HomeMy WebLinkAbout20140696 Ver 1_Approval Letter_20140806�"r
NCDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory John E. Skvarla, III
Governor Secretary
August 6, 2014
Strick's Family Camp Ground
Ernestine J. Strickland
Post Office Box 14
Hertford, NC 27944
DWQ Project # 14 -0696
Perquimans County
Subject Property: Strick's Family Camp Ground, 168 Hertford Beach Road
Perquimans River Basin, Perquimans River [PAS 52, 30- 6 -(3); SC]
Approval of 401 Water Quality Certification (GC3900) with Additional Conditions
Dear Ms. Strickland:
You have our approval, in accordance with the attached conditions and those listed below, to
construct three (3) 2 foot x 14 foot finger piers and install 23 pilings to expand the existing
dockage from 18 slips to 20 slips with proposed shading impact of 84 square feet (0.0019
acres). The proposed project is as described within your CAMA Major application dated July 3,
2014 and received by the N.C. Division of Water Resources (DWR) on July 7, 2014. The
impacts described in your application are covered by General Water Quality Certification
Number(s) 3900 - (GC3900). This Certification(s) is issued in conjunction with the CAMA Major
Permit and General Permit(s) 198000291 issued by the US Army Corps of Engineers (USACE).
This Certification allows you to use the CAMA Major Permit when the Division of Coastal
Management issues it. In addition, you should obtain or otherwise comply with any other
required federal, state or local permits before you go ahead with your project including (but not
limited to) Erosion and Sediment Control, Non - discharge regulations. Also, this approval to
proceed with your proposed impacts or to conduct impacts to waters as depicted in your
application shall expire upon expiration of the 404 or CAMA Permit.
This approval is for the purpose and design that you described in your application. Approved
plans and specifications for this project are incorporated by reference and are enforceable parts
of the permit.` If you change your project, you must notify us and you may be required to send
us a new application. If the property is sold, the new owner must be given a copy of this
Certification and approval letter and is thereby responsible for complying with all conditions. If
total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of
stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h).
Division of Water Resources — Water Quality Regional Operations Section — Washington Regional Office
943 Washington Square Mall, Washington, NC 27889
Phone: 252- 946 -64811 Fax: 252- 975 -3716\ Internet: www.nedenr.gov
Strick's Family Camp Ground
Ernestine J. Strickland
August 7, 2014
Page 2 of 3
This approval requires you to follow the conditions listed in the attached certification and any
additional conditions listed below.
The Additional Conditions of the Certification are:
1. Impacts Approved
The following impacts are hereby approved as long as all of the other specific and general
conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are
approved including incidental impacts:
2. Water Quality Certification
The proposed project must comply with all of the conditions of General Water Quality
Certification (GC) 3900.
3. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or
applicable Buffer Rules, and any subsequent modifications, the applicant is required to
return the attached certificate of completion to the 401 Oversight/Express Review Permitting
Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699 - 1650.
4. Washing of boats within docking facility is prohibited as the wash water is considered to be a
wastewater and must be collected and disposed of property.
Violations of any condition herein set forth may result in revocation of this Certification and may
result in criminal and /or civil penalties. The authorization to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application and as authorized by
this Certification shall expire upon expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved
water impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the
date that you receive this letter. To ask for a hearing, send a written petition, which conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings,
6714 Mail Service Center, Raleigh, N.G. 27699 -6714. This certification and its conditions are
final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Resources under Section 401 of the
Clean Water Act. If you have any questions, please telephone Roberto Scheller of the
Amount Approved
Units
Plan Location or Reference
Stream
feet
404 /CAMA Wetlands
acres
Waters
0.0019 acres shading
Application Plan Sheets
Buffers
(square fit.
2. Water Quality Certification
The proposed project must comply with all of the conditions of General Water Quality
Certification (GC) 3900.
3. Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or
applicable Buffer Rules, and any subsequent modifications, the applicant is required to
return the attached certificate of completion to the 401 Oversight/Express Review Permitting
Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC,
27699 - 1650.
4. Washing of boats within docking facility is prohibited as the wash water is considered to be a
wastewater and must be collected and disposed of property.
Violations of any condition herein set forth may result in revocation of this Certification and may
result in criminal and /or civil penalties. The authorization to proceed with your proposed
impacts or to conduct impacts to waters as depicted in your application and as authorized by
this Certification shall expire upon expiration of the 404 or CAMA Permit.
If you do not accept any of the conditions of this Certification (associated with the approved
water impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the
date that you receive this letter. To ask for a hearing, send a written petition, which conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings,
6714 Mail Service Center, Raleigh, N.G. 27699 -6714. This certification and its conditions are
final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Resources under Section 401 of the
Clean Water Act. If you have any questions, please telephone Roberto Scheller of the
Strick's Family Camp Ground
Ernestine J. Strickland
August 7, 2014
Page 3 of 3
Washington Regional Office at 252 - 948 -3940 or Karen Higgins of the Wetlands, Buffers,
Stormwater, Compliance and Permitting (Webscape) Unit at 919 -807 -6364.
Sincerely,
Z�f
Robert Tankard
Assistant Regional Supervisor
Division of Water Resources
Enclosures: Certificate of Completion
GC 3940.
cc: Raleigh Bland, Corps of Engineers, Washington Field Office
DWR Webscape Unit
DCM, Doug Huggett, Morehead Office
DCM, Lynn Mathis, Elizabeth City Office
File copy