Loading...
HomeMy WebLinkAboutB-5639 Duplin Bridge 36 follow-up field visitFrom:Westphal, Anneliese To:Sprinkle, Hannah H; Shaver, Brad E SAW Cc:Farrell, Sean C; Gingrich, Sophia E; Riley, Katherine G Subject:B-5639 Duplin Bridge 36 follow-up field visit Date:Friday, July 29, 2022 1:49:54 PM Attachments:image001.png Area 1 IMG_5756.jpg Area 2 IMG_5760.jpg Area 2 IMG_5764.jpg Area 3 IMG_5766.jpg Area 3 IMG_5768.jpg Area 4 temp bridge IMG_5829.jpg Area 5 IMG_5744.jpg Area 5 IMG_5745.jpg Area 6 IMG_5747.jpg Area 6 IMG_5748.jpg L-DET Sta. 21+00 No area assigned IMG_5746.jpg NJ ditch and pond IMG_5751.jpg NJ ditch and pond IMG_5753.jpg Hi Hannah and Brad, Please see attached my photos and notes from a 7/28/2022 review of the subject bridge. I visited the places originally detailed and labelled as “Areas” in Sean’s 7/11/2022 email. I also reviewed the area near the NJ ditch and pond and LDet-Sta. 21+00 which needed a small amount of sediment removed and a new wattle installed. Area 1: L_DET Sta. 14+00 Rt. The removed additional sediment from the low side of this area. Most of this area was not wetland. Removal is sufficient. Area 2: L_DET Sta. 14+75 Rt. Since my last visit they removed additional sediment, especially a thin linear plume within the lizard’s tail. Other higher areas were removed. Removal is sufficient. Area 3: L_DET Sta. 15+25 Rt. Extra sediment has been removed. Removal is sufficient. Area 4: Under the temporary bridge at about L_DET Sta. 18+00. They had removed sediment at the stream bank since my last visit, however, there is still additional sediment past the stream bank (less than a 5-gallon bucket) that was deposited since my last visit (7/21/2022). It is still unclear where this is coming from; likely from the area between the temporary bridge and the new bridge. They will remove it. Area 5: L_DET Sta. 23+25 Rt. Most of this area has had the sediment removed, but there was still a small pile of sediment past the silt fence. This was somehow overlooked. They will remove it. Area 6: -L- Sta. 25+50 Lt. They have done a lot of work here, but there is still some sediment in the water (within a natural low area), which they could not remove because of the standing water. This remaining sediment is isolated due to the low area, and they will remove it when they water recedes. They are aware that more work needs to be done here. Area 7: -L- Sta. 25+25 Lt. Removal was sufficient during last site visit (7/21/2022). Sta. -L- +/- 13+20 Rt (NJ ditch and pond area): They installed wattles in the ditch line. Removal is sufficient. L_DET- Sta. 21+00 Rt: A new wattle was installed here. They also removed a small amount of sediment. Removal is sufficient. Please let me know if there are any questions or concerns. They are getting close to finishing the new bridge. There are plans to switch traffic to the new bridge in about a week. They will then begin the process of removing the temporary bridge and fills. Thanks, Anneliese Anneliese Westphal Environmental Senior Specialist Division 3 NCDOT- Division of Highways 910 341 2000 office 910 604 1330 mobile 910 675 0143 fax awestphal@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429-5647 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.