Loading...
HomeMy WebLinkAbout20120073 All Versions_email drainage revisions_20140815 Ridings, Rob From:Ridings, Rob Sent:Friday, August 15, 2014 8:59 AM To:Montague, Heather W; Eric.C.Alsmeyer@usace.army.mil Cc:Shapiro, Alan W; Atkins, Robert J; Murray, Christopher A; Phipps, Dawn; Shannon, Liam W Subject:RE: R-2241A (Person) Site 3 Drainage Revisions Heather, Thanks for the information. I’ll file it for records. Looks good on our end. Thanks, Rob From: Montague, Heather W Sent: Wednesday, August 13, 2014 12:47 PM To: Eric.C.Alsmeyer@usace.army.mil; Ridings, Rob Cc: Shapiro, Alan W; Atkins, Robert J; Murray, Christopher A; Phipps, Dawn; Shannon, Liam W Subject: R-2241A (Person) Site 3 Drainage Revisions Eric and Rob- This email is for your records only so that you are aware of the existing conditions and necessary drainage revisions at R- 2241A Site 3. In the years between project design and construction, it is apparent that numerous changes were made “by others” to include piping portions of once open stream segments to support driveway/yard changes, addition of drop inlets, and addition of a junction box with manhole, etc. These changes will require some field adjustments in order to get the existing drainage to tie into the project drainage. NCDOT proposes to elbow the section of pipe below the last driveway over and match it with the proposed ditch (this will eliminate the need of a new 900mm driveway pipe). These changes do not affect stream impacts and will be reflected in the as-builts. Note that I’ve sent you information before about this general area. Reference email string starting 10/17/13 and finishing on 11/08/13 for Site 3 EC question where it was decided to eliminate the installation of a skimmer basin shown on the EC plans at STA 20+30RT. Heather W. Montague NCDOT DIV 5 Environmental Specialist hwmontague@ncdot.gov (252)492-0111 office (919)691-1596 cell Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1