Loading...
HomeMy WebLinkAboutWQ0037835_Monitoring - 06-2022_20220720 DWR - NonDischarge Monitoring Report Submittal y. •4 .. NORTH CAROLINA Enrlranmenlel QHaflly Monitoring Report Submittal .............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Permit Number#* WQ0037835 Name of Facility:* James A. Loughlin(Northside)WWTP Month:* June Year:* 2022 Report Information Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR JUNE 2022 N DMR 256.89KB Electronically.pdf PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2,NDMLR,GW-59). Confirmation Email Address:* milton.vann@cfpua.org Name of Submitter:* Milton Vann Signature: Date of submittal: 7/20/2022 This will be filled in automatically Initial Review .............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Reviewer: Gerald,Wanda Is the project number correct?* WQ0037835 Is the monitoring report accepted?* Yes No Regional Office* Wilmington Reviewer: _anonymous Review Date: 8/3/2022 235 Government Center Drive MO C Fear Wilmington,NC 28403 Phone: (910)332-6736 Fax: (910)332-6731 Public Utility Authority WASTEWATER TREATMENT Stevantseip.Sustanabeity.Service. July 18, 2022 Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh,NC 27699-1617 The June 2022 Non-Discharge Monitoring Report (NDMR) for the James A. Loughlin (Northside) Wastewater Treatment Plant, Reclaimed Water Generation and Bulk Distribution System(WQ0037835)accompanies. Should you have any questions,please contact me at(910) 332-6586. Sincerely, Milton S. Vann, Jr. Wastewater Treatment Superintendent lc Attachments By E-Mail cc: Jeff Cermak,NS WWT Plant Supervisor Tristin Rickabaugh,NS Operations Supervisor Frank Styers, Assistant Executive Director, CFPUA Matt Hourihan, Assistant Operation Director, CFPUA Beth Eckert, Environment Management Director, CFPUA Carel Vandermeyden, Assistant Executive Director, CFPUA WWT file FORM:NDMR 03-12 NON-DISCHARGE MONITORING REPORT(NDMR) Page 1 of 2 Permit No.: WQ0037835 Facility Name: Northside WWTP 1 County: New Hanover Month: June I Year: 2022 PPI: 001 Flow Measuring Point: ❑Influent ❑Effluent ❑✓ No flow generated Parameter Monitoring Point: ❑Influent i]Effluent ❑Groundwater Lowering ❑Surface Water Parameter Code -* WQ01 00310 61211 31616 00610 00600 00400 00665 00530 00076 c - to > 0ma, 0 m m u E '9 ctf, d 2:. � 0 E o a o00ao -2 c V ~ icia' O m uo E . I- u z 3 t'0 re C w core 24-hr hrs Gallons mg/L #/100 mL #/100 mL mg/L mg/L su mg/L mg/L NTU 1 0 2 0 3 0 4 0 5 0 6 0 _ 7 0 8- 0 T 10 0 11 0 - - _ 12 0 13 0 14 0 15 0 _ 16 _ 0 _ 17 0 18 0 19 0 - .. ` 20 0 21 0 22 0 23 0 24 0 25 0 26 0 27 0 28 0 29 0 30 0 31, 0 Average: 0 Daily Maximum: 0 ,- Daily Minimum: 0 _ Sampling Type: Calculated Composite Grab j j. Grab Composite Composite Grab Composite Composite Grab Monthly Avg.Limit: 10 14 4 5 Daily Limit: 15 14 25 6 6-9 10 10 Sample Frequency: Monthly Monthly Monthly If EC>14 Monthly j Monthly 5 x Week Monthly Monthly Per Event FORM:NDMR 03-12 NON-DISCHARGE MONITORING REPORT(NDMR) Page 2 of 2 Sampling Person(s) Certified Laboratories Name: No sampling conducted,zero gallons of reclaimed water distributed. Name: Name: Name: Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? 2 Compliant E Non-Compliant If the facility is non-compliant,please explain in the space below the reason(s)the facility was not in compliance. Provide in your explanation the date(s)of the non-compliance and describe the corrective action(s)taken.Attach additional sheets if necessary. Zero gallons of reclaimed water distributed. Operator in Responsible Charge(ORC)Certification Permittee Certification ORC: Geoffrey D. Cermak Permittee: Cape Fear Public Utility Authority-Northside WWTP Certification No.: 27164 Signing Official: Milton S.Vann Grade: WW- IV Phone Number: 910-332-6562 Signing Official's Title: Wastewater Treatment Superintendent Has the ORC changed since the previous NDMR? ❑Yes 0 No Phone Number: 910-332-6586 Permit Expiration: 1/31/2021 1 111 - I $ 2-Z V � �_. - L- 7& Jidture Date Signature Date By this signature,I certify that this report is accurrate and complete to the best of my knowledge. I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh,North Carolina 27699-1617