Loading...
HomeMy WebLinkAboutThree Oaks I-5986A Construction Permitting Compliance Report 07-19-2022 INSPECTION DATE: JULY 19, 2022 1 Three Oaks Engineering – Construction Permitting Compliance Report Three Oaks Inspector(s): Nancy Oberle, Hayley Wood RK&K Inspector(s): Matt Cook, Brent Husky S.T. Wooten Inspector(s): NCDOT Inspector(s): Greg Price TIP No.: I-5986A Date of Inspection: July 19, 2022 County: Cumberland *The project received about 5 inches of rain prior to the walk through causing most sites to need general maintenance. Permit Site 22 (-Y5FLY- 57+08 to 62+55 LT & RT) Wetland WW • Clean out silt fence where needed. 7/19/2022 Site 22 – wetland WW. 7/19/2022 Site 22 – wetland WW. INSPECTION DATE: JULY 19, 2022 2 Permit Site 23 (-L- 252+34 RT & LT) Stream SC-1 & SC-2 • Repair/clean out silt fence where needed. • Clean out culverts at inlet. Site 23 – stream SC-2 outlet 7/19/2022 7/19/2022 7/19/2022 Site 23 – new 8’x8’ RCBC outlet 7/19/2022 Site 23 – stream SC-1 inlet Site 23 – new 8’x8’ RCBC inlet INSPECTION DATE: JULY 19, 2022 3 Permit Site 24 (-L- 300+87 to 304+48 LT & RT) Stream SD-1 & SD-2 • Repair/clean out silt fence where needed at both inlet and outlet. Permit Site 25 (-L- 355+00 LT) Stream SE-1 • Clean site and repair/replace silt fence at inlet and outlet. 7/19/2022 Site 24 – SD-2 outlet Site 24 – SD-1 inlet 7/19/2022 Site 25 – stream SE-1 inlet 7/19/2022 INSPECTION DATE: JULY 19, 2022 4 Pond PG near Permit Site 28 (-SR3 - 30+00 to 35+87 LT) • Site was visited during walk through to check on progress. 7/19/2022 7/19/2022 Site 25 – stream SE-2 outlet; new 10’x7’ RCBC Site 25 – stream SE-2 outlet 7/19/2022 Pond PG INSPECTION DATE: JULY 19, 2022 5 Permit Site 30 (-L- 422+85 - 436+87 LT & RT) Stream SF and Wetlands WAI & WAK • Repair rock check at site inlet. • Plug the median drain and clean up and stabilize site outlet. • Stabilization has been applied to site and new 12’x6’ RCBC has been installed. Site 30 – stream SF inlet Site 30 – new 12’x6’ RCBC inlet Site 30 – stream SF outlet Site 30 – new 12’x6’ RCBC outlet 7/19/2022 7/19/2022 7/19/2022 7/19/2022 INSPECTION DATE: JULY 19, 2022 6 Permit Site 33 (-L- 540+45 RT) • Clean up site and repair/replace silt fence where needed. Permit Site 34 (-L- 574+64 RT) Stream SH-1 • Remove sandbag from the stream. 7/19/2022 Site 33 – new 8’x8’ RCBC and 24” RCP; inlet side 7/19/2022 Site 34 – stream SH-1 inlet