Loading...
HomeMy WebLinkAbout20140818 Ver 1_401 Application_201408149 ENVTRONW,NTAI. SFRVTFS, TNC 524 SOUTH NEW HOPE ROAD RALEIGH NORTH - CAROLINA 27610 (919)212 -1760 July 28, 2014 Ms Kdren Higgins N.0 Division of Water Resources 1650 Mail Service Center Raleigh, NC 27699 -1650 Re: 540 Flex Site Apex, NC Ms. Higgins- Enclosed please find four copies of the PCN being submitted for a commercial development proposing 0 05 acre of'wetland.impact There,are no stream,or buffer impacts and the,stormwater review is under the jurisdiction of Apex. Please contact me if you have any questions or comments. Sincerely, n e al Services, Inc e f Harbour Senior Manager o�oF wntER�G ��' ® Office Use Only: Corps action ID no. o DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes QX No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑X No For the record only for Corps Permit: ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 In below. ❑ Yes ❑ No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes X❑ No 2. Project Information 2a. Name of project: 540 Flex Site 2b. County: Wake 2c. Nearest municipality / town: Apex 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: j 3. Owner Information —`'- 3a. Name(s) on Recorded Deed: JVI Development II INC AUG U 1 201 3b. Deed Book and Page No. 015448, 00322 In Joey Joanne QU �y 3c. Responsible Party (for LLC if applicable): 3d. Street address: 2509 Southwinds Run 3e. City, state, zip: Apex, NC 27502 -6512 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4 Applicant Information (if different from owner) 4a Applicant is E]' Agent ❑ Other, specify Developer is the applicant ,4b Name 4c Business name (if applicable) 4d Street address 4p, City, state, zip 4f Telephone no� 4g 'Fax no 4h Email address 5. Agent /Consultant Information (if applicable) 5a Name Jeff Harbour 5b Business name (if applicable) ESI — 5c Street address 524 South New Hope Road 5d City, state, zip Raleigh, NC 27610 5e- Telephone no 919- 21'2 -1760 5f Fax no 919 - 212 -1707 5g Email address jharbour@esinc cc Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a Property identification no (tax PIN or'parcel ID) 0732234906 000 1,b Site coordinates (In decimal degrees)- Latitude 35 73969 Longitude -78.89076 1c- Property size 1075 acres 2 Surface'Waters 2a Name of nearest body of water to proposed project Reedy Branch 2b Water Quality Classification of nearest receiving water- C,NSW 2c RiJer,basm Cape Fear 3 Project Description 3a Describe the existing conditions on the site and the general land use i,n the vicinity of the project at the time of this application 'Site,contains,,old pastures and farm buildings DOT also used frontage as,staging area during 540, construction Surrounding land use is residential 3b List the total estimated acreage of all existing wetlands on the property 0 07 3c List the total estimated linear feet of,all existing streams (intermittent and perennial) on the property 0 3d Explain the purpose of the proposed project Purpose is,to,develop site for a,multi -use storage facility to serve the local'residents 3e Describe the overall project in detail, including the type of equipment to be used Site will be graded and developed to provide multi -use storage facility Graders, dump trucks, excavators, etc will be used during construction 4. Jurisdictional Determinations 4a Have jurisdictional wetland `or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past'? ❑X Yes ❑ No ❑ Unknown Comments 4b If the Corps made the jurisdictional determination, what type of determination was made? X❑ Preliminary ❑ Final 4c If yes, who delineated the jurisdictional areas? Name (if known) J Harbour, K Murphrey Agency /Consultant Company ESI Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation Met ACOE on -site on April 15, 2014 (SAW 2014 - 00716) Town of,Apez,reviewed + ste on Apnl "7, 2014 (Apex 14 -005) 5 Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes X❑ No ❑ Unknown 5b If yes, explain in detail according to "help file" instructions 6. Future Project Plans 6a Is this a phased project? ❑ Yes ❑X No 6b If yes, explain Page, 3 of 10 PCN Form — Version 1 4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a Which sections were completed below for°,your project (check all that apply) ❑X Wetlands ❑ Streams — tnbutanes ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site,, then complete this question for each wetland area Impacted 2a Wetland Impact number Permanent (P) or Temporary T 2b Type of Impact 2c Typeaof wetland 2d Forested 2e Type of jurisdiction Corps, (404,10) or DWQ (401, other) 2f Area of Impact (acres) W1 T Fill Seep No Corps 0,05 W2 Choose one Choose'one Yes /No W3 Choose,one Choose one Yes /No W4 Choose one Choose,one Yes /No - W5 - Choose one Choose one Yes /No W6 Choose one Choose one Yes /No - 2g Total Wetland Impacts: 0 05' 2h Comments This wetland has been historically impacted by NCDOT activities during 540 construction (see attached photo sequence) It cannot be avoided due to its location on th&property 3. Stream Impacts If there are perennial or Intermittent stream Impacts (Including temporary Impacts) °proposed on the site, then complete this question for all stream sites Impacted 3a Stream'Impact number Permanent (P) or Temporary (T) 3b Type of Impact 3c Stream name 3d Perennial (PER) or Intermittent (INT)? 3e Type of jurisdiction 3f Average stream width (feet) 3g Impact length (linear feet) S1 Choose one I S2 Choose one S3 Choose one - S4 - Choose one S5 - Choose one - - S6 - - Choose one - 3h Total stream and tributary impacts 1 0 31 Comments Page 4 of 10 PCN, Form — Version 1 4 January 2009 4 Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then indivii ually list all open water'im acts below _ 4a Open water impact number Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c - Type of impact 4d Waterbody type 4e Area of impact (acres) 01 - Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f Total open water impacts 0 4g Comments 5 Pond or Lake Construction If and orllake construction proposed, the complete the, chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f- Total: 5g Comments 5h Is aidam high,hazard permit required? ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts,(for DWQ) If project'wdl impact a protected riparian buffer, then complete the chart below If yes, then'mdividually list all buffer impacts below- If any impacts require mitigation, then you MUST fill out Section D of this form 6a Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico, ❑ Catawba ❑ Randleman ❑X Other Cape,Fear 6b Buffer Impact number — Permanent (P) or Temporary T �6c Reason for impact 6d Stream name 6e Buffer mitigation required? 6f Zone 1 impact (square feet ) 6g Zone 2 impact (square feet B1 Yes /No B2 Yes /No B3 _ Yes /No B4 Yes /No B5 _ Yes /No B6 Yes /No 6h Total Buffer Impacts: 0 0 61 Comments Page 5 of 1'0 D. Impact Justification and Mitigatiom 1. Avoidance and Minimization la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project The wetland cannot be,avoided due to its location near'the road frontage Minimization effortswere looked at'but,would hav_e,resultmg'inia retaining wall approximately 15 feet,high due to the amount of fill required to bring`the site•to a buildable grade This,high retaining wall was deemed unsafe and considered,to bean unrealistic option to minimize impact Wthe small,0 07 acre area Impacts to the wetland are 0 05 acre lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques All applicable sediment and erosion control requirements,wiil be strictly employed during all phases,of construction Contractors will following BMPs with regard to equipment,maintenance whde,operating onsde 2. Com ensato 'Miti ation for Impacts to Waters of the U.S or,Waters of the,State 2a DoesAhe project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ❑X No 2b If yes, mitigation is required by (check all,that apply) ❑ DWQ ❑ Corps 2c If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if-Using a Mitigation Bank 3a Name of 'Mitigation Bank 3b Credits Purchased�(attach receipt and letter) Type Choose one Type Choose one Type Choose one Quantity Quantity Quantity 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program _ 4a Approval letter from in -lieu fee program,is, attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature Choose one 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - ripanan wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres �4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan- e Page 6 of 1,0 PCN Form— Version 14 January°2609 6. Buffer'Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? E] Yes No 6b If yes, ,then identify the square feet of impact to,each zone,of the, riparian, buffer that °requires mitigation Calculate the amount,'of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square,feet) Zone 1 3 (2 for Catawba) Zone 2 1 5, 6f Total buffer mitigation required:, 6g If buffer mitigation is required, discuss what type of mitigation'is proposed (e g , paymenfto private mitigation bank, permittee responsible riparian buffer restoration, payment into an,approved in -lieu fee fund) 6h Comments Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1 a Does the project Include or is it adjacent to protected riparian buffers identified ❑X Yes ❑ No within one of the NC RI anan Buffer Protection, Roles? 1b If yes, then Is a diffuse flow plan Included? If no, explain why Buffers are located adjacent to the,site alongside an intermittent stream that goes under 540 This area ❑ Yes X❑ No is outside the construction zone 2 Stormwater Management Plan 2a What is the overall percent Imperviousness of this project? oho 2b Does this-project require a Stormwater Management Plan? E9 Yes ❑ No 2c If this project DOES NOT require,a Stormwater Management Plan, explain why 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan. The Town of Apex is responsible•for the review of the SMP Stormwater ponds will be used to capture and treat runoff 2e Who will be responsible for the review of the Stormwater Management Plan? Town of Apex 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction isrthis ro ect? Town of,Apex ❑ Phase II ❑ NSW 3b Which of theJollowing locally - Implemented stormwater management programs ❑ USMP apply (check;all that apply) ❑ Water'Supply Watershed ❑ Other, 3c Has the approved Stormwater Management Plan with proof of approval been El Yes No attached? 4. DWQ Stormwater Program Review []Coastal counties ❑HQW 4a Which of the following state - Implemented stormwater management programs apply ❑ORW (check all that apply) X❑Session Law 2006 -246 to Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes Q No attached 5. DWQ 401 Unit�Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 1,0 PCN Form — Version 1 4 January�2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes X❑ No use of public (federal /state) land? lb ilf you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State []Yes ❑,No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered "yes' ,to the above, has the document review been finalized by,the State Clearing House? (If�so, attach a copy of the NEPA or SEPA'final approval ❑ Yes ❑ No letter ) Comments 2. Violations (DWQ Requirement) 2a Is the,site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, E] Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this,an after- the -fact permit application? ❑Yes 0 No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this prolect5(based on past and reasonably anticipated future impacts) result in [Ell es ®No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide,a short.narrative description f 4. Sewage Disposal (DWQ Requirement) Aa Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Municipal sanitary sewer Page 9 of 1,0 PCN Form — Version 1 4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) $a. Will this project occur in or near an area with federally protected species or ❑Yes No habitat? 5b. Have you checked'with the USFWS conceming�E.ndangered "Species Act Oyes ® No impacts? 5c. If yes, indicate the USFWS Field Office you,have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? On- sft6habitat assessment revealed no suitable habitat for wW spaWes,listed'tor Wake County. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur In or neat an area designated as essential fish ,habitat? Q Yes No 6b. What data sources did ,,you.use to determinemhether your site would impact Essential Fish Habitat? List of EFH Waterbodies published by NOAH 7. Historic,or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur +in or near an;area,that'the state, federal,or tribal governments have,designated as havingihistode or cultural preservation El Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history And, archaeology)? 7b. What data sources did you use to detenrine whether your site would impactihistoric or archeological,resources? NO SHPO S. Flood,Zone Designation,(Corps Requirement) 8a.,Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ) No 8b.ltf yes, explain how,project meets�FEMA requirements: 8c. What'source(s) did you use to make the floodplaln determination? NC, Flood AAaps Joseph V. lonnane, Applicant/Agents Printed Name plf tlAgenrvSignature Date (AgerQ signature is valid only Fm authoraatwn r from the cant is r6ided Page 10 of 10 � � � � � &7) }!k &zk� }a|2^ \7m \k)I\ |k)k9 �§\ }\ �) \ \! fff;) � oa 6Wt ■\ &E |, §f f\7 PMM 540 Flex Site — Representative Photo of the Onsite Wetland N O O fD (J7 4��b O N T O O (D tD x fD N O N O D Lri 4�-%b 0 N O N (D X D N O N W a U'I 4��h O T CD X G � JA�`1V0�0 a o Z_o w U) tn �N. w „ f9 Z �'N 1-4 z li E�$ h iz Z a < ,,,af!!fl81BIOIf�� Wczi 1 U ICL 2- Q Z w v ai u. aDyw ro - NZNNF� Gam= = -,vO,vN 3a N 0 m'AD�ro�ooZ 16 yO�nZ D02(10n ~�S(Xp mC OQp'r; DA -=j p pry NiA O =i-a Dpl� yam+ X ALm'z > N'>"z ^"°NZJOZOG41ON FEZ-! Xi ZZZ� ;2AZ� O_ bN3� °i°�5�pr�rwo�if°, -o �� n�ooro �AOrs mrnn3��y TXTo_,00N� -o s � Q_ m' ONG1my_=Q 3C' CD412 �ii �'(:i ° :1 O NE�OO +NAi G'rno >�NZ nz A mil (n oa�c Xp'cno}i �z o��?Sg�ai^cy'n��in oAn� pK- n_roy�omz, G °G" n °�oQUC� cnn �o�o �ppin�190 <'�z�m, 'co,��D c moo�oDgO-l" a wz y~OnVX��olnmi ��nHA ➢App zz ni NO Rsm <=S In �° AprvN °Po�n�°n�f '>c �I A O`rooiz�� °oi °Z "$AEON N3� ZC -�-•m Gz1f�1NX�NOZ OU Nyi I �7�DOC u°o XSK'196 -Do U N�o m '02009E E - z4>59.s' oAEA 6" n c! yyX =OO�n`r"b on 3i ,1800 ��"00 Oo ffnn J0 Cl Z 5 -z y ;� � -�Z -On0 NDr�P�y_Cp Arni3T LL�J >tj� �1 SPAS° i� 0 rn p N'N� ro n3O 2AO- yy'p�ZC `$17`$00iU R�O n (l=K NNOZ 541ACr"�On S Oo �z� ii zvz � Nz z'0 n On A me ° OOSdKon0 OOn OF f i 6 G nn' zo °�" (1a 5p4 zoro UI�INi rn_N N mD 3ONmNZ Oz�bna X�3 2° So�,an -oor np1 >pz nygQ Om �°`< ilgl OmGyn`a mKVyz ys S Y qX3 DzZA r3i� C� =r 3y mD r p �(-� F p ° T M p AC z0 on Om n C G 00 NNa Zgp� °C < O _� O yy A V. F �WnCD'f�(� rnT�(p� ri+ VZ �n Z D (1 nN yOO� �O p N Op 3 P O N �a\lA aw ti - G nN��L^� O�roT'O�S� �£cn OXrP rl'34A1O'yN>K p�NgwDOC Ag Om-i4� k _ CO 00 OAOpp X �i DAK °y °fez � =A``2oDG �AS3 Xs O{ ONE C o �NZm 6 O�� N �ORZN �Kro pp Q �N3zrw.iOCg °'N� � :vNN ; NY 2> n?N (Dl K F z - - - _ - -- _ Ono Na P''O, AZ6 NO SNN 'Om 00 A ➢ O � O- WOA10� O a 0+ m m Z m F O y N- CEIA '� 2 C 3 0 O Z N TN NV O Oi`('Ai Ar-2 O F n3? rozSS W NWT TV `p z v5�A ;�' ggT�O �°➢+ O soy w s Z N 6 o o ° m a rZ V , O .I I aI m L DO I I NC 5i0 NL ND '� ii >U 810 > � )P 1415 uYy_ -- -- °r DurreR - loo" `t' �- , -� - , - OLIVE Cl N rn 8 540 FLEX BU5I N F55 f ARK "' •• �� > li °'�� %''. f 5 Jones & CxosSen K 4 PHA5E I CONSTRUCTION DRAWINGS \_ q8§6 � W A U { . 0 T `• N N NO f TOWN OF APEX WAKE COUNTY NORTH CAROLINA �, I� a = 9 ENGINEERING, P L LC n N N ' �: - � % °v;'; � a � ' § I �' 'Crvd Englneenng I Construction Management I'Land Planning 5ITE LAYOUT 'PLAN " -, - / - - - - - _ - -- _ aI m L DO I I NC 5i0 NL ND '� ii >U 810 > � )P 1415 uYy_ -- -- °r DurreR - loo" `t' �- , -� - , - OLIVE Cl N rn 8 540 FLEX BU5I N F55 f ARK "' •• �� > li °'�� %''. f 5 Jones & CxosSen K 4 PHA5E I CONSTRUCTION DRAWINGS \_ q8§6 � W A U { . 0 T `• N N NO f TOWN OF APEX WAKE COUNTY NORTH CAROLINA �, I� a = 9 ENGINEERING, P L LC n N N ' �: - � % °v;'; � a � ' § I �' 'Crvd Englneenng I Construction Management I'Land Planning 5ITE LAYOUT 'PLAN " -, I i 1 I I I II I I I I JAMES t BARBARA FAULKNER I 1 PIN: 0732 -24 -6223 ( 1 ZONED: RR USE: SINGLE FAMILY t I Iz Io Ib (I I SURVEYED-- l STREAM ' J LOCATION J i W m �o EDWIN 4 MARGARET WALKER PIN: 0732 -23 -9343 ZONED: RR USE: SINGLE FAMILY Cy TOWN OF APEX REQUIRED NOTES: I . NO 51TE DEVELOPMENT ACTIVITY INCLUDING BUT NOT LIMIT'--",::D TO TESTING, CLEARING, INSTALLATION OF 5 *E MEASURES, OR GRADING, SHALL OCCUR UNTIL REQUIRED PROTECTION FENCING HAS BEEN IN5TALLED.AND IN5PECTEG'. , A PROTECTION FENCING INSTALLATION PERMIT MAY BE OBTAINED AT THE PLANNING DEPARTMENT OR BY CALLING 919 249 -3426. 2. PROTECTION FENCING MUST BE PLACED AWAY FROM ANY SAVED TREE ONE FOOT FOR EACH INCH OF TREE CALIPER. PROTECTION FENCING MUST BE PLACED AT LEAST GO FEET AWAY FROM ANY OTHER DE51GNATED RESOURCE CONSERVATION AREA, SUCH AS BUT NOT LIMITED TO HISTORIC BUILDINGS AND STRUCTURES, WETLANDS, AND PONDS. PROTECTION FENCING MUST BE PLACED ALONG ThE OUTSIDE LINE OF THE 100 -YEAR FLOODPLAIN, AND THE OUTSIDE EDGE OF ANY RIPARIAN BUFFER. ADDITIG'NAL PROTECTION FENCING MAY BE REQUIRED IN OTHER LOCATIGN5 CL05E TO CONSTRUCTION ACTIVITY WHERE IT 15 DEEMED NECESSARY BY THE ZONING ENFORCEMENT OFFICER; SUCH AREAS MAY INCLUDE BUT ARE NOT LIMITED TO COMMON PROPERTY LINES OR NEAR PUBLIC AREAS (SIDEWALKS, ETC.). 3. ALL GRADING AND SUPPORT STRUCTURES ASSOCIATED WITI-. ANY RETAINING STRUCTURE SHALL NOT ENCROACH INTO ANY REQUIRED BUFFER OR PROTECTED AREA (SUCH AS BUT NOT LIMITED TO, RCA AND CRITICAL ROOT ZONES C: TREES, PUBLIC UTILITY EASEMENTS AND RIGHTS -OF -WAY), AND SHALL BE CONTAINED ENTIRELY ON SITE. 4. 51TE ELEMENTS REQUIRED TO SATISFY RECREATIONAL REQUIREMENT5 SUCH AS BUT NOT LIMITED TO PLAY FIELDS AND GREENWAY TRAILS AND ITEMS TYPICALLY A550CIATED WITH THEM (BENCHES, TRASH CONTAINERS, 5C -N5, ETC.) MUST MEET ANY APPLICABLE STANDARDS FOUND IN THE TOWN OF APEX STANDARD 5PECIFICATlON5 AND CONSTRUCTION DETAILS AND THE REQUIREMENTS OF 7.-IE TOWN OF APEX PARKS AND RECREATION DEPARTMENT. 5. THE SCREENING OF LOADING DOCKS, TRASH CONTAINERS (hCILUDING DUMP5TER5 AND ROLL -OUT CARTS), OUTDOOR STORAGE, MECHANICAL AND HVAC EQUIPMENT, AND SIMILAR FACILITIES ON THE ROOF, ON THE GROUND, OR Oh: 'BUILDINGS SHALL MEET THE REQUIREMENTS FOUND IN SECTION 8.2.8 OF THE UNIFIED DEVELOPMENT ORDINANCE; SPECIFICALLY SCREENING MUST BE DONE 50 7-1AT: 1. IT 15 INCORPORATED INTO THE OVERALL DE51GN THEME OF THE BUILDING AND LANDSCAPE. 11, SCREENING MATERIALS ARE NOT DIFFERENT FROM OR lip:.: ERIOR TO THE PRINCIPAL MATERIALS OF THE BUILDING OR LANDSCAPE, AND ARE 51MILAR IN i,'dATERIAL5 AND COLOR. III. SCREENED ITEMS ARE OUT OF VIEW FROM ADJACENT PROPERTIE5 AND PUBLIC STREETS, AND A TOTALLY OPAQUE SCREEN 15 ACHIEVED. IV. ANY GROUND - MOUNTED HVAC OR OTHER MECHANICAL OR UTILITY EQUIPMENT 51X -FEET TALL OR HIGHER MUST BE FENCED AND LANDSCAPED. V. DUMP5TER ENCLOSURES MUST MEET THE ABOVE REQUIREMENTS PLUS THEY MUST BE AT LEAST EIGHT -FEET TALL OR THE HEIGHT OF THE DUMP5TER, WHICHEVER I. , TALLER; AND BE BUILT OF MASONRY MATERIAL. G. ALL REQUIRED 51TE ELEMENTS SHOWN WITHIN A PARTICULAR. PHASE MUST BE INSTALLED BEFORE A FINAL CERTIFICATE OF OCCUPANCY MAY BE 155UED FOR ANY BUILDIi V'G WITHIN THAT PHASE. 7. 51TE ITEMS SUCH AS BUT NOT LIMITED TO, LIGHTING, LANDSCAPING (INCLUDING MULCH), SCREENING (I.E.: DUMP5TER5(TRA5H, MECHANICAL/HVAC, ETC.), 51TE STABILIZATION (SEEDING), AND PARKING AND PAVEMENT MARKING MUST BE COMPLETED PRIOR TO SCHEDULING A FINAL SITE INSPECTION. 8. NO SIGNS ARE APPROVED AS PART OF 51TE PLAN APPROVAL :PROCESS. A SEPARATE SIGN PERMIT MUST BE OBTAINED PRIOR TO INSTALLATION OF THE SIGN. A MA5TE' SIGN PLAN MUST BE SUBMITTED FOR APPROVAL. WILLIAM * KATHRYN GA51OROW5KI PIN: 0732 -23 -9453 ZONED: RR U5E: 5INGLE FAMILY NC 540 IMPACT AREA PHASE I BUILDING SUMMARY: I I FLEX OFFICE UNITS I G, I I G 5F 15 FLEX BU51NE55 UNITS 28,328 5F G WORKSHOP SPACES 0 SF 98 AUTO /BOAT STORAGE SPACES 34,340 5F I WINE HUMIDOR AREA 1,080 5F I CONDITIONED STORAGE AREA 0 5F NOTES: I . ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF APEX STANDARDS AND SPECIFICATIONS. 2. BOUNDARY AND TOPOGRAPHIC INFORMATION TAKEN FROM SURVEY PROVIDED BY SMITH SMITH SURVEY COMPANY. 3. REFER TO ARCHITECTURAL DRAWINGS FOR BUILDING DETAIL INFORMATION. 4. NO FEMA MAPPED FLOODPLAIN EXISTS ON THIS PROPERTY PER FEMA MAP #37183CO483E DATED 03 MARCH 1992. 5. PERIMETER LANDSCAPING SHALL PROVIDE REQUIRED SCREENING FOR HVAC UNITS. G. PERIMETER SECURITY CHAINLINK FENCING TO BE G' HIGH WITH BLACK VINYL COATING. 7. DEVELOPER WILL BE RESPONSIBLE FOR A FEE -IN -LIEU FOR THE 51DEWALK ALONG THE OLIVE CHAPEL ROAD FRONTAGE. 41 f s t ,I 1 I II t I 1 I � E 1 11 s1 v rl� < 11 l T'(QP 5AR AND 51OP 51GN AY � 11 2 0 1 4 0 8 1 8 AUG 0 12014 0 It u����`� °ado G �G ClApIk G Fy RLb 5ARtd51DE LN. WO Ur OL1VF CHAPEL ROAD vopp o`'J� u oho Z o VICINITY MAP N.T.S. � ` 3OR 1 / 1 w W E 70 Wm Z (r 0 t O z a w 8 ��4 1 .0 c u H \ 'STER 0 It u����`� °ado G �G ClApIk G Fy RLb 5ARtd51DE LN. WO Ur OL1VF CHAPEL ROAD vopp o`'J� u oho Z o VICINITY MAP N.T.S. O 20 40 30 GRAPHIC SCALE � ` J 1 a 1 w W E Wm Z m c 0 t O z O 20 40 30 GRAPHIC SCALE r.�•j v � c � J � a r.�•j v � c � Z w W E Wm Z m c 0 O z a w 8 .0 c u 221 N. SALEM Sr. SURE 001 PO BOX 1062 APEX, NC 27502 Of6cm 419-367 -1174 ' Rogbtmtlon: P40151 1 aaBaae,;,,.si��° Q z m 0 U Q (� a Wiz( V 1 mil. W Z Z 0 L 0 z LLJ X 0 U-i U -- _j (n LL W 0(s) V ! L 1L a O O qr MWN 1 " =40` r 5MJ MAY 5, 2014 1 3114 1 PER TRC 1322