Loading...
HomeMy WebLinkAboutNC0024872_Compliance Report_20210727NZI NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT Water Resources ENVIRONMENTAL QUALITY BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)I 1. Control Authority (POTW) Name: Davie County - Cooleemee 2. Control Authority Representative(s): John Grey (Utilities Engineer/Pretreatment Coordinator), Michael Weir (Water Resources Superintendent), Tim Smith (ORC), Joy Howard (Administrative Coordinator) 3. Title(s): (See above) 4. Last Inspection Date: 09/02/2020 Inspection Type (Check One): ® PCI ❑ Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ® YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ® NO ICIS CODING Main Program Permit Number NICIolo12141817121 MM/DD/YY J 07 I 27 21 7. Current Number Of Significant Industrial Users (SIUs)? 1 8. Number of SIUs With No IUP, or With an Expired IUP? 0 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 0 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 0 11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods? 0 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 0 13. Number of SIUs in SNC with Pretreatment Schedule? 0 14. Number of SIUs on Schedules? 0 15. Current Number Of Categorical Industrial Users (CIUs)? 0 16. Number of CIUs in SNC? N/A POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during either of the Last 2 Semi -Annual Periods? Not Been Published for Public Notice?(May refer to PAR if Excessive SIUs in SNC) 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 20. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? ❑ YES r NO Violations in November of 2020 for reporting only. Tropical storm caused basin to collapse and flooding through lab/offices of POTW. ❑ YES I1 NO SNC for Limits: None SNC for Reporting: None Not Published: N/A None ❑ YES A NO NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 1 LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ® YES ❑ NO Is Table Adequate? Z YES ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ® YES ❑ NO 26. If NO to 23 - 26, list violations 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO 28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headwaters Analysis (HWA) 10/3/2016 (revision 1/2/2017) 1/ Yes ❑ No 3/3/2017 1/ Yes ❑ No 9/30/2021 Industrial Waste Survey (IWS) 5/29/2020 Yes ❑ No 8/25/2020 1/ Yes ❑ No 4/30/2025 Sewer Use Ordinance (SUO) *Updated 11/6/2017, but no changes were related to pretreatment* 10/23/2013 Yes ❑ No 12/30/2013 1/ Yes ❑ No Enforcement Response Plan (ERP) 6/2/2020 // Yes ❑ No 9/2/2020 1/ Yes ❑ No Short Term Monitoring Plan (STMP) 3/12/2018 (revision 3/27/2018) Yes ❑ No 3/28/2018 /1 Yes ❑ No INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION 29. User Name 1. Ingersoll Rand 30. IUP Number 004 31. Does File Contain Current Permit? Yes ❑ No 32. Permit Expiration Date 1/1/2025 33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A N/A 34. Does File Contain Permit Application Completed Within One Year Prior to Permit Issue Date? A Yes ❑ No 6/29/2020 35. Does File Contain an Inspection Completed Within Last Calendar Year? A Yes ❑ No Virtual Inspection Conducted 12/29/2020 Due to COVID-19 Restrictions 36. a. Does the File Contain a Slug/Spill Control Plan? b. If No, is One Needed? (See Inspection Form from POTW) a. 0 Yes ■ No b. •Yes ■ No 37. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic Organic Management Plan (TOMP)? ❑Yes❑No®N/A 38. a. Does File Contain Original Permit Review Letter from the Division? b. All Issues Resolved? a. 0 Yes ■ No b.❑Yes❑No®N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete its Sampling as Required by IUP, including flow? A Yes ❑ No 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? A Yes ❑ No 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its Sampling as Required by IUP, including flow? o Yes❑No❑N/A 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports on time? ®Yes❑No❑N/A 42a. For categorical IUs with Combined Wastestream Formula (CWF), does file include process/dilution flows as Required by IUP? ❑Yes❑No®N/A 42b. For categorical IUs with Production based limits, does file include production rates and/or flows as Required by IUP? ❑Yes❑No®N/A 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify All Limits Non -Compliance from Both POTW and SIU Sampling? /1 Yes ❑ No 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify All Reporting Non -Compliance from SIU Sampling? ❑Yes❑No®N/A 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- a.❑Yes❑No®N/A NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 2 Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days? c. If applicable, Did POTW resample within 30 days of becoming aware of SIU limit violations in the POTW's sampling of the SIU? 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)? 48. Does the File Contain Penalty Assessment Notices? 49. Does The File Contain Proof Of Penalty Collection? 50. a. Does the File Contain Any Current Enforcement Orders? b. Is SIU in Compliance with Order? 51. Did the POTW Representative Have Difficulty in Obtaining Any of This Requested Information For You? FILE REVIEW COMMENTS: b.❑Yes❑No®N/A c.❑Yes❑No®N/A ❑ Yes // No ❑Yes❑NoON/A ❑Yes❑NoON/A ❑Yes❑NoON/A a.❑Yes❑No®N/A b.❑Yes❑No®N/A ❑ Yes I/ No All requested files were provided for review. A random comparison of effluent data from January 2021 to eDMR data showed no discrepancies in reporting. Program elements are up-to-date. Note that the next HWA is due September 30, 2021. The pretreatment program was found to be well -run and compliant upon this inspection. OVERALL SUMMARY AND COMMENTS: Comments: Mr. Grey reached out to Michael Montebello for reclassification of Ingersoll Rand to a non -state -permitted site in December of 2020. As Ingersoll Rand has reduced flow significantly below the threshold of 25,000 GPD for SIUs and does not produce any categorical waste, the POTW wishes to continue the Pretreatment Program monitoring Ingersoll-Rand independently. Lowe stated that he would follow up with Mr. Montebello to find out how such a request might work. Requirements: None. Recommendations: None. NOD: ❑ YES ® NO NOV: ❑ YES ® NO QNCR: ❑ YES ® NO POTW Rating: Satisfactory X Marginal UnSatisfactory PCI COMPLETED BY: Alex Lowe, WSRO of DWR DATE: 07/27/2021 NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3