HomeMy WebLinkAboutNCC222750_Site Plan or Location Map_20220802a�
DUKE
ENERGY
PROGRESS
HOLLY SPRINGS UTLEY CREEK 230kV SUBSTATION
1520 DEXTER RIDGE DRIVE
HOLLY SPRINGS, NORTH CAROLINA 27540
PROJECT INFORMATION
DUKE ENERGY PROGRESS, LLC (DEP)
411 FAYETTEVILLE STREET
LANDOWNER
RALEIGH, NORTH CAROLINA 27601
PHONE: (919)-546-7169
MCADAMS COMPANY
ENGINEER
2905 MERIDIAN PARKWAY
DURHAM, NORTH CAROLINA 27713
PHONE: (919)-361-5000
ESP ASSOCIATES, INC.
211 RACINE DRIVE, SUITE 101
SURVEYOR
WILMINGTON, NORTH CAROLINA 28403
PHONE: (910)-313-6823
EXISTING USE
WIRELESS TELECOMMUNICATIONS TOWER (HS)
PROPOSED USE
INFRASTRUCTURE/UTILITIES (MAJOR) (HS)
WIRELESS TELECOMMUNICATIONS TOWER (HS)
EXISTING BUILDING
N/A
PROPOSED BUILDING
N/A
PARCEL ID
0638452323, 063869171, 0638780892
MAP BOOK AND PAGE NUMBER
SEE PLANS
DEED BOOK AND PAGE NUMBER
SEE PLANS
SITE ZONING
RURAL RESIDENTIAL (RR) (HOLLY SPRINGS)
R-80 (WAKE COUNTY)
TOTAL ACREAGE SUBDIVIDED AREA
66.44 AC. (HOLLY SPRINGS)1,397.25
AC. (WAKE COUNTY)
ACREAGE OF LAND TO BE
47.41 AC.
DISTURBED/EXPOSED
0.46 AC. (HOLLY SPRINGS)N/A
EXISTING IMPERVIOUS AREA
(WAKE COUNTY)
PROPOSED IMPERVIOUS AREA %
3.88% (HOLLY SPRINGS)N/A
(WAKE COUNTY)
PROPOSED IMPERVIOUS AREA (TOTAL)
2.56 AC. (HOLLY SPRINGS)
4.44 AC. (WAKE COUNTY)
PROPOSED IMPERVIOUS AREA
2.56 AC. (HOLLY SPRINGS)
(TOTAL INCLUDING FUTURE)
4.44 AC. (WAKE COUNTY)
RIVER BASIN
CAPE FEAR RIVER BASIN
PARKING
NONE
EQUIPMENT HEIGHT
83
MIGRATORY BIRD HOTLINE
STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY SERVICE
AREA. INTERACTIONS OF BIRDS WITH GENERATING FACILITIES, TRANSMISSION AND DISTRIBUTIONS, SUBSTATIONS
OTHER STRUCTURES AND EQUIPMENT, AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO BIRDS. DUKE
ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND CONTRACTORS WITH
RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES.
CAROLINAS: 800.573.3853 1 FLORIDA: 727.386.3084 1 MIDWEST: 317.430.4497
SPILL REPORTING HOTLINE
IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT, FEDERAL AND STATE LAWS
REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER REGULATORY
AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION. IMMEDIATELY NOTIFY YOUR SUPERVISOR AND THE
FIELD ENVIRONMENTAL/EHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS DISCOVERED. IF YOU ARE
UNABLE TO REACH THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL, CONTACT ONE OF THE DUKE ENERGY SPILL
REPORTING HOTLINES AT:
CAROLINAS & MIDWEST: 800.527.3853 1 FLORIDA: 866.769.1266
Know what's below.
Cal I before you dig.
WAKE COUNTY
LATITUDE: N 35.642628'
LONGITUDE: W-78.873021 °
CONSTRUCTION DRAWINGS
PROJECT NUMBER: E21004501
DATE: DULY 19th, 2022
ACCESS
ROAD S
I
CI II7CTAT1l1H1
A,- t
Holy Sp,ings
Township
VICINITY MAP
CONTRACTOR SHALL NOTIFY "NC811" (811) OR (1-800-632-4949) AT
LEAST 3 FULL BUSINESS DAYS PRIOR TO BEGINNING CONSTRUCTION
OR EXCAVATION TO HAVE EXISTING UTILITIES LOCATED.
CONTRACTOR SHALL CONTACT ANY LOCAL UTILITIES THAT PROVIDE
THEIR OWN LOCATOR SERVICES INDEPENDENT OF "NC811 ".
REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY.
N.T.S.
EM]
SHEET INDEX
COVER SHEET
SHT 1 OF 84
PROJECT NOTES
SHT 2 OF 84
SURVEY - SHEET KEY MAP
SHT 3 OF 84
SURVEY - ALTA/NSPS LAND TITLE
SHT 4 OF 84
SURVEY - TOPOGRAPHIC MAP
SHT 5 OF 84
SURVEY - TOPOGRAPHIC MAP
SHT 6 OF 84
SURVEY - TOPOGRAPHIC MAP
SHT 7 OF 84
SURVEY - TOPOGRAPHIC MAP
SHT 8 OF 84
SURVEY - RECOMBINATION MAP
SHT 9 OF 84
DEMOLITION AND CLEARING PLAN - OVERALL
SHT 10 OF 84
DEMOLITION AND CLEARING PLAN - SUBSTATION
SHT 11 OF 84
DEMOLITION AND CLEARING PLAN - SECONDARY PROPERTY ENTRANCE
SHT 12 OF 84
DEMOLITION AND CLEARING PLAN - PRIMARY PROPERTY ENTRANCE
SHT 13 OF 84
DEMOLITION AND CLEARING PLAN - TRANSMISSION ACCESS ROUTE
SHT 13A OF 84
SITE PLAN - OVERALL
SHT 14 OF 84
SITE PLAN - OVERALL SUBSTATION
SHT 15 OF 84
SITE PLAN - SUBSTATION
SHT 16 OF 84
SITE PLAN - SECONDARY PROPERTY ENTRANCE
SHT 17 OF 84
SITE PLAN - PRIMARY PROPERTY ENTRANCE
SHT 17A OF 84
SITE PLAN -TRANSMISSION ACCESS ROUTE
SHT 17B OF 84
GRADING AND STORM DRAINAGE PLAN - OVERALL
SHT 18 OF 84
GRADING AND STORM DRAINAGE PLAN - SUBSTATION
SHT 19 OF 84
GRADING AND STORM DRAINAGE PLAN - SECONDARY PROPERTY ENTRANCE
SHT 20 OF 84
GRADING AND STORM DRAINAGE PLAN - PERMANENT STOCKPILE
SHT 20A OF 84
GRADING AND STORM DRAINAGE PLAN - PRIMARY PROPERTY ENTRANCE
SHT 21 OF 84
GRADING AND STORM DRAINAGE PLAN - TRANSMISSION ACCESS ROUTE
SHT 21A OF 84
PLAN AND PROFILE - NORTH/SOUTH BASELINE
SHT 22 OF 84
PLAN AND PROFILE - EAST/WEST BASELINE
SHT 23 OF 84
PLAN AND PROFILE - SOUTH RETAINING WALL
SHT 24 OF 84
PLAN AND PROFILE - NORTH RETAINING WALL
SHT 25 OF 84
PLAN AND PROFILE - SUBSTATION STORM DRAINAGE - SDA WEST
SHT 26 OF 84
PLAN AND PROFILE - SUBSTATION STORM DRAINAGE - SDA EAST
SHT 27 OF 84
PLAN AND PROFILE - ACCESS ROUTE
SHT 28 OF 84
PLAN AND PROFILE - ACCESS ROUTE
SHT 29 OF 84
PLAN AND PROFILE - ACCESS ROUTE
SHT 30 OF 84
PLAN AND PROFILE - ACCESS ROUTE
SHT 31 OF 84
PLAN AND PROFILE - ACCESS ROUTE
SHT 32 OF 84
PLAN AND PROFILE - ACCESS ROUTE
SHT 33 OF 84
PLAN AND PROFILE - ACCESS ROUTE
SHT 34 OF 84
PLAN AND PROFILE - ACCESS ROUTE
SHT 35 OF 84
PLAN AND PROFILE - ACCESS ROUTE
SHT 36 OF 84
EROSION CONTROL PLAN - PHASE 1 - SUBSTATION
SHT 37 OF 84
EROSION CONTROL PLAN - PHASE 2 - SUBSTATION
SHT 38 OF 84
EROSION CONTROL PLAN - PHASE 3 - SUBSTATION
SHT 39 OF 84
EROSION CONTROL PLAN - PHASE 1 - SECONDARY PROPERTY ENTRANCE
SHT 40 OF 84
EROSION CONTROL PLAN - PHASE 2 - SECONDARY PROPERTY ENTRANCE
SHT 41 OF 84
EROSION CONTROL PLAN - PHASE 3 - SECONDARY PROPERTY ENTRANCE
SHT 42 OF 84
EROSION CONTROL PLAN - PHASE 1- PERMANENT STOCKPILE
SHT 42A OF 84
EROSION CONTROL PLAN - PHASE 2 - PERMANENT STOCKPILE
SHT 42B OF 84
EROSION CONTROL PLAN - PHASE 3 - PERMANENT STOCKPILE
SHT 42C OF 84
EROSION CONTROL PLAN - ACCESS ROAD - PHASE 1
SHT 43 OF 84
EROSION CONTROL PLAN - ACCESS ROAD - PHASE 1
SHT 44 OF 84
EROSION CONTROL PLAN - ACCESS ROAD - PHASE 1
SHT 45 OF 84
EROSION CONTROL PLAN - ACCESS ROAD - PHASE 1
SHT 46 OF 84
EROSION CONTROL PLAN - ACCESS ROAD - PHASE 2
SHT 47 OF 84
EROSION CONTROL PLAN - ACCESS ROAD - PHASE 2
SHT 48 OF 84
EROSION CONTROL PLAN - ACCESS ROAD - PHASE 2
SHT 49 OF 84
EROSION CONTROL PLAN - ACCESS ROAD - PHASE 2
SHT 50 OF 84
EROSION CONTROL DETAILS
SHT 51 OF 84
EROSION CONTROL DETAILS
SHT 52 OF 84
EROSION CONTROL DETAILS - PERMANENT RISER BASIN AND SEDIMENT TRAP
SHT 53 OF 84
EROSION CONTROL DETAILS - BASIN AND DISSIPATOR DETAILS
SHT 54 OF 84
EROSION CONTROL DETAILS - TEMPORARY SEDIMENT TRAPS
SHT 55 OF 84
EROSION CONTROL DETAILS - NCG01
SHT 56 OF 84
STORM DRAINAGE DETAILS
SHT 57 OF 84
STORM DRAINAGE DETAILS
SHT 58 OF 84
SITE DETAILS - SUBSTATION AND ACCESS ROAD DETAILS
SHT 59 OF 84
STORMWATER MANAGEMENT PLAN
SHT 60 OF 84
STORMWATER MANAGEMENT DETAILS
SHT 61 OF 84
STORMWATER MANAGEMENT DETAILS
SHT 62 OF 84
STORMWATER MANAGEMENT DETAILS
SHT 63 OF 84
STORMWATER MANAGEMENT LANDSCAPE
SHT 64 OF 84
LANDSCAPE PLAN
SHT 65 OF 84
LANDSCAPE PLAN
SHT 66 OF 84
LANDSCAPE PLAN
SHT 67 OF 84
TREE PRESERVATION PLAN
SHT 68 OF 84
SIGHT PLAN AND PROFILE - EQUIPMENT AND POLES
SHT 69 OF 84
SIGHT PLAN AND PROFILE - ENTRANCE AND POLES
SHT 70 OF 84
MSE RETAINING WALL DESIGN DRAWINGS
SHT 71 OF 84
MSE RETAINING WALL DESIGN DRAWINGS
SHT 72 OF 84
MSE RETAINING WALL DESIGN DRAWINGS
SHT 73 OF 84
MSE RETAINING WALL DESIGN DRAWINGS
SHT 74 OF 84
SITE LIGHTING ARRANGEMENT
SHT 75 OF 84
CARO
SEAL vim•:
034365
PRELIMINARY DRAWING — NOT FOR R CONSTRUCTION
McADAMS
The John R. McAdams Company, Inc.
2905 Meridian Parkway
Durham, NC 27713
phone 919. 361. 5000
fax 919. 361. 2269
license number: C-0293, C-187
www.mcadamsco.com