HomeMy WebLinkAbout24_City Park SCM 2_O&M AgreementFILTER STRIP/RESTORED RIPARIAN BUFFERILEVEL
SPREADER OPERATION AND MAINTENANCE AGREEMENT
Project Name: City Park Level Spreader #2
City Project Number:
City BMP ID: City Park BMP #2
PIN Number: 8864790671
Mail after recording to: City of Burlington
Stormwater Division
P.O. Box 1358
Burlington, NC 27216
NORTH CAROLINA
ALAMANCE COUNTY
This STORMWATER OPERATION AND MAINTENANCE AGREEMENT,
made this day 181h of February , 20 15
by City of Burlington — Stormwater Division whose principal address is
1103 S. Mebane Street, Burlington NC 27216 with, to, and for the
benefit of the City of Burlington, a municipal corporation of the State of North Carolina, whose
address is P.O. Box 1358, Burlington, North Carolina 27216.
City of
Level Spreader O&A/Agreement #1 BURLINGTON
Water Resources
Filter Strip, Restored Riparian Buffer and Level Spreader
Operation and Maintenance Agreement
I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a
known set location. Any deficient BMP elements noted in the inspection will be corrected,
repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety
of the public, and the removal efficiency of the BMP.
Important maintenance procedures:
— Immediately after the filter strip is established, any newly planted vegetation will be
watered twice weekly if needed until the plants become established (commonly six
weeks).
— Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation
— Stable groundcover will be maintained in the drainage area to reduce the sediment load to
the vegetation.
— Two to three times a year, grass filter strips will be mowed and the clippings harvested to
promote the growth of thick vegetation with optinwnn pollutant removal efficiency. Turf
grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as
12 inches depending on aesthetic requirements (NIPC, 1993). Forested filter strips do not
require this type of maintenance.
— Once a year, the soil will be aerated if necessary.
— Once a year, soil pH will be tested and lime will be added if necessary.
After the filter strip is established, it will be inspected quarterly and within 24 hours after
every storm event greater than 1.0 inch. Records of operation and maintenance will be kept in
a known set location and will be available upon request. Annually, by May 31, an inspection
shall be completed by a qualified professional and submitted to the City of Burlington.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired
immediately.
BMP element:
Potentialproblem:
How t will remediate the problenr.
The entire filter strip
Trash/debris is present.
Remove the trash/debris.
system
The Flow splitter device (if
The Flow splitter device is
Unclog the conveyance and dispose of
applicable)
clogged.
any sediment off -site.
The Flow splitter device is
Make any necessary repairs or replace if
damaged.
damage is too large for repair.
F le, St, iI, Rev... vd Buller Lerel Spreude, W k / = l greewem-Juh' _7013 Page ? o t 4
6MP element:
Potentialproblem:
How I will remediate theproblem:
The swale and the level lip
The swale is clogged with
Remove the sediment and dispose of it
sediment.
off -site.
The level lip is cracked, settled,
Repair or replace lip.
undercut, eroded or otherwise
damaged.
There is erosion around the end
Regrade the soil to create a berm that is
of the level spreader that shows
higher than the level lip, and then plant
stormwater has bypassed it.
a ground cover and water until it is
established. Provide lime and a one-
time Fertilizer application.
Trees or shrubs have begun to
Remove them.
grow on the Swale orjust
downslo e of the level lip.
The bypass channel
Areas of bare soil and/or erosive
Regrade the soil if necessary to remove
gullies have formed.
the gully, and then reestablish proper
erosion control.
Turf reinforcement is damaged
Study the site to see if a larger bypass
or riprap is rolling downhill.
channel is needed (enlarge if
necessary). After this, reestablish the
erosion control material.
The filter strip
Grass is too short or too long (if
Maintain grass at a height of
applicable).
approximately three to six inches.
Areas of bare soil and/or erosive
Regrade the soil if necessary to remove
gullies have formed.
the gully, and then plant a ground cover
and water until it is established.
Provide time and a one-time fertilizer
application.
Sediment is building up on the
Remove the sediment and restabilize the
filter strip.
soil with vegetation if necessary.
Provide lime and a one-time fertilizer
application.
Plants are desiccated.
Provide additional irrigation and
fertilizer as needed.
Plants are dead, diseased or
Determine the source of the problem:
dying.
soils, hydrology, disease, etc. Remedy
the problem and replace plants. Provide
a one-time fertilizer application.
Nuisance vegetation is choking
Remove vegetation by hand if possible.
out desirable species.
If herbicide is used, do not allow it to
get into the receiving water.
The receiving water
Erosion or other signs of damage
Contact the City of Burlington Water
have occurred at the outlet.
Resources stormwater Division at 336-
222-5140.
/ dic, Saip Resmred Bullle, Le,e( Spreade, UA IL-I,oreenww-hdi '013 Page 3 of 4
I acknowledge and agree by my signature below that I am responsible for the
performance of the maintenance procedures listed above. I agree to notify the City of
Burlington of any problems with the system or prior to any changes to the system or
responsible party.
Project name: City Park Level Spreader #2
BMP drainage area number: Area #1
Print name: Michael Layne PE
Title: Water Resources - Field O erations Manager
Address: 1103 S. Mebane Street, Burlington NC 27216
Phone: 336-222-5140
Date: 2./ $.//S
a Notary Public for the State of
County of d4&u"k , do hereby certify that
personally appeared before me this
�lr , and acknowledge the due execution of the
restored buffer and/or level spreader maintenance requirements.
Witness my hand and official seal,
tiG�QLL� pY�j
q NOTARY ��
7e
PUBLIC Z
7
9A'CE CO
SEAL c�
My commission expires
/Y
Level Spreader O&M Agreement 42
Page 4 of 4