HomeMy WebLinkAbout20140868 Ver 1_Application_20140813(Version 2; Released April 2014)
42252.1.1 TIP No.:B-5114 County(ies):Randolph Page 1 of 1
TIP Number:Date:
Phone:Phone:
Email:Email:
County(ies):
CAMA County?
No
Design/Future:2035 Existing:Year:
Threatened/Endangered Species?No Comments:
No N/A
N/A
Project Includes Bridge Spanning Water Body?Deck Drains Discharge Over Buffer?Dissipator Pads Provided in Buffer?N/A
Deck Drains Discharge Over Water Body?(If yes, provide justification in the General Project Narrative)(If yes, describe in the General Project Narrative; if no, justify in the
General Project Narrative)(If yes, provide justification in the General Project Narrative)
General Project Information
Project Description
Waterbody Information
Existing Site
Project Length (lin. miles or feet):
ac.
Surface Water Body (1):
Water Supply III (WS-III)NCDWR Surface Water Classification for Water Body
919.707.6731
ac.
Two 12' travel lanes w/2' to 25' grassed shoulders and grassed side slopes.
12300 2015
High Point, NC
3.5
Proposed Project
Yadkin-Pee Dee No
Buffer Rules in Effect
mkelly@ncdot.gov
Impairments:
None
Other Stream Classification:
NonePrimary Classification:
Project Built-Upon Area (ac.)
Annual Avg Daily Traffic (veh/hr/day):
None
This project maintains shoulder section in portions of the -L- line to maintain sheet flow. Directly connected impervious areas have been avoided. Grass conveyance and
shoulder treatment have been maintained to the maximum extent practicable. Energy dissipation has been provided at discharge points and outfalls. Existing eroding ditches
have been stabilized with rip rap and geosynthetics.
Typical Cross Section Description:
8300
Two 12' travel lanes w/12'center turning lane,4' paved shoulders,expressway and
shoulder berm gutter, 4' grassed shoulders and grassed side slopes.
North Carolina Department of Transportation
Highway Stormwater Program
STORMWATER MANAGEMENT PLAN
FOR NCDOT PROJECTS
Project Type:
1020 Birch Ridge Dr.Address:
7/8/2014
WBS Element:
Bridge ReplacementWBS Element:
City/Town:
919.707.6736
Randolph
Raleigh, N.C. 27610
Contractor / Designer:
rlovinggood@ncdot.gov
Address:
B-5114
Ray Lovinggood, PE
Raleigh, N.C. 27610
42252.1.1
River Basin(s):
Mike KellyNCDOT Contact:
General Project Narrative:
(Description of Minimization of Water
Quality Impacts)
1020 Birch Ridge Dr.
NCDWR Stream Index No.:
Surrounding Land Use: Commerical
Uwharrie River 13-2-(0.5)
2.5
Supplemental Classification:
None
None
NoneNone
0.316 MI
None
None
None
N/A
Wetlands within Project Limits?
W
E
T
L
A
N
D
A
N
D
S
U
R
F
A
C
E
W
A
T
E
R
I
M
P
A
C
T
S
P
E
R
M
I
T
S
I
T
E
1
S
I
T
E
3
S
I
T
E
2
S
H
E
E
T
_
_
O
F
_
_
P
E
R
M
I
T
D
R
A
W
I
N
G
255010050255010050 51020 10 DHVDTV ======8,300 12,300 11708 40 %%MPH ADTADT2035% ** TTST 3%DUAL 5%
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
000PROFILE (HORIZONTAL)
4
2
2
5
2
.
1
.
1
P
E
R
O
W
U
T
L
B
R
Z
-
1
6
1
9
(
5
)
B
R
Z
-
1
6
1
6
(
5
)
B
R
Z
-
1
6
1
9
(
5
)
P
R
O
J
E
C
T
L
E
N
G
T
H
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
L
E
T
T
I
N
G
D
A
T
E
:
S
T
A
T
E
S
T
A
T
E
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
S
T
A
T
E
P
R
O
J
.
N
O
.
F.
A
.
P
R
O
J
.
N
O
.
DE
S
C
R
I
P
T
I
O
N
N
O
.
T
O
T
A
L
SH
E
E
T
S
N
.
C
.
S
H
E
E
T
1
P
r
e
p
a
r
e
d
i
n
t
h
e
O
f
f
i
c
e
o
f
:
S
I
G
N
A
T
U
R
E
:
S
I
G
N
A
T
U
R
E
:
P
.
E
.
P
.
E
.
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
2
0
0
6
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
P
R
O
J
E
C
T
E
N
G
I
N
E
E
R
P
R
O
J
E
C
T
D
E
S
I
G
N
E
N
G
I
N
E
E
R
GRAPHIC SCALES PLANSPROFILE (VERTICAL)
H
Y
D
R
A
U
L
I
C
S
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
O
A
D
W
A
Y
D
E
S
I
G
N
L
O
C
A
T
I
O
N
:
T
Y
P
E
O
F
W
O
R
K
:
09/08/99
B
-
5
1
1
4
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
000 See Sheet 1-A For Index of Sheets$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAM E$$$$
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
R
a
l
e
i
g
h
N
C
,
2
7
6
1
0
CONTRACT:TIP PROJECT:B-5114
DEPARTMENT
O
F
T
R
A
N
S
P
OR
T
A
T
IO N
S
TATE
O
F
N
O
R
T
H
C
AROLINA
See Sheet 1-B For Conventional Symbols
J
A
M
E
S
A
.
S
P
E
E
R
,
P
E
A
L
L
I
S
O
N
K
.
W
H
I
T
E
2015 DESIGN DATATOTAL
L
E
N
G
T
H
O
F
T
I
P
P
R
O
J
E
C
T
B
-
5
1
1
4
=
0
.
3
1
6
M
I
-L- STA. 11+50.0
0
BEGIN TIP PROJECT B
-
5
1
1
4
-
L
-
S
T
A
.
2
8
+
2
0
.
0
0
E
N
D
T
IP
P
R
O
J
E
C
T
B
-
5
1
1
4
SR 1619
S
R
1
6
1
9
D
EN
TO
N
RAILRO
AD
TO
SR 1622US 29-70/I-85E
A
P
R
I
L
1
6
,
2
0
1
4
J
U
N
E
1
6
,
2
0
1
5
FUNC CLASS=MINORARTERIAL LENGT
H
R
O
A
D
W
A
Y
T
I
P
P
R
O
J
E
C
T
B
-
5
1
1
4
=
0
.
2
7
0
M
I
S
R
1
6
1
9
(
P
R
O
S
P
E
C
T
S
T
R
E
E
T
)
I
N
H
I
G
H
P
O
I
N
T
4
5
6
7
T
O
S
R
1
6
1
0 T
H
O
M
A
S
V
I
L
L
E
H
I
G
H
P
O
I
N
T TO THOMASVILLE
TO HIGH POINT
B
R
I
D
G
E
1
3
6
O
V
E
R
U
S
2
9
-
7
0
/
I
-
8
5
B
U
S
I
N
E
S
S
O
N
1664CharityChurchLn.Pl.Rd.Bethel Dr.BUS85 $BUS85%2970 HIGH POINTNCRR / NS RAILROAD2970BMendenhailAirportFF136CITY LIMIT CITY LIMITCITY LIMIT Norfolk$OFFSITE DETOUR PROJECT BEGIN PROJECT END %16181610 1616 16101617 1619 16201663 1621 1619 1622 16191623179616231632166816291621162816851665166316271626162716273261162516271624ClaytonSt.sanAve.Arti-Rd.StarflowerDr.Baptist Charity Park BethelDr.Old Thomasville BolivarAve.PineviewAve.BethelAuctionRd.ProspectGableSt.St.TowerAve.BolesAve.ViewOakmontRd.Dr.DixieCecil St.Hills BeverlyDr.Ave.Eastward MissionaryChurch Dr.BerkleySt.ThompsonSt.Old Thomasville AlbertsonZelmaBlvd.Rd.Albertson Rd.Ext.RAILROAD ThompsonExt.Rd.16
1
6
M endenhall
MendenhallRd.OldRd.Point OldProspectMiddle Rd. Church Pilot ViewPostCedarSt.South Rd.High PointCITY LIMIT POP. 90,393DENTONMendenhallVICINITY MAP R
A
N
D
O
L
P
H
C
O
U
N
T
Y
AUCTION RD.
CO
N
V
E
N
T
I
O
N
A
L
P
L
A
N
S
H
E
E
T
S
Y
M
B
O
L
S
-RP1-
-RP2-
-Y4-
A PORTION OF THIS PROJECT IS WITHIN THE MUNICIPAL
B
O
U
N
D
A
R
I
E
S
O
F
H
I
G
H
P
O
I
N
T
.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO TH
E
L
I
M
I
T
S
E
S
T
A
B
L
I
S
H
E
D
B
Y
M
E
T
H
O
D
l
l
l
.
-Y4- STA 7+00
BEGIN CONST.
-Y4- STA 35+50
END CONST.
-RP1EXT-
-Y1-
-Y4-
-
L-
-
L
-
S
T
A
.
1
8
+
8
0
.
6
1
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
.
2
1
+
2
5
.
6
1
E
N
D
B
R
I
D
G
E
LENGT
H
S
T
R
U
C
T
U
R
E
T
I
P
P
R
O
J
E
C
T
B
-
5
1
1
4
=
0
.
0
4
6
M
I
G
R
A
D
I
N
G
,
D
R
A
I
N
A
G
E
,
P
A
V
I
N
G
,
S
T
R
U
C
T
U
R
E
A
N
D
S
I
G
N
A
L
S
4
2
2
5
2
.
2
.
F
R
1
4
2
2
5
2
.
2
.
F
R
U
1
GAS2
955.30 GAS1951.03
GAS3953.42
GAS4953.37
GAS5
953.36 GAS6
953.36 GAS7
953.47 GAS8
955.40
957.07
957.11
GAS11953.97 GAS12953.45 GAS13
958.00
GAS14956.07 GAS15958.55
958.61
966.41
GAS16953.82 GAS17
955.89
INV=9
5
7.0
7
’
INV=95
7.11’
G
R
O
U
N
D
E
L
E
V=955.8
9’
Elv. 9
5
3.8
2
E 16
9
4
80
4.9
4
6
0
N 789
0
69.9
8
90
T
H 1
GR
OU
N
D
E
L
E
V
=95
8.00’
Elv. 9
5
3
.97
E
16
9
4
8
2
4
.2
9
10
N 7
8
94
2
9
.7
5
9
0
T
H 2
GR
OU
N
D
E
L
E
V=958.00’
Elv. 95
3.45
E 1694824.3740
N 789430.212
0
T
H 3
Elv. 953.42
E 16
9
4
8
5
8.6
7
9
0
N
7
8
9
54
7.2
6
2
0
T
H 4
E
l
v
.
9
5
1
.
0
3
E
16948
6
3.293
0
N
7895
5
8
.740
0
T
H
5
Elv. 9
5
3
.37
E
16
9
4
8
6
3
.
5
2
5
0
N
7
8
9
5
5
8.700
0
T
H
6
E
l
v
.
9
5
3
.
3
6
E
1
6
9
4
8
6
7
.
4
2
5
0
N
7
8
9
5
6
7
.
3
5
4
0
T
H
7
El
v
.
9
5
3
.
3
6
E
1
6
9
4
8
6
7
.
7
9
1
0
N
7
8
9
5
6
7
.
5
4
7
0
T
H
8
El
v
.
9
5
3
.
4
7
E
169
4
86
9.7
7
90
N
7
8
9
5
6
6
.
6
4
1
0
TH
9
GROU
N
D
EL
=958.55’
V
A
L
VE E
L=9
5
6.07’
C
O
R
S
9
6
N
A
D
8
3/
1
8
S
H
E
E
T
_
_
O
F
_
_
P
E
R
M
I
T
D
R
A
W
I
N
G
SSSURFAC
E
W
A
T
E
R
DENOT
E
S
I
M
P
A
C
T
S
I
N
Scale: 1"= 100’0’
1
0
0
’
2
0
0
’
3
0
0
’
100’R:\Hydraulics\PERM ITS_Environm ental\Drawings\B5114_Hyd_prm _wet_PSH04.dgnmkelly7/9/2014
-
R
P
1E
X
T
-
11
12
13
14
1
5
1
6
26
25
17
18
19
20
21
22
23
24
1
5
10 11 12 13
1
4
1
6
1
7
1
8
1
9
2
0
2
1
2
2
S
E
E
D
E
T
A
I
L
S
I
T
E
1
S
S
S
15" RCP Approx. LocationREMOVEREMO
V
E
Convert to JBwMH
T
B
2
G
I
T
B
2
G
I
C
L
B
R
I
P
R
A
P
T
B
2
G
I
T
B
2
G
I
T
B
2
G
I
T
B
2
G
I
R
E
T
A
I
N
R
E
T
A
I
N
RETAINREMOVE
18" RCP-III
15"
15"
12" RCP-V
12" RCP-V
REMOVE/REPLACE
2
G
I
E
L
B
O
W
S
w
/
2
ELBO
W
S
w
/
2
R
E
M
O
V
E
/
R
E
P
L
A
C
E
C
L
B
R
I
P
R
A
P
2GI
18" RC
P-V
12" RCP-V
15
" RC
P-II
I
2
G
I
C
L
B
R
I
P
R
A
P
R
E
M
O
V
E
H
W
2
G
I
2
G
I
T
B
2
G
I
P
R
E
C
A
S
T
M
H
6
’
D
I
A
.
18" RCP-III 2GI 18" RCP-III
15
" RC
P-V
18" RCP-III
*
N
O
T
E
:
N
O
D
E
C
K
D
R
A
I
N
S
R
E
Q
U
I
R
E
D
24" RCP-III
24" RCP-IV
24" R
C
P-IV
24" RCP-III
2
G
I
2
G
I
R
E
M
O
V
E
F
L
O
W
A
B
L
E
F
I
L
L
F
L
O
W
A
B
L
E
F
I
L
L
P
L
U
G
P
L
U
G
P
L
U
G
PLU
G
P
P
P
P
EL
B
ELB
ELB
ELB
O
F
2
4
"
R
C
P
-
I
I
I
R
E
P
L
A
C
E
W
I
T
H
1
6
L
F
C
O
L
L
A
R
A
N
D
8
L
F
O
F
2
4
"
C
O
N
C
P
I
P
E
.
R
E
M
O
V
E
F
E
S
&
C
O
N
C
C
A
N
O
P
Y
M
T
L
S 1SFD GRV1SFDGRV
G
R
V
1S
M
T
L
B
U
S
GRV
GR
V
12" CONC DI
G
R
V
L
T
L
T
L
T
7
2
" C
HL
w
/
3
S
B
W PLANTERG
R
V
G
R
V
B
S
T
1S
M
T
L
B
U
S
G
R
V
24" RCP
24" RCP
24" RCP
DI
DI
G
R
V
G
R
V
A
/
G
G
A
S
3
0
0
0
0
G
A
L
S
A
/
G
G
A
S
15
0
0
0
GA
L
S
GATE
W OOD
VAR HT
W
O
O
D
V
A
R
H
T
w
/
M
T
L
P
O
S
T
M
T
L
GU
A
R
D
R
A
IL
H
O
U
S
E
S
IGN
AL
R
/
R
HW 2 @ 10" CMP
WW
WW
WW
WW
W
W
WW
WW
WW
1 3
6
12
15
16
30
WOODS
WOODS
WOODS
LT
"AUCTION"
NCGS MON.
72" CHL W/ 3SBW
72" CHL W/ 3SBW
7
2
" C
HL
W/
3
S
B
W 7
2
"
C
H
L
W/
3
S
B
W
72" CHL W/ 3SBW
7
2
"
C
H
L
W/
3
S
B
W
7
2
"
C
H
L
W/
3
S
B
W
7
2
"
C
H
L
W/
3
S
B
W
72" CHL W/ 3SBW48" CHL48" CHL BST AND GRV
72" CHL W/ 3SBW
GATE
F
E
S
GRV DI
-
E
L
-
-EY4-
-EL-
-
E
Y
6
-
G
A
T
E
HIGH POINT
, T
H
O
MAS
VILL
E
AND
D
E
NT
ON
R
AILR
OAD
(CS
X)
S
HE
D
MT
L
AN
D
B
L
K
1S
B
L
K
W/
M
T
L
B
U
S
GUARD HOUSE BK
W/
L
T
W/LT
W/LT
W/
L
T
T
E
O
I
EOI
EOI
EOI
-EY5-18" RCP
EOI
EOI
72" CHL W/ 3SBW
UNABLE TO LOCATE END15" RCP72" CHL W/ 3SBW48" CHL 48’ CHL 48" CHL 12" RCP
72" CHL W/ 3SBW
W/LT
R/R TIES
-EY4LOOP1-
REVISIONS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
$$$$$$SYSTIM E$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
4
B
-
5
1
1
4
SE
E S
HE
E
T 6
M
ATC
H LINE -
Y4- 17+00.00
M ATCH LINE -L- STA. 22+50.00 SEE SHEET
5
M
ATC
H LINE -
Y4- ST
A. 26
+50.00 SEE S
HE
E
T 7
N
A
D
8
3
/
C
O
R
S
9
6
FFFCFC
F
C
F
C
C
C
F
C
C
C
CC
C
C
C
C
C
C
C
F
F
C
C
F
C
F
F
C
F
C
C
C
C
C
C
C
C
C
C
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
F
F
F
F
F
F
F
F
F
F
F
F
F
F
2
8
S
H
E
E
T
_
_
O
F
_
_
P
E
R
M
I
T
D
R
A
W
I
N
G
SSSURFAC
E
W
A
T
E
R
DENOT
E
S
I
M
P
A
C
T
S
I
N
Scale: 1"= 100’0’
1
0
0
’
2
0
0
’
3
0
0
’
100’R:\Hydraulics\PERM ITS_Environm ental\Drawings\B5114_Hyd_prm _wet_PSH04.dgnmkelly7/9/2014
-
R
P
1E
X
T
-
11
12
13
14
1
5
1
6
26
25
17
18
19
20
21
22
23
24
1
5
10 11 12 13
1
4
1
6
1
7
1
8
1
9
2
0
2
1
2
2
S
E
E
D
E
T
A
I
L
S
I
T
E
1
S
S
S
15" RCP Approx. LocationREMOVEREMO
V
E
Convert to JBwMH
T
B
2
G
I
T
B
2
G
I
C
L
B
R
I
P
R
A
P
T
B
2
G
I
T
B
2
G
I
T
B
2
G
I
T
B
2
G
I
R
E
T
A
I
N
R
E
T
A
I
N
RETAINREMOVE
18" RCP-III
15"
15"
12" RCP-V
12" RCP-V
REMOVE/REPLACE
2
G
I
E
L
B
O
W
S
w
/
2
ELBO
W
S
w
/
2
R
E
M
O
V
E
/
R
E
P
L
A
C
E
C
L
B
R
I
P
R
A
P
2GI
18" RC
P-V
12" RCP-V
15
" RC
P-II
I
2
G
I
C
L
B
R
I
P
R
A
P
R
E
M
O
V
E
H
W
2
G
I
2
G
I
T
B
2
G
I
P
R
E
C
A
S
T
M
H
6
’
D
I
A
.
18" RCP-III 2GI 18" RCP-III
15
" RC
P-V
18" RCP-III
*
N
O
T
E
:
N
O
D
E
C
K
D
R
A
I
N
S
R
E
Q
U
I
R
E
D
24" RCP-III
24" RCP-IV
24" R
C
P-IV
24" RCP-III
2
G
I
2
G
I
R
E
M
O
V
E
F
L
O
W
A
B
L
E
F
I
L
L
F
L
O
W
A
B
L
E
F
I
L
L
P
L
U
G
P
L
U
G
P
L
U
G
PLU
G
P
P
P
P
EL
B
ELB
ELB
ELB
O
F
2
4
"
R
C
P
-
I
I
I
R
E
P
L
A
C
E
W
I
T
H
1
6
L
F
C
O
L
L
A
R
A
N
D
8
L
F
O
F
2
4
"
C
O
N
C
P
I
P
E
.
R
E
M
O
V
E
F
E
S
&
910915 915915915920 920920920
9
2
0
9
2
5
925
925 925 925925930 930930930
930
9
3
0
930
930
9
3
0
930
935
935
93
5
9
3
5
935
935
935
935
935
935
935
935
93
5
935935935
935
935
9
3
5
935
9
3
5
93
5
935
935
935 935935935
940
94
0
9
4
0
940
940
940
940
9
4
0
940
940
940
940
940
940
940
940940
9
4
0
940
940
940 940940940 940 940 940 945945945945945945945945945945
945
945
94
5
94
5
9
4
5
945
94
5
945
945
945
945
945
945 945
945
945
945
945
945
94
5
945
9
4
5
945
950950950950
9
5
0
9
5
0
950
9
5
0
950950950950950950950950950950950950950
950
950
950 950
950
9
5
0
950
950
950
950
950
950
950
950
950
950
950
950
950
9
5
0
9
5
0
950950950 950 950 950950
9
5
5
9
5
5
9
5
5
9
5
5
9
5
5955 955 955
955
955
955
955
955
9
5
5
955
955
955
955
955
955
955
955
955
9
5
5
9
5
5
9
5
5
9
5
5
9
5
5
9
5
5
955955955955955955955955955955
95
5
95
5
955
955
955955
9
60
9
6
0
9
6
0
9
6
0
9
6
0
960 960
960
960
960
960
9
60
960
9
6
0
960
960
960
960
960
960
9
6
0
960
9
6
0
960
96096
0
960
960
960
960
960
960
960960960
960
9
6
0
9
6
0
9
60
960
960
9
6
5
9
6
5
965
965
965
9
6
5
965
965
9
6
5
9
6
5
965
965965
9
6
5
965
965
965
965
965
9
7
0
9
7
0
970
970
970
970
970
970
97
5
9
7
5
975
975
C
O
N
C
C
A
N
O
P
Y
M
T
L
S 1SFD GRV1SFDGRV
G
R
V
1S
M
T
L
B
U
S
GRV
GR
V
12" CONC DI
G
R
V
L
T
L
T
L
T
7
2
" C
HL
w
/
3
S
B
W PLANTERG
R
V
G
R
V
B
S
T
1S
M
T
L
B
U
S
G
R
V
24" RCP
24" RCP
24" RCP
DI
DI
G
R
V
G
R
V
A
/
G
G
A
S
3
0
0
0
0
G
A
L
S
A
/
G
G
A
S
15
0
0
0
GA
L
S
GATE
W OOD
VAR HT
W
O
O
D
V
A
R
H
T
w
/
M
T
L
P
O
S
T
M
T
L
GU
A
R
D
R
A
IL
H
O
U
S
E
S
IGN
AL
R
/
R
HW 2 @ 10" CMP
WW
WW
WW
WW
W
W
WW
WW
WW
1 3
6
12
15
16
30
WOODS
WOODS
WOODS
LT
"AUCTION"
NCGS MON.
72" CHL W/ 3SBW
72" CHL W/ 3SBW
7
2
" C
HL
W/
3
S
B
W 7
2
"
C
H
L
W/
3
S
B
W
72" CHL W/ 3SBW
7
2
"
C
H
L
W/
3
S
B
W
7
2
"
C
H
L
W/
3
S
B
W
7
2
"
C
H
L
W/
3
S
B
W
72" CHL W/ 3SBW48" CHL48" CHL BST AND GRV
72" CHL W/ 3SBW
GATE
F
E
S
GRV DI
-
E
L
-
-EY4-
-EL-
-
E
Y
6
-
G
A
T
E
HIGH POINT
, T
H
O
MAS
VILL
E
AND
D
E
NT
ON
R
AILR
OAD
(CS
X)
S
HE
D
MT
L
AN
D
B
L
K
1S
B
L
K
W/
M
T
L
B
U
S
GUARD HOUSE BK
W/
L
T
W/LT
W/LT
W/
L
T
T
E
O
I
EOI
EOI
EOI
-EY5-18" RCP
EOI
EOI
72" CHL W/ 3SBW
UNABLE TO LOCATE END15" RCP72" CHL W/ 3SBW48" CHL 48’ CHL 48" CHL 12" RCP
72" CHL W/ 3SBW
W/LT
R/R TIES
-EY4LOOP1-
REVISIONS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
$$$$$$SYSTIM E$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
4
B
-
5
1
1
4
SE
E S
HE
E
T 6
M
ATC
H LINE -
Y4- 17+00.00
M ATCH LINE -L- STA. 22+50.00 SEE SHEET
5
M
ATC
H LINE -
Y4- ST
A. 26
+50.00 SEE S
HE
E
T 7
N
A
D
8
3
/
C
O
R
S
9
6
FFFCFC
F
C
F
C
C
C
F
C
C
C
CC
C
C
C
C
C
C
C
F
F
C
C
F
C
F
F
C
F
C
C
C
C
C
C
C
C
C
C
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
F
F
F
F
F
F
F
F
F
F
F
F
F
F
3
8
REVISIONS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
$$$$$$SYSTIM E$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
I
N
C
O
M
P
L
E
T
E
P
L
A
N
S
D
O
N
O
T
U
S
E
F
O
R
R
/
W
A
C
Q
U
I
S
I
T
I
O
N
Scale: 1"= 30’0’30’30’
S
S
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
I
M
P
A
C
T
S
I
N
MATC
H LINE -
Y4- ST
A. 26
+50.00 SE
E S
HE
E
T 7
S
H
E
E
T
_
_
O
F
_
_
P
E
R
M
I
T
D
R
A
W
I
N
G
-RP1EX
T
-
R:\Hydraulics\PERM ITS_Environm ental\Drawings\B5114_Hyd_prm _wet_PSH4A_BU.dgnmkelly7/9/2014
S
S
OO
S
I
T
E
1
D
E
T
A
I
L
J
U
D
IT
H
R
.
M
c
K
A
G
U
E
A
N
D
W
I
F
E
R
O
N
A
L
D
W
.
M
c
K
A
G
U
E
1
0
S
S
S R
E
T
A
I
N
1415
1
6
26
15
" RC
P
-II
I
2
G
I
P
R
E
C
A
S
T
M
H
6
’
D
I
A
.
OF 24" RCP-III REPLACE WITH 16 LF COLLAR AND 8 LF OF 24" CONC PIPE.REMOVE FES &
R
E
T
A
I
N
15
" RC
P
-II
I
2
G
I
P
R
E
C
A
S
T
M
H
6
’
D
I
A
.
24" RCP
9’ BST
9’ BST
V
A
R
B
S
T
V
A
R
B
S
T
VA
R
B
S
T
VAR BST VAR BST
F
E
S
VAR BSTMATC
H LINE -
Y4- ST
A. 26
+50.00 SE
E S
HE
E
T 7
F
F
F
F
F
8
4
S
H
E
E
T
_
_
O
F
_
_
P
E
R
M
I
T
D
R
A
W
I
N
G
Scale: 1"= 100’0’100’200’300’100’SSSURFACE WATER DENOTES IMPACTS IN R:\Hydraulics\PERM ITS_Environm ental\Drawings\B5114_Hyd_prm _wet_PSH07.dgnmkelly7/9/2014SEE DETAIL SITE 1 SEE DETAIL SITE 3 SEE DETAIL SITE 2JUDITH R.
M
c
K
A
G
U
E
AND
W
I
F
E
RONALD W
.
M
c
K
A
G
U
E
10TSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY REVISIONS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
$$$$$$SYSTIM E$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
7
B
-
5
1
1
4
M ATCH LIN E -Y4- STA. 26+50.00 SEE SHEET 4
N
A
D
83/
C
O
R
S
96
S SSSSSSSSSSSTS
2
G
I
R
E
T
A
I
N
T
E
M
P
S
T
E
E
L
P
L
A
T
E
C
L
B
R
I
P
R
A
P
17 272829
3
0
3
1
3
2
3
3
3
4
3
5
2GIREMOVE HW
1
5
"
R
C
P
-
I
I
I
G
R
A
D
E
T
O
D
R
A
I
N
REMOVE
C
L
B
R
I
P
R
A
P
24" RCP-III 24" RCP-III
TRENCHLESS INSTALLATION 24" WELDED STEEL
2GICL B RIP RAP
P
L
U
G
P
L
U
G
F
L
O
W
A
B
L
E
F
I
L
L
P
P
AH
Y
10
97
4
.85
A
HY
11
96
5
.9
7
18" RCP
18
" RC
P
18" RCP
D
I
BILLBOARD
HW
U
S
2
9
/
7
0
(
B
U
S
8
5
)
N
.
B
O
U
N
D
T
O
H
I
G
H
P
O
I
N
T
U
S
2
9
/
7
0
(
B
U
S
8
5
)
S
.
B
O
U
N
D
2
5
’
B
S
T
2
5
’
B
S
T
9
’
B
S
T
8
’
B
S
T
WO
O
D
S
WOODS CITY OF HIGH POINTSTREAM DISAPPEARS STREAM REAPPEARS FES
F
E
S
-
E
Y
4
-
22
56
R
/
W
M
O
N
.
AH
Y
10
97
4
.85
A
HY
11
96
5
.9
7
18" RCP
18" RCP D
I
CITY OF HIGH POINT
G
RA
U
3
5
0
TL-
3
C
A
T
-
1
G
R
A
U
3
5
0
T
L
-
3
FF F FFFFFCFC
F
CF
FF
F
F
FF
FF
FF
FF
FF
F
F
5
8
S
H
E
E
T
_
_
O
F
_
_
P
E
R
M
I
T
D
R
A
W
I
N
G
Scale: 1"= 100’0’100’200’300’100’SSSURFACE WATER DENOTES IMPACTS IN R:\Hydraulics\PERM ITS_Environm ental\Drawings\B5114_Hyd_prm _wet_PSH07.dgnmkelly7/9/2014SEE DETAIL SITE 1 SEE DETAIL SITE 3 SEE DETAIL SITE 2JUDITH R.
M
c
K
A
G
U
E
AND
W
I
F
E
RONALD W
.
M
c
K
A
G
U
E
10TSTSIMPACTS IN SURFACE WATER DENOTES TEMPORARY REVISIONS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
$$$$$$SYSTIM E$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
7
B
-
5
1
1
4
M ATCH LIN E -Y4- STA. 26+50.00 SEE SHEET 4
N
A
D
83/
C
O
R
S
96
S SSSSSSSSSSSTS
2
G
I
R
E
T
A
I
N
T
E
M
P
S
T
E
E
L
P
L
A
T
E
C
L
B
R
I
P
R
A
P
17 272829
3
0
3
1
3
2
3
3
3
4
3
5
2GIREMOVE HW
1
5
"
R
C
P
-
I
I
I
G
R
A
D
E
T
O
D
R
A
I
N
REMOVE
C
L
B
R
I
P
R
A
P
24" RCP-III 24" RCP-III
TRENCHLESS INSTALLATION 24" WELDED STEEL
2GICL B RIP RAP
P
L
U
G
P
L
U
G
F
L
O
W
A
B
L
E
F
I
L
L
P
P
AH
Y
10
97
4
.85
A
HY
11
96
5
.9
7
880
880
885
885
885
88
5
8
8
5
88
5
885
890
890
890
890
890
890
8
9
0
890
890
8
90
895
895
8
9
5
8
9
5
895
89
5
8
95
895
895
895
895
895
895
900
900
900
9
0
0
900
900
900
9
0
0
90
0
900
90
0
900
9
0
0
900900
900
900
900
900
905
905
905
905
905 905 905
9
0
5
905
905
9
0
5
905
9
0
5
905
905
905
905
905
9
0
5
905
905
905
905
910
910
910
910 910 910910 910 910
9
1
0
9
1
0
910
9
1
0
910
9
10
910
910
910
910
910
9
1
0
9
10
9
1
0
910
910
91
0
915
915
915 915 915 915 915 915915
9
1
5
915
915
9
15
915
9
1
5
915
915
915
915
915
915
915
915
9
1
5
915
915
91
5
91
5
920
920
920 920 920 920 920 920920
9
2
0
9
2
0
920
92
0
920
9
2
0
9
2
0
920
920
920
9
20
920
920
9
2
0
9
2
0
920
920
9
2
0
920920
920
92
0
9
2
5
9
2
5
9
2
5
9
2
5
9
2
5
9
2
5
9
2
5
9
2
5
9
2
5
9
2
5
925
925
925
925
9
2
5
9
25
9
2
5
9
2
5
925
925
925
9
2
5
9
2
5
925925925925925925
925925
925925
9
2
5
925
9
2
5
9
2
5
9
2
5
930 93093
0
9
3
0
9
3
0
9
3
0
9
3
0
9
3
0
930930 930930
9
3
0
9
3
0
9
3
0
9
3
0
9
3
0
93 0
93
0
9
3
0
930
9
3
0
9
3
0
9
3
0
930
930
930
9
3
0
9
30
930 930930 930930930
930
9
3
0
9
3
0
930
930
930
930
930
9
3
0
930
9
30
930
930
9
3
0
9
30
935
93
5
9
35
9
3
5
935
935
93
5
9
3
5
9
3
5
9
3
5
935
935
93
5
93
5
935 935
935
9359
3
5
935
9
3
5
940
9
4
0
9
4
0
940
9
4
0
9
4
0
9
4
0
940
9
4
0
9
4
0
9
4
0
940945
945 94
5
94
5
945
945
9
4
5
94
5
945
9
4
5
9
4
5
950
950
950
9
5
0
95
0
9
5
0
9
5
0
95
0
950
950
9
5
5
95
5
955
9
5
5
18" RCP
18
" RC
P
18" RCP
D
I
BILLBOARD
HW
U
S
2
9
/
7
0
(
B
U
S
8
5
)
N
.
B
O
U
N
D
T
O
H
I
G
H
P
O
I
N
T
U
S
2
9
/
7
0
(
B
U
S
8
5
)
S
.
B
O
U
N
D
2
5
’
B
S
T
2
5
’
B
S
T
9
’
B
S
T
8
’
B
S
T
WO
O
D
S
WOODS CITY OF HIGH POINTSTREAM DISAPPEARS STREAM REAPPEARS FES
F
E
S
-
E
Y
4
-
22
56
R
/
W
M
O
N
.
AH
Y
10
97
4
.85
A
HY
11
96
5
.9
7
18" RCP
18" RCP D
I
CITY OF HIGH POINT
G
RA
U
3
5
0
TL-
3
C
A
T
-
1
G
R
A
U
3
5
0
T
L
-
3
FF F FFFFFCFC
F
CF
FF
F
F
FF
FF
FF
FF
FF
F
F
6
8
REVISIONS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
7
A
$$$$$$SYSTIM E$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
I
N
C
O
M
P
L
E
T
E
P
L
A
N
S
D
O
N
O
T
U
S
E
F
O
R
R
/
W
A
C
Q
U
I
S
I
T
I
O
N
S
H
E
E
T
_
_
O
F
_
_
P
E
R
M
I
T
D
R
A
W
I
N
G
S
c
a
l
e
:
1
"
=
3
0
’
0
’
3
0
’
3
0
’
SS
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
I
M
P
A
C
T
S
I
N
R:\Hydraulics\PERM ITS_Environm ental\Drawings\B5114_Hyd_prm _wet_PSH07A_BU.dgnmkelly7/9/2014MATCH LIN E -Y4- STA. 26+50.00 SEE SHEET 4TST
S
I
M
P
A
C
T
S
I
N
S
U
R
F
A
C
E
W
A
T
E
R
D
E
N
O
T
E
S
T
E
M
P
O
R
A
R
Y
S
I
T
E
S
1
,
2
&
3
D
E
T
A
I
L
S
I
T
E
2
S
I
T
E
3
SITE 1S S
S
S
S
S
S S S
SS
ST
S
17 27
2
8
2
9
3
0
2
G
I
R
E
M
O
V
E
H
W
R
E
M
O
V
E
24" RCP-III
24" RCP-III
2
G
I
C
L
B
R
I
P
R
A
P
F
L
O
W
A
B
L
E
F
I
L
L
18" RCP
H
W
W
O
O
D
S
S
T
R
E
A
M
D
I
S
A
P
P
E
A
R
S
S
T
R
E
A
M
R
E
A
P
P
E
A
R
S
F
E
S
C
IT
Y
O
F
H
IG
H
P
O
IN
T
FF F
F
FF
FF
CF
C
F
F
7
8
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design
(ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft)
1 15+85-RP1EXT-RT 24" PIPE EXTENSION &< 0.01 < 0.01 53 10
RIP-RAP EROSION CONTROL
2 28+00-Y4-LT ROADWAY FILL < 0.01 113
3 28+08-Y4-RT 24" PIPE < 0.01 < 0.01 36 8
TOTALS*:0.02 < 0.01 202 18 0
*Rounded totals are sum of actual impacts
NOTES:
Revised 2014 02 18 SHEET OF
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
B-5114
WETLAND PERMIT IMPACT SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
RANDOLPH COUNTY
BRIDGE #136 ON SR 1619
OVER US 29-70/I-85 BUSINESS
8 8
255010050255010050 51020 10 DHVDTV ======8,300 12,300 11708 40 %%MPH ADTADT2035% ** TTST 3%DUAL 5%
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
000PROFILE (HORIZONTAL)
4
2
2
5
2
.
1
.
1
P
E
R
O
W
U
T
L
B
R
Z
-
1
6
1
9
(
5
)
B
R
Z
-
1
6
1
6
(
5
)
B
R
Z
-
1
6
1
9
(
5
)
P
R
O
J
E
C
T
L
E
N
G
T
H
R
I
G
H
T
O
F
W
A
Y
D
A
T
E
:
L
E
T
T
I
N
G
D
A
T
E
:
S
T
A
T
E
S
T
A
T
E
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
S
T
A
T
E
P
R
O
J
.
N
O
.
F.
A
.
P
R
O
J
.
N
O
.
DE
S
C
R
I
P
T
I
O
N
N
O
.
T
O
T
A
L
S
H
E
E
T
S
N
.
C
.
SH
E
E
T
1
P
r
e
p
a
r
e
d
i
n
t
h
e
O
f
f
i
c
e
o
f
:
S
I
G
N
A
T
U
R
E
:
S
I
G
N
A
T
U
R
E
:
P
.
E
.
P
.
E
.
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
2
0
0
6
S
T
A
N
D
A
R
D
S
P
E
C
I
F
I
C
A
T
I
O
N
S
P
R
O
J
E
C
T
E
N
G
I
N
E
E
R
P
R
O
J
E
C
T
D
E
S
I
G
N
E
N
G
I
N
E
E
R
GRAPHIC SCALES PLANSPROFILE (VERTICAL)
H
Y
D
R
A
U
L
I
C
S
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
O
A
D
W
A
Y
D
E
S
I
G
N
L
O
C
A
T
I
O
N
:
T
Y
P
E
O
F
W
O
R
K
:
09/08/99
B
-
5
1
1
4
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
000 See Sheet 1-A For Index of Sheets17-APR-2014 08:56R:\Roadw ay\Proj\B5114_Rdy_tsh.dgn$$$$USERNAME$$$$
1
0
0
0
B
i
r
c
h
R
i
d
g
e
D
r
.
,
R
a
l
e
i
g
h
N
C
,
2
7
6
1
0
CONTRACT:TIP PROJECT:B-5114
DEPARTMENT
O
F
T
R
A
N
S
P
OR
T
A
T
ION
S
T
ATE
O
F
N
O
R
T
H
C
AROLINA
See Sheet 1-B For Conventional Symbols
J
A
M
E
S
A
.
S
P
E
E
R
,
P
E
A
L
L
I
S
O
N
K
.
W
H
I
T
E
2015 DESIGN DATATO
T
A
L
L
E
N
G
T
H
O
F
T
I
P
P
R
O
J
E
C
T
B
-
5
1
1
4
=
0
.
3
1
6
M
I
-L- STA. 11+
5
0
.
0
0
BEGIN TIP PROJE
C
T
B
-
5
114
-
L
-
S
T
A
.
2
8
+
2
0
.
0
0
E
N
D
TIP
P
R
O
J
E
C
T
B
-
5
114
SR 1619
S
R
1
6
1
9
D
EN
TO
N
RAILRO
A
D
TO
SR 1622US 29-70/I-85E
A
P
R
I
L
1
6
,
2
0
1
4
J
U
N
E
1
6
,
2
0
1
5
FUNC CLASS=MINORARTERIAL LE
N
G
T
H
R
O
A
D
W
A
Y
T
I
P
P
R
O
J
E
C
T
B
-
5
1
1
4
=
0
.
2
7
0
M
I
S
R
1
6
1
9
(
P
R
O
S
P
E
C
T
S
T
R
E
E
T
)
I
N
H
I
G
H
P
O
I
N
T
4
5
6
7
T
O
S
R
1
6
1
0 T
H
O
M
A
S
V
I
LLE
H
I
G
H
P
O
I
N
T TO THOMASVILLE
TO HIGH POINT
B
R
I
D
G
E
1
3
6
O
V
E
R
U
S
2
9
-
7
0
/
I
-
8
5
B
U
S
I
N
E
S
S
O
N
1664CharityChurchLn.Pl.Rd.Bethel Dr.BUS85 $BUS85%2970 HIGH POINTNCRR / NS RAILROAD2970BMendenhailAirportFF13
6
CITY LIM IT CITY LIMITCITY LIMIT Norfolk$OFFSITE DETOUR PROJE
C
T
BEGIN PROJECT END %16181610 1616 16101617 1619 16201663 1621 1619 1622 16191623179616231632166816291621162816851665166316271626162716273261162516271624ClaytonSt.sanAve.Arti-Rd.StarflowerDr.Baptist Charity Park BethelDr.Old Thomasville BolivarAve.PineviewAve.BethelAuctionRd.ProspectGableSt.St.TowerAve.BolesAve.ViewOakmontRd.Dr.DixieCecil St.Hills BeverlyDr.Ave.Eastward MissionaryChurch Dr.BerkleySt.ThompsonSt.Old Thomasville AlbertsonZelmaBlvd.Rd.Albertson Rd.Ext.RAILROAD ThompsonExt.Rd.
1
6
1
6
Mendenhall
MendenhallRd
.
Ol
d
Rd.Point OldProspectMiddle Rd. Church Pilot ViewPostCedarSt.South Rd.High PointCITY LIMIT POP. 90,393DENTONMendenhallVICINITY MAP
R
A
N
D
O
L
P
H
C
O
U
N
T
Y
AUCTION RD.
C
O
N
V
E
N
T
I
O
N
A
L
P
L
A
N
S
H
E
E
T
S
Y
M
B
O
L
S
-RP1-
-RP2-
-Y4-
A PORTION OF THIS PROJECT IS WITHIN THE MUNICI
P
A
L
B
O
U
N
D
A
R
I
E
S
O
F
H
I
G
H
P
O
I
N
T
.
CLEARING ON THIS PROJECT SHALL BE PERFORMED T
O
T
H
E
L
I
M
I
T
S
E
S
T
A
B
L
I
S
H
E
D
B
Y
M
E
T
H
O
D
l
l
l
.
-Y4- STA 7+00
BEGIN CONST.
-Y4- STA 35+50
END CONST.
-RP1EXT-
-Y1-
-Y4-
-
L-
-
L
-
S
T
A
.
1
8
+
8
0
.
6
1
B
E
G
I
N
B
R
I
D
G
E
-
L
-
S
T
A
.
2
1
+
2
5
.
6
1
E
N
D
B
R
I
D
G
E
LE
N
G
T
H
S
T
R
U
C
T
U
R
E
T
I
P
P
R
O
J
E
C
T
B
-
5
1
1
4
=
0
.
0
4
6
M
I
G
R
A
D
I
N
G
,
D
R
A
I
N
A
G
E
,
P
A
V
I
N
G
,
S
T
R
U
C
T
U
R
E
A
N
D
S
I
G
N
A
L
S
4
2
2
5
2
.
2
.
F
R
1
4
2
2
5
2
.
2
.
F
R
U
1
C
O
R
S
9
6
N
A
D
8
3/
Existin
g
E
d
g
e
o
f
P
a
v
e
m
e
n
t
Existin
g
C
u
r
b
Propos
e
d
S
l
o
p
e
S
t
a
k
e
s
C
u
t
Propos
e
d
S
l
o
p
e
S
t
a
k
e
s
F
i
l
l
Existin
g
M
e
t
a
l
G
u
a
r
d
r
a
i
l
Existin
g
C
a
b
l
e
G
u
i
d
e
r
a
i
l
Propos
e
d
G
u
a
r
d
r
a
i
l
Equalit
y
S
y
m
b
o
l
Pavem
e
n
t
R
e
m
o
v
a
l
Baselin
e
C
o
n
t
r
o
l
P
o
i
n
t
RIGH
T
O
F
W
A
Y
:
Existin
g
R
i
g
h
t
o
f
W
a
y
M
a
r
k
e
r
Existin
g
R
i
g
h
t
o
f
W
a
y
L
i
n
e
h
Existin
g
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
Propos
e
d
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
CF
Existin
g
E
a
s
e
m
e
n
t
L
i
n
e
Propos
e
d
T
e
m
p
o
r
a
r
y
C
o
n
s
t
r
u
c
t
i
o
n
E
a
s
e
m
e
n
t
Propos
e
d
T
e
m
p
o
r
a
r
y
D
r
a
i
n
a
g
e
E
a
s
e
m
e
n
t
Propos
e
d
P
e
r
m
a
n
e
n
t
D
r
a
i
n
a
g
e
E
a
s
e
m
e
n
t
Propos
e
d
P
e
r
m
a
n
e
n
t
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
HYDROLOGY:Stream or Body of WaterHydro, Pool or ReservoirFlow ArrowDisappearing StreamSpring
;
zvWKProposed Lateral, Tail, Head DitchFalse Sump Propos
e
d
C
a
b
l
e
G
u
i
d
e
r
a
i
l
M
A
J
O
R
:
B
r
i
d
g
e
,
T
u
n
n
e
l
o
r
B
o
x
C
u
l
v
e
r
t
B
r
i
d
g
e
W
i
n
g
W
a
l
l
,
H
e
a
d
W
a
l
l
a
n
d
E
n
d
W
a
l
l
M
I
N
O
R
:
H
e
a
d
a
n
d
E
n
d
W
a
l
l
P
i
p
e
C
u
l
v
e
r
t
F
o
o
t
b
r
i
d
g
e
P
a
v
e
d
D
i
t
c
h
G
u
t
t
e
r
U
T
I
L
I
T
I
E
S
:
ROA
D
S
A
N
D
R
E
L
A
T
E
D
F
E
A
T
U
R
E
S
:
E
x
i
s
t
i
n
g
P
o
w
e
r
P
o
l
e
P
r
o
p
o
s
e
d
P
o
w
e
r
P
o
l
e
P
U
/
G
P
o
w
e
r
C
a
b
l
e
H
a
n
d
H
o
l
e
P
o
w
e
r
M
a
n
h
o
l
e
P
o
w
e
r
L
i
n
e
T
o
w
e
r
P
o
w
e
r
T
r
a
n
s
f
o
r
m
e
r
E
x
i
s
t
i
n
g
J
o
i
n
t
U
s
e
P
o
l
e
P
r
o
p
o
s
e
d
J
o
i
n
t
U
s
e
P
o
l
e
E
x
i
s
t
i
n
g
T
e
l
e
p
h
o
n
e
P
o
l
e
P
r
o
p
o
s
e
d
T
e
l
e
p
h
o
n
e
P
o
l
e
T
e
l
e
p
h
o
n
e
M
a
n
h
o
l
e
T
e
l
e
p
h
o
n
e
B
o
o
t
h
T
e
l
e
p
h
o
n
e
P
e
d
e
s
t
a
l
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
H
a
n
d
H
o
l
e
R}T pQle]/b
H
-
F
r
a
m
e
P
o
l
e
O
O
P
O
W
E
R
:
T
E
L
E
P
H
O
N
E
:
T
e
l
e
p
h
o
n
e
C
e
l
l
T
o
w
e
r
R
e
c
o
r
d
e
d
U
/
G
P
o
w
e
r
L
i
n
e
R
e
c
o
r
d
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
D
e
s
i
g
n
a
t
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
a
b
l
e
(
S
.
U
.
E
.
*
)
R
e
c
o
r
d
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
o
n
d
u
i
t
D
e
s
i
g
n
a
t
e
d
U
/
G
T
e
l
e
p
h
o
n
e
C
o
n
d
u
i
t
(
S
.
U
.
E
.
*
)
R
e
c
o
r
d
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
s
C
a
b
l
e
W
A
T
E
R
:
W
a
t
e
r
M
a
n
h
o
l
e
W
a
t
e
r
M
e
t
e
r
W
a
t
e
r
V
a
l
v
e
W
a
t
e
r
H
y
d
r
a
n
t
R
e
c
o
r
d
e
d
U
/
G
W
a
t
e
r
L
i
n
e
4IHa
T
V
:
T
V
S
a
t
e
l
l
i
t
e
D
i
s
h
T
V
P
e
d
e
s
t
a
l
T
V
T
o
w
e
r
U
/
G
T
V
C
a
b
l
e
H
a
n
d
H
o
l
e
R
e
c
o
r
d
e
d
U
/
G
T
V
C
a
b
l
e
R
e
c
o
r
d
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
C
a
b
l
e
D
e
s
i
g
n
a
t
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
C
a
b
l
e
(
S
.
U
.
E
.
*
)
r|I]
G
A
S
:
G
a
s
V
a
l
v
e
G
a
s
M
e
t
e
r
R
e
c
o
r
d
e
d
U
/
G
G
a
s
L
i
n
e
n c
S
A
N
I
T
A
R
Y
S
E
W
E
R
:
S
a
n
i
t
a
r
y
S
e
w
e
r
M
a
n
h
o
l
e
S
a
n
i
t
a
r
y
S
e
w
e
r
C
l
e
a
n
o
u
t
U
/
G
S
a
n
i
t
a
r
y
S
e
w
e
r
L
i
n
e
R
e
c
o
r
d
e
d
S
S
F
o
r
c
e
d
M
a
i
n
L
i
n
e
D
e
s
i
g
n
a
t
e
d
S
S
F
o
r
c
e
d
M
a
i
n
L
i
n
e
(
S
.
U
.
E
.
*
)
do
A
/
G
W
a
t
e
r
A
b
o
v
e
G
r
o
u
n
d
G
a
s
L
i
n
e
A
/
G
G
a
s
A
b
o
v
e
G
r
o
u
n
d
W
a
t
e
r
L
i
n
e
A
b
o
v
e
G
r
o
u
n
d
S
a
n
i
t
a
r
y
S
e
w
e
r
A
/
G
S
a
n
i
t
a
r
y
S
e
w
e
r
M
I
S
C
E
L
L
A
N
E
O
U
S
:
U
t
i
l
i
t
y
P
o
l
e
OFS3
U
t
i
l
i
t
y
P
o
l
e
w
i
t
h
B
a
s
e
U
t
i
l
i
t
y
L
o
c
a
t
e
d
O
b
j
e
c
t
U
t
i
l
i
t
y
T
r
a
f
f
i
c
S
i
g
n
a
l
B
o
x
U
t
i
l
i
t
y
U
n
k
n
o
w
n
U
/
G
L
i
n
e
?
C
O
N
C
C
O
N
C
W
W
v
v
D
r
a
i
n
a
g
e
B
o
x
:
C
a
t
c
h
B
a
s
i
n
,
D
I
o
r
J
B
S
t
o
r
m
S
e
w
e
r
S
t
o
r
m
S
e
w
e
r
M
a
n
h
o
l
e
m
U
/
G
T
a
n
k
;
W
a
t
e
r
,
G
a
s
,
O
i
l
A
/
G
T
a
n
k
;
W
a
t
e
r
,
G
a
s
,
O
i
l
BOUNDARIES AND PROPERTY:State LineCounty LineTownship LineCity LineReservation LineProperty LineExisting Iron PinProperty CornerProperty MonumentExisting Fence LineProposed Woven Wire FenceProposed Chain Link FenceProposed Barbed Wire Fence gF123Existing Wetland BoundaryProposed Wetland BoundaryExisting Endangered Animal BoundaryExisting Endangered Plant BoundaryBUILDINGS AND OTHER CULTURE:Area Outline Gas Pump Vent or U/G Tank CapChurchSchoolDamSignSmall Mine Well VMWWSxFoundationSBuildingyyVEGE
T
A
T
I
O
N
:
Single
T
r
e
e
XY
V
i
n
e
y
a
r
d
Single
S
h
r
u
b
HedgeWoods
L
i
n
e
O
r
c
h
a
r
d
V
i
n
e
y
a
r
d
RAIL
R
O
A
D
S
:
Standa
r
d
G
a
u
g
e
RR Sig
n
a
l
M
i
l
e
p
o
s
t
SwitchRR Ab
a
n
d
o
n
e
d
RR Dis
m
a
n
t
l
e
d
S
FLOW
D
e
s
i
g
n
a
t
e
d
U
/
G
P
o
w
e
r
L
i
n
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
F
i
b
e
r
O
p
t
i
c
s
C
a
b
l
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
W
a
t
e
r
L
i
n
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
T
V
C
a
b
l
e
(
S
.
U
.
E
.
*
)
D
e
s
i
g
n
a
t
e
d
U
/
G
G
a
s
L
i
n
e
(
S
.
U
.
E
.
*
)
U
/
G
T
e
s
t
H
o
l
e
(
S
.
U
.
E
.
*
)
*S.U.E. = Subsurface Utility EngineeringWLBEIPBECM
C
O
N
C
H
W
C
B
C
S
X
T
R
A
N
S
P
O
R
T
A
T
I
O
N
M
I
L
E
P
O
S
T
3
5
S
W
I
T
C
H
Cemetery
E
X
I
S
T
I
N
G
S
T
R
U
C
T
U
R
E
S
:
Parcel / Sequence Number
E
A
A
T
U
R
E
n
d
o
f
I
n
f
o
r
m
a
t
i
o
n
E
.
O
.
I
.
Note: Not to Scale
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
1
-
B
B
-
5
1
1
4
A
b
a
n
d
o
n
e
d
A
c
c
o
r
d
i
n
g
t
o
U
t
i
l
i
t
y
R
e
c
o
r
d
s
WLBEABEPB
RW
RW
RW
CAE
T
D
E
P
D
E
P
U
E
SPPTTT
C
T
C
T
F
O
T
F
O
WWT
V
T
V
T
V
F
O
T
V
F
O
GG
S
S
F
S
S
F
S
S
?
U
T
L
Jurisdictional StreamJS 12/05/11Buffer Zone 1Buffer Zone 2 BZ 1BZ 2Wetland Propos
e
d
P
e
r
m
a
n
e
n
t
E
a
s
e
m
e
n
t
w
i
t
h
Iron
P
i
n
a
n
d
C
a
p
M
a
r
k
e
r
Propos
e
d
T
e
m
p
o
r
a
r
y
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
T
U
E
Iron
P
i
n
a
n
d
C
a
p
M
a
r
k
e
r
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
w
i
t
h
D
U
E
Propos
e
d
P
e
r
m
a
n
e
n
t
D
r
a
i
n
a
g
e
/
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
A
U
E
Propos
e
d
A
e
r
i
a
l
U
t
i
l
i
t
y
E
a
s
e
m
e
n
t
C
R
Propos
e
d
C
u
r
b
R
a
m
p
S
T
A
T
E
O
F
N
O
R
T
H
C
A
R
O
L
I
N
A
D
I
V
I
S
I
O
N
O
F
H
I
G
H
W
A
Y
S
CO
N
V
E
N
T
I
O
N
A
L
P
L
A
N
S
H
E
E
T
S
Y
M
B
O
L
S
U
n
d
e
r
g
r
o
u
n
d
S
t
o
r
a
g
e
T
a
n
k
,
A
p
p
r
o
x
.
L
o
c
.
G
e
o
e
n
v
i
r
o
n
m
e
n
t
a
l
B
o
r
i
n
g
U
S
T
Known Soil Contamination: Area or SitePotential Soil Contamination: Area or Site Conc
r
e
t
e
o
r
G
r
a
n
i
t
e
R
/
W
M
a
r
k
e
r
Propos
e
d
R
i
g
h
t
o
f
W
a
y
L
i
n
e
w
i
t
h
CA
Conc
r
e
t
e
C
/
A
M
a
r
k
e
r
Propos
e
d
C
o
n
t
r
o
l
o
f
A
c
c
e
s
s
L
i
n
e
w
i
t
h
-
E
Y
4
-
-
Y
4
--RP2-
DATUM DESCRIPTIONTHE LOCALIZED COORDINATE SYSTEM DEVELOPED FOR THIS PROJECTIS BASED ON THE STATE PLANE COORDINATES ESTABLISHED BYNGS FOR MONUMENT "B5114-2"NORTHING: 788040.753(ft) EASTING: 1694751.292(ft)ELEVATION: 963.58(ft)THE AVERAGE COMBINED GRID FACTOR USED ON THIS PROJECT(GROUND TO GRID) IS: 0.99989792THE N.C. LAMBERT GRID BEARING ANDLOCALIZED HORIZONTAL GROUND DISTANCE FROMALL LINEAR DIMENSIONS ARE LOCALIZED HORIZONTAL DISTANCESVERTICAL DATUM USED IS NAVD 88>INDICATES GEODETIC CONTROL MONUMENTS USED OR SET FOR HORIZONTAL PROJECT CONTROLBY THE NCDOT LOCATION AND SURVEYS UNIT.PROJECT CONTROL ESTABLISHED USING GLOBAL POSITIONING SYSTEM.NOTES:1. THE CONTROL DATA FOR THIS PROJECT CAN BE FOUND ELECTRONICALLY BY SELECTINGPROJECT CONTROL DATA AT:THE FILES TO BE FOUND ARE AS FOLLOWS:SITE CALIBRATION INFORMATION HAS NOT BEEN PROVIDED FOR THIS PROJECT. IF FURTHERINFORMATION IS NEEDED, PLEASE CONTACT THE LOCATION AND SURVEYS UNIT.NETWORK ESTABLISHED FROM NGS ONLINE POSITIONING SERVICE (OPUS)HTTPS://CONNECT.NCDOT.GOV/RESOURCES/LOCATION/
>
>
>
>
>
>
>
>
>
>
>
>
>
>
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
6/2/9917-APR-2014 08:56R:\Roadway\Proj\b5114_ls_1c.dgn$$$$USERNAM E$$$$
L
o
c
a
t
i
o
n
a
n
d
S
u
r
v
e
y
s
N
O
T
E
:
D
R
A
W
I
N
G
N
O
T
T
O
S
C
A
L
E
S
U
R
V
E
Y
C
O
N
T
R
O
L
S
H
E
E
T
B
-
5
1
1
4
B
-
5
1
1
4
1
C
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
E
=
1
6
9
5
3
9
0
.
9
2
4
5
N
=
7
9
0
4
9
1
.
4
3
3
8
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
7
8
8
0
4
0
.
7
5
3
0
E
=
1
6
9
4
7
5
1
.
2
9
2
0
N
=
7
8
9
6
5
7
.
6
3
4
9
E
=
1
6
9
5
1
6
4
.
1
4
9
0
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
7
9
0
3
1
8
.
2
7
4
2
E
=
1
6
9
6
1
3
9
.
4
1
9
6
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
7
9
0
6
7
4
.
1
1
6
4
E
=
1
6
9
6
9
3
0
.
2
6
0
6
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
7
9
0
6
3
1
.
4
9
3
3
E
=
1
6
9
5
6
0
2
.
6
5
7
1
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
7
9
0
2
4
5
.
8
8
7
6
E
=
1
6
9
5
5
5
8
.
2
4
9
2
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
7
8
9
9
6
4
.
7
5
1
1
E
=
1
6
9
5
3
5
3
.
1
8
2
5
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
7
9
0
2
2
9
.
2
3
4
7
E
=
1
6
9
5
0
6
6
.
4
0
1
0
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
7
9
0
1
6
6
.
1
4
2
9
E
=
1
6
9
4
7
5
0
.
9
2
8
0
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
7
8
9
7
5
3
.
6
0
4
0
E
=
1
6
9
4
6
4
3
.
1
9
4
4
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
7
8
9
5
2
0
.
9
4
1
9
E
=
1
6
9
4
4
4
8
.
8
0
4
6
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
7
8
9
3
9
6
.
3
4
9
0
E
=
1
6
9
4
7
7
3
.
6
7
2
0
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
7
8
9
5
0
0
.
1
9
7
5
E
=
1
6
9
4
0
8
1
.
4
2
3
9
LOCALIZED PROJECT COORDINATESN = 789263.7854E = 1693539.5177
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
-
L
-
S
T
A
.
1
1
+
5
0
.
0
0
B
E
G
I
N
T
I
P
P
R
O
J
E
C
T
B
-
5
1
1
4
E
=
1
6
9
4
7
8
3
.
8
4
4
7
N
=
7
8
9
0
1
2
.
1
8
2
8
-
L
-
S
T
A
.
2
8
+
2
0
.
0
0
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
5
1
1
4
N
C
D
O
T
G
P
S
S
T
A
T
I
O
N
"
B
5
1
1
5
-
2
"
N
C
D
O
T
G
P
S
S
T
A
T
I
O
N
"
B
5
1
1
4
-
1
"
N
C
D
O
T
B
A
S
E
L
I
N
E
S
T
A
T
I
O
N
"
B
L
-
3
"
N
C
D
O
T
B
A
S
E
L
I
N
E
S
T
A
T
I
O
N
"
B
L
-
4
"
N
C
D
O
T
B
A
S
E
L
I
N
E
S
T
A
T
I
O
N
"
B
Y
1
-
5
"
N
C
D
O
T
B
A
S
E
L
I
N
E
S
T
A
T
I
O
N
"
B
Y
2
-
6
"
>
N
C
D
O
T
B
A
S
E
L
I
N
E
S
T
A
T
I
O
N
"
B
Y
3
-
7
"
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
N
=
7
9
0
6
1
1
.
3
9
5
9
E
=
1
6
9
5
2
2
9
.
7
5
4
8
N
C
D
O
T
B
A
S
E
L
I
N
E
S
T
A
T
I
O
N
"
R
P
1
-
8
"
N
C
D
O
T
B
A
S
E
L
I
N
E
S
T
A
T
I
O
N
"
R
P
2
-
9
"
N
C
D
O
T
B
A
S
E
L
I
N
E
S
T
A
T
I
O
N
"
B
Y
4
-
1
0
"
N
C
D
O
T
B
A
S
E
L
I
N
E
S
T
A
T
I
O
N
"
B
Y
4
-
1
1
"
N
C
D
O
T
B
A
S
E
L
I
N
E
S
T
A
T
I
O
N
"
B
Y
4
-
1
2
"
N
C
D
O
T
B
A
S
E
L
I
N
E
S
T
A
T
I
O
N
"
B
Y
4
-
1
3
"
N
C
D
O
T
B
A
S
E
L
I
N
E
S
T
A
T
I
O
N
"
B
Y
4
-
1
4
"
NCDOT BASELINE STATION "BY4-15"
L
O
C
A
L
I
Z
E
D
P
R
O
J
E
C
T
C
O
O
R
D
I
N
A
T
E
S
-
Y
1
-
-
RP1--L-
NC GRID NAD 83/CORS96B5114_LS_CONTROL.TXT
B
Y
1
P
O
I
N
T
D
E
S
C
.
N
O
R
T
H
E
A
S
T
E
L
E
V
A
T
I
O
N
Y
1
S
T
A
T
I
O
N
O
F
F
S
E
T
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
5
B
Y
1
-
5
7
8
9
5
2
0
.
9
4
1
9
1
6
9
4
4
4
8
.
8
0
4
6
9
6
6
.
4
1
1
2
+
6
0
.
9
3
2
1
.
3
8
L
T
P
O
I
N
T
D
E
S
C
.
N
O
R
T
H
E
A
S
T
E
L
E
V
A
T
I
O
N
L
S
T
A
T
I
O
N
O
F
F
S
E
T
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
B
R
P
1
P
O
I
N
T
D
E
S
C
.
N
O
R
T
H
E
A
S
T
E
L
E
V
A
T
I
O
N
L
S
T
A
T
I
O
N
O
F
F
S
E
T
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
E
Q
Q
Q
3
B
L
-
3
7
9
0
2
2
9
.
2
3
4
7
1
6
9
5
0
6
6
.
4
0
1
0
9
5
3
.
6
6
2
4
+
0
4
.
7
8
2
3
.
6
2
L
T
P
O
I
N
T
D
E
S
C
.
N
O
R
T
H
E
A
S
T
E
L
E
V
A
T
I
O
N
Y
4
S
T
A
T
I
O
N
O
F
F
S
E
T
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
8
R
P
1
-
8
7
9
0
2
4
5
.
8
8
7
6
1
6
9
5
5
5
8
.
2
4
9
2
9
3
4
.
0
9
2
9
+
6
4
.
5
1
1
2
3
.
6
4
L
T
B
R
P
2
P
O
I
N
T
D
E
S
C
.
N
O
R
T
H
E
A
S
T
E
L
E
V
A
T
I
O
N
Y
4
S
T
A
T
I
O
N
O
F
F
S
E
T
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
E
Q
1
2
B
Y
4
-
1
2
7
8
9
9
6
4
.
7
5
1
1
1
6
9
5
3
5
3
.
1
8
2
5
9
3
2
.
3
1
2
6
+
6
2
.
1
8
4
8
.
6
7
R
T
P
O
I
N
T
D
E
S
C
.
N
O
R
T
H
E
A
S
T
E
L
E
V
A
T
I
O
N
L
S
T
A
T
I
O
N
O
F
F
S
E
T
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
9
R
P
2
-
9
7
8
9
6
5
7
.
6
3
4
9
1
6
9
5
1
6
4
.
1
4
9
0
9
4
5
.
1
0
1
8
+
9
9
.
1
7
2
6
0
.
0
9
R
T
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
W
I
N
G
W
A
L
L
O
F
R
A
I
L
R
O
A
D
B
R
I
D
G
E
C
H
I
S
L
E
D
S
Q
U
A
R
E
I
N
N
O
R
T
H
E
A
S
T
C
O
R
N
E
R
O
F
L
S
T
A
T
I
O
N
2
0
+
8
1
.
0
0
4
7
L
E
F
T
N
7
8
9
9
3
0
E
1
6
9
4
9
3
2
B
M
1
E
L
E
V
A
T
I
O
N
=
9
5
3
.
6
5
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
R
E
B
A
R
&
C
A
P
B
Y
5
-
1
5
S
6
6
5
8
’
0
.
1
1
"
W
D
i
s
t
2
7
1
5
.
4
4
Y
4
S
T
A
T
I
O
N
3
4
+
3
5
.
0
0
N
7
8
9
2
6
4
E
1
6
9
3
5
4
0
B
M
2
E
L
E
V
A
T
I
O
N
=
9
4
4
.
7
3
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
R
E
B
A
R
&
C
A
P
B
Y
5
-
1
1
S
8
5
2
9
’
6
.
9
6
"
E
D
i
s
t
1
0
1
.
2
6
Y
4
S
T
A
T
I
O
N
3
4
+
3
5
.
0
0
N
7
9
0
3
1
8
E
1
6
9
6
1
3
9
B
M
3
E
L
E
V
A
T
I
O
N
=
9
2
7
.
5
2
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
4
B
L
-
4
7
9
0
6
3
1
.
4
9
3
3
1
6
9
5
6
0
2
.
6
5
7
1
9
6
1
.
8
6
O
U
T
S
I
D
E
P
R
O
J
E
C
T
L
I
M
I
T
S
3
B
L
-
3
7
9
0
2
2
9
.
2
3
4
7
1
6
9
5
0
6
6
.
4
0
1
0
9
5
3
.
6
6
2
4
+
0
4
.
7
8
2
3
.
6
2
L
T
E
Q
1
P
O
I
N
T
N
O
T
S
E
T
7
8
9
8
3
8
.
6
3
7
0
1
6
9
4
9
2
9
.
1
2
0
1
U
N
K
N
O
W
N
1
9
+
9
3
.
8
5
2
1
.
0
5
L
T
1
B
5
1
1
4
-
1
7
8
9
3
9
6
.
3
4
9
0
1
6
9
4
7
7
3
.
6
7
2
0
9
5
8
.
6
1
1
5
+
2
8
.
9
6
3
2
.
9
6
L
T
2
B
5
1
1
4
-
2
7
8
8
0
4
0
.
7
5
3
0
1
6
9
4
7
5
1
.
2
9
2
0
9
6
3
.
5
8
O
U
T
S
I
D
E
P
R
O
J
E
C
T
L
I
M
I
T
S
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
P
O
I
N
T
D
E
S
C
.
N
O
R
T
H
E
A
S
T
E
L
E
V
A
T
I
O
N
L
S
T
A
T
I
O
N
O
F
F
S
E
T
B
L
E
Q
1
1
1
B
5
1
1
4
-
1
7
8
9
3
9
6
.
3
4
9
0
1
6
9
4
7
7
3
.
6
7
2
0
9
5
8
.
6
1
1
5
+
2
8
.
9
6
3
2
.
9
6
L
T
E
Q
3
B
L
-
3
7
9
0
2
2
9
.
2
3
4
7
1
6
9
5
0
6
6
.
4
0
1
0
9
5
3
.
6
6
2
4
+
0
4
.
7
8
2
3
.
6
2
L
T
6
B
Y
2
-
6
7
9
0
1
6
6
.
1
4
2
9
1
6
9
4
7
5
0
.
9
2
8
0
9
6
2
.
3
8
2
2
+
4
5
.
5
6
2
9
6
.
1
1
L
T
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
P
O
I
N
T
D
E
S
C
.
N
O
R
T
H
E
A
S
T
E
L
E
V
A
T
I
O
N
L
S
T
A
T
I
O
N
O
F
F
S
E
T
B
Y
2
E
Q
Q
3
B
L
-
3
7
9
0
2
2
9
.
2
3
4
7
1
6
9
5
0
6
6
.
4
0
1
0
9
5
3
.
6
6
2
4
+
0
4
.
7
8
2
3
.
6
2
L
T
7
B
Y
3
-
7
7
9
0
6
1
1
.
3
9
5
9
1
6
9
5
2
2
9
.
7
5
4
8
9
5
6
.
0
5
2
7
+
4
4
.
2
6
1
8
6
.
0
9
L
T
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
P
O
I
N
T
D
E
S
C
.
N
O
R
T
H
E
A
S
T
E
L
E
V
A
T
I
O
N
L
S
T
A
T
I
O
N
O
F
F
S
E
T
B
Y
3
1
0
B
Y
4
-
1
0
7
9
0
6
7
4
.
1
1
6
4
1
6
9
6
9
3
0
.
2
6
0
6
9
2
0
.
2
9
O
U
T
S
I
D
E
P
R
O
J
E
C
T
L
I
M
I
T
S
1
1
B
Y
4
-
1
1
7
9
0
3
1
8
.
2
7
4
2
1
6
9
6
1
3
9
.
4
1
9
6
9
2
7
.
5
2
O
U
T
S
I
D
E
P
R
O
J
E
C
T
L
I
M
I
T
S
1
2
B
Y
4
-
1
2
7
8
9
9
6
4
.
7
5
1
1
1
6
9
5
3
5
3
.
1
8
2
5
9
3
2
.
3
1
2
6
+
6
2
.
1
8
4
8
.
6
7
R
T
E
Q
1
1
P
O
I
N
T
N
O
T
S
E
T
7
8
9
8
3
8
.
6
3
7
0
1
6
9
4
9
2
9
.
1
2
0
1
U
N
K
N
O
W
N
2
2
+
2
3
.
7
0
1
0
.
2
1
L
T
1
3
B
Y
4
-
1
3
7
8
9
7
5
3
.
6
0
4
0
1
6
9
4
6
4
3
.
1
9
4
4
9
4
0
.
8
5
1
9
+
2
8
.
0
5
4
9
.
9
1
L
T
1
4
B
Y
4
-
1
4
7
8
9
5
0
0
.
1
9
7
5
1
6
9
4
0
8
1
.
4
2
3
9
9
5
4
.
6
7
1
3
+
1
1
.
7
7
4
9
.
1
6
L
T
1
5
B
Y
4
-
1
5
7
8
9
2
6
3
.
7
8
5
4
1
6
9
3
5
3
9
.
5
1
7
7
9
4
4
.
7
3
O
U
T
S
I
D
E
P
R
O
J
E
C
T
L
I
M
I
T
S
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
P
O
I
N
T
D
E
S
C
.
N
O
R
T
H
E
A
S
T
E
L
E
V
A
T
I
O
N
Y
4
S
T
A
T
I
O
N
O
F
F
S
E
T
B
Y
4
TO THOMASVILLEBUSINESS I-85 US 29/70 SOUTH BOUND LANESBUSINESS I-85 US 29/70 NORTH BOUND LANESAUCT
I
O
N
R
O
A
D
S
R
1
6
6
3
E
L
E
V
=
9
5
3
.
6
5
O
F
R
A
I
L
R
O
A
D
B
R
I
D
G
E
’X
’
I
N
C
O
N
C
R
E
T
E
W
I
N
G
W
A
L
L
B
M
#
1
B
U
S
I
N
E
S
S
I
-
8
5
U
S
2
9
/
7
0
S
O
U
T
H
B
O
U
N
D
L
A
N
E
S
B
U
S
I
N
E
S
S
I
-
8
5
U
S
2
9
/
7
0
N
O
R
T
H
B
O
U
N
D
L
A
N
E
S
T
O
H
I
G
H
P
O
I
N
T
PR
O
S
P
E
C
T
S
T
R
E
E
T
S
R
1
6
1
9
T
O
H
I
G
H
P
O
I
N
T
BEL
M
A
R ST
REET S
R 1623
AB
ANDONE
D
S
P
UR
BETH
E
L
D
RIVE
S
R
16
2
1
HI
G
H
P
OI
N
T, T
H
O
M
A
S
VIL
L
E
A
N
D
D
E
N
T
O
N
R
AIL
R
O
A
D (
C
S
X)
PR
O
SP
E
C
T
STR
E
E
T
SR
1619
TO
TH
O
M
A
SV
IL
L
E HIGH POINT, THO
MASVILLE AND DENTON RAILROAD (CSX)
WITH NAD 83/CORS96 STATE PLANE GRID COORDINATES OF"B5114-2" TO -L- STATION 11+50.00 ISN 0155’09.4" E 971.975’
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
V
A
R
S
E
E
X-
S
E
C
TI
O
N
S
CL
V
A
R
S
E
E
X-
S
E
C
TI
O
N
S
4
:1
V
A
R
S
E
E
X-
S
E
C
TI
O
N
S
-
L
-
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
2
B
-
5
1
1
4
P
A
V
E
M
E
N
T
D
E
S
I
G
N
6/2/9917-APR-2014 08:56R:\Roadway\Proj\B5114_Rdy_typ.dgn$$$$USERNAM E$$$$
0
.
0
8
0
.
0
8
0
.0
8
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
D
1
U
D
1
C
1
U
S
E
T
Y
P
I
C
A
L
N
O
.
1
U
S
E
T
Y
P
I
C
A
L
N
O
.
2
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
1
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
2
ORIGINAL G
R
O
U
N
D
O
R
I
G
I
N
A
L
G
R
O
U
N
D
T
T
-
L
-
S
T
A
.
1
2
+
0
0
.
0
0
T
O
S
T
A
.
1
3
+
2
7
.
0
0
4
’
8
’
P
S
1
1
’
W
/
G
R
1
2
’
4
’
8
’
P
S
1
1
’
W
/
G
R
1
2
’
V
A
R
.
2
4
’
-
3
6
’
*
V
A
R
.
0
’
-
1
2
’
V
A
R
.
V
A
R
.
E
X
I
S
T
E
X
I
S
T
G
R
A
D
E
P
O
I
N
T
U
C
1
C
1
1
2
"
1
2
"
I
N
S
T
A
L
L
S
H
O
U
L
D
E
R
B
E
R
M
G
U
T
T
E
R
(
S
B
G
)
A
S
F
O
L
L
O
W
S
.
1
2
’
*
-
L
-
S
T
A
.
2
5
+
8
0
.
0
0
T
O
S
T
A
.
2
7
+
2
2
.
0
0
-
L
-
S
T
A
.
1
3
+
2
7
.
0
0
T
O
S
T
A
.
1
4
+
6
0
.
0
0
*
-
L
-
S
T
A
.
1
4
+
6
0
.
0
0
T
O
S
T
A
.
1
7
+
0
0
.
0
0
E
2
E
2
V
A
R
S
E
E
X-
S
E
C
TI
O
N
S
CL
V
A
R
S
E
E
X-
S
E
C
TI
O
N
S
4
’
8
’
1
8
’
P
S 1
1
’
W
/
G
R
1
2
’
4
:1
V
A
R
S
E
E
X-
S
E
C
TI
O
N
S
-
L
-
0
.
0
8
0
.
0
2
0
.
0
8
0
.
0
2
4
’
8
’
1
8
’
P
S
1
1
’
W
/
G
R
1
2
’
0
.
0
2
0
.0
8
1
2
’
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
C
1
C
1
D
1
D
1
ORIGINA
L
G
R
O
U
N
D
O
R
I
G
I
N
A
L
G
R
O
U
N
D
T
T
T
H
I
S
L
I
N
E
G
R
A
D
E
T
O
2
’
-
4
"
O
R
I
G
I
N
A
L
G
R
O
U
N
D
M
I
N
.
3
’
-
0
"
0
.
0
2
0
.
0
2
G
R
A
D
E
P
O
I
N
T
T
H
I
S
L
I
N
E
G
R
A
D
E
T
O
2
’
-
4
"
O
R
I
G
I
N
A
L
G
R
O
U
N
D
M
I
N
.
3
’
-
0
"
C
1
D
1
C
1
D
1
T
R
2
R
2
T
1
2
"
1
2
"
1
2
"
V
A
R
.
V
A
R
.
E
2
E
2
E
2
E
2
E
3
E
3
*
V
A
R
.
0
’
-
1
2
’
*
*
6
’
*
*
6
’
2:
1
2
:1
-
L
-
S
T
A
.
1
1
+
5
0
.
0
0
T
O
S
T
A
.
1
2
+
0
0
.
0
0
-
L
-
S
T
A
.
2
7
+
7
0
.
0
0
T
O
S
T
A
.
2
8
+
2
0
.
0
0
5
0
’
C
1
V
C
1
T
H
I
S
L
I
N
E
G
R
A
D
E
T
O
O
R
I
G
I
N
A
L
G
R
O
U
N
D
C
1
D
1
T
1
2
"
E
2
E
3
R
1
I
N
S
T
A
L
L
E
X
P
R
E
S
S
W
A
Y
G
U
T
T
E
R
(
E
X
G
)
A
S
F
O
L
L
O
W
S
.
-
L
-
S
T
A
.
1
4
+
2
3
.
5
7
T
O
S
T
A
.
1
6
+
8
4
.
8
9
R
T
0
.
0
2
4
’
4
’
P
S
4
’
N
O
T
E
:
R
E
S
U
R
F
A
C
E
W
I
T
H
C
1
-
L
-
S
T
A
.
2
7
+
2
2
.
0
0
T
O
S
T
A
.
2
7
+
7
0
.
0
0
*
*
-
L
-
S
T
A
.
1
7
+
0
0
.
0
0
T
O
S
T
A
.
1
8
+
8
0
.
6
1
(
B
E
G
I
N
B
R
I
D
G
E
)
*
*
-
L
-
S
T
A
.
2
1
+
2
5
.
6
1
(
E
N
D
B
R
I
D
G
E
)
T
O
S
T
A
.
2
5
+
8
0
.
0
0
-
L
-
S
T
A
.
1
8
+
1
5
.
0
0
T
O
S
T
A
.
1
8
+
5
6
.
9
9
(
B
E
G
I
N
A
P
P
R
O
A
C
H
S
L
A
B
)
L
T
-
L
-
S
T
A
.
1
8
+
5
3
.
0
0
T
O
S
T
A
.
1
8
+
5
6
.
9
9
(
B
E
G
I
N
A
P
P
R
O
A
C
H
S
L
A
B
)
R
T
-
L
-
S
T
A
.
2
1
+
4
9
.
2
4
(
E
N
D
A
P
P
R
O
A
C
H
S
L
A
B
)
T
O
S
T
A
.
2
2
+
3
0
.
0
0
L
T
&
R
T
V
A
R
S
E
E
X-
S
E
C
TI
O
N
S
2:1
M
A
X
(
S
E
E
M
I
L
L
I
N
G
A
N
D
R
E
S
U
R
F
A
C
I
N
G
D
E
T
A
I
L
)
6
"
W
W
/
/
/
/
/
/
/
/
/
/
/
/
3
"
M
I
N
.
U
E
3
2
.
5
"
M
I
N
.
2
.
5
"
M
I
N
.
3
"
M
I
N
.
D
e
t
a
i
l
S
h
o
w
i
n
g
M
e
t
h
o
d
o
f
W
e
d
g
i
n
g
C
S
U
R
V
E
Y
L
C
2
D
2
D
1
C
1
E
3
D
2
N
O
T
E
:
M
I
L
L
V
1
A
N
D
R
E
S
U
R
F
A
C
E
W
I
T
H
C
1
M
I
L
L
I
N
G
D
E
T
A
I
L
A
N
D
R
E
S
U
R
F
A
C
I
N
G
(
-
L
-
)
C
1
D
1
PAVEMENT SCHEDULELAYERS.C1LAYERS.C3PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE,D1NOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE.EARTH MATERIAL.T PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B, PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,AT AN AVERAGE RATE OF 112 LBS. PER SQ. YD. PER 1" DEPTH. TOBE PLACED IN LAYERS NOT TO EXCEED 2" IN DEPTH.C2 AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD. IN EACH OF TWO TYPE I19.0B, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE,D2GREATER THAN 4" IN DEPTH.TYPE I19.0B, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN 2" IN DEPTH ORR1EXPRESSWAY GUTTERR2SHOULDER BERM GUTTER AT AN AVERAGE RATE OF 570 LBS. PER SQ. YD.PROP. APPROX. 5" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,E2PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TOTHAN 5" IN DEPTH.BE PLACED IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATERE3 PROP. APPROX. 2.5" ASPHALT CONCRETE INTERMEDIATE COURSE,D3TYPE I19.0C, AT AN AVERAGE RATE OF 285 LBS. PER SQ. YD.PROP. VAR. DEPTH ASPHALT CONCRETE INTERMEDIATE COURSE,D5GREATER THAN 4" IN DEPTH.TYPE I19.0C, AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH, TO BE PLACED IN LAYERS NOT LESS THAN 2" IN DEPTH ORAT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0B,E1 PROP. APPROX. 4" ASPHALT CONCRETE INTERMEDIATE COURSE,D4TYPE I19.0C, AT AN AVERAGE RATE OF 456 LBS. PER SQ. YD.PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, ATAN AVERAGE RATE OF 456 LBS. PER SQ. YD. E4PROP. APPROX. 8.5" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, ATAN AVERAGE RATE OF 484.5 LBS. PER SQ. YD. IN EACH OF TWO LAYERS.E5PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0C,AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TOTHAN 5" IN DEPTH.BE PLACED IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATERE6J1PROP. 8" AGGREGATE BASE COURSEMILLING EXISTING ASPHALT PAVEMENT, 0 TO 3" DEPTHV1 EXISTING PAVEMENT.U J2PROP. VAR. DEPTH AGGREGATE BASE COURSEVARIABLE DEPTH ASPHALT PAVEMENT (SEE STANDARD WEDGING DETAILWSHEET No. 2)MILLING EXISTING ASPHALT PAVEMENT, 1" DEPTHV2 C4 PROP. APPROX. 1" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5C, AT AN AVERAGE RATE OF 168 LBS. PER SQ. YD.
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
2
-
A
B
-
5
1
1
4
P
A
V
E
M
E
N
T
D
E
S
I
G
N
6/2/9917-APR-2014 08:56R:\Roadway\Proj\B5114_Rdy_typ.dgn$$$$USERNAM E$$$$
V
A
R
S
E
E
X-
S
E
C
TI
O
N
S
CL
V
A
R
S
E
E
X-
S
E
C
TI
O
N
S
8
’
1
2
’
4
:1
V
A
R
S
E
E
X-
S
E
C
TI
O
N
S
0
.
0
8
0
.
0
8
0
.
0
2
8
’
1
2
’
0
.0
8
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
C
1
C
1
D
1
U
S
E
T
Y
P
I
C
A
L
N
O
.
4
0
.
0
2
D
1
4
’
P
S
4
’
P
S
-
R
P
1
-
S
T
A
.
1
0
+
1
8
.
2
4
T
O
-
R
P
1
-
S
T
A
.
1
1
+
4
6
.
0
0
CL
8
’
1
2
’
0
.
0
8
0
.
0
8
0
.
0
2
8
’
1
2
’
0
.0
8
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
C
1
C
1
E
1
D
1
0
.
0
2
E
1
D
1
8
’
4
’
P
S
4
’
P
S
-
R
P
2
-
U
S
E
T
Y
P
I
C
A
L
N
O
.
5
-
R
P
2
-
S
T
A
.
1
0
+
1
8
.
0
0
T
O
-
R
P
2
-
S
T
A
.
1
2
+
0
5
.
0
0
G
R
A
D
E
P
O
I
N
T
G
R
A
D
E
P
O
I
N
T
T
T
T
1
1
"
1
1
"
1
1
"
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
3
CL
1
2
’
0
.
0
8
0
.
0
2
1
2
’
0
.0
8
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
-
Y
4
-
1
2
’
1
2
’
1
3
’
1
3
’
2
6
’
3
4
’
3
4
’
F
D
P
S
F
D
P
S
2:1
6
:1
O
R
I
G
I
N
A
L
G
R
O
U
N
D
S
L
O
P
E
SEE X-
S
E
C
T
I
O
N
S
VA
R
I
A
B
L
E
2:1
1
5
’
1
0
’
0
.
0
8
0
.0
8
0
.
0
2
T
E
5
U
E
5
T
4
’
6
’
C
3
E
5
6
’
4
’
E
5
CL
L
A
N
E
CL
L
A
N
E
P
O
I
N
T
C
R
O
W
N
P
O
I
N
T
C
R
O
W
N
0
.
0
4
0
.
0
4
4
:
1
U
C
3
1
5
.
5
"
1
5
.
5
"
E
X
I
S
T
P
O
I
N
T
G
R
A
D
E
P
O
I
N
T
G
R
A
D
E
E
X
I
S
T
D
4
D
4
D
4
C
3
VA
R
SEE X-SEC
TIO
N
S
VA
R
SEE X-SEC
TIO
N
S
(6:1 M
IN
)
T
(6:1
MI
N)
S
E
E
X
-
S
E
C
T
I
O
N
S
V
A
R
.
W
I
D
T
H
6
:
1
8
’
1
0
’
8
’
U
S
E
T
Y
P
I
C
A
L
N
O
.
3
-
Y
4
-
S
T
A
.
1
2
+
8
0
.
0
0
T
O
-
Y
4
-
S
T
A
.
2
9
+
7
0
.
0
0
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
4
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
5
D
4
C
3
A
D
D
4
’
M
E
D
I
A
N
P
A
V
E
D
S
H
O
U
L
D
E
R
S
S
H
O
U
L
D
E
R
R
E
P
L
A
C
E
W
I
T
H
8
’
W
I
D
E
S
T
R
E
N
G
T
H
E
N
E
D
P
A
V
E
D
R
E
M
O
V
E
E
X
I
S
T
.
8
’
P
A
V
E
D
S
H
O
U
L
D
E
R
A
N
D
0
.
0
2
0
.
0
2
0
.0
8
U
T
-
R
P
1
E
X
T
-
S
T
A
.
1
4
+
0
0
.
0
0
T
O
S
T
A
.
1
7
+
1
4
.
5
4
N
O
T
E
:
I
N
S
T
A
L
L
G
U
A
R
D
R
A
I
L
A
N
D
R
E
P
A
I
R
E
X
I
S
T
I
N
G
S
H
O
U
L
D
E
R
S
L
O
P
E
E
X
I
S
T
I
N
G
T
I
E
T
O
6
:1 M
IN
6
:
1
M
I
N
VAR.
V
A
R.
V
2
C
4
V
2
C
4
1
)
2
)
3
)
G
R
A
D
I
N
G
O
F
M
E
D
I
A
N
S
L
O
P
E
S
S
E
E
C
R
O
S
S
-
S
E
C
T
I
O
N
S
F
O
R
P
R
O
P
O
S
E
D
4
)
(
S
E
E
C
R
O
S
S
-
S
E
C
T
I
O
N
S
X
-
2
0
T
O
X
-
2
3
)
-
R
P
1
-
D
1
E
1
E
1
G
U
I
D
A
N
C
E
I
N
P
H
A
S
I
N
G
T
H
E
W
O
R
K
.
H
A
S
B
E
E
N
C
O
M
P
L
E
T
E
D
.
R
E
F
E
R
T
O
T
M
P
F
O
R
T
R
A
F
F
I
C
S
H
I
F
T
S
A
N
D
M
E
D
I
A
N
C
O
N
S
T
R
U
C
T
I
O
N
M
I
L
L
V
2
A
N
D
F
I
L
L
C
4
T
H
E
E
X
I
S
T
I
N
G
-
Y
4
-
L
A
N
E
S
A
F
T
E
R
S
T
A
1
1
+
4
6
.
0
0
T
O
1
2
+
2
5
.
0
0
R
E
S
U
R
F
A
C
E
A
N
D
W
I
D
E
N
-
R
P
1
-
A
N
D
-
R
P
1
E
X
T
-
T U C1C3D1E1VARIABLE DEPTH ASPHALT PAVEMENT (SEE STANDARD WEDGING DETAILW E5EARTH MATERIALEXIST. PAVEMENT 3" S9.5B3" S9.5C4" B25.0BE25" B25.0BR2R1EXPRESSWAY GUTTERSHOULDER BERM GUTTER C2D2VARIABLE DEPTH I19.0BE6VARIABLE DEPTH B25.0C E3VARIABLE DEPTH B25.0B C4D3D4D5VARIABLE DEPTH I19.0C4" B25.0CE48.5" B25.0C VARIABLE DEPTH S9.5B4" I19.0B2.5" I19.0C4" I19.0CNOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE.1" S9.5CV2MILL EXIST. PAVEMENT 1"SHEET No. 2)
CL
1
2
’
1
3
’
1
3
’
A
P
P
R
O
X
.
A
P
P
R
O
X
.
CL
CL
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
U
S
E
T
Y
P
I
C
A
L
N
O
.
6
1
2
’
1
2
’
-
Y
4
-
S
B
-
Y
4
-
N
B
1
2
’
-
Y
4
-
S
E
E
P
L
A
N
S
H
E
E
T
S
6
A
N
D
7
*
*
E
E
O
P
D
E
N
O
T
E
S
E
X
I
S
T
.
E
D
G
E
O
F
P
A
V
E
M
E
N
T
T
I
E
T
O
E
E
O
P
*
*
T
I
E
T
O
E
E
O
P
*
*
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
6
C
3
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
2
-
B
B
-
5
1
1
4
P
A
V
E
M
E
N
T
D
E
S
I
G
N
6/2/9917-APR-2014 08:56R:\Roadway\Proj\B5114_Rdy_typ.dgn$$$$USERNAM E$$$$
1
0
’
T
D
4
8
’
SLOPE EXISTIN
G
TIE TO
C
3
1
5
.
5
"
-
Y
4
-
S
T
A
.
8
+
5
0
.
0
0
T
O
-
Y
4
-
S
T
A
.
1
2
+
8
0
.
0
0
(
F
O
R
M
E
D
I
A
N
C
R
O
S
S
O
V
E
R
)
-
Y
4
-
S
T
A
.
2
9
+
7
0
.
0
0
T
O
-
Y
4
-
S
T
A
.
3
4
+
0
0
.
0
0
(
F
O
R
M
E
D
I
A
N
C
R
O
S
S
O
V
E
R
)
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
7
CL
1
2
’
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
-
Y
4
-
1
3
’
1
3
’
3
6
’
1
0
’
T
U
C
3
4
’
2
’
C
3
CL
CLU
1
5
.
5
"
D
3
D
3
2
’
P
S
1
2
’
3
’
2
’
3
’
1
2
’
1
2
’
8
’
P
S
S
B
L
A
N
E
S
N
B
L
A
N
E
S
W
O
R
K
Z
O
N
E
A
R
E
A
W
O
R
K
Z
O
N
E
A
R
E
A
6
’
4
:1
1
0
’
T
D
4
8
’
S
L
O
P
E
E
X
I
S
T
I
N
G
T
I
E
T
O
C
3
1
5
.
5
"
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
N
O
.
7
CL
1
2
’
G
R
A
D
E
T
O
T
H
I
S
L
I
N
E
-
Y
4
-
1
3
’
1
3
’
3
6
’
1
0
’
T
U
C
3
4
’
2
’
C
3
U
1
5
.
5
"
D
3
D
3
2
’
P
S
1
2
’
3
’
2
’
3
’
1
2
’
1
2
’
8
’
P
S
6
’
4
:
1
CL
N
B
L
A
N
E
S
CL
S
B
L
A
N
E
S
(
S
T
R
E
N
G
T
H
E
N
O
U
T
S
I
D
E
P
A
V
E
D
S
H
O
U
L
D
E
R
S
F
O
R
T
R
A
F
F
I
C
S
H
I
F
T
)
S
E
E
T
R
A
N
S
P
O
R
T
A
T
I
O
N
M
A
N
A
G
E
M
E
N
T
P
L
A
N
S
F
O
R
T
R
A
F
F
I
C
S
H
I
F
T
S
E
E
T
R
A
N
S
P
O
R
T
A
T
I
O
N
M
A
N
A
G
E
M
E
N
T
P
L
A
N
S
F
O
R
T
R
A
F
F
I
C
S
H
I
F
T
(
W
O
R
K
Z
O
N
E
)
(
W
O
R
K
Z
O
N
E
)
P
O
I
N
T
C
R
O
W
N
P
O
I
N
T
C
R
O
W
N
E
5
E
5
E
5
E
5
E
5
E
5
D
3
J
1
1
3
.
5
"
*
4
’
*
4
’
E
X
.
E
X
.
E
X
.
E
X
.
0
0
0
0
V
2
C
4
C
4
V
2
T
Y
P
I
C
A
L
S
E
C
T
I
O
N
3
F
O
R
G
U
I
D
A
N
C
E
.
A
N
D
A
R
E
T
O
B
E
R
E
M
O
V
E
D
.
R
E
G
R
A
D
E
M
E
D
I
A
N
S
L
O
P
E
S
T
O
D
R
A
I
N
,
S
E
E
T
E
M
P
M
E
D
I
A
N
C
R
O
S
S
O
V
E
R
S
H
A
V
E
S
E
R
V
E
D
T
H
E
I
R
P
U
R
P
O
S
E
4
’
W
I
D
E
P
A
V
E
D
S
H
O
U
L
D
E
R
S
I
N
T
H
E
M
E
D
I
A
N
W
H
E
N
E
V
E
R
T
H
E
*
I
N
L
O
C
A
T
I
O
N
S
O
F
T
E
M
P
M
E
D
I
A
N
C
R
O
S
S
O
V
E
R
S
,
R
E
T
A
I
N
G
U
I
D
A
N
C
E
I
N
P
H
A
S
I
N
G
T
H
E
W
O
R
K
.
H
A
S
B
E
E
N
C
O
M
P
L
E
T
E
D
.
R
E
F
E
R
T
O
T
M
P
F
O
R
T
R
A
F
F
I
C
S
H
I
F
T
S
A
N
D
M
E
D
I
A
N
C
O
N
S
T
R
U
C
T
I
O
N
M
I
L
L
V
2
A
N
D
F
I
L
L
C
4
T
H
E
E
X
I
S
T
I
N
G
-
Y
4
-
L
A
N
E
S
A
F
T
E
R
T U C1C3D1E1E5EARTH MATERIALEXIST. PAVEMENT 3" S9.5B3" S9.5C4" B25.0BE25" B25.0BR2R1EXPRESSWAY GUTTERSHOULDER BERM GUTTER C2D2VARIABLE DEPTH I19.0BE6VARIABLE DEPTH B25.0C E3VARIABLE DEPTH B25.0B C4D3D4D5VARIABLE DEPTH I19.0C4" B25.0CE48.5" B25.0C VARIABLE DEPTH S9.5B4" I19.0B2.5" I19.0C4" I19.0CJ2J1PROP. 8" ABCPROP. VAR. DEPTH ABCNOTE: PAVEMENT EDGE SLOPES ARE 1:1 UNLESS SHOWN OTHERWISE.1" S9.5CV2MILL EXIST. PAVEMENT 1"VARIABLE DEPTH ASPHALT PAVEMENT (SEE STANDARD WEDGING DETAILW SHEET No. 2)
S
T
A
.
1
8
+
5
3
-
L
-
R
T
.
B
E
G
I
N
S
B
G
S
T
A
.
2
2
+
3
0
-
L
-
E
N
D
S
B
G
S
T
A
.
1
8
+
1
5
-
L
-
L
T
.
B
E
G
I
N
S
B
G
S
TA. 2
2
+
3
0
-
L-
EN
D
S
BG
R
E
M
O
V
E
R
E
T
A
I
N
RE
T
A
I
N
RETAINREMOVE/REPLACE
R
E
M
O
V
E
/
R
E
P
L
A
C
E
Slope Ditch Front
R
E
M
O
V
E
H
W
Slope Ditch Front
S
l
o
p
e
F
i
l
l
G
e
o
t
e
x
t
i
l
e
Slope FillGeotextileREVISIONS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
17-APR-2014 08:56R:\Roadway\Proj\B5114_Rdy_psh4.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
4
B
-
5
1
1
4
SEE S
HEET 6
M
ATC
H LINE -
Y4- 17+00.00
M ATCH LINE -L- STA. 22+50.00 SEE SHEET 5
2015 ADT2035 ADT1,6002,300 700 6001,5002,100 200 2008,00011,600 8,30012,3003,3004,600 1,100SR 1619PROSPECT ST.SR 1663US 70-29EB RAMP SR 1619PROSPECT ST.
S
E
E
S
H
E
E
T
S
8
&
9
F
O
R
P
R
O
F
I
L
E
S
S
E
E
S
H
E
E
T
S
8
&
9
F
O
R
P
R
O
F
I
L
E
S
AUCTION RD.1,000
M
ATC
H LINE -
Y4- ST
A. 26+50.00 SEE S
HEET 7
E
X
G
-
D
E
N
O
T
E
S
E
X
P
R
E
S
S
W
A
Y
G
U
T
T
E
R
S
B
G
-
D
E
N
O
T
E
S
S
H
O
U
L
D
E
R
B
E
R
M
G
U
T
T
E
R
I-85 BUS.26,42537,500I-85 BUS.
1-C SEE SHEET
-
D
E
N
O
T
E
S
P
R
O
P
O
S
E
D
T
R
A
F
F
I
C
S
I
G
N
A
L
C
O
N
C
C
A
N
O
P
Y
M
T
L
TO THOMASVILLES1SFDGRV1SFDGRV
G
R
V
1S
M
T
L
B
U
S
GRV
GR
V
12" C
O
N
C
INV=954.12’INV=954.22’INV=955.23’DI
B
S
T
G
R
V
L
T
L
T
L
T
7
2
" C
HL
w
/
3
S
B
W PLANTERG
R
V
G
R
V
B
S
T
VALVE
1S
M
T
L
B
U
S
G
R
V
R
/
R
S
IGN
AL
OVE
R
H
E
AD
24" RCP
24" RCP
24" RCP
DI
DI
INV=915.42’
G
R
V
G
R
V
A
/
G
G
A
S
3
0
0
0
0
GA
L
S
A
/
G
G
A
S
15
0
0
0
G
A
L
S
GATE
W OODVAR HT
W
O
O
D
V
A
R
H
T
P
O
S
T
S
M
T
L
w
/
MT
L
P
O
S
T
MT
L
G
U
A
R
D
R
A
IL
H
OUS
E
S
IGNAL
R
/
R
S
IGNAL
R
/
R
S
IGN
AL
R
/
R
S
E
A
T
=
9
4
8
.3
7
’
S
E
A
T
=
9
4
8
.3
7
’
S
E
A
T
=
9
4
8
.2
9
’
S
E
A
T
=
9
4
8
.3
2
’
HW 2 @ 10" CMP
WW
WW
WW
WW
W
W
WW
WW
WW
S
T
E
E
L
A
ND
C
O
N
C
S
T
E
E
L
A
N
D
C
O
N
C
22’ BST
VAR BST
VAR BST
1 23
4 5
6
7
8
9
10
11
12
13
14
15
16
28
2930
3
1
WOODS
WOODS
WOODS
LT
9’ BST
9’ BST
VAR
B
S
T
VAR
B
S
T
VAR
B
S
T
V
A
R
B
S
T
V
A
R
B
S
T
"AUCTION"
NCGS MON.
72" CHL W/ 3SBW
72" CHL W/ 3SBW
7
2
" C
H
L
W/
3
S
B
W 7
2
"
C
H
L
W/
3
S
B
W
72" CHL W/ 3SBW
7
2
"
C
H
L
W/
3
S
B
W
7
2
"
C
H
L
W/
3
S
B
W
7
2
"
C
H
L
W/
3
S
B
W
72" CHL W/ 3SBW48" CHL48" CHL BST AND GRV
72" CHL W/ 3SBW
GATE
F
E
S
B
R
ID
G
E
#
13
6
PROSPECT ST. SR 1619 24’ BST
G
R
V
DI
E
I
P
E
I
P
E
I
P
E
I
P
E
I
P
E
X
IS
T
IN
G
R
/W
EXISTING R/W
EIP
EIPEIP
E
I
P
S
0
2
0
5
’
4
1"
E
2
5
.
10
’
E
I
P
E
I
P
11.44’
S
0
1
3
4
’
3
1"
W
2
11.
2
6
’
EIP TO R/W
S
13
2
5’4
9"
E
6
3.6
9’
N 7436’28" E
320.00’
S 8639’34" E
476.20’
EXISTING R/W
E
I
P
N 8610’37" E
327.77’
N 0037’45
"
E
50.00
’
N
0
2
0
5
’
4
1"
W
1
6
2.
9
6
’
N
0
0
3
7
’
4
5
"
E
9
9
.
0
3
’
E
XIS
T
ING
R
/
W
3
0
.
0
0
’
G
A
T
E
w
/
P
U
M
P
MT
L
P
O
S
T
S
M
T
L
P
O
S
T
S
P
O
S
T
S
M
T
L
B
Y
2
-
6
P
O
T
BY4-13 PINC
H
IGH
P
OIN
T
, T
H
OMAS
VILLE
AND
DE
N
T
ON
R
AILR
OAD
(C
S
X)
EXISTING R/W
43
.00’
57
.00’
13.93’
CLEARANCE
BRIDGE
14.16’
CLEARANCE
BRIDGE
E
X
IS
T
ING
R
/
R
R
/
W
E
X
IS
T
ING
R
/
R
R
/
W
43.00’
57.00’
60.00’
43.00’
57.00’
E
X
IS
T
ING
R
/
R
R
/
W
E
XIS
T
IN
G
R
/
R
R
/
W
E
X
IS
T
ING
R
/
R
R
/
W
E
X
IS
T
ING
R
/
R
R
/
W
E
X
IS
T
IN
G
R
/
W
E
X
IS
T
IN
G
R
/
W
S
H
E
D
M
T
L
A
N
D
B
L
K
1
S
B
L
K
W/
M
T
L
B
U
S
GUARD HOUSE BK
BK S
W/
L
T
W/LT
W/LT
W/
L
T
T
E
O
I
6" TYPE UNKNOWN
6
" T
Y
P
E
U
N
KN
O
WN
6" TYPE UNKNOWN
4
"
P
L
A
S
T
I
C
4
" S
T
E
E
L
4
"
P
L
A
S
T
I
C
SIZE/TYPE UNKNOW N
SIZE/TYPE UNKNOW N
S
T
A
T
IO
N
G
A
S
T
E
S
T
V
E
N
T
G
A
S
V
E
N
T
G
A
S
S
T
A
T
IO
N
G
A
S
T
E
S
T
GENERATOR
EOI
EOI
EOI
EOI
ELEV = 953.65
E = 1694932
N = 789930
BM #1
THOMPSON RD SR 1620
16’ BST
UNKNOWNSIZE/TYPE
18" RCP
1.25" STEEL
EOI
EOI
72" CHL W/ 3SBW
6" TYPE UNKNOWN
UNABLE TO LOCATE END15" RCP72" CHL W/ 3SBW48" CHL 48’ CHL 48" CHL148.63’N 8610’37" E AXLE
148.35’
N 8851’29" E
60.00’12" RCP
HUT TELEPHONE
TANK PROPAIN
72" CHL W/ 3SBW S 8656’58" E 159.09’
S 8656’58" E 149.23’
W/LT
S 8656’58" E 50.00’
R/R TIES
30.09’+05.85 30.01’+64.21
17.32’
+48.70
14
5
.
3
6
’
+
8
1.
4
4
S
E
T
)
(
P
O
IN
T
N
O
T
-
B
Y
4
-
P
O
T
-
B
L
-
P
O
T
=
DB 229
0
P
G
2
0
1
2
CAROLINA THOMA
S
D
E
V
E
L
O
P
M
E
N
T
,
L
L
C
D
B
2
2
12
P
G
11
5
8
T
A
G
A
B
A
A,
I
N
C.
N 6801’39" E
300.00’V
A
R
B
S
T
PB 67 PG 43DB 1796 PG 2241DB 1422 PG 1425PAIGE K. PIERCEAND WIFEC. VAN PIERCE, JR.
P
B
1
P
G
1
0
7
D
B
1
9
0
2
P
G
3
0
7
BOBB
Y
L.
G
R
U
B
B,
T
R
U
S
T
E
E
P
B
1
P
G
1
0
7
D
B
1
2
1
3
P
G
1
7
7
1
P
A
M
E
L
A
G.
Y
O
R
K
A
N
D
WI
F
E
R
O
B
E
R
T
W.
Y
O
R
K
P
B
1
P
G
10
7
D
B
115
6
P
G
5
9
9
V
E
R
A
F
E
R
R
E
L
L
A
N
D
W
I
F
E
W
I
L
B
U
R
F
.
F
E
R
R
E
L
L
P
B
1
P
G
10
7
D
B
8
0
6
P
G
16
6
E
R
V
I
N
R
.
D
A
V
I
S
,
S
R
.
DB 535 PG 157
DUKE POWER COMPANY
D
B
14
2
3
P
G
1
115
A
M
E
R
I
G
A
S
P
R
O
P
A
N
E
,
L
.
P
.
DB 1952 PG 2102 PENNY S. JENKINSAND WIFE ROBERT G. JENKINS, JR.
R
P
2
-
9
P
O
T
-
B
Y
1-
P
O
T
B
5
114
-
1 P
IN
C
=
D
B
2
0
4
0
P
G
2
2
5
5
J
U
D
I
T
H
R
.
M
c
K
A
G
U
E
A
N
D
W
I
F
E
R
O
N
A
L
D
W
.
M
c
K
A
G
U
E
+25.00+
3
4
.
4
2
5
0
’
L
T
+
6
5
.
8
5
EX
I
S
T
R
/
W
+00.00& EXIST R/W 40’ RT
4
0
’
R
T
+
3
4
.
4
2
+
6
0
.
7
4
-
R
P
1
-
+
6
6
.
3
4
-
R
P
1
-
+
1
4
.
3
3
5
0
’
L
T
+
9
9
.5
5
EXIS
T
R/W
+
5
0
.0
0
&
EXIS
T
R/W
E
x
i
s
t
.
R
/
W
+
6
8
.
4
8
E
x
i
s
t
.
R
/
W
+
0
0
.
1
0
4
0
’
R
T
E
x
i
s
t
.
R
/
W
9
0
’
R
T
+
5
5
.
0
0
+
1
0
.
0
0
3
5
’
R
T
+
3
5
.
0
0
3
5
’
R
T
+
3
5
.
0
0
5
0
’
R
T
E
x
i
s
t
.
R
/
W
6
0
’
R
T
-
R
P
1
-
+
6
6
.
3
4
E
x
i
s
t
.
R
/
W
Exist. R/W +50.0050’ LT +00.00& EXIST R/W 60’ LT 50’ LT 60’ LT123
4
5
6
7
+
3
0
.
0
0
4
0
’
R
T
8
0
.
0
0
’
R
T
Ex
i
s
t
R
/
W
R
P
1
_
E
x
t
+
2
6
.
1
4
P
r
o
p
.
R
/
W
+
5
5
.
0
0
5
7
.
0
0
’
R
T
+
0
0
.
0
0
8
2
’
R
T
+
9
6
.
0
0
7
0
’
R
T
+
8
8
.
0
0
8
0
’
R
T
+
0
0
.
0
0
-
R
P
1
E
X
T
-
+
1
3
.
6
4
6
5
.
0
0
R
T
-
R
P
1
_
E
X
T
-
+
6
7
.
0
0
6
5
.
0
0
’
R
T
-
R
P
1
E
X
T
-
+
0
0
.
0
0
1
0
50’ TAPER
2
4
0
’ TA
P
ER
POT Sta. 10+00.00 10
PC Sta. 13+34.42
15
20
1
0
P
I
S
t
a
1
4
+
9
9
.
0
1
DL
=
3
2
6
.
3
3
’
T
=
1
6
4
.
5
9
’
R
=
1
,
0
1
3
.
0
0
’
PI Sta
1
0
+
3
9
.
1
0
DL = 5
5
.
3
4
’
T = 2
8
.
1
0
’
R = 1
3
0
.
0
0
’
P
I
S
t
a
1
5
+
9
4
.
1
3
DL
=
1
5
6
.
0
7
’
T
=
8
0
.
5
9
’
R
=
2
5
4
.
0
0
’
-
R
P
1
-
-
L
-
-
R
P
1-
P
O
T
Sta. 12
+
14.3
3
-
Y
1
-
P
C
S
t
a
.
1
5
+
1
3
.
5
4
-
Y1-
P
T
S
ta
. 16
+
6
9
.6
1
-
R
P
1
-
P
T
S
t
a
.
1
0
+
6
6
.
3
4
P
T
S
t
a
.
1
6
+
6
0
.
7
4
-
Y1-
P
O
T
S
t
a
. 17
+
0
6
.7
1
-
R
P
1-
P
O
T
S
t
a
. 10
+
0
0
.0
0
-
L
-
P
O
T
S
t
a
. 17
+
6
9
.6
1
B
E
G
I
N
B
R
I
D
G
E
-L- STA. 11+50.00 BEGIN TIP PROJEC
T
B
-
5
1
1
4
-
Y
1
-
L
=
3
5
4
.
4
4
’
P
I
S
t
a
2
5
+
1
7
.
6
4
DT
=
1
8
4
.
7
1
’
R
=
5
1
0
.
0
0
’
04
04
01
02
03
05
00
Exist.
05
04
03
02
01
01
0202
0202
01
00
+60
TYPE B-77
4
6
4
8
’ 0
4
"
-
L-
P
OT
S
T
A. 19
+
99.61
-
Y4-
P
OT
S
T
A. 2
2
+
42.99
-
R
P
1
-
S
T
A
.
1
1
+
4
6
.
0
0
E
N
D
G
R
A
D
E
TYPE B-77
4’4’
GRAU 350 TL-3
GRAU 350 TL-3
T
Y
P
E
-
I
I
I
TYPE-
III
TYPE-
III
TYPE-
III
AT-1
-
Y
4
L
O
O
P
1
-
P
I
S
t
a
1
0
+
7
6
.
5
3
DL
=
1
3
6
.
7
6
’
T
=
7
5
.
2
4
’
R
=
1
3
2
.
0
0
’
SR 1663
AUCTION RD
3
0
.
0
0
’
R
-RP1-
4
0
.0
0
’
R
6
0
.0
0
’
R
G
RAU
3
5
0
TL-
2
20
25
-
L
-
S
T
A
.
1
8
+
5
6
.
9
9
-
L
-
S
T
A
.
1
8
+
8
0
.
6
1
-
L
-
S
T
A
.
2
1
+
2
5
.
6
1
-
L
-
S
T
A
.
2
1
+
4
9
.
2
4
P
I
S
t
a
1
4
+
3
1
.
1
6
DL
=
2
1
2
.
4
9
’
T
=
1
1
7
.
5
2
’
R
=
2
0
0
.
0
0
’
-
R
P
1
E
X
T
-
15
-
R
P
1
E
X
T-
P
O
T
Sta. 12
+
14.3
3
-
R
P
1
E
X
T
-
P
C
S
t
a
.
1
3
+
1
3
.
6
4
-
R
P
1
E
X
T
-
P
C
S
t
a
.
1
6
+
0
9
.
7
2
-
R
P
1
E
X
T
-
P
T
S
t
a
.
1
5
+
2
6
.
1
4
GRAU 350 TL-3
G
U
A
R
D
R
A
I
L
P
R
O
P
O
S
E
D
AT-1
5
0
’ LEFT
TU
RN
TAPER
12’12’
4’PS
4’PS
4’12’12’4’
4
’PS
12’
12’12’
12’
12’
4’ P
S
4’ P
S
12’
12’
12’
6’PS
6.35’
10
0
’ RIG
H
T
TU
RN
TAPER
10
0
’ RIG
H
T
TU
RN
TA
PER
1
2
0
.
0
0
’
R
12’
75’ TAPER 5
0
.0
0
’
R
0
0
0
1
0
2
0
2
0
2
-
R
P
1
E
X
T
-
S
T
A
.
1
2
+
2
5
.
0
0
U
T
I
L
I
T
Y
V
A
U
L
T
D
O
N
O
T
D
I
S
T
U
R
B
E
N
D
B
R
I
D
G
E
E
N
D
A
P
P
R
O
A
C
H
S
L
A
B
B
E
G
I
N
A
P
P
R
O
A
C
H
S
L
A
B
W
o
o
d
F
e
n
c
e
A
v
o
i
d
R
1
0
.
0
0
’
R10’
R
1
0
’
-RP1- PC Sta. 10+11.00
+
8
5
.
0
4
E
n
d
E
X
G
+
9
8
.
5
3
B
e
g
i
n
E
X
G
E
N
D
P
A
V
E
M
E
N
T
C
O
N
S
T
.
15" RCP Approx. LocationREM
O
V
E
Convert to JBwMH
T
B
2
G
I
T
B
2
G
I
C
L
B
R
I
P
R
A
P
T
B
2
G
I
T
B
2
G
I
T
B
2
G
I
T
B
2
G
I
2:12:1D ( Not to Scale)STANDARD ’V’ DITCHFROM STA.11+08-RP1-LT. TO STA.12+07-RP1-LT.Min. D= 0.0Ft.DETAIL GGroundNaturalGroundNatural
S
E
E
D
E
T
A
I
L
G
REMOVE
18" RCP-III
15"
15"
12" RCP-V
12" RCP-V
2
G
I
E
L
B
O
W
S
w
/
2
ELBO
W
S
w
/
2
C
L
B
R
I
P
R
A
P
2GI FROM STA.11+00-RP1-RT TO STA.12+00-RP1-RT DETAIL AMax. d=1.5Ft.Min. D=2.0Ft.Type of Liner= PSRM Ground Natural2:1DFlatter3:1 ord( Not to Scale)CUT DITCH
18" RCP-V
12" RCP-V
15
" RC
P-II
I
2
G
I
C
L
B
R
I
P
R
A
P
2
G
I
2
G
I
T
B
2
G
I
1
1
0
s
y
P
S
R
M
S
E
E
D
E
T
A
I
L
A
P
R
E
C
A
S
T
M
H
6
’
D
I
A
.
18" RCP-III 2GI 2:1DVARIABLE ( Not to Scale)SPECIAL CUT DITCHFROM STA. 12+20-L-RT. TO STA. 13+50-L-RT.FROM STA. 21+00-L-LT. TO STA. 24+00-L-LT.DETAIL DMin. D= 1.0Ft.Ground Natural18" RCP-III
15
" RC
P-V
SEE DE
T
A
I
L
D
18" RCP-III
S
TA
.
2
1+
0
0
-
L-
LT.
TO
2
4
+
0
0
-
L-
LT.
A
L
S
O
S
E
E
-
L
-
X
-
S
E
C
T
I
O
N
S
S
E
E
D
E
T
A
I
L
D
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
*
N
O
T
E
:
N
O
D
E
C
K
D
R
A
I
N
S
R
E
Q
U
I
R
E
D
24" RCP-III
24" RCP-IV
24" RCP-IV
24" RCP-III
2
G
I
2
G
I
R
E
M
O
V
E
F
L
O
W
A
B
L
E
F
I
L
L
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
D
d
2:1
FROM STA.12
+
0
0
-
R
P
1
-
R
T
T
O
S
T
A
.
1
4
+
0
0
-
R
P
1
E
X
T
-
R
T
D
E
T
A
I
L
E
M
a
x
.
d
=
2
.
0
F
t
.
M
i
n
.
D
=
2
.
0
F
t
.
Type of Liner=
C
L
A
S
S
B
R
i
p
-
R
a
p
Flatter
3:1 or
Ground Natura
l
+
/
-
5
5
0
S
Y
G
E
O
T
E
X
T
I
L
E
+
/
-
4
0
0
T
O
N
S
C
L
A
S
S
I
R
I
P
R
A
P
S
E
E
D
E
T
A
I
L
F
+
/
-
2
8
5
s
y
G
E
O
T
E
X
T
I
L
E
+
/
-
2
7
0
T
O
N
S
C
L
A
S
S
B
R
I
P
R
A
P
S
E
E
D
E
T
A
I
L
E
P
L
U
G
P
L
U
G
P
L
U
G
P
LU
G
P
PP
P
ELB
EL
B
ELB
ELB
0404
0
4
0
9
0
4
2
3
0401 0402 0403
0
4
0
5
0
4
0
6
0
4
0
7
0
4
0
8
0
4
1
0
0
4
1
1
0
4
1
2
0
4
1
3
0
4
1
4
0
4
1
5
0
4
1
6
0
4
1
7
0
4
2
0
0
4
2
1
0
4
2
2
0
4
2
4
0
4
2
5
042
6
( Not to Scale)SPECIAL LATERAL ’V’ DITCHDdEX. SLOPEFROM STA.14+00-RP1EXT-RT TO STA.16+00-RP1EXT-RT DETAIL FMax. d= 2.0Ft.Min. D= 2.0Ft.Type of Liner= CLASS I Rip-Rap EX. SLOPEGroundNatural
FLO
W
ABLE
FILL
O
F
2
4
"
R
C
P
-
I
I
I
R
E
P
L
A
C
E
W
I
T
H
1
6
L
F
C
O
L
L
A
R
A
N
D
8
L
F
O
F
2
4
"
C
O
N
C
P
I
P
E
.
R
E
M
O
V
E
F
E
S
&
FFFC
F
C
F
C
F
C
C
C
F
C
C
C
CC
C
C
C
C
C
C
C
F
F
C
C
F
C
F
F
C
F
C
C
C
C
C
C
C
C
C
C
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
C
F
F
F
F
F
F
F
F
F
F
F
F
F
F
N
A
D
8
3
/
C
O
R
S
9
6
R
E
T
A
I
N
C Proposed Ditch
S
T
A
.
2
5
+
5
0
-
L
-
L
T
.
T
O
2
7
+
0
0
-
L
-
L
T
.
S
E
E
-
L
-
X
-
S
E
C
T
I
O
N
S
S
P
E
C
I
A
L
S
H
O
U
L
D
E
R
G
R
A
D
I
N
G
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
S
l
o
p
e
D
i
t
c
h
F
r
o
n
t
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
17-APR-2014 08:57R:\Roadway\Proj\B5114_Rdy_psh5.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5
B
-
5
1
1
4
MATCH LINE -L- STA. 22+50.00 SEE SHEET 4
S
E
E
S
H
E
E
T
S
8
&
9
F
O
R
P
R
O
F
I
L
E
S
2
0
1
5
A
D
T
2
0
3
5
A
D
T
1
,
7
0
0
1
,
6
0
0
2
,
1
0
0
8
,
3
0
0
1
2
,
3
0
0
7
,
6
0
0
1
1
,
8
0
0
3
,
3
0
0
4
,
6
0
0
3
,
9
0
0
S
R
1
6
1
9
P
R
O
S
P
E
C
T
S
T
.
S
R
1
6
2
1
U
S
7
0
-
2
9
W
B
R
A
M
P
S
R
1
6
1
9
P
R
O
S
P
E
C
T
S
T
.
B
E
T
H
E
L
D
R
1
,
3
0
0
2
,
9
0
0
1
,
5
0
0
1
,
6
0
0
1
,
1
0
0
1
,
1
0
0
2
6
,
4
2
5
3
7
,
5
0
0
I
-
8
5
B
U
S
.
-
D
E
N
O
T
E
S
P
R
O
P
O
S
E
D
T
R
A
F
F
I
C
S
I
G
N
A
L
-
D
E
N
O
T
E
S
P
R
O
P
O
S
E
D
5
"
M
O
N
O
L
.
C
O
N
C
.
I
S
L
A
N
D
(
K
E
Y
E
D
I
N
)
BUS1S BLKGRV GRVSTEPSCONCCONCR/R SIGNALOVERHEAD
R/
R
S
I
G
N
A
L
O
V
E
R
H
E
A
D
W
B
S
T
C
U
R
B
BST CU
R
B
CONCIS BLK BUSGRVSTEPSCONCBST ISLAND STEPSWOOD
G
R
V
G
R
V
1
S
B
K
B
U
S
GR
V
B
S
T
C
U
R
B
B
S
T
C
U
R
B
1S BLK BUS B
S
T
B
S
T
B
S
T
CONC
B
S
T
B
S
T
U
/G T
A
NK
S
3
@ 10
0
0
0
G
A
L
FLAG POLE
PUM
P GAS
S
GAS VENTS
2
P
U
MP
S
w
/
C
A
N
O
P
Y
M
T
L
V
A
R
H
T
CO
N
C
W
A
L
L
HOUSESIGNALR/RW/ MTL
P
O
S
T
MTL GUA
R
D
R
A
IL
BLK WALLVAR HTBLK WALL VAR HT POSTSMTL W
C
O
N
C
T
O H
IGH
P
OINT
AB
AN
D
ON
E
D
S
P
UR
21’ BST
V
A
R
B
S
T
17
1
8
1
9
2
021
2
2
2
3
24
25
2
6
3233 34 35 36 373839
24’ BST
C
I
T
Y
O
F
HI
G
H
P
O
I
N
T
CITY OF HIGH POINT
CI
TY
O
F
HI
G
H
P
OI
N
T
C
IT
Y
O
F
H
IG
H
P
O
IN
T
72" CHL W/ 3SBW
P
R
OS
P
E
C
T
S
T
. S
R
16
19
2
1’ B
S
T
BETHAL DR. SR 1621
B
E
L
M
A
R
S
T.
S
R
1
6
2
3
T
O
T
O
W
E
R
A
V.
EIP
E
IP
E
I
P
E
IP
E
IP
EI
P
E
XIS
TI
NG
R/
W
EIPEIPEIPNAILPKN 0349’05" E77.74’N 8948’55" E270.99’S 0011’05" E75.11’N 8950’14" E81.28’ 8.86’TO R/WEIP
S
12
2
8’
2
7"
E
2
3
6.
0
1’
EXISTING R/R R/W 50.00’
50.00’
EXISTING R/W
E
XIS
T
ING
R
/
W
E
XIS
T
ING
R
/
W
60
.00’
E
X
I
S
T
I
N
G
R
/
R
R
/
W
B
Y
3
-
7
P
O
T
BL-4 POT
H
I
G
H
P
O
I
N
T
,
T
H
O
M
A
S
V
I
L
L
E
A
N
D
D
E
N
T
O
N
R
A
I
L
R
O
A
D
(
C
S
X
)
E
X
I
S
T
I
N
G
R
/
R
R
/
W
43.00’57.00’
E
X
I
S
T
I
N
G
R/
W
43.00’57.00’EXISTING R/R R/W
60.00’
43.00’
50.00’
MI
LE
M
A
R
K
E
R
#
3
4041
18
" R
C
P
W/
L
T
W/
L
T
W/
L
T
DOCK LOADINGTHOMASVILLE RD.TO OLD
HH
T
2" PLASTIC
2
"
P
L
A
S
T
I
C
1
2
"
D
I
P
12" DIP
12" DIP
4" STEEL
4
" S
T
E
E
L
4
"
S
T
E
E
L
ME
T
E
R
P
O
WE
R
STATIONPUMP
S
T
A
T
I
O
N
G
A
S
T
E
S
T
V
E
N
T
G
A
S
VENT GAS
S
T
A
T
IO
N
G
A
S
T
E
S
T
S
T
A
T
I
O
N
G
A
S
T
E
S
T
T
12
" C
IP
12
" C
IP
12
" D
IP
8
"
DI
P
U
N
K
N
O
W
N
SIZ
E/
T
YP
E
LINEPRIVATE
U
N
KN
O
WN
S
IZ
E
/
T
Y
P
E
UNKNOWN SIZE/TYPE
F
O
U
N
D
A
T
IO
N
C
O
N
C
S
IG
N
P
O
L
E
S
E
R
V
IC
E
CITY OF HIGH POINT 137.23’+95.73
18" RCP
-BY3- POT POT =-BY2- PINC=BL-3 DB 1408 PG 531 SHIRLEY E. BURNS AND WIFE BOBBY E. BURNSDB 1999 PG 163
9
DJ WORLDWIDE, L.L
.C
.
P
B
2
2
P
G
16
D
B
5
3
6
P
G
3
3
6
D
B
6
4
4
P
G
3
6
6
K
E
N
N
E
D
Y
O
IL
C
O
M
P
A
N
Y
P
B
14
P
G
7
0
D
B
2
0
6
6
P
G
2
6
2
1
D
T
J
P
R
O
P
E
R
T
IE
S
, L
.L
.C
.
4
0
’
L
T
4
0
’
L
T
4
0
’ RT
+
7
1
.
2
3
+
8
7
.
3
7
+
2
0
.
0
0
&
E
X
I
S
T
R
/
W
4
0
’
L
T
+
2
0
.
0
0
+
8
7
.3
7
+
8
4
.
1
6
5
0
’
L
T
+
9
3
.
9
0
5
0
’ LT
+
11.4
9
4
0
’ LT
8
9
+
2
0
.
0
0
7
0
’
L
T
+
4
4
.
2
8
EX
I
S
T
R
/
W
+
2
0
.
0
0
4
0
’
L
T
4
0
’
R
T
E
X
I
S
T
R
/
W
E
x
i
s
t
R
/
W
PC Sta. 23+32.93 25
-
L-
P
OT
S
ta
. 2
4
+
7
4
.10
-
R
P
2
-
P
OT
S
ta
. 10
+
0
0
.0
0
-RP2- POT Sta. 12+39.67
P
T
S
ta
. 2
6
+
8
7
.3
7
P
C
S
ta. 10
+
2
2
.4
0
PT Sta. 11+20.44
10
0
’ TAPER
P
O
T
S
ta
. 2
9
+
17
.13
5
0
’ TAPER
00
0102 03 04 05 06
06
05
04
03
02
01
01
05
Ex
is
t
.
EN
D
C
O
N
S
TRU
C
TIO
N
-
RP
2
-
S
TA
. 12
+
0
5
.0
0
Ex
is
t
.
50’ TAPER
PI Sta 25+17.64DL = 354.44’T = 184.71’R = 510.00’-L-
-
R
P
2
-
P
I
S
t
a
1
0
+
7
3
.
2
4
DL
=
9
8
.
0
5
’
T
=
5
0
.
8
5
’
R
=
1
5
0
.
0
0
’
E
N
D
T
I
P
P
R
O
J
E
C
T
B
-
5
1
1
4
-
L
-
S
T
A
.
2
8
+
2
0
.
0
0
Exist.00
01
02
024
02
01
00 01 02024 SR 1621 (BETHEL DR)
-RP2-5
0
.
0
0
’
R
50.00’R 60.00’RGRAU 350 TL-2GRAU 350 TL-2
S
H
O
U
LD
ER (S
EE TYP
. S
EC
TIO
N
N
O
. 3
)
REP
LA
C
E W
ITH
8
’ W
ID
E S
TREN
G
TH
EN
ED
P
A
VED
REM
O
VE EXIS
T. 8
’ PAVED
S
H
O
U
LD
ER A
N
D
S
EE TRA
N
SPO
RTA
TIO
N
M
AN
AG
EM
EN
T P
LAN
S
FO
R I-8
5
BU
S
W
O
RK Z
O
N
E LIM
ITS
(RD
W
Y S
TD
. D
W
G
. 110
1.0
3
, S
H
EET 4
O
F 9
FO
R M
ED
IAN
C
RO
S
SO
VER D
ETAILS)
120.00’R
NR
UT
TFEL
’
0
01
REPAT
12
’12
’12
’
12’12’12’4’
R
4
’
100’ RIGHT TURN TAPER 4’PS
12’
R
1
0
’
R
4
’
R
8
’
C
O
N
C
ISLAN
D
C
O
N
C
ISLAN
D
C
L
B
R
IP
RA
P
F
S
S
E
E
D
E
T
A
I
L
B
20:110:1LS=Ditch Slope S ( Not to Scale)FALSE SUMP2’DETAIL BTraffic Flow Outside Ditch1.0’ M ax.0.5’ M in.etc.GISTA. 12+22-RP2-LT.
S
E
E
D
E
T
A
I
L
C
10:1D10:1 ( Not to Scale)SPECIAL CUT DITCHFROM STA. 27+50-L-LT. TO STA. 28+00-
L
-
L
T
.
DETAIL CMin. D= 0.7Ft
.
Ground Natural
2:1
D
V
A
RIA
B
LE
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
C
U
T
D
I
T
C
H
F
R
O
M
S
T
A
.
2
1
+
0
0
-
L
-
L
T
.
T
O
S
T
A
.
2
4
+
0
0
-
L
-
L
T
.
D
E
T
A
I
L
D
M
i
n
.
D
=
1
.
0
F
t
.
G
r
o
u
n
d
N
a
t
u
r
a
l
2
G
I
STA. 21+00-L-LT. TO 24+00-L-LT.
ALSO SEE -L- X-SECTIONS SEE DETAIL D SPECIAL CUT DITCH
0
5
0
1
0
5
0
2
C C F
F
FF
F
F
F
F
C
F
C
C
C
C
F
C
F
C
F
C
NAD 83/ CORS 96
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
17-APR-2014 08:57R:\Roadway\Proj\B5114_Rdy_psh6.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
6
B
-
5
1
1
4
M ATCH LIN E -Y4- 17+00.00 SEE SHEET 4
S
E
E
S
H
E
E
T
2
B
F
O
R
M
E
D
I
A
N
C
R
O
S
S
O
V
E
R
D
E
T
A
I
L
S
E
E
S
H
E
E
T
9
F
O
R
P
R
O
F
I
L
E
G
U
I
D
A
N
C
E
I
N
P
H
A
S
I
N
G
T
H
E
W
O
R
K
S
E
C
T
I
O
N
S
3
&
6
A
N
D
T
M
P
F
O
R
B
E
E
N
C
O
M
P
L
E
T
E
D
.
R
E
F
E
R
T
O
T
Y
P
.
A
N
D
M
E
D
I
A
N
C
O
N
S
T
R
U
C
T
I
O
N
H
A
S
-
Y
4
-
L
A
N
E
S
A
F
T
E
R
T
R
A
F
F
I
C
S
H
I
F
T
S
M
I
L
L
A
N
D
F
I
L
L
T
H
E
E
X
I
S
T
I
N
G
T
G
A
T
E
G
A
T
E
18" RCP
1
8
"
R
C
P
24" RCP
18
"
RCP
D
I
S
BK
F
O
U
N
D
A
T
I
O
N
S
W
/
2
7
W
O
O
D
S
7
2
"
C
H
L
W
/
3
S
B
W
7
2
" C
H
L
W/ 3
S
B
W
7
2
"
C
H
L
W
/
3
S
B
W
7
2
"
C
H
L
W
/
3
S
B
W
F
E
S
F
E
S
F
E
S
F
E
S
S
0
4
14’
12"
W
2
7
6.
7
0’
E
I
P
E
I
P
E
I
P
E
I
P
S
P
I
K
E
R
/
R
E
IP
E
I
P
E
I
P
N
0
2
0
5
’5
4
" W
2
7
7.
5
0
’
E
X
I
S
T
I
N
G
R
/
W
B
Y
4
-
1
4
P
I
N
C
BY4-15 POT
B
Y
1-
5
P
O
T
E
X
I
S
T
I
N
G
R
/
W
S
0
3
3
6
’3
9
" E
8
2
7.
4
7
’
S
0
3
3
9
’12
" E
7
9
6.
3
9
’
R
/
W
1
.
2
8
’
E
I
P
T
O
E
O
I
E
O
I
E
O
I
E
O
I
6
"
T
Y
P
E
U
N
K
N
O
W
N
6
"
T
Y
P
E
U
N
K
N
O
W
N
4
"
P
L
A
S
T
I
C
E
O
I
24" RCP 18" RCP24" RCP FESFESFESCBTOP=940.01’TT RIP RAP ROCK 18" HDPE END OF PIPE N/A DIRECTIONAL ONLY260.00’EXISTING R/WEXISTING R/W
2
0
9.
0
4
’
+
2
9.
8
8
13
7.
9
9
’
+
7
1.
3
1
D
B
2
3
13
P
G
13
5
4
M
E
N
D
E
N
H
A
L
L
A
U
C
T
IO
N
C
O
M
P
A
N
Y,
IN
C.
D
B
2
0
2
4
P
G
2
4
16
O
F
H
IG
H
P
O
IN
T
IG
L
E
S
IA
N
U
E
V
A
V
ID
A
D
B
2
0
0
0
P
G
14
6
3
S
H
IP
W
A
S
H
E
N
T
E
R
P
R
IS
E
S
, L
.L
.C
.D
B
114
7
P
G
3
4
7
M
E
N
D
E
N
H
A
L
L
A
U
C
T
IO
N
C
O
M
P
A
N
Y
,
IN
C
.
10
4
’
4
’
SEE TRANSPORTATION MANAGEMENT PLA
N
S
F
O
R
BEGINNING I-85 BUS(NB) WORK ZONE LIM
I
T
S
(RDWY STD. DWG. 1101.03, SHEET 4 OF 9FOR MEDIAN CROSSOVER DETAILS)
-Y1- POT Sta. 10+00.00
(
S
E
E
T
Y
P
.
S
E
C
T
I
O
N
N
O
.
3
)
P
A
V
E
D
S
H
O
U
L
D
E
R
S
A
D
D
4
’
M
E
D
I
A
N
A
U
C
T
I
O
N
R
D
S
R
1
6
6
3
INTO MEDIAN CROSSOVER GRADING TRANSITION BEGIN MEDIAN -Y4- STA. 7+50.00
+50
+80
PT Sta. 10+00.00
10
15
POT Sta. 7+15.97PC Sta. 7+55.77
M
E
D
I
A
N
C
R
O
S
S
O
V
E
R
(
S
E
E
T
Y
P
.
S
E
C
T
I
O
N
.
N
O
.
6
)
D
I
S
T
U
R
B
S
T
R
E
A
M
D
O
N
O
T
C
A
T
-
1
G
R
A
U
3
5
0
T
L
-
3
S
H
O
U
L
D
E
R
(
S
E
E
T
Y
P
.
S
E
C
T
I
O
N
N
O
.
3
)
R
E
P
L
A
C
E
W
I
T
H
8
’
W
I
D
E
S
T
R
E
N
G
T
H
E
N
E
D
P
A
V
E
D
R
E
M
O
V
E
E
X
I
S
T
.
8
’
P
A
V
E
D
S
H
O
U
L
D
E
R
A
N
D
150.00’150.00’
+50 +50
POT Sta. 7+00.00
2
0
’
BEGIN -Y4- CONST. (-Y4- STA 7+00)REMOVE AND RESET EXISTING MEDIANGUARDRAIL CONSTRUCTED BY PROJECT W-5208L
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FF
FC
FC
FF
FF
FF
FF
F
FF
F
N
A
D
8
3/
C
O
R
S
9
6
R
E
T
A
I
N
G
R
O
U
N
D
N
A
T
U
R
A
L
S
L
O
P
E
F
I
L
L
G
E
O
T
E
X
T
I
L
E
REMOVE HW
S
l
o
p
e
F
i
l
l
G
e
o
t
e
x
t
i
l
e
REVISIO NS
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
R
/
W
S
H
E
E
T
N
O
.
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
17-APR-2014 08:57R:\Roadway\Proj\B5114_Rdy_psh7.dgn$$$$USERNAM E$$$$8/17/99
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
7
B
-
5
1
1
4
M ATCH LIN E -Y4- STA. 26+50.00 SEE SHEET 4
S
E
E
S
H
E
E
T
2
B
F
O
R
M
E
D
I
A
N
C
R
O
S
S
O
V
E
R
D
E
T
A
I
L
S
E
E
S
H
E
E
T
9
F
O
R
P
R
O
F
I
L
E
GUIDANCE IN PHASING THE WORK SECTIONS 3 & 6 AND TMP FOR BEEN COMPLETED. REFER TO TYP.AND MEDIAN CONSTRUCTION HAS -Y4- LANES AFTER TRAFFIC SHIFTS MILL AND FILL THE EXISTING18" RCP
18
" R
C
P
18" RCP
D
I
BILLBOARD
HW
2
5
’
B
S
T
2
5
’
B
S
T
9
’
B
S
T
8
’
B
S
T
WO
O
D
S
WOODS CITY OF HIGH POINTSTREAM DISAPPEA
R
S
STREAM RE
A
P
P
E
A
R
S
FES
F
E
S
22
56
E
X
I
S
T
I
N
G
R
/
W
EIPEIPEIPEIPEXISTING R/W
EIP
E
I
P
R
/
W
M
O
N
.
E
I
P
E
I
P
E
X
I
S
T
I
N
G
R
/
W
R
P
1-
8
P
O
T
-RP2- POT BY4-12 PINC =
BY4-11 PINC
VENT GAS STATION GAS TEST
18" RCP
18" RCP D
I
S
1057
’55" E
852
.01’
260.00’
CITY OF HIGH POIN
T
171.62’
+37
.04
132
.04
’
+66
.40
1
3
0
.
7
7
’
+
1
7
.
2
7
P
B
9
P
G
5
3
D
B
15
7
7
P
G
13
0
9
D
B
15
7
7
P
G
13
18
D
B
15
7
7
P
G
13
15
S
T
E
V
E
N
G
.
G
O
R
D
O
N
D
B
12
3
5
P
G
7
D
M
W
E
N
T
E
R
P
R
IS
E
S
IN
C
.
DB 2040 P
G
2
2
5
5
JUDITH R. M
c
K
A
G
U
E
AND W
I
F
E
RONALD W. M
c
K
A
G
U
E
80.00’ RTExist R/WRP1_Ext +26.14 Exist. R/W TIE PDE TO EIP80.00’ RT Exist R/W -RP1_EXT-+09.7210 -Y4- R/W 140’ @ EX.END CONS
T
R
U
C
TI
O
N
-RP2- STA.
1
2
+
0
5.
0
0
G
RA
U
3
5
0
T
L-
3
+00
+70
I
N
T
O
M
E
D
I
A
N
C
R
O
S
S
O
V
E
R
G
R
A
D
I
N
G
T
R
A
N
S
I
T
I
O
N
B
E
G
I
N
M
E
D
I
A
N
-
Y
4
-
S
T
A
.
3
5
+
3
5
.
4
6
(SEE TYP
.
S
E
C
T
I
O
N
N
O
.
3
)
PAVED SH
O
U
L
D
E
R
S
ADD 4’ M
E
D
I
A
N
-Y4-
30
35
POT Sta. 36+00.00
M
E
D
I
A
N
C
R
O
S
S
O
V
E
R
(
S
E
E
T
Y
P
.
S
E
C
T
I
O
N
N
O
.
6
)
C
A
T
-
1
G
R
A
U
3
5
0
T
L
-
3
S
H
O
U
L
D
E
R
(
S
E
E
T
Y
P
.
S
E
C
T
I
O
N
N
O
.
3
)
R
E
P
L
A
C
E
W
I
T
H
8
’
W
I
D
E
S
T
R
E
N
G
T
H
E
N
E
D
P
A
V
E
D
R
E
M
O
V
E
E
X
I
S
T
.
8
’
P
A
V
E
D
S
H
O
U
L
D
E
R
A
N
D
S
E
E
T
R
A
N
S
P
O
R
T
A
T
I
O
N
M
A
N
A
G
E
M
E
N
T
P
L
A
N
S
F
O
R
I
-
8
5
B
U
S
W
O
R
K
Z
O
N
E
L
I
M
I
T
S
(
R
D
W
Y
S
T
D
.
D
W
G
.
1
1
0
1
.
0
3
,
S
H
E
E
T
4
O
F
9
F
O
R
M
E
D
I
A
N
C
R
O
S
S
O
V
E
R
D
E
T
A
I
L
S
)
1
5
0
.
0
0
’
1
5
0
.
0
0
’
2
0
’
B
E
G
I
N
-
Y
4
-
C
O
N
S
T
.
(
-
Y
4
-
S
T
A
3
5
+
5
0
)
R
E
M
O
V
E
A
N
D
R
E
S
E
T
E
X
I
S
T
I
N
G
M
E
D
I
A
N
G
U
A
R
D
R
A
I
L
C
O
N
S
T
R
U
C
T
E
D
B
Y
P
R
O
J
E
C
T
W
-
5
2
0
8
L
2
G
I
T
E
M
P
S
T
E
E
L
P
L
A
T
E
C
L
B
R
I
P
R
A
P
(
N
o
t
t
o
S
c
a
l
e
)
T
O
E
P
R
O
T
E
C
T
I
O
N
d
F
L
A
TT
E
R
2:1
O
R
F
R
O
M
S
T
A
.
2
6
+
5
0
T
O
S
T
A
.
2
7
+
5
0
-
Y
4
-
L
T
D
E
T
A
I
L
F
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
B
R
i
p
-
R
a
p
d
=
2
.
0
F
t
.
2GI
1
5
"
R
C
P
-
III
165sy GEOTEXTILE 150 TONS CLASS B RIP RAP SEE DETAIL F
G
R
A
D
E
T
O
D
R
A
I
N
REMOVE
C
L
B
R
I
P
R
A
P
24" RCP-III 24" RCP-III
TRENCHLESS INSTALLATION 24" WELDED STEEL
2GICL B RIP RAP
P
L
U
G
P
L
U
G
F
L
O
W
A
B
L
E
F
I
L
L
P
P
0
7
1
2
070107020703
0
7
0
6
0
7
1
8
0
7
0
4
+/-550SY GEOTEXTILE +/-270 TONS CLASS I RIP RAP SEE DETAIL F
(
N
o
t
t
o
S
c
a
l
e
)
S
P
E
C
I
A
L
L
A
T
E
R
A
L
’
V
’
D
I
T
C
H
D
d EX. SLO
PE
F
R
O
M
S
T
A
.
1
4
+
0
0
-
R
P
1
E
X
T
-
R
T
T
O
S
T
A
.
1
6
+
0
0
-
R
P
1
E
X
T
-
R
T
D
E
T
A
I
L
F
M
a
x
.
d
=
2
.
0
F
t
.
M
i
n
.
D
=
2
.
0
F
t
.
T
y
p
e
o
f
L
i
n
e
r
=
C
L
A
S
S
I
R
i
p
-
R
a
p
E
X. S
L
O
P
E
G
r
o
u
n
d
N
a
t
u
r
a
l
FF F FFFFFCF
C
F
CF
FF
F
F
FF
FF
FF
FF
FF
F
F
N
A
D
8
3/
C
O
R
S
9
6
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
8
B
-
5
1
1
4
17-APR-2014 08:57R:\Roadway\Proj\B5114_Rdy_pfl.dgn$$$$USERNAM E$$$$24252627
2
8
2
9
920 930 940 950 960 970
-
L
-
-L-
-
Y
1
-
-L- STA. 12+00.00EL = 958.50’-L- STA. 27+22.00EL = 956.16’END GRADE
-
Y
1
-
S
T
A
.
1
6
+
8
8
.
5
1
E
L
=
9
5
6
.
0
1
’
E
N
D
G
R
A
D
E
-
Y
1
-
S
T
A
.
1
6
+
5
5
.
7
5
E
L
=
9
5
4
.
8
9
’
B
E
G
I
N
G
R
A
D
E
9
2
0
9
3
0
9
4
0
9
5
0
9
6
0
9
7
0
10111213
1
4
1
5
1
6
1
7
1
8
1
9
2
0
2
1
2
2
2
3
2
4
E
N
D
P
R
O
J
E
C
T
-
L
-
S
T
A
.
2
8
+
2
0
.
0
0
N 789930 E 1694932 ELVE. 953.65’ (BUS I-85)7029OVER US THOMASVILLE AND DENTON RAILROAD BRIDGE OF NORTH EAST WING WALL OF HIGH POINT,BM#1 CHISLED SQUARE IN NORTH EAST CORNER
S
E
E
S
H
E
E
T
S
4
&
5
F
O
R
-
L
-
D
E
S
I
G
N
SEE SHEETS 4 & 5 FOR -L- DESIGN
17+69.61
-
Y
1
-
/
-
R
P
1
-
T
I
E
24+74.10 -RP2- TIE
S
E
E
S
H
E
E
T
4
F
O
R
-
Y
1
-
D
E
S
I
G
N
3
5
M
P
H
4
0
M
P
H
4
0
M
P
H
D
I
T
C
H
L
E
G
E
N
D
RIGHT D
I
T
C
H
LEFT D
I
T
C
H
D
I
T
C
H
L
E
G
E
N
D
R
I
G
H
T
D
I
T
C
H
L
E
F
T
D
I
T
C
H
970960950940930920
9
7
0
9
6
0
9
5
0
9
4
0
9
3
0
9
2
0
4
0
M
P
H
BEGIN GRADE-L- STA. 11+50.00 BEGIN PROJECTRESURF.MILL &
R
E
S
U
R
F
.
M
I
L
L
&
1
5
1
6
1
7
9
2
0
9
3
0
9
4
0
9
5
0
9
6
0
9
7
0
9
2
0
9
3
0
9
4
0
9
5
0
9
6
0
9
7
0
958.50
P
I
=
1
4
+
5
2
.
0
0
E
L
=
9
6
0
.
0
2
’
(
+
)
0
.
6
0
3
2
%
(-
)1.7
2
0
8
%
V
C
=
1
3
5
’
K
=
5
8
P
I
=
1
7
+
2
6
.
5
0
E
L
=
9
5
5
.
3
0
’
(-
)1.7
2
0
8
%
(
+
)
1.
9
9
8
0
%
V
C
=
1
8
3
’
K
=
4
9
P
I
=
2
0
+
5
0
.
0
0
E
L
=
9
6
1
.
7
6
’
(
+
)
1.
9
9
8
0
%
(-
)2
.0
9
2
5
%
V
C
=
2
0
0
’
K
=
4
9
P
I
=
2
3
+
4
2
.
0
0
E
L
=
9
5
5
.
6
5
’
(-
)2
.0
9
2
5
%
(-
)1.2
12
1%
954.95
P
I
=
1
6
+
7
0
.
1
9
E
L
=
9
5
5
.
1
4
’
(
+
)
1.
7
2
18
%(
+
)
4.
7
3
7
8
%
(
+
)
2
.
13
8
0
%
956.40
-
L
-
S
T
A
1
7
+
6
6
.
9
1
T
I
E
T
O
E
O
P
-
Y
1
-
S
T
A
1
6
+
4
5
.
4
1
-
E
Y
6
-
S
T
A
1
5
+
4
8
.
5
4
=
H
P
T
D
(
C
S
X
)
R
A
I
L
V
C
=
6
0
’
K
=
6
8
954.95 PI = 25+40.00EL = 953.25’(-)1.2121%(+)1.5989%VC = 200’K = 71 PI =12+42.000El = 955.63 (+) 0.7667%(+) 0.7593%EL.=955.40’BEGIN DITCH STA. 12+12-L-RTEL.=956.45’END DITCH STA. 13+50-L-RT
ELEV.= 951.28’
BEGIN DITCH STA. 21+00-L-LT.
(
+
)
0
.
4
0
6
7
%
ELEV.= 952.50’
DITCH STA. 24+00-L-LT.
ELEV.= 955.28’BEGIN DITCH STA. 27+50-L-LT.
ELEV.= 956.42’
END DITCH STA. 28+00-L-LT.
(+) 2.2
8
0
0
%
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
9
B
-
5
1
1
4
17-APR-2014 08:57R:\Roadway\Proj\B5114_Rdy_pfl.dgn$$$$USERNAM E$$$$
S
E
E
S
H
E
E
T
S
4
,
6
&
7
F
O
R
-
Y
4
-
D
E
S
I
G
N
-
Y
4
-
-Y4- STA. 12+80.0010111213
1
4
1
5
1
6
1
7
1
8
1
9
2
0
2
1
2
2
2
3
2
4
910 920 930 940 950 960
932.00
931.97
-
Y
4
-
DITCH LEGENDRIGHT DITCHLEFT DITCH24252627
2
8
2
9
3
0
3
1
3
2
3
3
3
4
3
5
3
6
880 890 900 910 920 930 940 950 960
CL
CL
1
3
’
7
"
C
L
E
A
R
A
N
C
E
M
I
N
I
M
U
M
-
Y
4
-
S
T
A
1
9
+
4
3
.
6
8
-
E
Y
6
-
S
T
A
1
7
+
3
2
.
8
6
=
R
R
B
R
I
D
G
E
H
P
T
D
(
C
S
X
)
D
E
P
T
H
S
U
P
E
R
S
T
R
U
C
T
U
R
E
A
P
P
R
O
X
7
.
2
’
9
6
0
9
5
0
9
4
0
9
3
0
9
2
0
9
1
0
9
6
0
9
5
0
9
4
0
9
3
0
9
2
0
9
1
0
9
0
0
8
9
0
8
8
0
-
Y
4
-
S
T
A
.
2
9
+
7
0
.
0
0
E
L
E
V
.
9
6
0
.
5
0
’
-
Y
4
-
S
T
A
2
2
+
4
2
.
9
9
-
L
-
B
R
I
D
G
E
S
T
A
1
9
+
9
9
.
6
1
=
GRADE LINE EXIST MEDIAN
G
R
A
D
E
L
I
N
E
E
X
I
S
T
M
E
D
I
A
N
2
4
"
-RP1--RP2-BEGIN GRADEEL = 956.07’-RP1- STA. 10+18.24EL = 950.28’END GRADE-RP1- STA. 11+46.00BEGIN GRADEEL = 953.05’-RP2- STA. 10+18.00EL = 945.82’END GRADE-RP2- STA. 12+05.00
S
E
E
S
H
E
E
T
4
F
O
R
-
R
P
1
-
D
E
S
I
G
N
SEE SHEET 5 FOR -RP2- DESIGN
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
5/28/99
S
H
E
E
T
N
O
.
P
R
O
J
E
C
T
R
E
F
E
R
E
N
C
E
N
O
.
H
Y
D
R
A
U
L
I
C
S
R
O
A
D
W
A
Y
D
E
S
I
G
N
E
N
G
I
N
E
E
R
E
N
G
I
N
E
E
R
1
0
B
-
5
1
1
4
17-APR-2014 08:57R:\Roadway\Proj\B5114_Rdy_pfl.dgn$$$$USERNAM E$$$$
-
R
P
1
_
E
X
T
-
101112 920 930 940 950 960
D
I
T
C
H
L
E
G
E
N
D
R
I
G
H
T
D
I
T
C
H
L
E
F
T
D
I
T
C
H
1
3
1
4
1
5
1
6
1
7
9
2
0
9
3
0
9
4
0
9
5
0
9
6
0
101112 910 920 930 940 950 960 PI = 10+70.00EL = 949.93’(-)6.0000%(-)2.7455%VC = 88’K = 27 PI = 11+80.00EL = 946.91’(-)4.3600%VC = 50’K = 31 STA
.
1
2
+
1
4
.
3
3
BEG
I
N
-
R
P
1
_
E
X
T
-
9
1
0
9
2
0
9
3
0
9
4
0
9
5
0
9
6
0
(-)1.8092%(-)4.9695%956.40 PI = 11+10.00EL = 951.51’(-)3.4167%VC = 72’K = 46 -L- STA 17+72.52TIE TO EOP(-) 4
.2
118
%
(-) 1.0934%(-) 2.9800%EL.=946.00’STA. 12+23.6-RP1EXT-END DITCHEL.=947.35’STA. 11+00-RP1-LTBEGIN DITCHPI =12+00.000EL.=949.44’ (RT)BEGIN DITCH STA. 11+00-RP1-El = 946.46 (RT)
EL.=938.04’ (RT)
END DITCH STA. 14+00-RP1EXT-
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_L.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
960
9
6
0
950
9
5
0
1
1
+
5
0
.
0
0
960
9
6
0
970
9
7
0
950
9
5
0
1
2
+
0
0
.
0
0
960
9
6
0
970
9
7
0
950
9
5
0
1
2
+
5
0
.
0
0
960
9
6
0
970
9
7
0
950
9
5
0
1
3
+
0
0
.
0
0
950
9
5
0
960
9
6
0
970
9
7
0
940
9
4
0
1
3
+
5
0
.
0
0
960
9
6
0
970
9
7
0
950
9
5
0
1
3
+
8
0
.
0
0
960
9
6
0
970
9
7
0
950
9
5
0
1
4
+
0
0
.
0
0
X
-
1
B
-
5
1
1
4
-
L
-
5
1
0
D
O
N
O
T
U
S
E
F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
P
R
E
L
I
M
I
N
A
R
Y
P
L
A
N
S
9
5
8
.
4
7
9
5
8
.
4
4
3:
1
0
.
0
3
5
0
.
0
0
0
2:1
9
5
8
.
6
1
3:
1
2:1
4
:1
0
.
0
3
5
0
.
0
0
0
9
5
5
.
6
9
9
5
8
.
8
8
3:
1
2:1
4
:1
0
.
0
4
0
0
.
0
2
3
9
5
5
.
8
6
9
5
9
.
0
6
3:
1
2:1
4
:1
0
.
0
4
0
0
.
0
4
7
9
5
6
.
4
5
9
5
9
.
1
6
4
:
1
0
.0
5
0
0
.0
5
0
6
%
Y
LI
N
E
T
I
E
9
5
9
.
2
3
2:1
2:1
4
:1
4:
1
0
.0
5
0
0
.0
5
0
9
5
5
.
5
7
9
5
7
.
4
5
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_L.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
960
9
6
0
970
9
7
0
950
9
5
0
1
4
+
5
0
.
0
0
960
9
6
0
970
9
7
0
950
9
5
0
1
5
+
0
0
.
0
0
960
9
6
0
970
9
7
0
950
9
5
0
1
5
+
5
0
.
0
0
960
9
6
0
970
9
7
0
950
9
5
0
1
6
+
0
0
.
0
0
960
9
6
0
970
9
7
0
950
9
5
0
1
6
+
5
0
.
0
0
960
9
6
0
970
9
7
0
950
9
5
0
1
7
+
0
0
.
0
0
X
-
2
B
-
5
1
1
4
-
L
-
5
1
0
9
5
9
.
4
5
0
.0
5
0
0
.0
5
0
958.76
4
:
1
2:1
9
5
9
.
2
8
2:1
4:
1
0
.0
5
0
0
.0
5
0
9
5
6
.
9
7
958.23
7
.
7
:
1
9
5
8
.
8
5
2:1
4:
1
0
.0
5
0
0
.0
5
0
9
5
6
.
2
1
957.34
2:1
9
5
8
.
5
2
2:1
4
:
1
0
.0
5
0
0
.0
5
0
9
5
5
.
4
1
956.42
2:1
9
5
7
.
8
5
2:1
4:
1
0
.
0
3
4
0
.
0
3
5
9
5
4
.
2
8
955.64
9
.
7
6
4
:
1
9
5
5
.
8
9
0
.
0
2
0
0
.
0
1
1
955.43
8
.
6
4
6
:
1
8
:
1
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_L.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
960
9
6
0
970
9
7
0
950
9
5
0
1
7
+
5
0
.
0
0
960
9
6
0
950
9
5
0
1
7
+
7
0
.
0
0
950
9
5
0
960
9
6
0
970
9
7
0
940
9
4
0
1
8
+
0
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
970
9
7
0
930
9
3
0
1
8
+
5
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
970
9
7
0
930
9
3
0
1
9
+
0
0
.
0
0
X
-
3
B
-
5
1
1
4
-
L
-
5
1
0
9
5
4
.
9
2
T
I
E
T
O
-
Y
1
-
-
R
P
1
-
0
.
0
2
0
0
.
0
1
3
4:
1
9
5
4
.
5
9
T
I
E
T
O
-
Y
1
-
-
R
P
1
-
0
.
0
2
0
0
.
0
2
0
8
%
9
5
3
.
7
0
S
T
A
1
0
+
8
3
.
4
5
-
R
P
1
-
2:1
0
.
0
2
0
0
.
0
2
0
9
5
2
.
8
1
2:1
957.24
-
R
P
1
-
0
.
0
2
0
0
.
0
2
0
957.24
9
4
5
.
5
0
0
.
0
2
0
0
.
0
2
0
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_L.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
940
9
4
0
950
9
5
0
960
9
6
0
970
9
7
0
930
9
3
0
1
9
+
5
0
.
0
0
930
9
3
0
940
9
4
0
950
9
5
0
960
9
6
0
970
9
7
0
920
9
2
0
2
0
+
0
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
970
9
7
0
930
9
3
0
2
0
+
5
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
970
9
7
0
930
9
3
0
2
1
+
0
0
.
0
0
X
-
4
B
-
5
1
1
4
-
L
-
5
1
0
9
3
4
.
9
2
0
.
0
2
0
0
.
0
2
0
9
3
3
.
6
1
0
.
0
2
0
0
.
0
2
0
9
3
5
.
0
9
0
.
0
2
0
0
.
0
2
0
9
4
5
.
3
6
0
.
0
2
0
0
.
0
2
0
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_L.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
940
9
4
0
950
9
5
0
960
9
6
0
970
9
7
0
930
9
3
0
2
1
+
5
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
970
9
7
0
930
9
3
0
2
2
+
0
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
970
9
7
0
930
9
3
0
2
2
+
5
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
930
9
3
0
2
3
+
0
0
.
0
0
X
-
5
B
-
5
1
1
4
-
L
-
5
1
0
9
5
2
.
8
6
2:1
2:1
0
.
0
2
0
0
.
0
2
0
959.14
959.14
2
0
.8
1:1
9
5
1
.
4
3
9
5
2
.
8
9
2:1
2:1
0
.
0
2
0
0
.
0
2
0
958.08
958.09
11.19
:19
5
1
.
5
8
9
5
3
.
2
8
2:1
2:1
0
.
0
2
0
0
.
0
0
1
9
5
1
.
7
3
6
1
.
7
8
:
1
9
5
3
.
3
1
2:1
0
.
0
2
5
0
.
0
2
5
2:1
9
5
1
.
8
8
9
.3
8
:1
2:1
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_L.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
950
9
5
0
960
9
6
0
940
9
4
0
2
3
+
5
0
.
0
0
950
9
5
0
960
9
6
0
940
9
4
0
2
4
+
0
0
.
0
0
950
9
5
0
960
9
6
0
940
9
4
0
2
4
+
5
0
.
0
0
950
9
5
0
960
9
6
0
940
9
4
0
2
4
+
7
5
.
0
0
950
9
5
0
960
9
6
0
940
9
4
0
2
5
+
0
0
.
0
0
950
9
5
0
960
9
6
0
940
9
4
0
2
5
+
5
0
.
0
0
950
9
5
0
960
9
6
0
940
9
4
0
2
6
+
0
0
.
0
0
X
-
6
B
-
5
1
1
4
-
L
-
5
1
0
9
5
3
.
3
5
2:1
2:1
9
5
1
.
9
4
2:1
2:1
0
.0
4
8
0
.0
4
8
9
5
3
.
6
1
-
R
P
2
-
0
.0
6
0
0
.0
6
0
2.5:
1
9
5
2
.
5
0
9
5
3
.
7
1
-
R
P
2
-
0
.0
6
0
0
.0
6
0
0
.
0
0
2
’
V
C
1
2
%
4
’
9
5
3
.
7
2
S
T
A
1
0
+
3
2
.
9
3
-
R
P
2
-
0
.0
6
0
0
.0
6
0
0
.
0
0
4
’
V
C
1
1
%
4
’
9
5
3
.
6
9
S
T
A
1
1
+
0
0
.
0
0
-
R
P
2
-
0
.0
6
0
0
.0
6
0
0
.
0
0
1
0
%
6
’
V
C
4
’
9
5
3
.
6
6
-
R
P
2
-
5
.
4
6
:
1
0
.0
6
0
0
.0
6
0
9
5
3
.
9
6
9
.
8
3
:
1
0
.0
5
0
0
.
0
3
8
2:1
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_L.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
960
9
6
0
950
9
5
0
2
6
+
5
0
.
0
0
960
9
6
0
950
9
5
0
2
7
+
0
0
.
0
0
960
9
6
0
950
9
5
0
2
7
+
5
0
.
0
0
960
9
6
0
970
9
7
0
950
9
5
0
2
8
+
0
0
.
0
0
960
9
6
0
950
9
5
0
2
8
+
5
0
.
0
0
960
9
6
0
970
9
7
0
950
9
5
0
2
9
+
0
0
.
0
0
X
-
7
B
-
5
1
1
4
-
L
-
5
1
0
9
5
4
.
8
2
2:1
0
.0
5
0
0
.
0
1
4
2:1
9
5
5
.
6
3
0
.0
5
0
0
.
0
1
0
3
7
.
8
:
1
9
5
5
.
0
2
2:1
9
5
6
.
6
0
2:1
1
0
:
1
0
.
0
2
0
0
.
0
2
0
10
:1
2:1
0
.
0
2
0
0
.
0
2
0
9
5
5
.
2
4
9
5
8
.
0
1
10
:1
1
0
:
1
0
.
0
2
0
0
.
0
2
0
10
:1
1
0
:
1
0
.
0
2
0
0
.
0
2
0
9
5
6
.
4
0
7
19
.7
4
:1
9
5
9
.
5
5
9
6
1
.
3
2
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Y4.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
950
9
5
0
960
9
6
0
940
9
4
0
1
0
+
0
0
.
0
0
950
9
5
0
960
9
6
0
940
9
4
0
1
0
+
5
0
.
0
0
950
9
5
0
960
9
6
0
940
9
4
0
1
1
+
0
0
.
0
0
950
9
5
0
960
9
6
0
940
9
4
0
1
1
+
5
0
.
0
0
950
9
5
0
960
9
6
0
940
9
4
0
1
2
+
0
0
.
0
0
960
9
6
0
950
9
5
0
1
2
+
5
0
.
0
0
950
9
5
0
960
9
6
0
970
9
7
0
940
9
4
0
1
3
+
0
0
.
0
0
X
-
8
B
-
5
1
1
4
-
Y
4
-
5
1
0
0
.
0
0
0
0
.
0
0
0
2:1
2:1
0
.
0
0
0
0
.
0
0
0
2:1
2:1
0
.
0
0
0
0
.
0
0
0
2:1
2:1
0
.
0
0
0
0
.
0
0
0
2:1
2:1
0
.
0
0
0
0
.
0
0
0
2:1
2:1
2:1
0
.
0
0
0
0
.
0
0
0
2:1 4
:
1
5
.6
7
7
:1
6
:
1
0
.
0
4
0
0
.
0
4
0
9
5
3
.
6
2
2:1
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Y4.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
950
9
5
0
960
9
6
0
970
9
7
0
940
9
4
0
1
3
+
5
0
.
0
0
950
9
5
0
960
9
6
0
970
9
7
0
940
9
4
0
1
4
+
0
0
.
0
0
950
9
5
0
960
9
6
0
970
9
7
0
940
9
4
0
1
4
+
5
0
.
0
0
950
9
5
0
960
9
6
0
970
9
7
0
940
9
4
0
1
5
+
0
0
.
0
0
950
9
5
0
960
9
6
0
970
9
7
0
940
9
4
0
1
5
+
5
0
.
0
0
X
-
9
B
-
5
1
1
4
-
Y
4
-
5
1
0
4
:
1
6
:1
5
.
4
2
4
:
1
0
.
0
4
0
0
.
0
4
0
9
5
3
.
3
9
2:1
6
:1
5
.
0
1
9
:
1
0
.
0
4
0
0
.
0
4
0
9
5
2
.
9
8
2:1
2:1
6
:1
5
.
5
8
8
:
1
0
.
0
4
0
0
.
0
4
0
9
5
2
.
5
1
2:1
2:1
6
:1
5
.
8
6
1:
1
0
.
0
4
0
0
.
0
4
0
9
5
1
.
8
0
2:1
2:1
5
.9
9
5
:1
6
:
1
0
.
0
4
0
0
.
0
4
0
9
5
0
.
8
7
2:1
2:1
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Y4.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
950
9
5
0
960
9
6
0
970
9
7
0
980
9
8
0
940
9
4
0
1
6
+
0
0
.
0
0
950
9
5
0
960
9
6
0
970
9
7
0
980
9
8
0
940
9
4
0
1
6
+
5
0
.
0
0
950
9
5
0
960
9
6
0
970
9
7
0
980
9
8
0
940
9
4
0
1
7
+
0
0
.
0
0
950
9
5
0
960
9
6
0
970
9
7
0
980
9
8
0
940
9
4
0
1
7
+
5
0
.
0
0
X
-
1
0
B
-
5
1
1
4
-
Y
4
-
5
1
0
6
:1
4.
5
8
1:
1
0
.
0
4
0
0
.
0
4
0
9
4
9
.
3
2
2:1
2:1
5
.18
6
:1
6
:
1
0
.
0
4
0
0
.
0
4
0
9
4
8
.
3
3
2:1
2:1
5
.2
9
4
:1
6
:
1
0
.
0
4
0
0
.
0
4
0
9
4
6
.
7
6
2:1
2:1
4
.9
3
4
:1
6
:
1
0
.
0
4
0
0
.
0
4
0
9
4
5
.
1
3
2:1
2:1
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Y4.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
940
9
4
0
950
9
5
0
960
9
6
0
970
9
7
0
980
9
8
0
930
9
3
0
1
8
+
0
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
970
9
7
0
980
9
8
0
930
9
3
0
1
8
+
5
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
970
9
7
0
980
9
8
0
930
9
3
0
1
9
+
0
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
970
9
7
0
930
9
3
0
1
9
+
5
0
.
0
0
X
-
1
1
B
-
5
1
1
4
-
Y
4
-
5
1
0
4
:
1
5
.0
3
8
:1
6
:
1
0
.
0
4
0
0
.
0
4
0
9
4
3
.
4
8
2:1
6
.18
8
:1
4
:
1
0
.
0
4
0
0
.
0
4
0
9
4
1
.
3
7
2:1
2:1
6
:1
4
.
9
6
0
:
1
0
.
0
4
0
0
.
0
4
0
9
4
0
.
1
8
2:1
2
0
.
5
:
1
6
:1
4.
1
3
6
:
1
0
.
0
4
0
0
.
0
4
0
9
3
8
.
3
9
2:1
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Y4.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
940
9
4
0
950
9
5
0
960
9
6
0
970
9
7
0
930
9
3
0
2
0
+
0
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
930
9
3
0
2
0
+
5
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
930
9
3
0
2
1
+
0
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
930
9
3
0
2
1
+
5
0
.
0
0
X
-
1
2
B
-
5
1
1
4
-
Y
4
-
5
1
0
6
:1
4
.
9
7
5
:
1
0
.
0
4
0
0
.
0
4
0
9
3
7
.
2
6
2:1
5
.19
9
:1
6
:
1
0
.
0
4
0
0
.
0
4
0
9
3
7
.
7
3
9
3
6
.
0
9
2:1 B
R
I
D
G
E
E
X
I
S
T
R
R
5
.
9
9
:
1
4
.3
14
:1
6
:
1
0
.
0
4
0
0
.
0
4
0
9
3
5
.
8
7
9
3
4
.
9
5
4
.2
7
9
:1
6
:
1
0
.
0
4
0
0
.
0
4
0
9
3
4
.
0
6
4
:
1
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Y4.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
940
9
4
0
950
9
5
0
960
9
6
0
930
9
3
0
2
2
+
0
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
930
9
3
0
2
2
+
5
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
930
9
3
0
2
3
+
0
0
.
0
0
940
9
4
0
950
9
5
0
960
9
6
0
930
9
3
0
2
3
+
5
0
.
0
0
X
-
1
3
B
-
5
1
1
4
-
Y
4
-
5
1
0
4
:1
4
:
1
4
.6
0
2
:1
6
:
1
0
.
0
4
0
0
.
0
4
0
9
3
3
.
5
5
B
R
I
D
G
E
E
X
I
S
T
R
R
4
:1
5
.0
0
3
:1
6
:
1
0
.
0
4
0
0
.
0
4
0
9
3
3
.
2
9
2:1
4
:1
6
:1
4.
1
3
9
:
1
0
.
0
4
0
0
.
0
4
0
9
3
2
.
7
4
4
:1
5
.8
3
9
:1
6
:
1
0
.
0
4
0
0
.
0
4
0
9
3
3
.
1
9
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Y4.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
940
9
4
0
950
9
5
0
960
9
6
0
930
9
3
0
2
4
+
0
0
.
0
0
930
9
3
0
940
9
4
0
920
9
2
0
2
4
+
5
0
.
0
0
930
9
3
0
940
9
4
0
920
9
2
0
2
5
+
0
0
.
0
0
930
9
3
0
940
9
4
0
920
9
2
0
2
5
+
5
0
.
0
0
930
9
3
0
940
9
4
0
920
9
2
0
2
6
+
0
0
.
0
0
930
9
3
0
940
9
4
0
920
9
2
0
2
6
+
5
0
.
0
0
X
-
1
4
B
-
5
1
1
4
-
Y
4
-
5
1
0
4:1
6
:1
4
.
8
2
7
:
1
0
.
0
4
0
9
3
2
.
6
1
-
E
Y
4
L
O
O
P
-
4:1
5
.8
0
0
:1
6
:
1
0
.
0
4
0
9
3
2
.
6
7
-
E
Y
4
L
O
O
P
-
4
:1
6
:1
5
.
7
8
5
:
1
0
.
0
4
0
0
.
0
4
0
9
3
2
.
2
5
4
:1
4
:
1
6
:1
4.
5
6
2
:
1
0
.
0
4
0
0
.
0
4
0
9
3
1
.
4
8
4
:1
4
:
1
6
:1
5
.
7
6
9
:
1
0
.
0
4
0
0
.
0
4
0
9
3
1
.
9
4
4
:1
4
:
1
5
.9
2
8
:1
6
:
1
0
.
0
4
0
0
.
0
4
0
9
3
1
.
7
1
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Y4.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
910
9
1
0
920
9
2
0
930
9
3
0
940
9
4
0
900
9
0
0
2
7
+
0
0
.
0
0
910
9
1
0
920
9
2
0
930
9
3
0
940
9
4
0
900
9
0
0
2
7
+
5
0
.
0
0
910
9
1
0
920
9
2
0
930
9
3
0
940
9
4
0
900
9
0
0
2
8
+
0
0
.
0
0
910
9
1
0
920
9
2
0
930
9
3
0
940
9
4
0
900
9
0
0
2
8
+
5
0
.
0
0
X
-
1
5
B
-
5
1
1
4
-
Y
4
-
5
1
0
5
.3
7
8
:1
6
:
1
0
.
0
4
0
9
3
1
.
4
0
-
R
A
M
P
1
E
X
T
-
2:1
4
.7
7
1:1
6
:
1
0
.
0
4
0
9
3
1
.
0
6
-R
A
M
P
1
E
X
T
-
2:1
4
.4
3
5
:1
6
:
1
0
.
0
2
0
0
.
0
0
2
0
.
0
4
0
0
.
0
4
0
9
3
0
.
6
2
2
.8
2
:1
2:1
2:1
4
.5
16
:1
6
:
1
0
.
0
0
9
0
.
0
0
6
0
.
0
4
0
0
.
0
4
0
9
3
0
.
2
2
2:1
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Y4.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
900
9
0
0
910
9
1
0
920
9
2
0
930
9
3
0
940
9
4
0
890
8
9
0
2
9
+
0
0
.
0
0
900
9
0
0
910
9
1
0
920
9
2
0
930
9
3
0
940
9
4
0
890
8
9
0
2
9
+
5
0
.
0
0
900
9
0
0
910
9
1
0
920
9
2
0
930
9
3
0
940
9
4
0
890
8
9
0
3
0
+
0
0
.
0
0
X
-
1
6
B
-
5
1
1
4
-
Y
4
-
5
1
0
4
.5
17
:1
6
:
1
0
.
0
0
4
0
.
0
1
6
0
.
0
4
0
0
.
0
4
0
9
2
9
.
8
8
2
.5
5
:1
2:1
0
.
0
4
0
0
.
0
4
0
6
:
1
4
.6
1:19
2
9
.
6
3
0
.
0
0
0
0
.
0
0
0
2:1
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Y4.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
910
9
1
0
920
9
2
0
930
9
3
0
940
9
4
0
900
9
0
0
3
0
+
5
0
.
0
0
910
9
1
0
920
9
2
0
930
9
3
0
940
9
4
0
900
9
0
0
3
1
+
0
0
.
0
0
920
9
2
0
930
9
3
0
940
9
4
0
910
9
1
0
3
1
+
5
0
.
0
0
930
9
3
0
940
9
4
0
920
9
2
0
3
2
+
0
0
.
0
0
930
9
3
0
940
9
4
0
950
9
5
0
920
9
2
0
3
2
+
5
0
.
0
0
X
-
1
7
B
-
5
1
1
4
-
Y
4
-
5
1
0
-
R
P
2
-
0
.
0
0
0
0
.
0
0
0
2:1
0
.
0
0
0
0
.
0
0
0
2:1
2:1
0
.
0
0
0
0
.
0
0
0
3
.5
6
:1
2:1
0
.
0
0
0
0
.
0
0
0
3:
1
2
.5
1:1
0
.
0
0
0
0
.
0
0
0
3.
4
4:
1
4
.7
1:1
00 00
1
0
1
0
1
0
1
0
2
0
2
0
2
0
2
0
3
0
3
0
3
0
3
0
4
0
4
0
4
0
4
0
5
0
5
0
5
0
5
0
6
0
60
6
0
60
7
0
70
7
0
70
8
0
80
8
0
80
9
0
90
9
0
90
1
0
0
100
1
0
0
100
1
1
0
110
1
1
0
110
1
2
0
120
1
2
0
120
1
3
0
130
1
3
0
130
1
4
0
140
1
4
0
140
1
5
0
150
1
5
0
15017-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Y4.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
930
9
3
0
940
9
4
0
950
9
5
0
920
9
2
0
3
3
+
0
0
.
0
0
930
9
3
0
940
9
4
0
950
9
5
0
920
9
2
0
3
3
+
5
0
.
0
0
930
9
3
0
940
9
4
0
950
9
5
0
920
9
2
0
3
4
+
0
0
.
0
0
X
-
1
8
B
-
5
1
1
4
-
Y
4
-
5
1
0
0
.
0
0
0
0
.
0
0
0
5.
3
2
:
1
4
.3
7
:1
0
.
0
0
0
0
.
0
0
0
3
.2
1:1
4.
3
2
:
1
0
.
0
0
0
0
.
0
0
0
4.
3
8
:
1
3
:1
00 00
5
5
5
5
1
0
1
0
1
0
1
0
1
5
1
5
1
5
1
5
2
0
2
0
2
0
2
0
2
5
2
5
2
5
2
5
3
0
30
3
0
30
3
5
35
3
5
35
4
0
40
4
0
40
4
5
45
4
5
45
5
0
50
5
0
50
5
5
55
5
5
55
6
0
60
6
0
60
6
5
65
6
5
65
7
0
70
7
0
70
7
5
75
7
5
7517-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Rp1.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
950
9
5
0
955
9
5
5
960
9
6
0
945
9
4
5
1
0
+
5
0
.
0
0
950
9
5
0
955
9
5
5
960
9
6
0
945
9
4
5
1
0
+
5
8
.
5
0
950
9
5
0
955
9
5
5
960
9
6
0
945
9
4
5
1
1
+
0
0
.
0
0
950
9
5
0
955
9
5
5
960
9
6
0
945
9
4
5
1
1
+
4
6
.
0
0
945
9
4
5
950
9
5
0
955
9
5
5
960
9
6
0
940
9
4
0
1
2
+
0
0
.
0
0
X
-
1
9
B
-
5
1
1
4
-
R
P
1
-
2
.
5
5
9
5
3
.
2
9
0
.
0
3
4
953.72
2:1
9
5
3
.
0
3
0
.
0
3
3
953.42
2:1
9
5
1
.
6
1
2:1
4
:1
0
.
0
2
0
9
4
9
.
4
4
4:1
0
.
0
2
0
4:1
9
5
0
.
1
6
2:1
4
:1
4:1
0
.
0
0
0
0
.
0
2
0
9
4
8
.
0
7
4:1946.85
9
4
8
.
5
2
2:1
4
:1
4:1
0
.
0
0
0
9
4
6
.
4
6
946.26
0
.
0
2
0
4:1
00 00
5
5
5
5
1
0
1
0
1
0
1
0
1
5
1
5
1
5
1
5
2
0
2
0
2
0
2
0
2
5
2
5
2
5
2
5
3
0
30
3
0
30
3
5
35
3
5
35
4
0
40
4
0
40
4
5
45
4
5
45
5
0
50
5
0
50
5
5
55
5
5
55
6
0
60
6
0
60
6
5
65
6
5
65
7
0
70
7
0
70
7
5
75
7
5
7517-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Rp1_ext.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
945
9
4
5
950
9
5
0
955
9
5
5
960
9
6
0
940
9
4
0
1
2
+
5
0
.
0
0
940
9
4
0
945
9
4
5
950
9
5
0
955
9
5
5
960
9
6
0
935
9
3
5
1
3
+
0
0
.
0
0
940
9
4
0
945
9
4
5
950
9
5
0
935
9
3
5
1
3
+
5
0
.
0
0
940
9
4
0
945
9
4
5
935
9
3
5
1
4
+
0
0
.
0
0
X
-
2
0
B
-
5
1
1
4
-
R
P
1
E
X
T
-
2
.
5
5
9
4
6
.
8
2
0
.0
8
4
:1
9
4
4
.
3
6
2:1
9
4
5
.
0
8
0
.0
8
4
:1
2:1
9
4
2
.
2
5
9
4
3
.
3
0
9
4
0
.
1
5
2:1
4
:1
0
.0
8
9
4
1
.
4
8
00 00
5
5
5
5
1
0
1
0
1
0
1
0
1
5
1
5
1
5
1
5
2
0
2
0
2
0
2
0
2
5
2
5
2
5
2
5
3
0
30
3
0
30
3
5
35
3
5
35
4
0
40
4
0
40
4
5
45
4
5
45
5
0
50
5
0
50
5
5
55
5
5
55
6
0
60
6
0
60
6
5
65
6
5
65
7
0
70
7
0
70
7
5
75
7
5
7517-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Rp1_ext.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
935
9
3
5
940
9
4
0
945
9
4
5
930
9
3
0
1
4
+
5
0
.
0
0
930
9
3
0
935
9
3
5
940
9
4
0
945
9
4
5
925
9
2
5
1
5
+
0
0
.
0
0
920
9
2
0
925
9
2
5
930
9
3
0
935
9
3
5
940
9
4
0
915
9
1
5
1
5
+
5
0
.
0
0
X
-
2
1
B
-
5
1
1
4
-
R
P
1
E
X
T
-
2
.
5
5
9
3
9
.
4
5
2
.6
5
:1
9
3
7
.
1
5
3
:1
9
3
5
.
0
1
5
.8
5
:1
00 00
5
5
5
5
1
0
1
0
1
0
1
0
1
5
1
5
1
5
1
5
2
0
2
0
2
0
2
0
2
5
2
5
2
5
2
5
3
0
30
3
0
30
3
5
35
3
5
35
4
0
40
4
0
40
4
5
45
4
5
45
5
0
50
5
0
50
5
5
55
5
5
55
6
0
60
6
0
60
6
5
65
6
5
65
7
0
70
7
0
70
7
5
75
7
5
7517-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Rp1_ext.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
910
9
1
0
915
9
1
5
920
9
2
0
925
9
2
5
930
9
3
0
935
9
3
5
940
9
4
0
905
9
0
5
1
6
+
0
0
.
0
0
910
9
1
0
915
9
1
5
920
9
2
0
925
9
2
5
930
9
3
0
935
9
3
5
905
9
0
5
1
6
+
5
0
.
0
0
X
-
2
2
B
-
5
1
1
4
-
R
P
1
E
X
T
-
2
.
5
5
9
3
3
.
3
2
3
:1
9
3
2
.
2
4
2
.7
3
:1
00 00
5
5
5
5
1
0
1
0
1
0
1
0
1
5
1
5
1
5
1
5
2
0
2
0
2
0
2
0
2
5
2
5
2
5
2
5
3
0
30
3
0
30
3
5
35
3
5
35
4
0
40
4
0
40
4
5
45
4
5
45
5
0
50
5
0
50
5
5
55
5
5
55
6
0
60
6
0
60
6
5
65
6
5
65
7
0
70
7
0
70
7
5
75
7
5
7517-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Rp1_ext.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
910
9
1
0
915
9
1
5
920
9
2
0
925
9
2
5
930
9
3
0
935
9
3
5
905
9
0
5
1
7
+
0
0
.
0
0
910
9
1
0
915
9
1
5
920
9
2
0
925
9
2
5
930
9
3
0
935
9
3
5
905
9
0
5
1
7
+
1
4
.
5
4
X
-
2
3
B
-
5
1
1
4
-
R
P
1
E
X
T
-
2
.
5
5
9
3
2
.
0
1
3
:1
9
3
2
.
2
2
00 00
5
5
5
5
1
0
1
0
1
0
1
0
1
5
1
5
1
5
1
5
2
0
2
0
2
0
2
0
2
5
2
5
2
5
2
5
3
0
30
3
0
30
3
5
35
3
5
35
4
0
40
4
0
40
4
5
45
4
5
45
5
0
50
5
0
50
5
5
55
5
5
55
6
0
60
6
0
60
6
5
65
6
5
65
7
0
70
7
0
70
7
5
75
7
5
7517-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Rp2.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
950
9
5
0
955
9
5
5
945
9
4
5
1
0
+
3
0
.
0
0
950
9
5
0
955
9
5
5
945
9
4
5
1
0
+
5
0
.
0
0
945
9
4
5
950
9
5
0
955
9
5
5
940
9
4
0
1
1
+
0
0
.
0
0
935
9
3
5
940
9
4
0
945
9
4
5
950
9
5
0
955
9
5
5
930
9
3
0
1
1
+
5
0
.
0
0
X
-
2
4
B
-
5
1
1
4
-
R
P
2
-
2
.
5
5
9
5
3
.
0
6
9
5
2
.
4
9
9
5
0
.
5
8
0
.
0
0
4
0
.
0
0
9
4:
1
6
:1
9
4
8
.
3
6
5.99:1
5
.
9
9
:
1
4
:1
4
:
1
0
.
0
1
2
0
.
0
1
3
9
4
5
.
2
5
945.2
4
00 00
5
5
5
5
1
0
1
0
1
0
1
0
1
5
1
5
1
5
1
5
2
0
2
0
2
0
2
0
2
5
2
5
2
5
2
5
3
0
30
3
0
30
3
5
35
3
5
35
4
0
40
4
0
40
4
5
45
4
5
45
5
0
50
5
0
50
5
5
55
5
5
55
6
0
60
6
0
60
6
5
65
6
5
65
7
0
70
7
0
70
7
5
75
7
5
7517-APR-2014 08:57R:\Roadway\XSC\B5114_Rdy_xpl_Rp2.dgn$$$$USERNAM E$$$$8/23/99
P
R
O
J
.
R
E
F
E
R
E
N
C
E
N
O
.
S
H
E
E
T
N
O
.
0
930
9
3
0
935
9
3
5
940
9
4
0
945
9
4
5
950
9
5
0
955
9
5
5
925
9
2
5
1
2
+
0
0
.
0
0
930
9
3
0
935
9
3
5
940
9
4
0
945
9
4
5
950
9
5
0
955
9
5
5
960
9
6
0
965
9
6
5
970
9
7
0
975
9
7
5
925
9
2
5
1
2
+
0
5
.
0
0
X
-
2
5
B
-
5
1
1
4
-
R
P
2
-
2
.
5
5
9
4
5
.
9
8
5.99:1
5
.
9
9
:
1
4
:1
4
:
1
0
.
0
2
8
0
.
0
0
3
9
4
3
.
2
6
943.7
3
9
4
5
.
7
6
5.99:1
5
.
9
9
:
1
4
:1
4
:
1
0
.
0
3
0
0
.
0
0
5
9
4
3
.
0
2
943.4
8