Loading...
HomeMy WebLinkAbout20140876 Ver 1_Site Plan_20140813COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: L:\Projects\RALUT\20110061 00RA \CADD \_Neuse River Syphon \CADD \Plan Set \201 1 0061 00 SHT COVER INDEX.dwg - # # ## - August 5, 2014 - Mark Satchell vw DICKSON community infrastructure consultants Transportation + Water Resources Urban A X PROGRESS/ DUKE ENERGY NOTES: NOTES: C Raleigh, NC 27607 m� 1. ACCESS TO ELECTRICAL FACILITIES MUST BE MAINTAINED AT ALL TIMES. AN UNOBSTRUCTED, LEVEL AND 30 FOOT WIDE ACCESS WAY MUST BE MAINTAINED 1. THE LIMIT OF DISTURBANCE LINE IS SHOWN FOR CLARITY, THE ACTUAL LOD SHOULD NOT EXCEED www.wkdickson.com �Q Q� ADJACENT TO AND UNDERNEATH THE OVERHEAD CONDUCTORS AND TO EACH THE LIMITS OF THE TEMPORARY CONSTRUCTION OR PERMANENT SANITARY SEWER EASEMENTS. FULL SCALE: 1 " =100 DURHgM V� TRANSMISSION STRUCTURE FOR PROGRESS/ DUKE ENERGY TO PERFORM ROUTINE MAINTENANCE AND EMERGENCY REPAIR. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXISTING GREENWAY MARKERS, SIGNS & ENTRANCE BOLLARDS. WHERE SUCH GREENWAY APPURTENANCES ARE IN CONFLICT WITH ROAD AKE FOREST 0 0 H O 0 2. REFUELING OF EQUIPMENT INSIDE PROGRESS/ DUKE ENERGY EASEMENT IS ACCESS, CONTRACTOR SHALL REMOVE & REPLACE EFFECTED ITEMS. NO SEPERATE PAYMENT O x 0R ALVIN E HWY PROHIBITED. SHALL BE MADE AND SHALL BE INCIDENTAL TO ACCESS. z �� 3. CONTRACTOR SHALL PROVIDE BRIDGE MAT, COFFER DAM AND PUMP AROUND AS NECESSARY. I I — O 4. A MINIMUM 8 -FOOT TRAIL CONSTRUCTED OF 6- INCHES OF NO. 57 STONE TOPPED WITH CO O SCREENINGS AND ENCLOSED WITH BARRICADE FENCING (MINIMUM OF 4 FEET HIGH) CLOSELY w LU — - SPRUCE TREE WAY 0 LU PLACED ON BOTH SIDES. REFERENCE SECTION ON DWG G11. J a LU C> w U �� I I REMOVE & — O ::) LL1 w FOREST SHADOW LANE Z pC I REPLACE 0 FALLS 3 RIVER SNOWY MEgpp I i Cn LANDSCAPING O 3 D UJ Q PROJECT LOCATION W CT /// 1386.6 SY w �,� m W J // JUTE MATING 0 L.L O � � rr a M J Z /�/ � STABILIZATION W a U PERRY CREEK RD EXISTING CITY OF RALEIGH / �' ° AS REQUIRED b I- F-- b w N - Q DURANT RD J 2 U) CO N �� GREENWAY _ / � // �� ww �yI -- -- / / / rT' Yj+:�'= �___ -- _�— k'�`�i e—ee5 eee�.�s n� � I _--- - -- - -- - VICINITY MAP � -- _ N/F 1 / EXISTING WETLAND ��r- / (TEMPORARY IMPACT), " -- / — �, p � � Lij W TQ0 BEDFORD AT FALLS ���� RIVER MASTER ASSN, INC / PROVIDE (264 SY) JUTE / MATING /STABILIZATION O v Y W W I— O c O ILL Z O D U U Iii DB 013092 PG 02409 DSO- MEASURES AS REQUIRED o w LLJ CHANDLER �\ PIN 1739041449 \ /I FsM wqy / I I r / PROPOSED 12'x50' TEMPORARY �� 10 O WqY a�U I ° CONSTRUCTION __ 12 Project Q.C. � I 1519 LF SILT FENCE ; � � N/F / ENTRANCE WILTSHIRE O VILLAGE SEE DWG G12 FOR \\ \- GREENWAY DETOUR I _ CITY OF RALEIGH I I _ / DB 008340, PG 02294 /Ig� TOWNHOMES _ -- 20110061 PIN 1729957247 SEE DWG G12 FOR / GREENWAY DETOUR EXISTING GREENWAY ACCESS EXISTING 30' / N. PERMANENT / AND TEMPORARY DETOUR N. ! CITY OF RALEIGH UTILITY ESMT / /// N/F 441 VILLAS BEDFORD AT FALLS PROPOSED 40' FALLS / RIVER HOMEOWNERS ASSN, INC PERMANE=NT 30. / Q DB 011134 PG 00506 CITY OF RALEIGH RIVER lV, PIN 1739041244 UTILITY ESMT 2 _ � REMOVE & / REPLACE 124.6 SY // c /Ty o � / "a CITY OF RALEIGH F RAL / DB 008340, PG 02294 _ 2 � / �� Q- EXIST GREENWAY // G F/ H �/ PIN 1729957247 TOI/�N O = co 348 LF SILT FENCE / �� Om / Q`' / J / 4P PROPOSED _ FQR A* l ZONE 1 TEMP IMPACT, ST .,R� LIMIT OF DISTURBANCE, TYP EA SIDE OF RIVER ^ DISTURBED AREA= 3.86 AC (7 782 SF TOTAL) V / O � _ Q7 ��= N/F CITY OF RALEIGH / \ SIPHON 2 -16 / Q p N/F O- y DIP a/ ` ZONE 2 TEMP IMPACT, TYP EA SIDE OF RIVER EXISTING WETLAND y / (4,574 SF TOTAL) / (TEMPORARY IMPACT), \�"�; �- w�QO � �� DB 008340, PG 02294 PIN 1739054931 \ / FALL �. Q BEDFORD AT J O S RIVER MASTER ASSN, INC / c'0 ��`' �....,, `l� �,Z. PROVIDE (73 SY) JUTE �o MATING /STABILIZATION d S MEASURES AS REQUIRED a �� 15' R/W \ REMOVE & / / DB 012895 PG 02214 PIN 1739035779 Q / / �, �....., .� % /`x '� r, �� i i'. 234 LF SILT FENCE STREAM J �� I 1.5' 2' PCB CROSSING (CR42), II I'> SEE NOTE 3 4' 4' 2' 1.5' REPLACE GREENWAY - '_- ?' �Cc `� �� � / ° o� �° ��''`� ;.. / o' I �/ T,�� <; ° I I GRADE 4' HIGH TEMP - BARRICADE I BOLLARDS �� V)` G��� .� o REMOVE & \v \ rl ( ��` '' ... �Q / \\ 1 I I POINT FENCE REMOVE &REPLACE GREENWAY MILE MARKER - SIGNS (AS NECESSARY), TYP REPLACE 1204.2 SY \ EXIST GREENWAY \P ® �i\ ' ZONE 2 ZONE 1 / �G - / RIPARIAN RIPARIAN %� r / �% � BUFFER BUFFER 0D too ati .� VARIES 0.02 0.02 0 ®I (/L= °� �— - I O TIE TO VARIES � EXIST c' x �\ N N w EXISTING CITY \` � p ��� �� �. / OF RALEIGH \ \ / / / w ��� / / / \ / // � �� i GREENWAY PATH \ • / ,/ - w \ w �� o X co t o w w 6" #57 STONE I ZONE 2 PERM I PACT, I TYP EA SIDE O RIVER D TOP WITH COMPACTED STONE SCREENINGS '4k m `► _ -�G., 0, _- rft _ 1�---- _=���c — i� -- =� � � . ZONE 1 4 _ p oo z RIPARIAN _ — il�, - -.., V U _ BUFFER (1,611 SF TOTAL) ° I I ` N SECTION - TEMPORARY .= I N GRAVEL DETOUR TRAIL ©� 0 0 — 0 0 0 _,�; - �� "' M `" "? l m TII = - , _ PROPOSED 12'x50' J�/ O I- ZONE 2 w RIPARIAN cn co TEMPORARY z w z CONSTRUCTION o BUFFER ZONE 1 PERM IMPACT, `V 228 O N 228 TYP EA SIDE OF RIVER ° w Q w w (2,418 SF TOTAL) b I SEE NOTE 4 �6/ �� X ENTRANCE, TYP J w w Q w 224 O o 100 0 457 LF SILT FENCE 224 1 515 LF I °____ °__ �— I 220 + N 2201 EXISTING PARKING LOT SEE DWG G12 FOR 15' GREENWAY DETOUR 10E TEMPORARY / I / BARRICADE FENCE . g/ EXISTING 40' X� PERMANENT , N/F � ���0 < w > Cn I I 216 co w J cA w I I I I I S6� ti 0 +° N N N M ry o� M 00 216 CO LO 0 N O C) N + o 0 499 LF // CITY OF RALEIGH HANSON AGGREGATES PROPOSED 20' I I I I 212 , SOUTHEAST, LLC I I I o / U fILITY ESMT TEMPORARY I I -1.57 /o Q w -2 �� 0 U) w > > + > 212 L-- � Q w cn cn w P TEMPORARY BARRICADE FENCE / / / / N/F , 2310 PARKLAKE DR NE STE ATLANTA GA 30345 I 550 CONST ESMT r! 208 � -0.73% w W 0.14% 1.52 .78% 208 / BEDFORD AT FALLS RIVER • / PIN 1739341240 MASTER ASSN, INC I 204 SCALE: HOR 1 " =40'; VERT 1 " =4' 204 \ / DB 012895 PG 02214 PIN 1739134227 O 200 0 0 CO M O- O co M 0 M Lo� 0 Co 0 200 ti M M LO ti� O . CiR c SO' F 7 1` LO O I� M N O N N r r •- .- .- N N N N N N N N N N ti O Co �- O d a7 a7 O ti ti O O O O O O O O O O O N N N N N N N N N e- N N 00 O O O O O 6 O O O O O O O O N N N N N N N L SCALE:1" =100' FSM w,q y , STORY BROOK LN Q . 0 +00 1 +00 2 +00 3 +00 4 +00 5 +00 6 +00 PROFILE - TEMPORARY GRAVEL DETOUR TRAIL A I B I C COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: L:\Projects\RALUT\20110061 00RA \CADD \_Neuse River Syphon \CADD \Plan Set \201 1 0061 00 SHT COVER INDEX.dwg - # # ## - August 5, 2014 - Mark Satchell vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL FULL SCALE: 1 " =100 0 100 200 2" FULL SCALE 1" = HALF SCALE I` Q� 0 0 H O Z O z O cr O LU U) 0 LU J a LU w U m O ::) LL1 w Z pC Q O Fn w ILL O a cr Ir H W W J 0 W rr a M J Z O U 0 w0 z Z U 0 0 J 2 U) CO N Cn c rr CL O = W C: U) o ' Z Lij W TQ0 —1 U Q C cz M Q Y W W I— O c O ILL Z O D U U Iii Q U = �- lii 2 2i U Qp ~ .J � = N N N U ~— , Z T H C/� T 't N �Z U O Z 0: Uj LLI Q Z O oOm 0 o O a�U Q PROJ. DATE: MAY 2012 Q.C.: 12 Project Q.C. DATE: Manager DRAWING NUMBER: G11 PROJ. NO.: 20110061 E} 3 GPI 2— 1 INSET 1 NOTE: A 3' 3' SHLD USE INSET 1 WHEN CONDITIONS PERMIT EXISTING C1 GRADE 2. 16:1 MAX I 0.02 ?.! V 1 5' 5' I 6' S H L D 4' W /SAFETY RAIL 3' GRADE POINT POTENTIAL 0.02 6= SAFETY RAIL 2\ qx T - —I I NOTE: NOTE: PROVIDE A 48" SAFETY RAIL FOR THE FOLLOWING CIRCUMSTANCES WITHIN 6' OF THE EDGE OF PAVEMENT 1. USE 6' SHOULDER IN FILL SECTIONS • SLOPE ? 3:1 AND DROP OF 6' AND T SHOULDER IN CUT SECTIONS • SLOPE ? 2:1 AND DROP OF 4' • SLOPE ? 1:1 AND DROP OF 1' ASPHALT TRAIL RESTORATION (TYP SECTION) I REENWAY / DETOUR CHANDLER WAY PROPOSED / UPPER NEUSE RIVER GREENWAY DETOUR / FALLS / RIVER co I N WAY rn OUR CLOSED GREENV TRAFF EXISTING UPPER NEUSE RIVER "Maft. GREENWAY Ift-wa "ftftft IN-oft ft-UM N, GREENWA nFT(ll II? EXISTING GRADE PAVEMENT SCHEDULE C1 PROPSED APPROX 2" ASPHALT CONCRETE SURFACE COURSE TYPE S9.513, AT AN AVERAGE RATE OF 224 LBS PER SQ YD J1 PROPOSED 6" AGGREGATE BASE COURSE T EARTH MATERIAL V1 GEOTEXTILE SEPERATOR FABRM IC SNOWY MEADOW CT O� �Z co S� Q N/F VILLAS BEDFORD AT FALLS RIVER HOMEOWNERS ASSN, INC DB 011134 PG 00506 PIN 1739041244 N/F / BEDFORD AT FALLS RIVER MASTER ASSN, INC DB 012895 PG 02214 PIN 1739035779 X� / N/F BEDFORD AT FALLS RIVER MASTER ASSN, INC DB 012895 PG 02214 PIN 1739134227 _S Z O =I ENTRANCE �� , Ci N/F BEDFORD AT FALLS RIVER MASTER ASSN, INC DB 013092 PG 02409 PIN 1739041449 1 A I B PROPOSED BARRICADE (NCDOT TYPE III BARRICADE), SEE DWG 47 UPPER NEUSE RIVER GREENWAY DETOUR GENERAL REQUIREMENTS: 1. THE CONTRACTOR SHALL NOTIFY CITY OF RALEIGH PARKS & RECREATION AND CULTURAL RESOURCES A MINIMUM OF 45 DAYS PRIOR TO EXECUTING GREENWAY DETOUR. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING A GREENWAY DETOUR TO ROUTE USERS AROUND THE SIPHON CONSTRUCTION ZONE. THE DETOUR ROUTE SHALL HAVE A COMPLETELY CONNECTED SIDEWALK NETWORK AND GREENWAY ACCESSES FOR PEDESTRIANS. 3. THE GREENWAY DETOUR SHALL BE EFFECTIVELY EXECUTED WHEN CONTRACTOR IS WORKING ON THE SOUTH SIDE OF THE RIVER AND USING THE GREENWAY CORRIDOR AS AN ACCESS. WHEN ALL WORK AND ACCESS TRANSITIONS TO THE OPPOSING SIDE, THE CONTRACTOR SHALL SECURE THE WORK AREA ON THE SOUTH SIDE AND MAKE TEMPORARY REPAIRS TO ANY DISTURBED PORTIONS OF THE PAVED GREENWAY USING COMPACTED GRAVEL SCREENINGS AND TEMPORARILY ROUTE PEDESTRIANS BACK TO GREENWAY. DETOUR SIGNAGE SHALL BE TEMPORARILY REMOVED OR COVERED AND THEN RE- INSTALLED OR UNCOVERED WHEN WORK RESUMES ON SOUTH SIDE. THIS PROCESS SHALL BE REPEATED UNTIL WORK IS ACCEPTABLY COMPLETED OR WHICH TIME CITY'S PROJECT REPRESENTATIVE; (VIC LEBSOCK, 333 FAYETTEVILLE ST, SUITE 300, RALEIGH, NC 27601 PH: (919) 996 -4786) DETERMINES ONGOING WORK AND GREENWAY USERS CAN SHARE CORRIDOR. 4. CONTRACTOR SHALL PLACE TEMPORARY BARRICADES WHERE SHOWN. BARRICADES SHALL BE EQUIPPED WITH SIGN THAT READS: NEUSE RIVER GREENWAY CLOSED BETWEEN FALLS RIVER ACCESS PARKING LOT AND NORTHWEST FALLS RIVER ACCESS. 5. CONTRACTOR SHALL PLACE GREENWAY DETOUR SIGNS ALONG GREENWAY DETOUR ROUTE ADJACENT TO EXISTING SIDEWALK AND PLAINLY VISIBLE TO PEDESTRIANS. 6. CONTRACTOR SHALL ERECT TEMPORARY INFORMATIONAL SIGNS AT TRAILHEADS AND OTHER CRITICAL LOCATIONS WHERE SHOWN. INFORMATIONAL SIGN SHALL HAVE OVERALL DETOUR MAP VISIBLE AND AT A LEGIBLE SCALE FOR PEDESTRIANS VIEWING. IT SHALL ALSO HAVE A SCHEDULE POSTED OF THE TEMPORARY CLOSING. 7. A PORTION OF THE GREENWAY DETOUR ROUTE WILL BE SHARED BY THE CONTRACTOR AND GREENWAY USERS. CONTRACTOR SHALL YIELD TO ALL GREENWAY ; USERS AND PROVIDE APPROPRIATE TRAFFIC CONTROL WHEN MOBILIZING EQUIPMENT AND MATERIAL DELIVERIES. IN SUCH CASES, CONTRACTOR MAY BE REQUIRED TO DIVERT GREENWAY USERS TEMPORARILY AROUND THE SHARED CORRIDOR VIA THROUGH THE PARKING LOT OR THROUGH A TEMPORARY TRAIL. I � LU z Q W Cn Cl) Cn EXISTING WETLAND (TEMPORARY IMPACT), _ _..------- ----- ....... / PROVIDE JUTE �-/ �.c_ir� - -• -- Ji / MATING /STABILIZATION / NCt) o _ MEASURES AS REQUIRED / EXISTING _ �U) / UPPER NEUSE RIVER GREENWAY / \ N/F CITY OF RALEIGH DB 008340, PG 02294 // WILTSHIRE VILLAGE PIN 1729957247 / TOWNHOMES Nb I� 'I / 4# CONTINUATION N/F HANSON AGGREGATES SOUTHEAST, LLC 2310 PARKLAKE DR NE STE 550 ATLANTA, GA 30345 PIN 1739341240 A � _ CIT - l to Y OF 11 / TORN OF INgK�! � FOREST o �o I II ' I � 6 �-LOD cn i I I I I I I I I � I i I IIII C/) o co I co N/F CITY OF RALEIGH DB 008340, PG 02294 PIN 1729957247 LEGEND OINFORMATIONAL SIGN C COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: L:\Projects\RALUT\20110061 00RA \CADD \_Neuse River Syphon \CADD \Plan Set \201 1 0061 00 SHT COVER INDEX.dwg - # # ## - July 11, 2014 - Mark Satchell —2 N/F CITY OF RALEIGH DB 008340, PG 0229 PIN 1739054931 1 vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL FULL SCALE: 1 "= 200 0 200 400 2" — FULL SCALE 1 " = HALF SCALE I` LLI 0 o H O z O H z O cr O U) o w J IL LU E M w U J m O w � Q o p Q O ILL W O a cr Ir H w w LU Q o J w Cz U pCz Z C) 0 W J 0 z m C/) U) >_ N LLJ Z) � �� QOw= z o zY15 LU w r< a .J Q Q U Y w w z � o O O D U U L � i- W� U d 2 2 2i U p ~ H (n = C N N Q Z (� T N T �Z U U __ T Z Uj o= p[ Ill Lu ¢ z oom o O 0- < 0- PROJ. DATE: MAY 2012 Q.C.: 12 Project Q.C. DATE: Manager DRAWING NUMBER: G12 PROJ. NO.: 20110061 COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: L:\Projects\RALUT\20110061 00RA \CADD \_Neuse River Syphon \CADD \Plan Set \201 1 0061 00 SHT NEUSE RIVER XING.dwg - # # ## - July 11, 2014 - Mark Satchell NNW WDICKSON NEUSE RIVER CROSSING GENERAL REQUIREMENTS: I 6 / B 1. THE DOUBLE BARRELL SIPHONS SHALL BE INSTALLED BY OPEN TRENCH CONSTRUCTION PROPOSED LAYDOWN AND I / I N/F C PROPOSED MH 1046 BEDFORD AT FALLS RIVER TEMPORARY MATERIAL AND COMPLY WITH APPLICABLE USACE AND DIVISION OF WATER QUALITY PERMITS. STORAGE AREA AS NEEDED Q) 6' DIA FLAT TOP M MASTER ASSN, INC NOTE: �H cF DB 013092 PG 02409 STA 3 +53.01 Urban 2. THE CONTRACTOR SHALL PREPARE A COFFER DAM WORK PLAN AND MAKE AVAILABLE FOR / PROPOSED MH 1045 STRUCTURE- / / J�C/ RIM EL= 194.61 < PIN 1739041449 1. AFTER PROPOSED SIPHON AND NEW SEWER IS OPERATIONAL AND 720 Corporate Drive OWNER'S REVIEW. �Z�Z / (OUTLET / ° 4 =76 47'49" RT APPROVED FOR USE AND SEWER HAS BEEN DIVERTED, (v) 919.782.0495 p SEE DWG S2) x (f) 919.782.9672 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE UNINTERRUPTED FLOW N/F �� / 8'X9' PRECAST VAULT �' CONTRACTOR SHALL DEWATER EXISTING SIPHON AND PERFORM ` \ 26.0 SY 00 OF WATER IN THE NEUSE RIVER. THEREFORE, THE CONTRACTION SHALL EMPLOY A VILLAS BEDFORD AT FALLS RIVER Fj�/ v 40 / W /VENT SUITABLE COFFER DAM TO ALLOW EXCAVATION IN THE WATERCOURSE UNDER DRY HOMEOWNERS ASSN, INC C M' _ , / STA 3 +67.26 5 CONDITIONS AND COMPLETE THE CROSSING IN A TWO STAGE PROCESS (ONE HALF AT DB 011134 PG 00506 S '`� / RIM EL= 196.40 p^ �J� CLASS I CLEANING AS REQUIRED TO OBTAIN DRY BARRELS AND PERFORM A �� , RIP RAP NASSCO -PACP CCTV INSPECTION. ` / PROPOSED 2 -16' TIME). PIN 1739041244 / / \ ` / \ RJ DIP SANITARY FULL SCALE: 1 "= 40 4. THE CONTRACTOR IS RESPONSIBLE FOR ALL COFFER DAM DESIGN AND INSTALLATION AND �' / f / / \' / O SEWER SIPHON PIPES / SEC C, DWG S2) 2" - FULL SCALE 1 " = HALF SCALE I` CUT -OFF AND DEWATERING MEASURES TO STAY WITHIN THE DESIGNATED LIMITS OF DISTURBANCE, TO OBTAIN A DRY WORK AREA AND TO MAINTAIN RIVER FLOW AROUND THE WORK SITE. / 286.94 LF 10" PVC / (SEE 151y, OO o x / @ 0.56% / 3 \ 5. THE CONTRACTOR SHALL SAFE GUARD THE COFFER DAM WITH BEACON LIGHTS OR OTHER FUNCTIONAL WARNING DEVICES TO WARN KAYAKERS AND CANCERS AND OTHER WATER / �, �Fj / \ O OO\O CRAFT OF THE TEMPORARY STRUCTURE. 57.2 SY 6. THE CONTRACTOR SHALL POST AN INFORMATION SIGN A MINIMUM OF 15 DAYS PRIOR TO /O^ 12" CPP- 191. %1 l CLASS I ; \ Q INSTALLING THE COFFER DAM AT THE CITY OF RALEIGH RIVER ACCESS LAUNCH SITE (FALLS PROPOSED MH 1047 ,Oil l / 12" CPP- 191 95 / / •� RIP RAP ZONE 1 / Fc / 3 DAM ACCESS -12098 FALLS OF THE NEUSE ROAD) ADVISING USERS OF THE TEMPORARY 4' DIA FLAT TOP MH Ij0 RIP RAP STA 0 +49.89 \ \'l' / / STRUCTURE AND POTENTIAL NAVIGATION CONCERNS THAT COULD TEMPORARILY BE \ / ' / AREA EXCEPTED WHILE WORK IS IN PROGRESS. COORDINATE SIGN CONTENT AND ITS RIM EL= 200.82 // PLACEMENT WITH THE CITY OF RALEIGH PARKS, RECREATION AND CULTURAL RESOURCES A =32 °25'55" LT _ ca� /� ° RIPARIAN / O / O �� p �` \ BUFFER / Q Q' SS / PROPOSED MH 1044 Ej' x y / / O 1< / Q� Q- �� \ 1/0 (INLET STRUCTURE / /RAP S 00��u \ -� -SEE DWG S2) 3 REPRESENTATIVE. 46.2 LF 10" PVC 7. ALL GROUND CONTOURS SHALL BE RETURNED TO THEIR ORIGINAL CONDITION. TO BE REMOVED / / i '�' / ( c' / / / AREA \ J 8'x9' PRECAST VAULT \ W /VENT PROPOSED LAYDOWN / i ,S / (6%/ / / �� 40 \ 8. THE COFFERDAM SHALL NOT BE REMOVED UNTIL CONSTRUCTION OF THE DOUBLE SIPHON 24" CPP /FES- 2 .0 / ,/ 4 i i AND BACKFILLING AND RESTORING ORIGINAL RIVER BOTTOM CONTOURS HAVE BEEN � / o� � < �� / / 12 CPP- 19 . 1 / ^� \ T U� STA 7 +04.37 AND TEMPORARY ZONE 2 PP- 1.7 0 / \ RIM EL= 199.80 MATERIAL STORAGE AREA / �. / � s� �S \ RIPARIAN '�} SEE TCE �]?�� COMPLETED TO AN EXTENT WHERE UNIMPEDED STREAM FLOW CAN BE RE- ESTABLISHED. PROPOSED MH 1 O5O / / �� / , N (3) / �� \ % BUFFER nD O NOTE EXISTING MH 1038 / THE CONTRACTOR IS ENCOURAGED TO PERFORM AN INITIAL TEST OF THE INSTALLED SIPHON PRIOR TO COFFER DAM REMOVAL. SUCH INITIAL TEST DOES NOT WAIVE 6' DIA FLAT TOP MH CONTRACTOR'S REQUIREMENT TO COMPLETE AN ACCEPTABLE TEST OF THE SIPHON FROM STA 0 +15.00 O N , S / / / / / / / �� �, _o / / UJ� \ STA 15 +92.20 / / Y, STA / m RIM EL= 198.90 / / OUTLET STRUCTURE TO INLET STRUCTURE. RIM EL= 202.28 w / / / / \ Ssx Tc 8 +00 9+00 INV IN= 191.77 / /gym / A =77 °57'16" LT ° s� I ( o� / O \ F / \ 30.1 LF 24" DIP F INO OSED 15.0 LF � / / � h \ TO BE REMOVED INV OUT= 191.46 9. THE CONTRACTOR SHALL COORDINATE DAILY WITH FALLS LAKE DAM OPERATOR WITH / / ° USACE WHILE WORKING IN THE RIVER. DAILY COORDINATION WILL BE CRITICAL TO Ox / , 1 PVC@ 0.28 /o ) UNDERSTAND ANY UNUSUAL DAM RELEASES THAT COULD IMPACT THE WORK AREA. / �C6 / EXISTING MH 104b \ rn STA 10 +17.83 Ap / '�h \ O ���Tct Az EXIST MH 1049 �� °�/ / �� / �� RIM EL= '197.83 fL 1 / - - - - - - - / \ p 10.DAM RELEASES VARY DEPENDING UPON SEASONAL FLOW TARGETS. NORMALLY, TO BE REMOVED f USACE AIMS FOR A FLOW TARGET AT THE CLAYTON HIGHWAY 42 STREAM GAUGE OF 184 / �'� \' �.t-/ INV IN= 189.06 X00 / OD OD N / / -Z /� INV IN= 188.79 -CO /P� `b SS -/� -4 -ss- - - - / ��/ IL CFS DURING WINTER AND 254 CFS DURING SUMMER. CONNECT EXIST PROPOSED MH 1048 ZONE 2 ° / ,• IM, OUT = 187.79 '� Ir - 36" RCP TO w PROPOSED MH 6' DIA FLAT TOP MH a �/ Q RIPARIAN STA 0 +43.10 I BUFFER % / �� RIM EL= 199.46 I °57'16" ` REMOVE & // / �/ - �/ ?- /// REPLACE 126.2 SY / Y .Y..W1 Y - PROPOSED MH 1043 � w > ��'� 5 0'` 2 06 ej �� �D / 4 =07 RT / ZONE 1 " EXIST GREENWAY / / EXISTING MH 1043 6' DIA FLAT TOP MH oIF Z \ O < � O G Q �� = �`P �` m RIPARIAN m CONNECT EXIST BUFFER 4 / STA 12 +16.56 / PROPOSED MH 1040 / / TOP STA 7 +28.33 = 1w 2 o w �� P�' g > �, 5 �` O \� � n ��, / / °U z ,� � / „y 24 DIP TO i 6' DIA FLAT MH J / RIM EL= 197.88 / / RIM EL= 197.41 N/F \ / / RIM EL= 199.43 0 I-Icn = p = oo a N x\�� Q -P�,�' �i / / 2 O �, 5 O 5� _ Y N co N • J P / ,� - _ � - _ - �O PROPOSED MH / / ' N/F INV IN- 191.06 / - f w A =37 °11'58" RT HANSON AGGREGATES % INV OUT = 190.96 g z SOUTHEAST, LLC / ti w J1 00 Q ° o ��5�'� ,`1'������ ^ // PROPOSED MH 1U49 / BEDFORD AT FALLS RIVER Q; ��� INV OUT = 190.73 �7- / J� PROPOSED 2310 PARKLAKE DR NE STE 550 / -' w J Lo N J O w Q . + w II / / a Q Q ° w ? O �� 0 < LU > > / / / �5/ 6' DIA FLAT TOFF MH �,/ MASTER ASSN, INC STA 0 +00.00 DB 012895 PG 02214 RIM EL =19 59 w PIN 1739035779 �/ �P�/ �P o Q w I °� �� / °� > _ ° z ° ° 18.19 LF ATLANTA, GA 30345 Q / /� °/ Q = _ -- " % PIN 1739341240 ``' ��- �° � � U) co o rn ° O 16 DIP@ 0.14 / / Q ° 1 ° o 10 / Z a ° v7 > _ _ / / � A =16 °20,'14" LT Q w SCALE: -40 o < < o w U � _ ° N rn �, // W w_ - Ln ./ C LO J�> U7 W W CO O I I J W Q 2 p Q LL w a- a W r__ w Z 208 _ (n w � _ w _ _ CD H > ° > a O I- O �_ = I- U O �„� co H - c5 co c9 o rn _ x U > >> Z Z z a o0 Q v7 >- -- w BUD OC o Z cY, �0 OY Lf-) �OOU �c9c0 � wNO � Q LLI J Z U) m N �a�OC) 01- =(Yj°��� 00 w °r00 II w< O���oo II 00 Q +Jw II j as wCOLUw -z O o =�W 100YRFLOOD �� > ° 2 204 O W I. +OJ p_j J II I ~ Q °W? O� >UQ�z> > � x\ U - w =a=O �Z CD �C:) EL= 204.67 U ���?Y C7) 204 -2 L � Y J OQ�Q O a-< CDWzz O 0D am�Qcn� >z Z �o 06 OF U < >LL �0 >UQ�> z >�U< � »> a(D >0.S(n - a(9 >ozS(na'ZZ Z W -- ?per � CnJw000 -� II �J� -- EXISTING GRADE ALONG 0 c U li.i � U w W d =_ Q �= 0 w I'-> O W + J II w a Q Q< ti w z_ 0 PROPOSED SAN SEWER g N N N UO NTT T ° w =� =( z Oo�cajQ�>> w ? dco�xsc~iYz z U Ill J -3 J 200 EXISTING GRADE ALONG 0 H� U o"t rn 00 PROPOSED 200 a�rr O PROPOSED SAN SEWER U) _j w 0 co - 00 11 249.9 LF OF 36" DIP GF Q.C. DATE: - - -- OQQ� +J II O= O �_ Q _ @0.106% PROPOSED DRAWING NUMBER: D v > S1 PROJ. NO.: a � � 006 C z z CLASS I RIP RAP I 7.0 LF (2) 16" 196 1 JL f �- -I_I� BANK STABILIZATION, I I RJ DIP @ 0.000% 196 I I \\ TYP I I PROPOSED EXISTING 24" DIP TO PROPOSED I 1 \ I 1 11.25° RJ DI 1 BEND, TYP 2 1 REMAIN, CONNECT TO 7.3 LF (2) 16" I 1 ORDINARY HIGH I I _ - - - PROPOSED MH 1049 RJ DIP @ 0.000 ° 4 1 WATER MARK 1 j- - - I 1 192 I I 1 1 EL= 189.99 1 1 1 1 192 - 1 1 PROPOSED 1 1 ORDINARY HIGH 1 1 11.25° RJ DI 1 1 WATER MARK u ----- - - - - -- 1 I BEND,TYP2 -1 1 EL= 189.31 ------------ - - - - -- 1 - - - - - - - - - - - - - - PfTOPZ =J79?3 CF �" DIP @ 0.05% T _ = NORMAL RIVER 24.0 PROPOSED 36" DIP 249.9 LF 24" DIP 36" RCP 1 1 �14 1 1 EL= 188.00 Q @ 0.053% 188 1 1 0 - - - - -- - - - - -LJ I (BY WOOTEN 1996) PROPOSED 97.8 LF (2) 188 - - - - - - - - - - - - --------------------------------- � 16 "RJDIP @19.89% SIPHON CONSTRUCTION SEQUENCING: TOE OF BANK TOE OF 1. INSTALL EROSION AND SEDIMENTATION CONTROL MEASURES AS SHOWN. PROPOSED 46.2 LF 10" PVC PROPOSED BANK 2. COORDINATE WITH CITY PARKS AND RECREATION DEPARTMENT ON TEMPORARY GREENWAY CLOSURE 15.0 LF OF 36" DIP TO BE REMOVED 14.2 LF OF 36" DIP WATER EL 183.29 AND DETOUR A MINIMUM OF 45 DAYS PRIOR TO MOBILIZING AND EXECUTING DETOUR. CITY PARKS AND 184 @ 0.050% @ 0.050% WATER EL 183.25 RECREATION WILL BE RESPONSIBLE FOR NOTIFYING USERS AND PUBLIC VIA CITY'S WEBSITE. 184 3. INSTALL AND MAINTAIN GREENWAY DETOUR PLAN. _ PROPOSED 4. INTENT OF DESIGN AND LAYOUT IS TO LEAVE EXITING SIPHON IN SERVICE WHILE NEW 36" MAIN AND I PROPOSED 125.4 LF (2) 16" - DOUBLE BARREL SIPHON IS CONSTRUCTED. 281 LF OF 36" DIP RJ DIP@ 0.000% W/12" / A. INSTALL, TEST AND HAVE OPERATIONAL BYPASS PUMP SYSTEM TO DIVERT FLOW FROM @ 0.050% PROPOSED ° CONC ENCASEMENT / EXISTING SIPHON OUTLET (MH 1041) TO EXIST MH 1055 AND FROM EXIST MH 1070 TO EXIST MH 180 o 0 24" CLASS 1 0 0 0 o _ 87.2 LF (2) 16" / 1055. 180 RIP RAP o 0 0 0 0 o N RJ DIP / B. CONSTRUCT, TEST AND HAVE OPERATIONAL THE REPLACEMENT MH FOR EXIST MH 1049 & @ -19.890% w co PROPOSED 36" TO PROPOSED MH 1048 AND PROPOSED 10" BETWEEN PROPOSED MH'S 1048 & 1 w �i` 1047 1 N < C. RECONNECT EXIST 10" FROM EXIST MH 1070 TO PROPOSED MH 1047 AND EXIST 24" FROM > z ° EXIST SIPHON OUTLET. TEMPORARILY PLUG NEW 36" INLET AT PROPOSED MH 1048. A N� 176 D. MAINTAIN BYPASS PUMPING SYSTEM AS NEEDED. 176 PROPOSED o Z E. CONSTRUCT, TEST AND HAVE OPERATIONAL NEW 36" MAIN FROM PRIOR MH 1048 TO SIPHON #57 STONE - 7.4 LF (2) 16" INLET BOX. RJ DIP F. INSTALL, TEST AND HAVE OPERATIONAL BYPASS PUMP SYSTEM TO DIVERT FLOW FROM EXIST @ 0.000% MH 1037 TO EXIST SIPHON INLET (TEMPORARILY PLUG INLET OF EXIST SIPHON INLET BOX). 2 -6 16" DIP CL G. CONSTRUCT, TEST AND HAVE OPERATIONAL PROPOSED SEWER BETWEEN NEW SIPHON INLET 172 12" 12" ELEV= 172.30 - STRUCTURE AND PROP MH 1038 AND EMERGENCY OVERFLOW SEWER FROM NEW SIPHON 172 PROPOSED INLET STRUCTURE TO PROP MH 1040. PROPOSED 5.0 LF (2) 16" H. RECONNECT EXIST 24" SEWER TO NEW MH 1038 & TO NEW MH 1040 AND COMPLETE REMOVAL SECTION A 11.25° RJ DI SCALE: HOR 1"=40'; VERT 1"=4' 10 24" CLASS I A RJ DIP @ 0.000% OF 24" SEWER BETWEEN NEW MH 1040 & NEW MH 1043. NOT TO SCALE BEND, RIP RAP 10' I. DIVERT FLOW TO NEW SEWER. TYP 2 EA END 12" #57 STONE J. DEWATER EXIST SIPHON AND COMPLETE CCTV INSPECTION. 168 168 00 LO (0 rl co N ti O 00 Cfl 00 CO O 67 O O N � O IR O f� N O L rl- Lq ti C7 O O 00 M O d It 00 6' rl- M r (6 M T (6 M r 0) LO M r It M r I M r °' I rn r rn r co rn r M a' Lo rn r O rn r -- 00 r ° °r° O) r` r O w r 00 r 0) O am r ti M r rn r 0) � M r O M r Lf) rn 0 +00 q 1 +00 2 +00 I 3 +00 4 +00 B 5 +00 6 +00 1 7 +00 8 +00 C 9 +00 10 +00 COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: L:\Projects\RALUT\20110061 00RA \CADD \_Neuse River Syphon \CADD \Plan Set \201 1 0061 00 SHT NEUSE RIVER XING.dwg - # # ## - July 11, 2014 - Mark Satchell NNW WDICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (f) 919.782.9672 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL FULL SCALE: 1 "= 40 0 40 80 2" - FULL SCALE 1 " = HALF SCALE I` w o H O Z O D Z 0 IY O p W IL J W r Ir U) U J 0 O CO w Q C/) ILL � 0 o p Q O Fn w ILL O a LLJ Ir Cl) Z W LU 0 W z Z ~ (n 0 Cz BUD OC o LU Z U U U = LLI J Z U) m N CL c OH� 0 r � � � Z L � Y J < I- a� Q � U < >LL -- U U Y U W LU 0 O= 0 c U li.i � U w W d =_ 2i U �_ J z 2 H N N N UO NTT T �� U z = U Ill J -3 J z Mzm 0 a�rr O QO_2 PROJ. DATE: MAY 2012 Q.C.: GF Q.C. DATE: - - -- DRAWING NUMBER: S1 PROJ. NO.: 20110061 COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON 8, CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: L:\ Projects \RALUT\201 1 0061 00RA \CADD \_Neuse River Syphon \CADD \Plan Set \20110061 SHT SIPHON STRUC.dwg - # # ## - July 11, 2014 - Mark Satchell vw DICKSON community infrastructure consultants Transportation + Water Resources A I i I C Raleigh, NC 27607 (v) 919.782.0495 OVERFLOW (1J 919.782.9672 PRECAST CONC www.wkdickson.com PRECAST CONC WEIR, TYP PROFESSIONAL SEAL SIPHON OUTLET FULL SCALE: 1 "= 40 SIPHON INLET No 80 VENT STRUCTURE FLUME A STRUCTURE FLUME B VENT - - - - -- — — — — — — — — — — — — - r - -- - - -- -- — — — — — — — 11.250MJ r -- - -- a -- -- - - - - - F------ - - - - -- - - - - - -- I I N I I BEND, TYP I M>_ I N I I Z I I M I I N I Z) I N I I I F— — — — — - - - - - - I 16" DIP 16 "DIP - H F--- - - - - -- W Z O PF M C - - -- T = — — I -7v7T N 1 = - - -- C I 36" DIP 0 C:) SLOPE 16 DIP 16 DIP J 36" DIP o 0 9 W - - - - - - U GROUT I I Al2" O u_ 3 . %' 'F' TROUG = — — _ °' 3 I ��' I I W ILL Q OZ H FLUME WALL j l II 1 ' FUTURE fi l) I FUTURE III I I I I I I I I 1I I - x-111 — W I I I 1 I I �- WATERPROOF � -�}��- � -� � III1 - �- - I I I 1 �- _ _ _ - - - -OF _j ACCESS DOOR i 1 J W �. 1 _ _WATERPROOF --- -- - - -� i ACCESS DOOR N W /LOCKABLE HASP I I I I I a I W /LOCKABLE HASP I 1 W� I CONCRETE CONCRETE I of I I I I I I : O = W c J SLAB FOOTING SLAB FOOTING L I `r° To c I W W D Y J T — — — — — — W LL zU o — A O � Q U = U IB Z U w J O =_ N N N zp w_ z ­41111111- 3' -0" M V TOP PLAN Cl) J 3 = > Z W Z J TOP PLAN 12" SIPHON OUTLETSTRUCTURE 6' -0" 12" 12" 1211 6' -0" 12" 12" SIPHON INLETSTRUCTURE SCALE: 3/8 " =1' -0" 8' -0" DATE: - - -- 8' -0" DRAWING NUMBER: SCALE: 3/8 " =1' -0" PLAN - SIPHON OUTLET STRUCTURE PLAN - SIPHON INLET STRUCTURE S2 SCALE: 3/8 " =1' -0" PROJ. NO.: SCALE: 3/8 " =1' -0" 20110061 EL= 199.80' NOTE: – EL- 196.40' d a d - 1. ALL GROUT PLACED /FORMED IN INLET AND d EXISTING d • ° d °a d d OUTLET STRUCTURES SHALL BE PROVIDED EXISTING a . ' a ° • ° . °° d ' a Q GRADE PROTECTIVE COATING IN ACCORDANCE WITH o GRADE ° d ° `V . " SPECIFICATIONS. 16" DIP OVERFLOW TO PROPOSED MH 1040 d — — OVERFLOW d ° d ° ° ` CL EL= 195.72 WEIR, TYP FLUME — N WALL INV= 195.00 d N d GROUT, w o ° TYP ° d 2 — d . 00 EL= 193.76 — 2 d EL= 190.52 0 FLUME ; CL EL= 189.67 — — a d d EL= 192.76 d 00 ° a - M CL EL= 191.77 d — _ J 4Y 00 _ ° d. da p d d° N N (V N d EL= 187.49 . d $° EL= 190.59' ° °1 ° ° ° 1 ° ° ° 1 ° It r ° d d ° e ° a V de r • s° ° r N 18" MIN #57 STONE 18" MIN #57 STONE UNDISTURBED \� \� \� \� \� X\ UNDISTURBED \� \ SUBGRADE /� SUBGRADE T-O" 7' -0" 121, 91.0.1 12" 1211 9._011 1211 SECTION A SECTION B EL= 206.50' EL= 206.50' SCALE: 3/8 " =1' -0" SCALE: 3/8 " =1' -0" P-• WATERPROOF WATERPROOF ACCESS DOOR ACCESS DOOR W /LOCKABLE HASP EL- 199.80' W /LOCKABLE HASP APPROXIMATE EXIST GRADE EL= 196.40' (FOR CLARITY ONLY- SEE PROFILE) _ °d / SLIP RESISTANT d T -0" — — — — ° PT MH STEP, TYP SQ OPENING da • EL--OW �� 1� INV EL= 191.09' d INV EL= 191.19' d . 3'_011 iv i TOP OF ° SQ OPENING _ d ° OVERFLOW d 1 87.20' 137.80' 97 ° WEIR (BEYOND) 1 TOP OF FLUME '80 < INV EL= 187.99 d WALL (BEYOND) INV EL= 188.98 24" CLASS 1 q N 11.25° RJ DIP GROUT d 11.25° RJ DIP RIP RAP 16" RJ DIP SIPHON BEND, TYP FILL — — — — — — °° BEND, TYP 16" RJ DIP SIPHON EL= 190.52 d EL= 192.76 36" DIP 36" DIP 16" DIP 11.25° RJ DIP o o o o 0 11.25° RJ DIP 16" RJ DIP GROUT BEND, TYP BEND, TYP 2% SLOPE FILL EL= 190.59' - - - - - -- — EL= 187.49 CL EL= 172.30' — XV \ \ \ / \ \ / \ \ / \ \'\ � /� /� /� /� /��. SECTION C 12 " #57 STONE SCALE: 3/8 " =1' -0" A I B I C COPYRIGHT ©, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON 8, CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. FILE NAME: L:\ Projects \RALUT\201 1 0061 00RA \CADD \_Neuse River Syphon \CADD \Plan Set \20110061 SHT SIPHON STRUC.dwg - # # ## - July 11, 2014 - Mark Satchell vw DICKSON community infrastructure consultants Transportation + Water Resources Urban Development + Geomatics 720 Corporate Drive Raleigh, NC 27607 (v) 919.782.0495 (1J 919.782.9672 www.wkdickson.com NC. LICENSE NO. F -0374 PROFESSIONAL SEAL FULL SCALE: 1 "= 40 0 40 80 2" = FULL SCALE 1 " = HALF SCALE I` w Q o D N H r O Z O H Z) cc H W Z O M O W W O J W Ka LL cUn U w J CC 00 LLJ O u_ Q Z 0 p O `s Fn W ILL Q OZ H W 2 0 W Z >O w O CL J W �. H C/) fY U D 06 o = W� J Z CO U) N W ::) : O = W c a 0 3 To c Z Q W W D Y J T Q -C U C/) QQ � Q U a W LL zU o — W O � Q U = U Lij U Z U w J O =_ N N N zp U �r z N M V _ � Cl) J 3 = > Z W Z J m PROJ. DATE: MAY 2012 Q.C.: GF Q.C. DATE: - - -- DRAWING NUMBER: S2 PROJ. NO.: 20110061