Loading...
HomeMy WebLinkAboutNC0024872_Compliance Report_20210730ROY COOPER Governor ELIZABETH S. BESER Secretary S. DANIEL SMITH Director Environmental Quality Johnny Lambert Davie County 261 Chaffin St Mocksville, NC 27028 NORTH CAROLINA July 30, 2021 SUBJECT: Compliance Inspection Report Cooleemee WWTP NPDES WW Permit No. NC0024872 Davie County Dear Mr. Lambert: On Tuesday, July 27, 2021, Alex Lowe of the WSRO conducted a routine Pretreatment Compliance Inspection of the Davie County - Cooleemee pretreatment program. Acting Pretreatment Coordinator John Grey, Water Resources Superintendent Michael Weir, ORC Tim Smith, and Administrative Coordinator Joy Howard were present for the inspection. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No. NC0024872. The full findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Pretreatment Compliance Inspection (PCI) Report." Pretreatment Program Elements All Pretreatment Program elements are up-to-date. Note that the next HWA is due September 30, 2021. Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headwaters Analysis (HWA) 10/3/2016 (revision 1/2/2017) Yes ❑ No 3/3/2017 Yes ❑ No 9/30/2021 Industrial Waste Survey (IWS) 5/29/2020 Yes ❑ No 8/25/2020 Yes ❑ No 4/30/2025 Sewer Use Ordinance (SUO) *Updated 11/6/2017, but no changes were related to pretreatment* 10/23/2013 /1 Yes ❑ No 12/30/2013 A Yes ❑ No Enforcement Response Plan (ERP) 6/2/2020 Yes ❑ No 9/2/2020 I Yes ❑ No Short Term Monitoring Plan (STMP) 3/12/2018 (revision 3/27/2018) 0 Yes ❑ No 3/28/2018 0 Yes ❑ No Program Background The program has only one SIU, Ingersoll Rand. The IUP was renewed on January 1, 2021, and an inspection was conducted within the past 12 months (due to COVID-19 restrictions, the inspection was conducted virtually, via telephone, with pictures of the facility provided by the SIUs representative). North Carolina 0epartment of Fn ironmental Qualify I Division of Water Resources Winston-Salem Regional Office 1450 West Hanes Mill Road,5uite 3001 Wen%ton-Salem, North Carolina 27105 336.776.9800 Action Items There were no significant issues or findings noted during the inspection and therefore, a response to this inspection report is not required. The pretreatment program was found to be well -run and compliant upon this inspection. If you should have any questions, please do not hesitate to contact Alex Lowe with the Water Quality Regional Operations Section in the Winston-Salem Regional Office at 336-776-9800 or via email at alex.lowe@ncdenr.gov. Sincerely, , DocuSiiggned by: < AAjte "-145B49E225C94EA... Lon T. Snider, Regional Supervisor Water Quality Regional Operations Section Winston-Salem Regional Office Division of Water Resources, NCDEQ Enclosed: Pretreatment Compliance Inspection Report Cc: Winston-Salem Regional Office — Digital File Laserfiche — Digital File John Grey, PE — Digital Copy North Carolina 0epartment of Fn ironmtntal Qualify I Division of Water Resources Winston-Salem Regional Office 1450 West Hanes Mill Road,5uite 3001 Wen%ton-Salem, North Carolina 27105 336.776.9800