Loading...
HomeMy WebLinkAbout20140379 Ver 1_Inspection_20140818Wetland Inspection Report Project Num• 20140379 Version 1 Status Issued Project Name: Cardinal Gas Pipeline @ Haw R Project Type Bank Stabilization & Shoreline County Alamance Stabilization (sills, rip rap) tY Region: Winston -Salem Location Cardinal Gas Pipeline @ Haw River- Stream Bank Stabilization Latitude +36° 05' Longitude- -79° 58' 11" SW Plan Location Site Owner Name Cardinal Pipeline Company Inspection Date 8/18/2014 Reason for Inspection Routine Inspection Type- Site Inspection (non -DOT) Inspection Contact Person: Title Phone: On -Site Representative(s) Primary Inspector Sue L Homewood Phone: 336- 771 -4964 Secondary Inspector(s) Facility Compliance Status 0 Compliant ❑ Not Compliant Program Areas 401 (includes isolated /non -404) Question Areas. 0 Permit (401 WQC) Inspection Summary page 1 Site Number: 20140379 Owner Sylvester, Ashley Inspection Date 8/18/2014 Inspection Type. Site Inspection (non -DOT) Reason for Visit- Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑ Are the culverts and /or filled areas installed properly? M ❑ ❑ ❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? M ❑ ❑ ❑ Comment Haw River stabilization complete and is compliant Stabilization along tributary has not been conducted at this time page 2