 Inspection Type (Check One): ® PCI ❑ Audit
5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO
6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO
ICIS CODING
Main Program Permit Number
NICIolo12141817121
MM/DD/YY
J 07 I 27
21
7. Current Number Of Significant Industrial Users (SIUs)?
1
8. Number of SIUs With No IUP, or With an Expired IUP?
0
9. Number of SIUs Not Inspected By POTW in the Last Calendar Year?
0
10. Number of SIUs Not Sampled By POTW in the Last Calendar Year?
0
11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual
Periods?
0
12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods?
0
13. Number of SIUs in SNC with Pretreatment Schedule?
0
14. Number of SIUs on Schedules?
0
15. Current Number Of Categorical Industrial Users (CIUs)?
0
16. Number of CIUs in SNC?
N/A
POTW INTERVIEW
17. Since the Last PCI, has the POTW had any NPDES Limits Violations?
If Yes, What are the Parameters and How are these Problems Being
Addressed?
18. Since the Last PCI, has the POTW had any Problems Related to an
Industrial Discharge (Interference, Pass -Through, Blockage, Citizens'
Complaints, Increased Sludge Production, Etc.)?
If Yes, How are these Problems Being Addressed?
19. Which Industries have been in SNC for Limits or Reporting during either of
the Last 2 Semi -Annual Periods? Not Been Published for Public
Notice?(May refer to PAR if Excessive SIUs in SNC)
20. Which Industries are on Compliance Schedules or Orders? For all SIUs on
an Order, Has a Signed Copy of the Order been sent to the Division?
20. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes,
Which Ones?
❑ YES r NO
Violations in November of 2020 for reporting only.
Tropical storm caused basin to collapse and
flooding through lab/offices of POTW.
❑ YES I1 NO
SNC for Limits: None
SNC for Reporting: None
Not Published: N/A
None
❑ YES A NO
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016
Page 1
LTMP/STMP FILE REVIEW:
22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO
23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO
24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? Z YES ❑ NO
25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO
26. If NO to 23 - 26, list violations
27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO
28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in
their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info:
Program Element
Last Submittal
Date In file?
Last Approval
Date In file
Date Next Due,
If Applicable
Headwaters Analysis (HWA)
10/3/2016
(revision 1/2/2017)
1/ Yes ❑ No
3/3/2017
1/ Yes ❑ No
9/30/2021
Industrial Waste Survey (IWS)
5/29/2020
Yes ❑ No
8/25/2020
1/ Yes ❑ No
4/30/2025
Sewer Use Ordinance (SUO)
*Updated 11/6/2017, but no changes
were related to pretreatment*
10/23/2013
Yes ❑ No
12/30/2013
1/ Yes ❑ No
Enforcement Response Plan (ERP)
6/2/2020
// Yes ❑ No
9/2/2020
1/ Yes ❑ No
Short Term Monitoring Plan (STMP)
3/12/2018
(revision 3/27/2018)
Yes ❑ No
3/28/2018
/1 Yes ❑ No
INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION
29. User Name
1. Ingersoll Rand
30. IUP Number
004
31. Does File Contain Current Permit?
Yes ❑ No
32. Permit Expiration Date
1/1/2025
33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A
N/A
34. Does File Contain Permit Application Completed Within One Year Prior
to Permit Issue Date?
A Yes ❑ No
6/29/2020
35. Does File Contain an Inspection Completed Within Last Calendar Year?
A Yes ❑ No
Virtual Inspection Conducted 12/29/2020
Due to COVID-19 Restrictions
36. a. Does the File Contain a Slug/Spill Control Plan?
b. If No, is One Needed? (See Inspection Form from POTW)
a. 0 Yes ■ No
b. •Yes ■ No
37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic
Organic Management Plan (TOMP)?
❑Yes❑No®N/A
38. a. Does File Contain Original Permit Review Letter from the Division?
b. All Issues Resolved?
a. 0 Yes ■ No
b.❑Yes❑No®N/A
39. During the Most Recent Semi -Annual Period, Did the POTW Complete
its Sampling as Required by IUP, including flow?
A Yes ❑ No
40. Does File Contain POTW Sampling Chain -Of -Custody Forms?
A Yes ❑ No
41. During the Most Recent Semi -Annual Period, Did the SIU Complete its
Sampling as Required by IUP, including flow?
o Yes❑No❑N/A
41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports
on time?
®Yes❑No❑N/A
42a. For categorical IUs with Combined Wastestream Formula (CWF), does
file include process/dilution flows as Required by IUP?
❑Yes❑No®N/A
42b. For categorical IUs with Production based limits, does file include
production rates and/or flows as Required by IUP?
❑Yes❑No®N/A
43a. During the Most Recent Semi -Annual Period, Did the POTW Identify
All Limits Non -Compliance from Both POTW and SIU Sampling?
/1 Yes ❑ No
43b. During the Most Recent Semi -Annual Period, Did the POTW Identify
All Reporting Non -Compliance from SIU Sampling?
❑Yes❑No®N/A
44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self-
a.❑Yes❑No®N/A
NC DWR Pretreatment Compliance Inspection (PCI) Form
Updated December 2016 Page 2
Monitoring Violations?
b. Did Industry Resample and submit results to POTW Within 30 Days?
c. If applicable, Did POTW resample within 30 days of becoming aware
of SIU limit violations in the POTW's sampling of the SIU?
46. During the Most Recent Semi -Annual Period, Was the SIU in SNC?
47. During the Most Recent Semi -Annual Period, Was Enforcement Taken
as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)?
48. Does the File Contain Penalty Assessment Notices?
49. Does The File Contain Proof Of Penalty Collection?
50. a. Does the File Contain Any Current Enforcement Orders?
b. Is SIU in Compliance with Order?
51. Did the POTW Representative Have Difficulty in Obtaining Any of This
Requested Information For You?
FILE REVIEW COMMENTS:
b.❑Yes❑No®N/A
c.❑Yes❑No®N/A
❑ Yes // No
❑Yes❑NoON/A
❑Yes❑NoON/A
❑Yes❑NoON/A
a.❑Yes❑No®N/A
b.❑Yes❑No®N/A
❑ Yes I/ No
All requested files were provided for review. A random comparison of effluent data from January 2021 to eDMR data showed no
discrepancies in reporting. Program elements are up-to-date. Note that the next HWA is due September 30, 2021. The pretreatment
program was found to be well -run and compliant upon this inspection.
OVERALL SUMMARY AND COMMENTS:
Comments: Mr. Grey reached out to Michael Montebello for reclassification of Ingersoll Rand to a non -state -permitted site in
December of 2020. As Ingersoll Rand has reduced flow significantly below the threshold of 25,000 GPD for SIUs and does not produce
any categorical waste, the POTW wishes to continue the Pretreatment Program monitoring Ingersoll-Rand independently. Lowe stated
that he would follow up with Mr. Montebello to find out how such a request might work.
Requirements: None.
Recommendations: None.
NOD: ❑ YES ® NO
NOV: ❑ YES ® NO
QNCR: ❑ YES ® NO
POTW Rating:
Satisfactory X Marginal UnSatisfactory
PCI COMPLETED BY: Alex Lowe, WSRO of DWR
DATE: 07/27/2021
NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3