Loading...
HomeMy WebLinkAboutSW3220702_Supplement-EZ Form_20220804SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 IProject Name 2 Project Area (ac) Preserve at Forest 1 6 IDoes this project use an off -site SCM? I No I COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet 30 8 Will the vegetated setback remain vegetated? Yes 9 if BUA is proposed in the setback does it meet NCAC 02H.1003 4 c-d ? No 10 is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Call 0 13 Wet Pond 6 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip LS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 Storm liter 0 24 Silva Cell 0 25 Sayfilter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Signature of Designer -5 •2fr • Zz9ZZ Date N .tea OHO W�[W fT ,P w A3 +O . W-4MCnA 07 C CL 9'l (9 Q 000T Gl @ fG N X P Y[• fT W X W ZN C Zv t@ N i . i i w (} Z 3 N �p z1 m N O O-i-i O O D 7 7 H Sip A z r d m y' 3 7 N d C c "� 7 a K 7 a Q$ K 0 3� T O N O a N y 7c S fR' N W W w y. [p N N. fD w m a �' R1 S i2. C SD C N N m M -< 0 O N_ 0 C O 00 W C C W C 70 Ca C FL p- N m 'S3 t,�0 61 N Ol O.O 7 �7 C D D > 7 CCQa D O a 01 @ CO 7 C7 ma N ¢�j O a D a y D o j _ 0 y y y N 7 7 w I v y • • p O co) 61 ,+ N" .. N .w '6 N L9 •6 N IL omi S y N .� m 7 L C7 Cr iC 0) N N N T 0 a CC-) rf6n . y m : W N p tD ID m m a p Z — w m — cu m a m Z C D 2; a aID y N N y xc A d a c� a ° O z CL CD c ° m m °^ D 03 m N a NEFL c 3 g 03 N � ^" 3 CD ^'CL O O Oa. o' a 3 0 a 0 + 0 3 p� x N 3 O O1 j Al Owi Ul w y V [�/� y NZZZ Z Zcl, Z�$°pNZ � ZZ �� w V wZW V rG7 W aeaaa a a aw0rD as 1 W �aK).0 W � W M W Z N— Z y ZwOf W W Z ZZ Owp�zzz bGo; aaa z a 'a V a �a a'D w L~GZNN� tD9,0 V EL 2L W WZ v v O w w W �1 N � V V zv,0o�zzz ; aeaaa z a z a zg-4fz 'Dy N N a zz an OwI o ozc°forO7ov .4 "0 m � , 2L -� v v Ow © O Cf - Z Z Z Z Z W Z V1 i Z Z Z i Z T " ���`Dw NQn an o o3 T m. N. 2L ( y co W Z � � v v p� o w Z z z Z Z z� W v z z z v v z NA7 y y a n� ND` �a w waww0� q" �;aeaaD M biwti y cn rhz Xw o oAoU,zzz g; Lh 0z�A� co z z z�rimz D.in�tiD zz 'Dn w NDt4:Q .. n� AAA r �-4Z � o v ❑o�nZzz Z Z �'' z�vtiZ �z a w m WZv-4-� ttm �cr; o aaD n n 5; an co Wn� oo N E, 4A!2� v v Z V I n m cn WET POND 1 ]Drainage area number 7 8 9 10 11 1 12 2 1 eF Minimum required treatment volume (cu ft) 802688 of 769615 of 646430 of 277335 cf 314777 of 40779GENERAL MQC FROM 02H.joso _ . Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes Yes Yes Yes Yes Is the SCM located away from contaminated soils? Yes Yes Yes Yes Yes Yes 3 4 5 What are the side slo e$ of the SCM H:V ? 3:1 3:1 3:1 3:1 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? Yes No Yes No Yes Yes 7 Are the inlets, outlets, and receiving stream protected from erosion 10- ear storm)? Yes Yes Yes Yes Yes Yes 8 Is there an overflow or bypass for inflow volume In excess of the desi n volume? No No No No 9 What is the method for dewaterin the 5CM for maintenance? Pum refened MNo,Nc umrerred Pum referred Pum referred Pum referred10 If a Iicable will the SCM be cleaned out after construction? Yes Yes Yes Yea Yes 11 Does the maintenance access com with General MDC B ? Yes Yes Yes Yes Yes 12 Does the drains a easement com with Genera@ MDC 9 ? Yes Yes Yes Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? NIA WA N/A WA N/A NIA 14 Is there an O&M Agreement that complies with General MOC (11)7 Yes Yes Yes Yes Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes Yes Yes Yes Yes 16 Doss the SCM follow the devices ec15c MDC? Yes Yes Yes Yes I Yes Yes 17 Was the SCM designed b an NC licensed rofessional? Yes Yes Yes Yes Yes Yes 18 Sizing method used SAIDA SA/DA SAIDA SAIDA SAIDA SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes Yes Yes Yes Yes 20 Elevatlon of the excavated main pool depth (bottom of sediment removal fmsl 639.50 616.50 649.54 649.50 626.50 608.50 211 Elevation of the main pool bottom (top of sediment removal) (fmsl) 640.00 617.00 050.00 850.00 629.00 609.00 22 Elevation of the bottom of the vegetated shelf fmsl 643.50 621.50 653.50 654.50 632.50 613.50 23 Elevation of the permanent pool fmsl 6".00 622.00 654.00 655.00 633.00 614.00 24 Elevation of the top of the ve stated shell fmsl 644.50 622.50 654.50 655,50 633.60 614.50 25 Elevation of the temporary ool fmsE 645.58 623,81 665.57 656.67 634AS 615.76 26 Surface area of the main permanent pool (square feet 24627 19698 17664 8093 9811 9677 27 Volume of the main permanent pool cubic feet 82077 of 73476 cf 55330 cf 24026 of 33349 of 33910 cf 28 Average depth of the main pool feet 3.33 ft 3.93 It 3.13 it 3.08 it 3.40 ft 3.50 ft 29 Average depth euation used Equation 2 Equation 2 Equation 2 Equation 2 Equation 2 Equation 2 30 If usino a uatlon 3 main pool perimeter feet NIA WA N/A WA N/A N/A 31 If using equation 3 width of submerged van. shell feet NIA WA NIA WA NIA NIA 32 Volume of the foreba cubic feet 14692 cf 13134 cf 9181 cf 4267 of 5303 cf 6086 of 33 Is this 15.20% of the volume in the mainpool? Yes Yes Yes Yes Yes Yes 34 Clean -out depth for foreba inches 6 in 6 in 6 In 6 in 6 in 6 In 35 Design volume of SCM (run) 42338 of 37991 cf 31071 cf 13265 of 15749 cf 19615 d 36 Is the outlet an orifice or a weir? Orifice Orifice Orifice Orifice Orifice Orifice 37 If orifice orifice diameter inches 2.75 in 2.50 In 3.00 in 2.00 in 2.00 in 2.50 in 38 If weir, weir height inches NIA N/A N/A NIA N/A NIA 39 If weir, weir length inches N/A N/A NIA NIA NIA NIA 40 Drawdown time for the temporary pool(days) 3.72 2.64 2.29 2.14 2.75 2.46 41 Are the Inlet(s) and outet located in a manner that avoids short- ci=tin 7 Yes Yes Yes Yes Yes Yes 42 Are berms or baffles provided to improve the flowpath? Yes Yes Yes Yes Yes Yes 43 IDepth of forebay at entrance inches 10 in 10 in 10 in 10 in 10 In 10 in 44 De th offorebay at exit inches 6 in 6 In 6 in 6 in 6 In 6 In 45 Does water flow out of the forebay In a non -erosive manner? Yes Yes Yes Yes Yes Yes 46 Width of the vegetated shelf feet 6 ft 6 It 6 it 6 it 6 ft 6 ft 47 Slope of vegetated shelf H:V 6:1 6:1 6:1 6:1 8:1 6:1 48 Does the orifice drawdown from below the top surface of the permanent oo€? Yes Yes Yes Yes Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1- 24-hr storm? Yes Yes Yes Yes Yes Yes 5D Are fountains proposed? (If Y, please provide documentation that MDC 9 is met. No No No No No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes Yes Yes Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes Yes Yes Yes Yes Yes 53 Species of turf that will be used an the dam and embankment HYBRID BERMUDA HYBRID BERMUDA HYBRID BERMUDA HYBRID BERMUDA HYBRID BERMUDA HYBRID BERMUDA 54 Hasa plantingIan been provided far the ve stated shaff7 Yes Yes Yes Yes Yes Yes OITIONAL INFORMATION 55 Please use this space to provde any additional information about the wet pond(s): Wet Pond 3 2:21 PM 5/5/2022