HomeMy WebLinkAbout20140328 Ver 1_20140814_Construction Progress Meeting Minutes_20140814Steenhuis, Joanne
From: John Core Dcore @wkdickson.com]
Sent: Thursday, August 14, 2014 7:06 PM
To: Neta L Grady; Donn Evans; Everett Pannkuk; derrick @andrewengineers.com
Cc: mickey.t.sugg @usace. army. mi1; Gregson, Jim; Scott Sigmon; Steenhuis, Joanne
Subject: 20130217.00.RA - Onslow County ABC Board Warehouse Bank Stabilization Project: Const.
Progress Metting Minutes
Attachments: 20140814—Construction Progress Meeting Minutes.pdf
Al I,
Please find attached a copy of the minutes for construction progress meeting held August 12, 2014 for the above
referenced project. Please let me know if there are any questions or corrections.
Thanks,
John C.
John Core, PE
W.K. Dickson - Raleigh Office
Office (919) 782 -0495 Ext. 5658
Cell (919) 521 -2262
0core wkdickson.com
www.wkdickson.com
C O N S T R U C T I O N Pk
P R O G R E S S M E E T I N G WDICKSON
M I N U T E S community infrastructure consultants
720 Corporate Center Drive Raleigh, North Carolina 27607 919.782.0495 tel. 919.782.9672 fax
Re: Onslow County ABC Warehouse Bank Stabilization (WKD Project #20130217.00.RA) —
Progress M eeti ng N o. 1
DATE August 12, 2014
A Construction Progress Meeting was held on August 12, 2014 at 11:00 am in the Conference
Room of the Onslow County ABC Warehouse. The participants included the following
representatives:
• Onslow County ABC Board (Nets Grady — System Administrator)
• D. Evans Contracti ng, Inc. (Taylor Evans — Superintendent)
• Andrews Consulting Engineers (E B. Pannkuk — Engineer /Special Inspector)
• NCDENR — 401 Wetlands & Buffer Unit (,banne Steenhuis — Senior Environmental
Speci al i st)
• WK Dickson (,bhn Core— Construction Administrator)'
To the best of our knowledge, we have reflected the minutes of this meeting. We ask that
attendees distribute these minutes to any necessary parties. If any items or issues that were
discussed have not been recorded, please note on your copy and return to us so we can modify
and redistribute.
NOTE: ITEMS SHOWN IN BOLD ARE COMMENTS SPECIFIC TO WHAT WAS DISCUSSED AT THE
PROGRESS MEETING
I. Acceptance of Preconstruction Minutes from meeting that was held on Jily 10, 2014. — Minutes
accepted with no comments, additions, or questions
II. Unresolved Old Business
A. None
III. Shop- Drawings:
A. Status of Shop Drawing Submittals — See attached for list of shop drawing submittals EB stated
that some of the brands were misrepresented. EB to follow up with corrected list.
IV. Easements, Encroachments, Permit Notification Requirements
1. No issues known to date
V. Work completed (Through August 12, 2014) (D. Evansto Report)
A. Anchors installed and tested.
B. Approximately 40% of the sheetpile driven. Sheet piles were left 2' above final grade.
C. Access road /parking area completed. No access issues reported by Owner.
VI. Work Anticipated in Next Period (September 12, 2014) (D. Evans to Report)
A. Sheet pile completed.
B. Tie -backs completed.
C. Plan on being substantially complete.
VII. Schedule
A. NTP was issued for .lily 14, 2014.
B. 30 days through Contract as of August 12, 2014.
C. 60 days remaining for Final Completion of October 12, 2014.
D. Statusof monthly rain day form: (D. Evans Contracting to Report) — Additional daysto be requested
by D. Evans
VIII. New Issues/ Concerns/Submittals
A. Sheetpile top elevation has been left two (2) feet above proposed grade. EB stated that the soil
conditions are different and there is more resistant from the soil than was expected. Soils were a
sandy soil in test reports however it seems that there is more clay in the soil. EB is currently
looking at the possibility of leaving the wall two (2) feet high since the toe is in a more cohesive
soil. Asa result sand may be required for approximately two (2) feet to relieve lateral pressure due
to water being stored in the more cohesive soil. The sand will likely require filter fabric to
maintain purity.
B. Does the Creek Side of the sheet pile need to be cleaned up?
IX. Safety, Traffic Control and Erosion Control
A. WKD /ABC /D. Evans to report - No concerns reported
B. Statusof responsiveness to maintenance of erosion control measures. — No concerns reported
C. Statusof maintaining the responsiveness (Daily Logs, Noteson Plans, etc.) . — No concerns reported
X. Cleanup /Performance Related issues
A. WKD /ABC /D. Evans— None.
B. Status of testing —Anchors tested; observation of sheet piles continues
XI. Partial Payment Request Form —
A. Statusof Payment Application 1 — Completed by engineer and given to Owner for processing.
XI 1. Accepted and or Anticipated Changes
A. May need to add line item for sand and filter fabric to be installed due to field observed field
conditions
B. Bevation change would not be a change order
I%
Sign-in Sheet for Progress Meeting 1 -
Onslow County ABC Bank Stabilization
12-Aug-14
Name
Title/Positio
2
L 4 vi
4.
jrt e,
66k;L,
Ll &L
4
-K
5
6
7
8
9
1-101
4.
PROJECT NUMBER:
FILE DESIGNATION
CLIENT:
PROJECT TITLE:
Dist'iboHon Not-
20130217.00.RA
20130217.00.RA P
Onslow County ABC B—d
ABC Ware house Bank Stabilization
D. Evans Contacting, Inc.
Dale Updated: 8/6/2014
Ini6a1: JAC
A as N - Approved as Noted
NET- No Exception Taken
NETS as N- No Exception Taken Except as Noted
R & R - Revise and Resubmit
REJ -R jetted
Sho D—
SUBMITTAL
DATE
SPEC.
DATE
No.
NO.
RECEIVED
SECTION
DESCRIPTION
M ... f -oo-
RETURNED
STATUS
Coo-
1
1
7/7/2014
Plans/Sp—ml Pro'. Tech. S e cs
Sheet Pile - Su edoc Series 1580
Creative Pultmsions
7/7/2014
NET
Reviewed b EBP
Modeling Services of
2
1
7/11/2014
peda I pets.
Plans/S 1 Pro'. Tech. S
J et Filte'
Illinois, I.C.
7/11 /2014
NET
Reviewed b EBP
y
3
1
7/11/2014
Plan,/Sp—ml Pro'. Tech. Spocs. Specs.
Wale'
IMPW
7/11 /2014
NET as N
Reviewed by EBP
4
1
7/11/2014
Plan,/Sp-ml Proj. Tech. Specs.
Helical Ancho's
Hubbell Po— Systems
7/11 /2014
NET
Reviewed by EBP
5
1
7/11/2014
Plan,/Sp—ml Pro'. Tech. Specs.
T— inato's to Wale'
IMPW
7/11 /2014
NET as N
Reviewed bV EBP
61
1
7/11/2014
Plan,/Special Pro'. Tech. Spocs.. Specs..
Fill e' Fabfic
T—Cate
7/11 /2014
NET
Reviewed b EBP
7
1
7/18/2014
333100
Ductile Iron 401 Lined Pipe
G'iffin/US Pipe
7/31/2014
NET as N
Pe' Cont'acto' email -size changed to 6"
8
1
7/18/2014
33 41 00
PVC Schedule 40 Pie
s —,s
NET
Whe'e is this bein g used?
9
1
7/18/2014
33 41 00
N-12 Pie
ADS, Inc.
7/31/2014
NET
to
1
7/18/2014
334100
PVC DWV Fittings
s —,s
7/31/2014
NET
11
1
7/18/2014
333100
MJ 401 Lined Fittings
Custom Fab
7/31/2014
NET as N
Pe' Cont'acto' email -size changed to 6"
12
1
7/18/2014
333100
Bass Cl-.out Plugs
MATCO-NORCA
7/31/2014
NET
131
1
7/18/2014
33 41 00
N-12 Fittings
ADS, Inc
7/31/2014
NET
14
1
7/18/2014
1333100
Cl-.out Ada te'
N o last
7/31/2014
NET
Reviewed by MTH. This shop d'awing is
being' jetted since this he'bicide is not
Southe'n Agficultual
safe to' aquatic inve'tebates and othe'
15
2
7/28/2014
32 92193
Atazine 4L Herbicide
Insecticides, Inc
8/6/2014
REJ
sto —V—d—d biotics. Please conside'
using a glyphosate he'bicide such as
Rodeo
Whe'e is this being used? Reviewed by
16
2
7/28/2014
Bioba"ie'
BBA Nonwovens
MTH
Reviewed by MTH. This shop d'awing is
being' jetted since this he'bicide is not
safe to' aquatic inve'tebates and othe'
17
2
7/28/2014
329219-3
Ce'tainty He'bicide
Monsanto Company
8/6/2014
REJ
sto —V—d—d biotics. Please conside'
using a glyphosate he'bicide such as
Rodeo
18
2
7/28/2014
SP -11
Com ost
M—V Oaks Soil Builde'
8/6/2014
NET
Reviewed bV MTH
Reviewed by MTH, This shop d'awing is
19
2
7/28/2014
N/A
Dylox Insecticide
Baye' Environmental
Science
8/6/2014
REJ
'jetted since Insecticides are not callout o'
specified to' this project.
20
2
7/28/2014
SP
Coi' Mattin
Fibe'wonde's
8/6/2014
NET
Reviewed bV MTH
Makhteshim A f
Reviewed by MTH, This shop d'awing is
21
2
7/28/2014
N/A
ro sec
Fipnil Insecticide
North Amefica�no
8/6/2014
REJ
'jetted since Insecticides are not callout o'
t—mg
Reviewed by MTH. This shop is
being' jetted since this he'bicide is not
Baye' Environmental
safe to' aquatic inve'tebates and othe'
22
2
7/28/2014
3292193
Ronsta'He'bicide
Science
8/6/2014
REJ
sto —V—d—d biotics. Please conside'
using a glyphosate he'bicide such as
Rodeo
23
2
7/28/2014
3292193
Roundu Pro He'bicide
Monsanto Coma
8/6/2014
NET
Reviewedb MTH
Erost Conse'vation Seeds
24
3
8/5/2014
SP-8
Wetland Plant Seeds
8/6/2014
NET
Reviewed by MTH
Inc.
Reviewed by MTH, It is noted that s—NII
soil components did not fall within the
cceptable tinge. Pe' Section 3.0: It is the
25
3
8/5/2014
SP -11
ysis repo' g'ass
Soil Anal t to' B —IU:hI Lawn
Helena Chemical
8/6/2014
NET as N
'esponsbility of the cont'acto' to follow
'ecom— IRhItions to' soils amendments
resulting from soil test results.
I'.\projec6\souihport \9065250 \k1.4\sub —i 11,—I,
PAYMENT REQUEST LOG
Project:
Onslow County ABC Bank Stabilization
Owner:
Onslow County ABC Board
Contractor:
D. Evans Contracting
Project Number:
WKD 20130217.00.RA
Contract Amount:
$198,138.10
Percent Complete
1.2%
Start of Construction:
07/14/14
Contract Time:
90
Required Completion:
10/12/14
Time Used:
30
Percent Time:
33.3%
No.
End of
Period
Received
To Owner
Work
Complete
Stored
Materials
Total
Retainage
Total Less
Retaina a
Previous
Payments
Payment Due
Sales Tax
Status
1
07/25/14
08/06/14
08/12/14
$2,390.00
$35,521.69
$37,911.69
$1,895.58
$36,016.11
111 1111 1111 1111
$36,016.11
$2,486.52
Unpaid
Total 1 $36,016.111 $2,486.52
CHANGE ORDER LOG
Project:
Owner:
Contractor:
Project Number:
Onslow County ABC Bank Stabilization
Onslow County ABC Board
D. Evans Contracting
WKD 20130217.00.RA
Start of Construction
Contract Time
Time Extension
Total Time
Date for Completion
Chanqe Orders
07/14/14 Original Contract Amount $198,138.10
90 Change In Price $0.00
New Contract Amount $198,138.10
90
10/12/14
Change in Price $0.00 0 Change in Time