HomeMy WebLinkAbout20140818 Ver 1_401 Application_201408149
ENVTRONW,NTAI. SFRVTFS, TNC
524 SOUTH NEW HOPE ROAD
RALEIGH NORTH - CAROLINA 27610
(919)212 -1760
July 28, 2014
Ms Kdren Higgins
N.0 Division of Water Resources
1650 Mail Service Center
Raleigh, NC 27699 -1650
Re: 540 Flex Site
Apex, NC
Ms. Higgins-
Enclosed please find four copies of the PCN being submitted for a commercial development proposing
0 05 acre of'wetland.impact There,are no stream,or buffer impacts and the,stormwater review is under
the jurisdiction of Apex. Please contact me if you have any questions or comments.
Sincerely,
n e al Services, Inc
e f Harbour
Senior Manager
o�oF wntER�G ��' ® Office Use Only:
Corps action ID no.
o DWQ project no.
Form Version 1.4 January 2009
Page 1 of 10
PCN Form — Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing
1a.
Type(s) of approval sought from the Corps:
❑X Section 404 Permit ❑ Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 39 or General Permit (GP) number:
1 c.
Has the NWP or GP number been verified by the Corps?
❑ Yes QX No
1 d.
Type(s) of approval sought from the DWQ (check all that apply):
❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
1e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑ Yes ❑X No
For the record only for Corps Permit:
❑ Yes ❑X No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
❑ Yes ❑X No
1 g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1 In
below.
❑ Yes ❑ No
1h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes X❑ No
2.
Project Information
2a.
Name of project:
540 Flex Site
2b.
County:
Wake
2c.
Nearest municipality / town:
Apex
2d.
Subdivision name:
2e.
NCDOT only, T.I.P. or state project no:
j
3.
Owner Information —`'-
3a.
Name(s) on Recorded Deed:
JVI Development II INC AUG U 1 201
3b.
Deed Book and Page No.
015448, 00322 In
Joey Joanne QU �y
3c.
Responsible Party (for LLC if
applicable):
3d.
Street address:
2509 Southwinds Run
3e.
City, state, zip:
Apex, NC 27502 -6512
3f.
Telephone no.:
3g.
Fax no.:
3h.
Email address:
Page 1 of 10
PCN Form — Version 1.4 January 2009
4
Applicant Information (if different from owner)
4a
Applicant is
E]' Agent ❑ Other, specify Developer is the applicant
,4b
Name
4c
Business name
(if applicable)
4d
Street address
4p, City, state, zip
4f
Telephone no�
4g 'Fax no
4h
Email address
5.
Agent /Consultant Information (if applicable)
5a
Name
Jeff Harbour
5b
Business name
(if applicable)
ESI
—
5c
Street address
524 South New Hope Road
5d
City, state, zip
Raleigh, NC 27610
5e-
Telephone no
919- 21'2 -1760
5f
Fax no
919 - 212 -1707
5g
Email address
jharbour@esinc cc
Page 2 of 10
B.
Project Information and Prior Project History
1.
Property Identification
1a
Property identification no (tax PIN or'parcel ID)
0732234906 000
1,b
Site coordinates (In decimal degrees)-
Latitude 35 73969 Longitude -78.89076
1c- Property size
1075 acres
2
Surface'Waters
2a
Name of nearest body of water to proposed project
Reedy Branch
2b
Water Quality Classification of nearest receiving water-
C,NSW
2c
RiJer,basm
Cape Fear
3
Project Description
3a Describe the existing conditions on the site and the general land use i,n the vicinity of the project at the time of this
application
'Site,contains,,old pastures and farm buildings DOT also used frontage as,staging area during 540, construction Surrounding land use is residential
3b
List the total estimated acreage of all existing wetlands on the property 0 07
3c
List the total estimated linear feet of,all existing streams (intermittent and perennial) on the property 0
3d Explain the purpose of the proposed project
Purpose is,to,develop site for a,multi -use storage facility to serve the local'residents
3e Describe the overall project in detail, including the type of equipment to be used
Site will be graded and developed to provide multi -use storage facility Graders, dump trucks, excavators, etc will be used during construction
4.
Jurisdictional Determinations
4a
Have jurisdictional wetland `or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past'?
❑X Yes ❑ No ❑ Unknown
Comments
4b
If the Corps made the jurisdictional determination, what type
of determination was made?
X❑ Preliminary ❑ Final
4c
If yes, who delineated the jurisdictional areas?
Name (if known) J Harbour, K Murphrey
Agency /Consultant Company ESI
Other
4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
Met ACOE on -site on April 15, 2014 (SAW 2014 - 00716)
Town of,Apez,reviewed + ste on Apnl "7, 2014 (Apex 14 -005)
5
Project History
5a
Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑ Yes X❑ No ❑ Unknown
5b
If yes, explain in detail according to "help file" instructions
6.
Future Project Plans
6a
Is this a phased project?
❑ Yes ❑X No
6b
If yes, explain
Page, 3 of 10
PCN Form — Version 1 4 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1a Which sections were completed below for°,your project (check all that apply)
❑X Wetlands ❑ Streams — tnbutanes ❑ Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site,, then complete this question for each wetland area Impacted
2a
Wetland Impact
number
Permanent (P) or
Temporary T
2b
Type of Impact
2c
Typeaof wetland
2d
Forested
2e
Type of jurisdiction
Corps, (404,10) or
DWQ (401, other)
2f
Area of
Impact
(acres)
W1 T
Fill
Seep
No
Corps
0,05
W2
Choose one
Choose'one
Yes /No
W3
Choose,one
Choose one
Yes /No
W4
Choose one
Choose,one
Yes /No
-
W5 -
Choose one
Choose one
Yes /No
W6
Choose one
Choose one
Yes /No
-
2g Total Wetland Impacts:
0 05'
2h Comments
This wetland has been historically impacted by NCDOT activities during 540 construction (see attached photo sequence) It cannot be avoided due to
its location on th&property
3. Stream Impacts
If there are perennial or Intermittent stream Impacts (Including temporary Impacts) °proposed on the site, then complete this
question for all stream sites Impacted
3a
Stream'Impact
number
Permanent (P) or
Temporary (T)
3b
Type of Impact
3c
Stream name
3d
Perennial (PER) or
Intermittent (INT)?
3e
Type of
jurisdiction
3f
Average
stream
width
(feet)
3g
Impact
length
(linear
feet)
S1
Choose one
I
S2
Choose one
S3
Choose one
-
S4 -
Choose one
S5 -
Choose one
-
-
S6 -
- Choose one
-
3h Total stream and tributary impacts
1 0
31 Comments
Page 4 of 10
PCN, Form — Version 1 4 January 2009
4 Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U S then indivii ually list all open water'im acts below _
4a
Open water
impact number
Permanent (P) or
Temporary T
4b
Name of waterbody
(if applicable)
4c
-
Type of impact
4d
Waterbody
type
4e
Area of impact (acres)
01 -
Choose one
Choose
02
Choose one
Choose
03
Choose one
Choose
04
Choose one
Choose
4f Total open water impacts
0
4g Comments
5 Pond or Lake Construction
If and orllake construction proposed, the complete the, chart below
5a
Pond ID number
5b
Proposed use or
purpose of pond
5c
Wetland Impacts (acres)
5d
Stream Impacts (feet)
5e
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f- Total:
5g Comments
5h Is aidam high,hazard permit required?
❑ Yes ❑ No If yes, permit ID no
51 Expected pond surface area (acres)
5j Size of pond watershed (acres)
5k Method of construction
6. Buffer Impacts,(for DWQ)
If project'wdl impact a protected riparian buffer, then complete the chart below If yes, then'mdividually list all buffer impacts
below- If any impacts require mitigation, then you MUST fill out Section D of this form
6a Project is in which protected basin?
❑ Neuse ❑ Tar - Pamlico, ❑ Catawba ❑ Randleman ❑X Other Cape,Fear
6b
Buffer Impact
number —
Permanent (P) or
Temporary T
�6c
Reason for impact
6d
Stream name
6e
Buffer
mitigation
required?
6f
Zone 1
impact
(square
feet )
6g
Zone 2
impact
(square
feet
B1
Yes /No
B2
Yes /No
B3 _
Yes /No
B4
Yes /No
B5 _
Yes /No
B6
Yes /No
6h Total Buffer Impacts:
0
0
61 Comments
Page 5 of 1'0
D. Impact Justification and Mitigatiom
1. Avoidance and Minimization
la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
The wetland cannot be,avoided due to its location near'the road frontage Minimization effortswere looked at'but,would hav_e,resultmg'inia retaining
wall approximately 15 feet,high due to the amount of fill required to bring`the site•to a buildable grade This,high retaining wall was deemed unsafe
and considered,to bean unrealistic option to minimize impact Wthe small,0 07 acre area Impacts to the wetland are 0 05 acre
lb Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
All applicable sediment and erosion control requirements,wiil be strictly employed during all phases,of construction Contractors will following BMPs
with regard to equipment,maintenance whde,operating onsde
2. Com ensato 'Miti ation for Impacts to Waters of the U.S or,Waters of the,State
2a DoesAhe project require Compensatory Mitigation for
impacts to Waters of the U S or Waters of the State?
❑ Yes ❑X No
2b If yes, mitigation is required by (check all,that apply)
❑ DWQ ❑ Corps
2c If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if-Using a Mitigation Bank
3a Name of 'Mitigation Bank
3b Credits Purchased�(attach receipt and letter)
Type Choose one
Type Choose one
Type Choose one
Quantity
Quantity
Quantity
3c Comments
4. Complete if Making a Payment to In -lieu Fee Program _
4a Approval letter from in -lieu fee program,is, attached
❑ Yes
4b Stream mitigation requested
linear feet
4c If using stream mitigation, stream temperature
Choose one
4d Buffer mitigation requested (DWQ only)
square feet
4e Riparian wetland mitigation requested
acres
4f Non - ripanan wetland mitigation requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
�4h Comments
5 Complete if Using a Permittee Responsible Mitigation Plan
5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan-
e
Page 6 of 1,0
PCN Form— Version 14 January°2609
6. Buffer'Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
E] Yes No
6b If yes, ,then identify the square feet of impact to,each zone,of the, riparian, buffer that °requires mitigation Calculate the
amount,'of mitigation required
Zone
6c
Reason for impact
6d
Total impact
(square feet)
Multiplier
6e
Required mitigation
(square,feet)
Zone 1
3 (2 for Catawba)
Zone 2
1 5,
6f Total buffer mitigation required:,
6g If buffer mitigation is required, discuss what type of mitigation'is proposed (e g , paymenfto private mitigation bank,
permittee responsible riparian buffer restoration, payment into an,approved in -lieu fee fund)
6h Comments
Page 7 of 10
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1
Diffuse Flow Plan
1 a
Does the project Include or is it adjacent to protected riparian buffers identified
❑X Yes ❑ No
within one of the NC RI anan Buffer Protection, Roles?
1b
If yes, then Is a diffuse flow plan Included? If no, explain why
Buffers are located adjacent to the,site alongside an intermittent stream that goes under 540 This area
❑ Yes X❑ No
is outside
the construction zone
2
Stormwater Management Plan
2a
What is the overall percent Imperviousness of this project?
oho
2b
Does this-project require a Stormwater Management Plan?
E9 Yes ❑ No
2c
If this project DOES NOT require,a Stormwater Management Plan, explain why
2d
If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan.
The
Town of Apex is responsible•for the review of the SMP Stormwater ponds will be used to capture and treat runoff
2e
Who will be responsible for the review of the Stormwater Management Plan?
Town of Apex
3.
Certified Local Government Stormwater Review
3a
In which local government's jurisdiction isrthis ro ect?
Town of,Apex
❑ Phase II
❑ NSW
3b
Which of theJollowing locally - Implemented stormwater management programs
❑ USMP
apply (check;all that apply)
❑ Water'Supply Watershed
❑ Other,
3c
Has the approved Stormwater Management Plan with proof of approval been
El Yes No
attached?
4.
DWQ Stormwater Program Review
[]Coastal counties
❑HQW
4a
Which of the following state - Implemented stormwater management programs apply
❑ORW
(check all that apply)
X❑Session Law 2006 -246
to Other
4b
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes Q No
attached
5.
DWQ 401 Unit�Stormwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b.
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page 8 of 1,0
PCN Form — Version 1 4 January�2009
F. Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
la
Does the project involve an expenditure of public (federal /state /local) funds or the
❑ Yes
X❑ No
use of public (federal /state) land?
lb
ilf you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
[]Yes
❑,No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c
If you answered "yes' ,to the above, has the document review been finalized by,the
State Clearing House? (If�so, attach a copy of the NEPA or SEPA'final approval
❑ Yes
❑ No
letter )
Comments
2.
Violations (DWQ Requirement)
2a
Is the,site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated
Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards,
E] Yes
❑X No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b
Is this,an after- the -fact permit application?
❑Yes
0 No
2c
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s)
3.
Cumulative Impacts (DWQ Requirement)
3a
Will this prolect5(based on past and reasonably anticipated future impacts) result in
[Ell es
®No
additional development, which could impact nearby downstream water quality?
3b
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy If you answered "no," provide,a short.narrative description
f
4.
Sewage Disposal (DWQ Requirement)
Aa Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility
Municipal sanitary sewer
Page 9 of 1,0
PCN Form — Version 1 4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
$a. Will this project occur in or near an area with federally protected species or
❑Yes No
habitat?
5b. Have you checked'with the USFWS conceming�E.ndangered "Species Act
Oyes ® No
impacts?
5c. If yes, indicate the USFWS Field Office you,have contacted.
-
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
On- sft6habitat assessment revealed no suitable habitat for wW spaWes,listed'tor Wake County.
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur In or neat an area designated as essential fish ,habitat?
Q Yes No
6b. What data sources did ,,you.use to determinemhether your site would impact Essential Fish Habitat?
List of EFH Waterbodies published by NOAH
7. Historic,or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur +in or near an;area,that'the state, federal,or tribal
governments have,designated as havingihistode or cultural preservation
El Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history And, archaeology)?
7b. What data sources did you use to detenrine whether your site would impactihistoric or archeological,resources?
NO SHPO
S. Flood,Zone Designation,(Corps Requirement)
8a.,Will this project occur in a FEMA- designated 100 -year floodplain?
❑ Yes ) No
8b.ltf yes, explain how,project meets�FEMA requirements:
8c. What'source(s) did you use to make the floodplaln determination?
NC, Flood AAaps
Joseph V. lonnane,
Applicant/Agents Printed Name
plf tlAgenrvSignature
Date
(AgerQ signature is valid only Fm authoraatwn
r from the cant is r6ided
Page 10 of 10
�
�
�
�
�
&7)
}!k
&zk�
}a|2^
\7m
\k)I\
|k)k9
�§\ }\
�) \ \!
fff;)
� oa
6Wt ■\
&E |,
§f f\7
PMM
540 Flex Site — Representative Photo of the Onsite Wetland
N
O
O
fD
(J7
4��b
O
N T
O
O (D
tD x
fD
N
O
N
O
D
Lri
4�-%b
0
N
O
N (D
X
D
N
O
N
W
a
U'I
4��h
O
T
CD
X
G � JA�`1V0�0
a
o
Z_o
w U)
tn
�N.
w „ f9 Z �'N 1-4
z
li
E�$
h iz Z a <
,,,af!!fl81BIOIf��
Wczi
1
U
ICL
2-
Q
Z
w v ai u. aDyw ro -
NZNNF� Gam= = -,vO,vN 3a N 0 m'AD�ro�ooZ 16
yO�nZ D02(10n ~�S(Xp mC OQp'r; DA -=j
p pry NiA O =i-a Dpl�
yam+ X ALm'z >
N'>"z ^"°NZJOZOG41ON FEZ-! Xi ZZZ� ;2AZ� O_
bN3� °i°�5�pr�rwo�if°, -o �� n�ooro
�AOrs mrnn3��y TXTo_,00N� -o s �
Q_ m' ONG1my_=Q 3C' CD412 �ii �'(:i °
:1 O NE�OO +NAi G'rno >�NZ nz A mil (n
oa�c Xp'cno}i �z o��?Sg�ai^cy'n��in
oAn� pK- n_roy�omz, G °G" n °�oQUC� cnn
�o�o �ppin�190 <'�z�m, 'co,��D c
moo�oDgO-l" a
wz y~OnVX��olnmi ��nHA ➢App zz
ni NO
Rsm
<=S In �° AprvN °Po�n�°n�f '>c
�I A O`rooiz�� °oi °Z
"$AEON
N3� ZC -�-•m Gz1f�1NX�NOZ OU
Nyi I �7�DOC u°o XSK'196 -Do U
N�o m
'02009E E - z4>59.s' oAEA 6"
n c! yyX =OO�n`r"b on
3i ,1800 ��"00 Oo ffnn
J0 Cl Z 5 -z
y ;� � -�Z -On0 NDr�P�y_Cp Arni3T LL�J
>tj� �1
SPAS° i�
0
rn
p
N'N� ro n3O 2AO- yy'p�ZC `$17`$00iU R�O
n (l=K NNOZ 541ACr"�On S
Oo
�z�
ii
zvz � Nz z'0 n On A me
° OOSdKon0 OOn OF f i
6
G nn' zo °�" (1a 5p4 zoro
UI�INi rn_N N mD 3ONmNZ Oz�bna
X�3 2° So�,an -oor np1
>pz nygQ Om �°`< ilgl OmGyn`a mKVyz ys
S Y qX3 DzZA r3i� C� =r
3y mD r p �(-� F
p ° T M p AC z0 on
Om n C G 00 NNa Zgp� °C
< O _� O yy A
V. F �WnCD'f�(�
rnT�(p� ri+ VZ �n Z
D (1 nN yOO� �O
p N Op 3 P O
N
�a\lA aw ti - G
nN��L^� O�roT'O�S�
�£cn OXrP
rl'34A1O'yN>K
p�NgwDOC Ag
Om-i4� k _
CO 00
OAOpp
X �i DAK °y
°fez � =A``2oDG
�AS3 Xs
O{ ONE C
o �NZm 6
O�� N
�ORZN
�Kro
pp Q
�N3zrw.iOCg °'N�
� :vNN ;
NY 2> n?N
(Dl K
F z
- - - _ - -- _
Ono Na P''O,
AZ6 NO SNN
'Om 00 A ➢
O
�
O- WOA10�
O a 0+
m m
Z m F
O y N-
CEIA '� 2
C 3 0 O Z N
TN NV
O
Oi`('Ai Ar-2
O F
n3? rozSS W
NWT TV `p z
v5�A
;�'
ggT�O �°➢+ O
soy w
s
Z N 6
o o
° m
a
rZ
V ,
O
.I
I
aI
m L
DO I
I
NC 5i0 NL ND '� ii
>U
810 > � )P 1415 uYy_ -- -- °r
DurreR -
loo" `t' �-
, -� - , -
OLIVE Cl
N
rn
8
540 FLEX BU5I N F55 f ARK "' •• ��
> li °'�� %''. f 5 Jones & CxosSen
K 4 PHA5E I CONSTRUCTION DRAWINGS \_ q8§6 �
W A U { . 0 T `•
N N NO f TOWN OF APEX WAKE COUNTY NORTH CAROLINA �, I� a = 9 ENGINEERING, P L LC
n
N N ' �:
- � % °v;'; � a � ' § I �' 'Crvd Englneenng I Construction Management I'Land Planning
5ITE LAYOUT 'PLAN " -,
-
/
- -
- - - _ - -- _
aI
m L
DO I
I
NC 5i0 NL ND '� ii
>U
810 > � )P 1415 uYy_ -- -- °r
DurreR -
loo" `t' �-
, -� - , -
OLIVE Cl
N
rn
8
540 FLEX BU5I N F55 f ARK "' •• ��
> li °'�� %''. f 5 Jones & CxosSen
K 4 PHA5E I CONSTRUCTION DRAWINGS \_ q8§6 �
W A U { . 0 T `•
N N NO f TOWN OF APEX WAKE COUNTY NORTH CAROLINA �, I� a = 9 ENGINEERING, P L LC
n
N N ' �:
- � % °v;'; � a � ' § I �' 'Crvd Englneenng I Construction Management I'Land Planning
5ITE LAYOUT 'PLAN " -,
I i
1
I I
I
II
I I
I I
JAMES t BARBARA FAULKNER I 1
PIN: 0732 -24 -6223 ( 1
ZONED: RR
USE: SINGLE FAMILY t I
Iz
Io
Ib
(I
I
SURVEYED-- l
STREAM ' J
LOCATION
J
i
W
m
�o
EDWIN 4 MARGARET WALKER
PIN: 0732 -23 -9343
ZONED: RR
USE: SINGLE FAMILY
Cy
TOWN OF APEX REQUIRED NOTES:
I . NO 51TE DEVELOPMENT ACTIVITY INCLUDING BUT NOT LIMIT'--",::D TO TESTING, CLEARING, INSTALLATION OF 5 *E MEASURES, OR GRADING, SHALL OCCUR UNTIL REQUIRED
PROTECTION FENCING HAS BEEN IN5TALLED.AND IN5PECTEG'. , A PROTECTION FENCING INSTALLATION PERMIT MAY BE OBTAINED AT THE PLANNING DEPARTMENT OR BY
CALLING 919 249 -3426.
2. PROTECTION FENCING MUST BE PLACED AWAY FROM ANY SAVED TREE ONE FOOT FOR EACH INCH OF TREE CALIPER. PROTECTION FENCING MUST BE PLACED AT LEAST GO
FEET AWAY FROM ANY OTHER DE51GNATED RESOURCE CONSERVATION AREA, SUCH AS BUT NOT LIMITED TO HISTORIC BUILDINGS AND STRUCTURES, WETLANDS, AND
PONDS. PROTECTION FENCING MUST BE PLACED ALONG ThE OUTSIDE LINE OF THE 100 -YEAR FLOODPLAIN, AND THE OUTSIDE EDGE OF ANY RIPARIAN BUFFER. ADDITIG'NAL
PROTECTION FENCING MAY BE REQUIRED IN OTHER LOCATIGN5 CL05E TO CONSTRUCTION ACTIVITY WHERE IT 15 DEEMED NECESSARY BY THE ZONING ENFORCEMENT
OFFICER; SUCH AREAS MAY INCLUDE BUT ARE NOT LIMITED TO COMMON PROPERTY LINES OR NEAR PUBLIC AREAS (SIDEWALKS, ETC.).
3. ALL GRADING AND SUPPORT STRUCTURES ASSOCIATED WITI-. ANY RETAINING STRUCTURE SHALL NOT ENCROACH INTO ANY REQUIRED BUFFER OR PROTECTED AREA (SUCH
AS BUT NOT LIMITED TO, RCA AND CRITICAL ROOT ZONES C: TREES, PUBLIC UTILITY EASEMENTS AND RIGHTS -OF -WAY), AND SHALL BE CONTAINED ENTIRELY ON SITE.
4. 51TE ELEMENTS REQUIRED TO SATISFY RECREATIONAL REQUIREMENT5 SUCH AS BUT NOT LIMITED TO PLAY FIELDS AND GREENWAY TRAILS AND ITEMS TYPICALLY
A550CIATED WITH THEM (BENCHES, TRASH CONTAINERS, 5C -N5, ETC.) MUST MEET ANY APPLICABLE STANDARDS FOUND IN THE TOWN OF APEX STANDARD 5PECIFICATlON5
AND CONSTRUCTION DETAILS AND THE REQUIREMENTS OF 7.-IE TOWN OF APEX PARKS AND RECREATION DEPARTMENT.
5. THE SCREENING OF LOADING DOCKS, TRASH CONTAINERS (hCILUDING DUMP5TER5 AND ROLL -OUT CARTS), OUTDOOR STORAGE, MECHANICAL AND HVAC EQUIPMENT, AND
SIMILAR FACILITIES ON THE ROOF, ON THE GROUND, OR Oh: 'BUILDINGS SHALL MEET THE REQUIREMENTS FOUND IN SECTION 8.2.8 OF THE UNIFIED DEVELOPMENT
ORDINANCE; SPECIFICALLY SCREENING MUST BE DONE 50 7-1AT:
1. IT 15 INCORPORATED INTO THE OVERALL DE51GN THEME OF THE BUILDING AND LANDSCAPE.
11, SCREENING MATERIALS ARE NOT DIFFERENT FROM OR lip:.: ERIOR TO THE PRINCIPAL MATERIALS
OF THE BUILDING OR LANDSCAPE, AND ARE 51MILAR IN i,'dATERIAL5 AND COLOR.
III. SCREENED ITEMS ARE OUT OF VIEW FROM ADJACENT PROPERTIE5 AND PUBLIC STREETS, AND A TOTALLY OPAQUE SCREEN 15 ACHIEVED.
IV. ANY GROUND - MOUNTED HVAC OR OTHER MECHANICAL OR UTILITY EQUIPMENT 51X -FEET TALL OR HIGHER MUST BE FENCED AND LANDSCAPED.
V. DUMP5TER ENCLOSURES MUST MEET THE ABOVE REQUIREMENTS PLUS THEY MUST BE AT LEAST EIGHT -FEET TALL OR THE HEIGHT OF THE DUMP5TER, WHICHEVER I. ,
TALLER; AND BE BUILT OF MASONRY MATERIAL.
G. ALL REQUIRED 51TE ELEMENTS SHOWN WITHIN A PARTICULAR. PHASE MUST BE INSTALLED BEFORE A FINAL CERTIFICATE OF OCCUPANCY MAY BE 155UED FOR ANY BUILDIi V'G
WITHIN THAT PHASE.
7. 51TE ITEMS SUCH AS BUT NOT LIMITED TO, LIGHTING, LANDSCAPING (INCLUDING MULCH), SCREENING (I.E.: DUMP5TER5(TRA5H, MECHANICAL/HVAC, ETC.), 51TE
STABILIZATION (SEEDING), AND PARKING AND PAVEMENT MARKING MUST BE COMPLETED PRIOR TO SCHEDULING A FINAL SITE INSPECTION.
8. NO SIGNS ARE APPROVED AS PART OF 51TE PLAN APPROVAL :PROCESS. A SEPARATE SIGN PERMIT MUST BE OBTAINED PRIOR TO INSTALLATION OF THE SIGN. A MA5TE'
SIGN PLAN MUST BE SUBMITTED FOR APPROVAL.
WILLIAM * KATHRYN GA51OROW5KI
PIN: 0732 -23 -9453
ZONED: RR
U5E: 5INGLE FAMILY
NC 540 IMPACT AREA
PHASE I BUILDING SUMMARY:
I I FLEX OFFICE UNITS
I G, I I G 5F
15 FLEX BU51NE55 UNITS
28,328 5F
G WORKSHOP SPACES
0 SF
98 AUTO /BOAT STORAGE SPACES
34,340 5F
I WINE HUMIDOR AREA
1,080 5F
I CONDITIONED STORAGE AREA
0 5F
NOTES:
I . ALL MATERIALS AND METHODS OF CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF
APEX STANDARDS AND SPECIFICATIONS.
2. BOUNDARY AND TOPOGRAPHIC INFORMATION TAKEN FROM SURVEY PROVIDED BY SMITH
SMITH SURVEY COMPANY.
3. REFER TO ARCHITECTURAL DRAWINGS FOR BUILDING DETAIL INFORMATION.
4. NO FEMA MAPPED FLOODPLAIN EXISTS ON THIS PROPERTY PER FEMA MAP #37183CO483E
DATED 03 MARCH 1992.
5. PERIMETER LANDSCAPING SHALL PROVIDE REQUIRED SCREENING FOR HVAC UNITS.
G. PERIMETER SECURITY CHAINLINK FENCING TO BE G' HIGH WITH BLACK VINYL COATING.
7. DEVELOPER WILL BE RESPONSIBLE FOR A FEE -IN -LIEU FOR THE 51DEWALK ALONG THE OLIVE
CHAPEL ROAD FRONTAGE.
41 f s t
,I 1
I II t
I 1
I �
E 1 11 s1
v rl�
< 11 l
T'(QP 5AR AND
51OP 51GN
AY � 11
2 0 1 4 0 8 1 8
AUG 0 12014
0 It
u����`� °ado
G
�G
ClApIk G Fy RLb
5ARtd51DE LN.
WO
Ur OL1VF CHAPEL ROAD
vopp
o`'J� u oho
Z o
VICINITY MAP
N.T.S.
�
`
3OR
1
/
1
w
W
E
70
Wm
Z
(r
0
t
O
z
a
w
8
��4
1
.0
c
u
H
\
'STER
0 It
u����`� °ado
G
�G
ClApIk G Fy RLb
5ARtd51DE LN.
WO
Ur OL1VF CHAPEL ROAD
vopp
o`'J� u oho
Z o
VICINITY MAP
N.T.S.
O 20 40 30
GRAPHIC SCALE
�
`
J
1
a
1
w
W
E
Wm
Z
m
c
0
t
O
z
O 20 40 30
GRAPHIC SCALE
r.�•j
v
�
c
�
J
�
a
r.�•j
v
�
c
�
Z
w
W
E
Wm
Z
m
c
0
O
z
a
w
8
.0
c
u
221 N. SALEM Sr.
SURE 001
PO BOX 1062
APEX, NC 27502
Of6cm 419-367 -1174
' Rogbtmtlon: P40151
1
aaBaae,;,,.si��°
Q
z
m
0
U
Q
(� a Wiz(
V 1 mil.
W Z
Z 0 L
0
z LLJ
X 0
U-i U --
_j (n
LL
W
0(s)
V !
L
1L
a
O
O
qr MWN
1 " =40` r 5MJ
MAY 5, 2014
1 3114 1 PER TRC
1322