HomeMy WebLinkAboutNCC202407_NOT Closeout Documents_20220728T O W 1V of Permit Number: 2020-1004
WAKE FOREST
ENGINEERING
Certificate of Completion
Erosion and Sediment Control
Town of Wake Forest Engineering Department
301 South Brooks Street
Wake Forest, NC 27587
Phone: (919) 435-9443
Subdivision/Site Name:
Plan Approval Date:
Date of Final Inspection/wall: thru:
Wake Forest Crossin Lot 7
6/1/2020
4/20/2021
Location:
Financial Responsible Party:
Contactor Phone Number:
12612 Capit Blvd.
David Waldrop
864-272-0088
Plan Specifications
Local Ordinance Met:
Temporary Controls Removed:
Permanent Controls Installed and
Met:
Operational:
Yes
Yesi
Yes
Yes
Additional Comments:
The undersigned (inspector) hereby accepts the installation of permanent and removal of temporary erosion and
sediment control devices (per plan and specification) on behalf of the Town of Wake Forest. The owner is responsible
for maintaining these devices, and in no way holds the Town responsible for cleanout or repair.
Inspector: Michael Worn
Contractor: Kemp
Construction
Owner: David Waldrop