HomeMy WebLinkAbout25_Fairchild SCM 1_O&M AgreementBIORETENTION BASIN
OPERATION AND MAINTENANCE AGREEMENT
Project Name: Fairchild Soccer Complex Bio-Retention
City Project Number:
City BMW ID: Fairchild Soccer Complex BMP 2
PIN Number: 8875804511
Mail after recording to: City of Burlington
Stormwater Division
P.O. Box 1358
Burlington, NC 27216
NORTH CAROLINA
ALAMANCE COUNTY
This STORMWATER OPERATION AND MAINTENANCE AGREEMENT,
made this day 181h of February 20 15
by City of Burlington - Stormwater Division whose principal address is
1103 S. Mebane Street, Burlington NC 27216 with, to, and for the benefit
of the City of Burlington, a municipal corporation of the State of North Carolina, whose address
is P.O. Box 1358, Burlington, North Carolina 27216.
Biorelenlian O&Al Agreenieni-7 / l 20/3
BCity of
uRGTQN
Water ResAurces
Bioretention Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a
known set location. Any deficient BMP elements noted in the inspection will be corrected,
repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety
Of the public, and the removal efficiency of the BMP.
Important operation and maintenance procedures:
— Immediately after the bioretention cell is established, the plants will be watered twice
weekly if needed until the plants become established (commonly six weeks).
— Snow, mulch or any other material will NEVER be piled on the surface of the
bioretention cell.
Fleavy equipment will NEVER be driven over the bioretention cell.
Special care will be taken to prevent sediment from entering the bioretention cell.
Once a year. a soil test of the soil media will be conducted.
After the bioretention cell is established, I will inspect it once a month and within 24 hours
after every storm event greater than 1.0 inches. Records of operation and maintenance will be
kept in a known set location and will be available upon request.
Annually, by May 31, an inspection shall be completed by a qualified professional and
submitted to the City of Burlington.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired
immediately.
BMP element:
Potentialproblems:
How 1 will remediate theproblem:
The entire BMP
Trash/debris is present.
Remove the trash/debris.
The perimeter of the
Areas of bare soil and/or erosive
Regrade the soil if necessary to remove
bioretention cell
gullies have formed.
the gully, and then plant a ground cover
and water until it is established.
Provide lime and a one-time fertilizer
application.
The inlet device: pipe,
The pipe is clogged (if
Unclog the pipe. Dispose of the
stone verge or swale
applicable).
sediment off -site.
The pipe is cracked or otherwise
Replace the pipe.
damaged (if applicable).
Erosion is occurring in the swale
Regrade the swale if necessary to
(if applicable).
smooth it over and provide erosion
control devices such as reinforced turf
matting or riprap to avoid future
problems with erosion.
Stone verge is clogged or
Remove sediment and clogged stone
covered in sediment (if
and replace with clean stone.
applicable).
HI... clenlion Uh+I / ,I,g, eemenf-- 11 _'O i 3 Page 2 of S
BM element:
Potentialproblems:
How I will remediate theproblem:
The pretreatment area
Flow, is bypassing pretreatment
Regrade if necessary to route all Flow to
area and/or gullies have formed.
the pretreaument area. Restabilize the
area after grading.
Sediment has accumulated to a
Search for the source of the sediment
depth greater than three inches.
and remedy the problem if possible.
Remove the sediment and restabilize the
pretreatment area.
Erosion has occurred.
Provide additional erosion protection
such as reinforced turf malting or riprap
if needed to prevent future erosion
problems.
Weeds are present.
Remove the weeds, preferably by hand.
The bioretention cell:
Best professional practices show
Prune according to best professional
vegetation
that pruning is needed to
practices.
maintain optimal plant health.
Plants are dead, diseased or
Determine the source of the problem:
dying.
soils, hydrology, disease, etc. Remedy
the problem and replace plants. Provide
a one-time fertilizer application to
establish the ground cover if a soil test
indicates it is necessary.
Tree stakes/wires are present six
Remove tree stakeAvires (which can kill
months after planting.
the tree if not removed).
The bioretention cell: soils
Mulch is breaking down or has
Spot mulch if there are only random
and mulch
Floated away.
void areas. Replace whole mulch layer
if necessary. Remove the remaining
much and replace with triple shredded
hard wood mulch at a maximum depth
of three inches.
Soils and/or mulch are clogged
Determine the extent of the clogging -
with sediment.
remove and replace eitherjust the top
layers or the entire media as needed.
Dispose of the spoil in an appropriate
off -site location. Use triple shredded
hard wood mulch at a maximum depth
of three inches. Search for the source of
the sediment and remedy the problem if
possible.
An annual soil test shows that
Dolomitic time shall be applied as
pH has dropped m heavy metals
recommended per the soil test and toxic
have accumulated in the soil
soils shall be removed, disposed of
media.
properly and replaced with new planting
media.
Blur elenGnn W 11 Igree"Ie'l1 1 / 201.i Page 3 of
BMP element:
Potentialproblems:
How 1 will remediate theproblem:
The underdrain system (if
Clogging has occurred.
Wash out the underdrain system.
applicable)
The drop inlet
Clogging has occurred.
Clean out the drop inlet. Dispose of the
sediment off -site.
The drop inlet is damaged
Repair or replace the drop inlet.
The receiving water
Erosion or other signs of damage
Contact the City of Burlington Water
have occurred at the outlet.
Resources Stormwater Division
at 336-222-51 40.
Bioraen6un 0,,Q dgrecmenl-- 11 _'013 pafle 4 of 5
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify the City of
Burlington of any problems with the system or prior to any changes to the system or
responsible party.
Project name: Fairchild Soccer Complex Bio-Retention
BMP drainage area number:
Print name: Michael Layne PE
Title: Water Resources - Field Operations Manager
Address: 1103 S. Mebane Street, Burlington NC 27216
7�Ti3OTC,
Signat
Date: 2-11 8// S
I, . P-- C m -e "Owt , a Notary Public for the State of
aVV6 ,-aI. , County of _ dlxaleq& , do hereby certify that
aof Re Gies, personally appeared before me this l8Al
day y of r ', and acknowledge the due execution of the
forgoing bioreten ' n maintenance requirements. Witness my hand and official seal,