HomeMy WebLinkAboutThree Oaks I-5986A Construction Permitting Compliance Report 07-19-2022
INSPECTION DATE: JULY 19, 2022 1
Three Oaks Engineering – Construction Permitting Compliance Report
Three Oaks Inspector(s): Nancy Oberle, Hayley Wood
RK&K Inspector(s): Matt Cook, Brent Husky
S.T. Wooten Inspector(s):
NCDOT Inspector(s): Greg Price
TIP No.: I-5986A
Date of Inspection: July 19, 2022
County: Cumberland
*The project received about 5 inches of rain prior to the walk through causing most sites to
need general maintenance.
Permit Site 22 (-Y5FLY- 57+08 to 62+55 LT & RT) Wetland WW
• Clean out silt fence where needed.
7/19/2022
Site 22 – wetland WW.
7/19/2022
Site 22 – wetland WW.
INSPECTION DATE: JULY 19, 2022 2
Permit Site 23 (-L- 252+34 RT & LT) Stream SC-1 & SC-2
• Repair/clean out silt fence where needed.
• Clean out culverts at inlet.
Site 23 – stream SC-2 outlet
7/19/2022
7/19/2022
7/19/2022
Site 23 – new 8’x8’ RCBC outlet
7/19/2022
Site 23 – stream SC-1 inlet Site 23 – new 8’x8’ RCBC inlet
INSPECTION DATE: JULY 19, 2022 3
Permit Site 24 (-L- 300+87 to 304+48 LT & RT) Stream SD-1 & SD-2
• Repair/clean out silt fence where needed at both inlet and outlet.
Permit Site 25 (-L- 355+00 LT) Stream SE-1
• Clean site and repair/replace silt fence at inlet and outlet.
7/19/2022
Site 24 – SD-2 outlet Site 24 – SD-1 inlet
7/19/2022
Site 25 – stream SE-1 inlet
7/19/2022
INSPECTION DATE: JULY 19, 2022 4
Pond PG near Permit Site 28 (-SR3 - 30+00 to 35+87 LT)
• Site was visited during walk through to check on progress.
7/19/2022 7/19/2022
Site 25 – stream SE-2 outlet; new 10’x7’ RCBC Site 25 – stream SE-2 outlet
7/19/2022
Pond PG
INSPECTION DATE: JULY 19, 2022 5
Permit Site 30 (-L- 422+85 - 436+87 LT & RT) Stream SF and Wetlands WAI & WAK
• Repair rock check at site inlet.
• Plug the median drain and clean up and stabilize site outlet.
• Stabilization has been applied to site and new 12’x6’ RCBC has been installed.
Site 30 – stream SF inlet Site 30 – new 12’x6’ RCBC inlet
Site 30 – stream SF outlet Site 30 – new 12’x6’ RCBC outlet
7/19/2022 7/19/2022
7/19/2022 7/19/2022
INSPECTION DATE: JULY 19, 2022 6
Permit Site 33 (-L- 540+45 RT)
• Clean up site and repair/replace silt fence where needed.
Permit Site 34 (-L- 574+64 RT) Stream SH-1
• Remove sandbag from the stream.
7/19/2022
Site 33 – new 8’x8’ RCBC and 24” RCP; inlet side
7/19/2022
Site 34 – stream SH-1 inlet