Loading...
HomeMy WebLinkAbout20140356 Ver 1_Cost Analysis_20140815Burdette, Jennifer a From: Jennifer Robertson <jennifer.robertson @wetland - consultants.com> Sent: Friday, August 15, 2014 9:47 AM To: Alexander, Tasha L SAW; Burdette, Jennifer a Subject: Addendum to Corps Request for Additional Information Attachments: 20140814 Addendum.pdf Tasha /Jennifer, Attached is an addendum to the Corps request for additional information response. This is a cost analysis for developing a min at a green -field site. Thank you, Jennifer L Robertson a � "J'J�aup i oro�bR,11tF^i�rrMVU4ail�m! rwr.dtlwinuflR, 3158 Charlotte Hwy Mooresville, NC 28117 (704) 512 -1206 mobile (704) 663 -2927 fax US Army Corps of Engineers Asheville Regulatory Field Office Attn: Mrs. Tasha Alexander 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 -5006 August 13, 2014 WNR Project # TQC -1004 NC Division of Water Resources, WQP Wetlands, Buffers, Streams — Compliance and Permitting Unit Attn: Mrs. Karen Higgins / Mrs. Jennifer Burdette 1650 Mail Service Center Raleigh, North Carolina 27699 -1650 Re: Corps Request for Additional Information — Addendum The Quartz Corp, USA — Pine Mountain Mine, +/- 755 Acres Corps Action ID: 2013 -01376 Mitchell County (Parcel ID: 0882 -00 -52 -1389) Spruce Pine, Mitchell County, North Carolina Tasha and Karen /Jennifer: The following cost analysis is provided for developing a green -field mine site. If a " "High Purity Quartz Deposit" was found in the United States of America that is of similar size and quality as that at the Pine Mountain Mine it would be a long and difficult challenge to find the property, if not impossible. Assuming one did find an economic deposit the cost to develop the mine site into production would be approximately $49,300,000. This would include exploration, land acquisition, permitting, engineering, mine equipment, and infrastructure. A new process plant which would include land acquisition, process equipment including installation, plant mobile equipment, shipping and infrastructure the costs would be approximately $42,200,000. Regarding waste from the plant, costs to construct settling ponds, storage areas, and infrastructure would be approximately $11,500,000. In summary the total cost estimate to build a green -field mine site similar to Pine Mountain with a process plant and tailing areas would be $103,000,000. These costs were generated from research done by the mining department at The Quartz Corp with support from the accounting department. Please let us know if you have any questions about this cost analysis. Best regards, �"i� l Jennifer L Robertson Asheville Office 775 Haywood Road, Suite D Asheville, NC 28806 828 -712 -9205 mobile