Loading...
HomeMy WebLinkAbout25_Fairchild SCM 1_O&M AgreementBIORETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT Project Name: Fairchild Soccer Complex Bio-Retention City Project Number: City BMW ID: Fairchild Soccer Complex BMP 2 PIN Number: 8875804511 Mail after recording to: City of Burlington Stormwater Division P.O. Box 1358 Burlington, NC 27216 NORTH CAROLINA ALAMANCE COUNTY This STORMWATER OPERATION AND MAINTENANCE AGREEMENT, made this day 181h of February 20 15 by City of Burlington - Stormwater Division whose principal address is 1103 S. Mebane Street, Burlington NC 27216 with, to, and for the benefit of the City of Burlington, a municipal corporation of the State of North Carolina, whose address is P.O. Box 1358, Burlington, North Carolina 27216. Biorelenlian O&Al Agreenieni-7 / l 20/3 BCity of uRGTQN Water ResAurces Bioretention Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety Of the public, and the removal efficiency of the BMP. Important operation and maintenance procedures: — Immediately after the bioretention cell is established, the plants will be watered twice weekly if needed until the plants become established (commonly six weeks). — Snow, mulch or any other material will NEVER be piled on the surface of the bioretention cell. Fleavy equipment will NEVER be driven over the bioretention cell. Special care will be taken to prevent sediment from entering the bioretention cell. Once a year. a soil test of the soil media will be conducted. After the bioretention cell is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches. Records of operation and maintenance will be kept in a known set location and will be available upon request. Annually, by May 31, an inspection shall be completed by a qualified professional and submitted to the City of Burlington. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblems: How 1 will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or erosive Regrade the soil if necessary to remove bioretention cell gullies have formed. the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe, The pipe is clogged (if Unclog the pipe. Dispose of the stone verge or swale applicable). sediment off -site. The pipe is cracked or otherwise Replace the pipe. damaged (if applicable). Erosion is occurring in the swale Regrade the swale if necessary to (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Stone verge is clogged or Remove sediment and clogged stone covered in sediment (if and replace with clean stone. applicable). HI... clenlion Uh+I / ,I,g, eemenf-- 11 _'O i 3 Page 2 of S BM element: Potentialproblems: How I will remediate theproblem: The pretreatment area Flow, is bypassing pretreatment Regrade if necessary to route all Flow to area and/or gullies have formed. the pretreaument area. Restabilize the area after grading. Sediment has accumulated to a Search for the source of the sediment depth greater than three inches. and remedy the problem if possible. Remove the sediment and restabilize the pretreatment area. Erosion has occurred. Provide additional erosion protection such as reinforced turf malting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. The bioretention cell: Best professional practices show Prune according to best professional vegetation that pruning is needed to practices. maintain optimal plant health. Plants are dead, diseased or Determine the source of the problem: dying. soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Tree stakes/wires are present six Remove tree stakeAvires (which can kill months after planting. the tree if not removed). The bioretention cell: soils Mulch is breaking down or has Spot mulch if there are only random and mulch Floated away. void areas. Replace whole mulch layer if necessary. Remove the remaining much and replace with triple shredded hard wood mulch at a maximum depth of three inches. Soils and/or mulch are clogged Determine the extent of the clogging - with sediment. remove and replace eitherjust the top layers or the entire media as needed. Dispose of the spoil in an appropriate off -site location. Use triple shredded hard wood mulch at a maximum depth of three inches. Search for the source of the sediment and remedy the problem if possible. An annual soil test shows that Dolomitic time shall be applied as pH has dropped m heavy metals recommended per the soil test and toxic have accumulated in the soil soils shall be removed, disposed of media. properly and replaced with new planting media. Blur elenGnn W 11 Igree"Ie'l1 1 / 201.i Page 3 of BMP element: Potentialproblems: How 1 will remediate theproblem: The underdrain system (if Clogging has occurred. Wash out the underdrain system. applicable) The drop inlet Clogging has occurred. Clean out the drop inlet. Dispose of the sediment off -site. The drop inlet is damaged Repair or replace the drop inlet. The receiving water Erosion or other signs of damage Contact the City of Burlington Water have occurred at the outlet. Resources Stormwater Division at 336-222-51 40. Bioraen6un 0,,Q dgrecmenl-- 11 _'013 pafle 4 of 5 I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify the City of Burlington of any problems with the system or prior to any changes to the system or responsible party. Project name: Fairchild Soccer Complex Bio-Retention BMP drainage area number: Print name: Michael Layne PE Title: Water Resources - Field Operations Manager Address: 1103 S. Mebane Street, Burlington NC 27216 7�Ti3OTC, Signat Date: 2-11 8// S I, . P-- C m -e "Owt , a Notary Public for the State of aVV6 ,-aI. , County of _ dlxaleq& , do hereby certify that aof Re Gies, personally appeared before me this l8Al day y of r ', and acknowledge the due execution of the forgoing bioreten ' n maintenance requirements. Witness my hand and official seal, e Gor v, L� Apt` A NOTAR`I PUBLIC �7�+IiVCE COS/ SEAL My commission expires Biorelemia, O&d/Agreement-7 112013 Page 5 of 5