Loading...
HomeMy WebLinkAboutGW1-2022-07048_Well Construction - GW1_20220802 WELL CONSTRUCTION RECORD For Internal use ONLY: This form can be used for single or multiple wells 1.Well Contractor Information: Gary Justice 14.WATER ZONES FROM TO DESCRIPTION Well Contractor Name 606 fL 610 fL 1/2 G P M NCWC 2150-A fL fL NC Well Contractor Certification Number 15.OUTER CASING(for multi-cased wells)OR LINER(if applicable) FRO SS TERIAL 0 M fL 102 u- 6 1/8 DIAMETER SIDRE21 MA PVC Justice Well DrillingInc in. Company Name 16.INNER CASING OR TUBING(geothermal closed-loop) RE21 -0065 FROM TO DIAMETER THICKNESS MATERIAL 2.Well Construction Permit#: ft. ft. in. List all applicable well permits(i.e.County,State, Variance,Injection,etc.) ft I ft. in. 3.Well Use(check well use): 17.SCREEN Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public ft ft. in. ❑Geothermal(Heating/Cooling/Coolin Supply) XResidential Water Supply tt' ft. in. ( g g PPY) PPY ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT ❑Irri ation 0 ft. 1 fL Hole Plug 1 bag poured Non-Water Supply Well: ❑Monitoring ❑Recovery 1 ft- 20 ft- Easy seal 20 Bags pumped Injection Well: 100 fL 102 fL Hole Plug 1 Bag ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK(if applicable) ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM ftTO ftMATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft ft ❑Experimental Technology ❑Subsidence Control 20.DRILLING LOG attach additional sheets if necessar ❑Geothermal(Closed Loop) ❑Tracer FROM TO DESCRIPTION color,hardness,soilfrock type,grain size,etc. El Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) t t 8/01/22 0 ft 100 ft Rock & dirt 4.Date Well(s)Completed: Well ID# ft ft 5a.Well Location: 100 fL 705 fL Granite Quarts Chris Vandyke ft ft Facility/Owner Name Facility ID#(if applicable) ft. ft. 2179 Sycamore Dr. Nebo N.0 ft. ft Physical Address,City,and Zip 173300798203 & 2L REMARKS McDowell 173300799151 - County -1.1-1) 5b.Latitude and Longitude in degrees/minutes/seconds or decimal degrees: 22 C cation: (if well field,one lat/long is sufficient) 35.74633 N-81 .90549 W u 01 2-2 Signature of Certified Well Cont or Dam 6.Is(are)the well(s): XPermanent or ❑Temporary By signing this form,I hereby certify that the well(s)was(were)constructed in accordance with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a 7.Is this a repair to an existing well: ❑Yes or XNo copy of this record has been provided to the well owner. If this is a repair,fill out known well construction information and explain the nature of the repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: You may use the back of this page to provide additional well site details or well 8.Number of wells constructed: 1 construction details. You may also attach additional pages if necessary. For multiple injection or non-water supply wells ONLY with the same construction,you can submit one.form. SUBMITTAL INSTUCTIONS 9.Total well depth below land surface: 705 (ft.) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths if different(example-3@200'and 2@100') construction to the following: 10.Static water level below top of casing: 60 (ft) Division of Water Resources,Information Processing Unit, Ifwater level is above casing,use"+" 1617 Mail Service Center,Raleigh,NC 27699-1617 11.Borehole diameter: 6 (in.) 24b. For Iniection Wells ONLY: In addition to sending the form to the address in Rotar 24aabove, also submit a copy of this form within 30 days of completion of well 12.Well construction method: y construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service Center,Raleigh,NC 27699-1636 13a.Yield m 1/2 Method of test: Air 24c.For Water Supply&Injection Wells: �p ) Also submit one copy of this form within 30 days of completion of 13b.Disinfection type: C I o ri n e 730/9,mount: 8 oZ well construction to the county health department of the county where constructed. Form GW-1 North Carolina Department of Environment and Natural Resources-Division of Water Resources Revised August 2013