Hey Colleen,
Sounds good. Sorry I was thinking Buffer one was the first 20 ft. To answer your questions.
1) only the first 20 ft will be cleared. No other trees other than what I have marked already will be cut.
2) the clearing is just for the installation of seawall.
3) once the seawall is installed and backfilled there will be grass planted back in that area. I'm not sure about any trees
or bushes being planted at this time. I'll leave that to the property owner once we move out.
4) the 1400 square foot impacted above normal pool does include the dredging of the boat slip. Your number is in the
previous email are correct.
5) the area is already accessible. I will not need to remove any more trees within the buffer to access the waterfront
with my equipment.
When I move out everything Disturbed will be seeded or mulched to prevent erosion. And there will be a silt fence
installed.
Thanks
On Thu, Jun 9, 2022, 9:12 AM Cohn, Colleen M <colleen.cohn@ncdenr.gov> wrote:
Hey Greg,
It looks like this one took a while getting out for Public Notice. The PN Comment period ends on 6/16, so I can't issue
until at least 6/17.
A couple of quick questions after looking at the application:
1. Zone 1 is the first 30 feet, so to confirm, clearing is only occurring within the first 20 feet? No other trees are
being cut within the buffer?
2. Is clearing solely for installation of the seawall?
i
3. Will any vegetation be replanted after the seawall is installed?
4. Is the 1400 sq ft of above normal pool impacts including the boathouse? (Is it 1400 sq ft of clearing or is it 1,144
sq ft of clearing with 256 sq ft of excavation for the boathouse?)
5. Do they need an access trail or road to the boathouse?
Thanks,
Colleen Cohn
Environmental Specialist II
North Carolina Department of Environmental Quality
Division of Water Resources
Raleigh Regional Office
380o Barrett Drive
Raleigh, NC 27609
Office: 919-791-4258
E-mail correspondence to and from this address may be subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Greg Poland <gpoland1982@gmail.com>
Sent: Wednesday, June 1, 2022 4:26 PM
To: Cohn, Colleen M <colleen.cohn@ncdenr.gov>
Subject: [External] Re: Provisional RGP 80 Verification, SAW-2022-00938, 1069 Sagamore Drive
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good afternoon Colleen, I received verification from April Norton last week that they were done with the 1069
Sagamore Drive project. Are you almost finished with that one? I know you have a lot on your plate but this one is
almost 2 months old so I figured I'd check in with you. I look forward to hearing from you soon. Thanks!
2
Greg Poland
Poland's Home Improvement
(252)907-9851
GPoland1982@gmail.com
On Wed, May 18, 2022, 9:36 AM Norton, April R CIV USARMY CESAW (USA) <April.R.Norton@usace.army.mil> wrote:
Dear Greg Poland,
This is a provisional general permit verification. Your proposed work may be authorized by the above referenced
general permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps
will provide you with a final general permit verification. Your proposed work shall not commence until after the 401
Certification has been issued or waived and until a final general permit verification has been provided to you.
Additional special conditions may be added to the final general permit verification.
Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory
program.
April R. Norton
Regulatory Division
US Army Corps of Engineers
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 441-3637
Fax: (919) 562-0421
Email: April.R.Norton@usace.army.mil
3