HomeMy WebLinkAbout20140328 Ver 1_20140814_Construction Progress Meeting Minutes_20140814Steenhuis, Joanne From: John Core Dcore @wkdickson.com] Sent: Thursday, August 14, 2014 7:06 PM To: Neta L Grady; Donn Evans; Everett Pannkuk; derrick @andrewengineers.com Cc: mickey.t.sugg @usace. army. mi1; Gregson, Jim; Scott Sigmon; Steenhuis, Joanne Subject: 20130217.00.RA - Onslow County ABC Board Warehouse Bank Stabilization Project: Const. Progress Metting Minutes Attachments: 20140814—Construction Progress Meeting Minutes.pdf Al I, Please find attached a copy of the minutes for construction progress meeting held August 12, 2014 for the above referenced project. Please let me know if there are any questions or corrections. Thanks, John C. John Core, PE W.K. Dickson - Raleigh Office Office (919) 782 -0495 Ext. 5658 Cell (919) 521 -2262 0core wkdickson.com www.wkdickson.com C O N S T R U C T I O N Pk P R O G R E S S M E E T I N G WDICKSON M I N U T E S community infrastructure consultants 720 Corporate Center Drive Raleigh, North Carolina 27607 919.782.0495 tel. 919.782.9672 fax Re: Onslow County ABC Warehouse Bank Stabilization (WKD Project #20130217.00.RA) — Progress M eeti ng N o. 1 DATE August 12, 2014 A Construction Progress Meeting was held on August 12, 2014 at 11:00 am in the Conference Room of the Onslow County ABC Warehouse. The participants included the following representatives: • Onslow County ABC Board (Nets Grady — System Administrator) • D. Evans Contracti ng, Inc. (Taylor Evans — Superintendent) • Andrews Consulting Engineers (E B. Pannkuk — Engineer /Special Inspector) • NCDENR — 401 Wetlands & Buffer Unit (,banne Steenhuis — Senior Environmental Speci al i st) • WK Dickson (,bhn Core— Construction Administrator)' To the best of our knowledge, we have reflected the minutes of this meeting. We ask that attendees distribute these minutes to any necessary parties. If any items or issues that were discussed have not been recorded, please note on your copy and return to us so we can modify and redistribute. NOTE: ITEMS SHOWN IN BOLD ARE COMMENTS SPECIFIC TO WHAT WAS DISCUSSED AT THE PROGRESS MEETING I. Acceptance of Preconstruction Minutes from meeting that was held on Jily 10, 2014. — Minutes accepted with no comments, additions, or questions II. Unresolved Old Business A. None III. Shop- Drawings: A. Status of Shop Drawing Submittals — See attached for list of shop drawing submittals EB stated that some of the brands were misrepresented. EB to follow up with corrected list. IV. Easements, Encroachments, Permit Notification Requirements 1. No issues known to date V. Work completed (Through August 12, 2014) (D. Evansto Report) A. Anchors installed and tested. B. Approximately 40% of the sheetpile driven. Sheet piles were left 2' above final grade. C. Access road /parking area completed. No access issues reported by Owner. VI. Work Anticipated in Next Period (September 12, 2014) (D. Evans to Report) A. Sheet pile completed. B. Tie -backs completed. C. Plan on being substantially complete. VII. Schedule A. NTP was issued for .lily 14, 2014. B. 30 days through Contract as of August 12, 2014. C. 60 days remaining for Final Completion of October 12, 2014. D. Statusof monthly rain day form: (D. Evans Contracting to Report) — Additional daysto be requested by D. Evans VIII. New Issues/ Concerns/Submittals A. Sheetpile top elevation has been left two (2) feet above proposed grade. EB stated that the soil conditions are different and there is more resistant from the soil than was expected. Soils were a sandy soil in test reports however it seems that there is more clay in the soil. EB is currently looking at the possibility of leaving the wall two (2) feet high since the toe is in a more cohesive soil. Asa result sand may be required for approximately two (2) feet to relieve lateral pressure due to water being stored in the more cohesive soil. The sand will likely require filter fabric to maintain purity. B. Does the Creek Side of the sheet pile need to be cleaned up? IX. Safety, Traffic Control and Erosion Control A. WKD /ABC /D. Evans to report - No concerns reported B. Statusof responsiveness to maintenance of erosion control measures. — No concerns reported C. Statusof maintaining the responsiveness (Daily Logs, Noteson Plans, etc.) . — No concerns reported X. Cleanup /Performance Related issues A. WKD /ABC /D. Evans— None. B. Status of testing —Anchors tested; observation of sheet piles continues XI. Partial Payment Request Form — A. Statusof Payment Application 1 — Completed by engineer and given to Owner for processing. XI 1. Accepted and or Anticipated Changes A. May need to add line item for sand and filter fabric to be installed due to field observed field conditions B. Bevation change would not be a change order I% Sign-in Sheet for Progress Meeting 1 - Onslow County ABC Bank Stabilization 12-Aug-14 Name Title/Positio 2 L 4 vi 4. jrt e, 66k;L, Ll &L 4 -K 5 6 7 8 9 1-101 4. PROJECT NUMBER: FILE DESIGNATION CLIENT: PROJECT TITLE: Dist'iboHon Not- 20130217.00.RA 20130217.00.RA P Onslow County ABC B—d ABC Ware house Bank Stabilization D. Evans Contacting, Inc. Dale Updated: 8/6/2014 Ini6a1: JAC A as N - Approved as Noted NET- No Exception Taken NETS as N- No Exception Taken Except as Noted R & R - Revise and Resubmit REJ -R jetted Sho D— SUBMITTAL DATE SPEC. DATE No. NO. RECEIVED SECTION DESCRIPTION M ... f -oo- RETURNED STATUS Coo- 1 1 7/7/2014 Plans/Sp—ml Pro'. Tech. S e cs Sheet Pile - Su edoc Series 1580 Creative Pultmsions 7/7/2014 NET Reviewed b EBP Modeling Services of 2 1 7/11/2014 peda I pets. Plans/S 1 Pro'. Tech. S J et Filte' Illinois, I.C. 7/11 /2014 NET Reviewed b EBP y 3 1 7/11/2014 Plan,/Sp—ml Pro'. Tech. Spocs. Specs. Wale' IMPW 7/11 /2014 NET as N Reviewed by EBP 4 1 7/11/2014 Plan,/Sp-ml Proj. Tech. Specs. Helical Ancho's Hubbell Po— Systems 7/11 /2014 NET Reviewed by EBP 5 1 7/11/2014 Plan,/Sp—ml Pro'. Tech. Specs. T— inato's to Wale' IMPW 7/11 /2014 NET as N Reviewed bV EBP 61 1 7/11/2014 Plan,/Special Pro'. Tech. Spocs.. Specs.. Fill e' Fabfic T—Cate 7/11 /2014 NET Reviewed b EBP 7 1 7/18/2014 333100 Ductile Iron 401 Lined Pipe G'iffin/US Pipe 7/31/2014 NET as N Pe' Cont'acto' email -size changed to 6" 8 1 7/18/2014 33 41 00 PVC Schedule 40 Pie s —,s NET Whe'e is this bein g used? 9 1 7/18/2014 33 41 00 N-12 Pie ADS, Inc. 7/31/2014 NET to 1 7/18/2014 334100 PVC DWV Fittings s —,s 7/31/2014 NET 11 1 7/18/2014 333100 MJ 401 Lined Fittings Custom Fab 7/31/2014 NET as N Pe' Cont'acto' email -size changed to 6" 12 1 7/18/2014 333100 Bass Cl-.out Plugs MATCO-NORCA 7/31/2014 NET 131 1 7/18/2014 33 41 00 N-12 Fittings ADS, Inc 7/31/2014 NET 14 1 7/18/2014 1333100 Cl-.out Ada te' N o last 7/31/2014 NET Reviewed by MTH. This shop d'awing is being' jetted since this he'bicide is not Southe'n Agficultual safe to' aquatic inve'tebates and othe' 15 2 7/28/2014 32 92193 Atazine 4L Herbicide Insecticides, Inc 8/6/2014 REJ sto —V—d—d biotics. Please conside' using a glyphosate he'bicide such as Rodeo Whe'e is this being used? Reviewed by 16 2 7/28/2014 Bioba"ie' BBA Nonwovens MTH Reviewed by MTH. This shop d'awing is being' jetted since this he'bicide is not safe to' aquatic inve'tebates and othe' 17 2 7/28/2014 329219-3 Ce'tainty He'bicide Monsanto Company 8/6/2014 REJ sto —V—d—d biotics. Please conside' using a glyphosate he'bicide such as Rodeo 18 2 7/28/2014 SP -11 Com ost M—V Oaks Soil Builde' 8/6/2014 NET Reviewed bV MTH Reviewed by MTH, This shop d'awing is 19 2 7/28/2014 N/A Dylox Insecticide Baye' Environmental Science 8/6/2014 REJ 'jetted since Insecticides are not callout o' specified to' this project. 20 2 7/28/2014 SP Coi' Mattin Fibe'wonde's 8/6/2014 NET Reviewed bV MTH Makhteshim A f Reviewed by MTH, This shop d'awing is 21 2 7/28/2014 N/A ro sec Fipnil Insecticide North Amefica�no 8/6/2014 REJ 'jetted since Insecticides are not callout o' t—mg Reviewed by MTH. This shop is being' jetted since this he'bicide is not Baye' Environmental safe to' aquatic inve'tebates and othe' 22 2 7/28/2014 3292193 Ronsta'He'bicide Science 8/6/2014 REJ sto —V—d—d biotics. Please conside' using a glyphosate he'bicide such as Rodeo 23 2 7/28/2014 3292193 Roundu Pro He'bicide Monsanto Coma 8/6/2014 NET Reviewedb MTH Erost Conse'vation Seeds 24 3 8/5/2014 SP-8 Wetland Plant Seeds 8/6/2014 NET Reviewed by MTH Inc. Reviewed by MTH, It is noted that s—NII soil components did not fall within the cceptable tinge. Pe' Section 3.0: It is the 25 3 8/5/2014 SP -11 ysis repo' g'ass Soil Anal t to' B —IU:hI Lawn Helena Chemical 8/6/2014 NET as N 'esponsbility of the cont'acto' to follow 'ecom— IRhItions to' soils amendments resulting from soil test results. I'.\projec6\souihport \9065250 \k1.4\sub —i 11,—I, PAYMENT REQUEST LOG Project: Onslow County ABC Bank Stabilization Owner: Onslow County ABC Board Contractor: D. Evans Contracting Project Number: WKD 20130217.00.RA Contract Amount: $198,138.10 Percent Complete 1.2% Start of Construction: 07/14/14 Contract Time: 90 Required Completion: 10/12/14 Time Used: 30 Percent Time: 33.3% No. End of Period Received To Owner Work Complete Stored Materials Total Retainage Total Less Retaina a Previous Payments Payment Due Sales Tax Status 1 07/25/14 08/06/14 08/12/14 $2,390.00 $35,521.69 $37,911.69 $1,895.58 $36,016.11 111 1111 1111 1111 $36,016.11 $2,486.52 Unpaid Total 1 $36,016.111 $2,486.52 CHANGE ORDER LOG Project: Owner: Contractor: Project Number: Onslow County ABC Bank Stabilization Onslow County ABC Board D. Evans Contracting WKD 20130217.00.RA Start of Construction Contract Time Time Extension Total Time Date for Completion Chanqe Orders 07/14/14 Original Contract Amount $198,138.10 90 Change In Price $0.00 New Contract Amount $198,138.10 90 10/12/14 Change in Price $0.00 0 Change in Time