Loading...
HomeMy WebLinkAboutNC0047384_Pretreatment Compliance Report_20220802NCNORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT W ¢.X,rf .1.1Nvv.1nL n11.11r BACKGROUND INFORMATION [Complete Prior To PCI; Review Program Info Database Sheet(s)1 1. Control Authority (POTW) Name: City of Greensboro 2. Control Authority Representative(s): Amy Varinoski 3. Title(s): Utilities Pretreatment Coordinator 4. Last Inspection Date: 6/29/2021 Inspection Type (Check One): ❑ PCI ® Audit 5. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s)? ❑ YES ❑ NO 6. Is POTW under an Order That Includes Pretreatment Conditions? ❑ YES ❑ NO Order Type, Number, Parameters: Are Milestone Dates Being Met? ❑ YES ❑ NO ICIS CODING Main Program Permit Number MM/DD/YY N 1 C 1 0 1 0 14 17 13 1 81 41 J081021221 7. Current Number Of Significant Industrial Users (SIUs)? 8. Number of SIUs With No IUP, or With an Expired IUP? 9. Number of SIUs Not Inspected By POTW in the Last Calendar Year? 10. Number of SIUs Not Sampled By POTW in the Last Calendar Year? 11. Number of SIUs In SNC For Limits Violations During Either of the Last 2 Semi -Annual Periods? 12. Number of SIUs in SNC For Reporting During Either of the Last 2 Semi -Annual Periods? 13. Number of SIUs in SNC with Pretreatment Schedule? 14. Number of SIUs on Schedules? 15. Current Number Of Categorical Industrial Users (CIUs)? 16. Number of CIUs in SNC? POTW INTERVIEW 17. Since the Last PCI, has the POTW had any NPDES Limits Violations? If Yes, What are the Parameters and How are these Problems Being Addressed? 18. Since the Last PCI, has the POTW had any Problems Related to an Industrial Discharge (Interference, Pass -Through, Blockage, Citizens' Complaints, Increased Sludge Production, Etc.)? If Yes, How are these Problems Being Addressed? 19. Which Industries have been in SNC for Limits or Reporting during either of the Last 2 Semi -Annual Periods? Not Been Published for Public Notice?(May refer to PAR if Excessive SIUs in SNC) SNC for SNC for Not Pul 20. Which Industries are on Compliance Schedules or Orders? For all SIUs on an Order, Has a Signed Copy of the Order been sent to the Division? 21. Are Any Permits or Civil Penalties Currently Under Adjudication? If Yes, Which Ones? ❑ YES ❑ NO ❑YES NO Limits: Reporting: lished: ❑YES NO LTMP/STMP FILE REVIEW: 22. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ❑ YES 23. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ❑ YES El NO 24. Is LTMP/STMP Data Maintained in a Table or Equivalent? ❑ YES El NO Is Table Adequate? ❑ YES ❑ NO 25. All LTMP/STMP effluent data reported on Discharge Monitoring Report? ❑ YES El NO Division Inspector, please verify yourself! 26. If NO to 23 - 26, list violations 27. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ❑ NO ❑ NO NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 1 If yes, which ones? Eliminated: Added: NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 2 28. PRETREATMENT PROGRAM ELEMENTS REVIEW— Please review POTW files, verify POTW has copy of Program Element in their files, complete with supporting documents and copy of PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) ❑ Yes ❑ No ❑ Yes ❑ No Industrial Waste Survey (IWS) ❑ Yes ❑ No ❑ Yes ❑ No Sewer Use Ordinance (SUO) ❑ Yes ❑ No ❑ Yes ❑ No Enforcement Response Plan (ERP) ❑ Yes ❑ No ❑ Yes ❑ No Long Term Monitoring Plan (LTMP) ❑ Yes ❑ No ❑ Yes ❑ No INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS OR 1 FILE REVIEW AND 1 IU INSPECTION 29. User Name 1. 2. 3. 30. IUP Number 31. Does File Contain Current Permit? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 32. Permit Expiration Date 33. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A 34. Does File Contain Permit Application Completed Within One Year Prior to Permit Issue Date? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 35. Does File Contain an Inspection Completed Within Last Calendar Year? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 36. a. Does the File Contain a Slug/Spill Control Plan? b. If No, is One Needed? (See Inspection Form from POTW) a. •Yes •No b. ■Yes ■ No a. •Yes •No b. ■Yes ■ No a. •Yes •No b. ■Yes ■ No Certification, Does File Contain a Toxic (TOMP)? ❑ Yes ❑No❑N/A ❑Yes❑No❑N/A ❑ Yes ❑No❑N/A 37. For 40 CFR 413 and 433 TTO Organic Management Plan 38. a. Does File Contain Original Permit Review Letter from the Division? b. All Issues Resolved? a. • Yes •No b.❑Yes❑No❑N/A a. • Yes ■No b.❑Yes ❑No❑N/A a. • Yes ■No b.❑Yes❑No❑N/A 39. During the Most Recent Semi -Annual Period, Did the POTW Complete its Sampling as Required by IUP, including flow? ❑ Yes ❑ No I J ❑ Yes ❑ No ❑ Yes ❑ No 40. Does File Contain POTW Sampling Chain -Of -Custody Forms? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 41. During the Most Recent Semi -Annual Period, Did the SIU Complete its Sampling as Required by IUP, including flow? ❑Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 41b. During the Most Recent Semi -Annual Period, Did SIU submit all reports on time? ❑Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 42a. For categorical IUs with Combined Wastestream Formula (CWF), does file include process/dilution flows as Required by IUP? ❑Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 42b. For categorical IUs with Production based limits, does file include production rates and/or flows as Required by IUP? ❑Yes❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 43a. During the Most Recent Semi -Annual Period, Did the POTW Identify All Limits Non -Compliance from Both POTW and SIU Sampling? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 43b. During the Most Recent Semi -Annual Period, Did the POTW Identify All Reporting Non -Compliance from SIU Sampling? ❑ Yes ❑No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 44. a. Was the POTW Notified by SIU (Within 24 Hours) of All Self- Monitoring Violations? b. Did Industry Resample and submit results to POTW Within 30 Days? c. If applicable, Did POTW resample within 30 days of becoming aware of SIU limit violations in the POTW's sampling of the SIU? a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A c.❑Yes❑No❑N/A a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A c.❑Yes❑No❑N/A a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A c.❑Yes❑No❑N/A 46. During the Most Recent Semi -Annual Period, Was the SIU in SNC? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 47. During the Most Recent Semi -Annual Period, Was Enforcement Taken as Specified in the POTW's ERP (NOVs, Penalties, timing, etc.)? ❑ Yes ❑No❑N/A ❑Yes❑No❑N/A ❑ Yes ❑No❑N/A 48. Does the File Contain Penalty Assessment Notices? ❑Yes❑No❑N/A ❑Yes❑No❑N/A ❑ Yes ❑No❑N/A 49. Does The File Contain Proof Of Penalty Collection? ❑ Yes ❑No❑N/A ❑Yes❑No❑N/A ❑ Yes ❑No❑N/A 50. a. Does the File Contain Any Current Enforcement Orders? b. Is SIU in Compliance with Order? a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A 51. Did the POTW Representative Have Difficulty in Obtaining Any of This Requested Information For You? ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No FILE REVIEW COMMENTS: NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 3 INDUSTRY INSPECTION ICIS CODING: Main Program Permit Number MM/DD/YY i i 1. Industry Inspected: N/A 2. Industry Address: N/A 3. Type of Industry/Product: N/A 4. Industry Contact: N/A Phone: N/A Title: N/A Fax: N/A 5. Does the POTW Use the Division Model Inspection Form or Equivalent? O N/A 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. I..: t: u.1 I.. l .,..:., .. Y B D NO D. 11....l 'IL— YWi NO C. n„1.,,.,1...,,..1 TV—. YUD NO E. L-:II..I.,..:.,.. YLD NO Industrial Inspection Comments: x OVERALL SUMMARY AND COMMENTS: Comments: Requirements: Recommendations: NOD: ❑ YES ❑ NO NOV: ❑ YES ❑ NO QNCR: ❑ YES ❑ NO POTW Rating: Satisfactory Marginal UnSatisfactory PCI COMPLETED BY: Alex Lowe of DWR, WSRO DATE: August 2, 2022 NC DWR Pretreatment Compliance Inspection (PCI) Form Updated December 2016 Page 4