Loading...
HomeMy WebLinkAbout20140802 Ver 1_401 Application_20140714I E N G I N E E R I N G & H Y D R O G E O L O G Y 231 HAYWOOD STREET, ASHEVILLE, NC 28801 TEL 828 281 3350 FAC 828 281 3351 WWW. ALTAMONTE NV IRON ME NTAL.COM July 25, 2014 North Carolina Division of Water Resources WBSCP Unit 1650 Mall Service Center Raleigh, North Carolina 27699 -1650 Subject. Pre - Construction Notification Submittal North Pacolet River Reach 4 Polk County, North Carolina Attached are five copies of the permit application for the above referenced project and a check for $570.00 for the permit fee One copy of the permit application has been sent to the Asheville Army Corps of Engineers office and to North Carolina Wildlife Resource Commission Mountain Region Coordinator. The permit package Includes the Pre - Construction Notification (PCN) form and associated supporting documents. Per the PCN Instructions, we have Included two copies of the full size plans along with three copies of 11 x 17 Inch size plans. We appreciate your assistance with this project I can meet you at the site If you would like to discuss this project further Please do not hesitate to contact meat (828) 712 -9194 If you have any questions or need additional information Sincerely, ALTAMONT ENVIRONMENTAL, INC Zan Price, P.E Enclosures Pre - Construction Notification Cc- Sandra Reid, Polk County Soil and Water Conservation District P \Polk SWCD NRCS \North Pacolet Reach 4 \Submittals \Permitting \2014 PCN \PCN Cover Letter_DWR Docx ALTAMONT ENVIRONMENTAL, IN HYDROGEOLOGY 231 HAYWOOD STREET, ASHEVILLE, NC 28801 TEL 828 281 3350 FAC 828 281 3351 www altamontenvironmental com TABLE OF CONTENTS Pre - Construction Notification Document Tables Table 1 Property Owner and Parcel Information Figures Figure 1 Site Location Map (USGS) Figure 2 Site Map (Aerial) Figure 3 BEHI Analysis Map Appendix A — Existing Conditions Photographs Appendix B — Letters and Authorizations Signed Agent Authorization Letter Property Owner Conservation Easement Option Agreement or Letter of Intent Federally Endangered and Threatened Species Assessment, US Fish and Wildlife Cultural Resources Inventory Appendix C — Assessment Data Bank Erosion Hazard Index (BEHI) Data Shear Stress Calculations Assessment of Existing Stream Condition Appendix D — Plan Sheets and Detail Sheets IVE JUL 2 9 2014 P \Polk SWCD NRCS \North Pacolet Reach 4 \Submittals\Permitting\2014 PCN \TABLE OF CONTENTS docx 20140802 aF wArF9 Office Use Only Corps action ID no o Y DWQ protect no Form Version 1 3 Dec 10 2008 Page 1 of 13 PCN Form — Version 1 3 December 10, 2008 Version Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing la Type(s) of approval sought from the Corps FE Section 404 Permit ❑Section 10 Permit 1b Specify Nationwide Permit (NWP) number 13 and 27 or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ® Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program ❑ Yes ® No 1g Is the protect located in any of NC's twenty coastal counties If yes, answer 1 h below ❑ Yes ® No 1h Is the protect located within a NC DCM Area of Environmental Concern (AEC) ❑ Yes ® No 2. Project Information 2a Name of protect North Pacolet River Reach 4 2b County Polk County, NC 2c Nearest municipality / town Columbus, North Carolina 2d Subdivision name 2e NCDOT only, T I P or state protect no 3 Owner Information 3a Name(s) on Recorded Deed Table of property owners and relevant information is attached as Table 1 3b Deed Book and Page No 3c Responsible Party (for LLC if applicable) 3d Street address IM 3e City, state, zip JUL 2 9 2014 3f Telephone no 3g Fax no r Wancn 3h Email address Page 1 of 13 PCN Form — Version 1 3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a Applicant is ❑ Agent ® Other, specify, Applicant and Protect Sponsor 4b Name Ms Sandra Reid — Polk County Sod & Water Conservation District 4c Business name (if applicable) Altamont Environmental, Inc 4d Street address 156 School Road 4e City, state, zip Mill Spring, NC 28722 4f Telephone no (828) 894 -8550 4g Fax no 4h Email address sreid @polknc org 5. Agent /Consultant Information (if applicable) 5a Name Zan Price, PE 5b Business name (if applicable) Altamont Environmental, Inc 5c Street address 231 Haywood Street 5d City, state, zip Asheville, NC 28801 5e Telephone no (828) 281 -3350 5f Fax no (828) 281 -3351 5g Email address zprice @altamontenvironmental com y Page 2 of 13 B. Project Information and Prior Project History 1. Property Identification 1a Property identification no (tax PIN or parcel ID) P88 -75, P76 -55, P76 -97, P76 -49 lb Site coordinates (in decimal degrees) Latitude 35 1951944 Longitude - 82 1550805 (DD DDDDDD) ( -DD DDDDDD) 1c Property size See Table 1 2. Surface Waters 2a Name of nearest body of water (stream, river, etc ) to proposed project North Pacolet River 2b Water Quality Classification of nearest receiving water C 2c River basin map is available at http //h2o enr state nc us /admen /maps/ [Broad River Basin Page 3 of 13 PCN Form — Version 1 3 December 10, 2008 Version 3. Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Conditions at the site consist of a degraded stream channel, eroding stream banks and a generally narrow and poorly vegetated riparian corridor Bank height ratios (top of bank height/bankfull height) exceed a value of 2 for most of the reach Bank height ratios closer to 1 are preferred for channel stability indicating an accessible floodplain A bank erosion hazard index (BEHI) assessment was conducted in 2013 The BEHI analysis constituted of approximately 6,100 and 3,600 linear feet on river left and river right, respectively The banks of Reach 4 were classified with the following BEHI rating Extreme — 60 feet Very High — 1,480 feet High — 2,635 feet Moderate — 4,275 feet Low — 1,250 feet r The banks classified as High, Very High, and Extreme are easily erodible Consequently, these sections cause stream impairment by contributing excess sediment to the stream, fading streambanks, and lateral instability Based on the BEHI analysis, the annual erosion rate of Reach 4 (6,100 and 3,600 linear feet on river right and left, respectively) is approximately 690 cubic yards, or roughly 45 dump trucks, of soil per year Land use adjacent to the site consists of a commercial sod farm on the eastern adjacent property and low- density residential homesites on the western adjacent parcels See attached representative photographs in Appendix A, Figure 1 (USGS Site Location Map), Figure 2 (Aerial Site Map), and Figure 3 (Bank Erosion Hazard Index (BEHI) Analysis Map) 3b List the total estimated acreage of all existing wetlands on the property 0 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 6,100 LF 3d Explain the purpose of the proposed project The Polk County Soil and Water Conservation District (PCSWCD) in cooperation with numerous stakeholders, have chosen to undertake the effort to conserve, enhance and restore the North Pacolet River Watershed The proposed streambank stabilization of Reach 4 will produce a stable stream with vegetated streambanks and access to a constructed floodplain The proposed project will improve aquatic habitat by reducing sedimentation, reducing water temperature by increasing shade cover, improving in- stream aquatic habitat by installing near bank structures in the channel resulting in improvements to the pool and riffle sequence, and by placing permanent conservation easements to ensure long -term protection for these improvements and the riparian corridor Page 4 of 13 3e Describe the overall project in detail, including the type of equipment to be used Functional uplift within the system will be achieved through bank stabilization efforts along the majority of Reach 4 These stabilization measures will include the construction of a vegetated floodplain bench that will reduce sheer - stress driven bank erosion by allowing overbank flooding to dissipate flow velocities within the channel The incised banks will be graded to a stable 3 Horizontal (H) 1 Vertical (V) side slope and allow frequent flooding on the newly formed floodplain Log J -hook structures will be placed within the channel to reduce near bank shear stress on tighter meander bends Toe - wood structures with geolifts will also be installed to protect once vulnerable and unstable cutbanks and to reduce erosion The project will include removal of nonnative invasive plant material throughout the riparian corridor and planting a native riparian buffer Invasive removal will consist of the use of mechanical equipment as well as hand removal Topsoil in the areas where grading will occur will be removed and stockpiled in a nearby location and stabilized Upon completion of rough grading stockpiled topsoil will be spread over graded and disturbed areas, streambanks and the stream buffer to re- incorporate nutrient rich topsoil and achieve final grade The entire conservation easement area (including streambanks) will be re- vegetated using a riparian seed mix and bare root plants Live stakes will be used in areas adjacent to the stream Equipment used to accomplish the above described work will include track - mounted excavators of various sizes equipped with buckets and hydraulic thumbs, track trucks and dump trucks to transport and stockpile materials Various hand tools will also be used throughout the project Restoration will generally be completed from upstream to downstream Operation of heavy machinery in the water will be avoided to the extent practical in order to complete the work described in this application Most streambank stabilization work will be completed from the streambank Sedimentation and erosion control practices will be implemented throughout the project and will consist of 1) only working in dry weather during low -flow conditions, 2) only exposing areas of soils that can be stabilized at the end of each work day, 3) installation of temporary silt fence at the toe of staging and stockpile areas, and on the downslope side of any work areas outside the streambanks, and 4) installation of seed, coir soil matting, and straw mulch See attached Plan Sheets and Detail Sheets 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments Zan Price and Natalie Bouchard of Altamont Environmental met Steve Kichefski and Scott Jones from the Asheville Regional office of the Army Corps of Engineers at ❑ Yes ® No ❑ Unknown the proposed project site on July 17, 2013 to review potential wetland areas that were shown on the National Wetland Inventory (NWI) towards the downstream extent of the project Mr Kichefski and Mr Jones concluded that the areas shown on the NWI are relic wetlands and are not jurisdictional wetlands 4b If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made? 4c If yes, who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for ® Yes ❑ No ❑ Unknown this project (including all prior phases) in the past? 5b If yes, explain in detail according to "help file" instructions The upstream Reach 3 project was permitted by the Army Corps on February 17, 2009 (SAW - 2008 - 03363) and NC DWQ on February 13, 2009 (DWQ 09 -0007) Construction was completed in 2011 Page 5 of 13 6. Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes, explain The plan is to construct Reach 4 in one phase However, if Clean Water Management Trust Fund funding is capped at an amount less than the total construction budget, the project may have to be completed in phases starting at the upstream end Page 6 of 13 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f. Total open water impacts 4g Comments 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a. ❑ Neuse El Tar-Pamlico F] Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? ❑ Yes B1 ❑P ❑T ❑ No El Yes B2 ❑P ❑T ❑ No El Yes B3 ❑P FIT ❑ No 6h Total buffer impacts 61 Comments Page 8 of 13 C. Proposed Impacts Inventory 1. Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 El F-1 T El Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h Comments See explanation in Section B, Part 4a of this application 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ❑ T Restoration North Pacolet River ® PER ❑ INT ® Corps ❑ DWQ 60 6,100 S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 6,100 31 Comments 6,100 feet on the left streambank and 3,600 feet on the right streambank Page 7 of 13 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project High quality riparian areas will be avoided during the project and placed in the permanent conservation easement Sequencing of construction will ensure that all disturbed areas are stabilized at the end of each work day Standard sedimentation and erosion control practices will be used per an approved E &SC plan b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques Altamont Environmental will provide contractors engaged in the implementation of this work both written and verbal onsite instruction of all impact avoidance statements provided below All heavy equipment will be kept out of the stream channel during streambank stabilization work to the extent practicable Disturbance of the channel bottom, streambanks, and equipment access areas will be held to the minimum extent necessary to allow for completion of the bank stabilization work Work will generally be conducted in an upstream -to- downstream direction Work will be completed in stages such that segments of the project will be completed and stabilized on a daily basis Temporary grass /grain cover will be planted on all bare soil within one day after ground disturbing activities are completed Tall fescue or other exotic grasses or plants will not be used in riparian areas Herbaceous, wood shrub, and tree vegetation will be installed during an appropriate time of year on the primary floodplain and streambanks upon completion of bank stabilization work Altamont will provide a site manager to inspect and supervise contractor work on a daily basis to help ensure that impact avoidance instructions are being followed Sediment and erosion control measures will be used at all disturbed areas and will be maintained in order to keep sediment and sediment laden stormwater out of streams 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U S or Waters of the State? 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps ❑ Mitigation bank 2c If yes, which mitigation option will be used for this El Payment to in -lieu fee program project? ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres Page 9 of 13 PCN Form — Version 1 3 December 10, 2008 Version 4h Comments 5. Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes you will have to fill out this entire form — please contact the State for more information ❑ Yes ® No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Page 10 of 13 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1 a Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If no, explain why ❑ Yes ❑ No Comments 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan, explain why This project consists of streambank stabilization, riparian buffer restoration, and placing riparian lands into conservation, of which clearing, grading, and excavating will be limited to near the stream and /or in the stream Erosion and sedimentation control measures such as silt fence and mulching and seeding will be implemented in areas such as top of bank, earthen material stockpile areas, and temporary construction access roads An erosion and sedimentation control permit will be applied for and obtained from the DENR Division of Land Resources prior to commencement of construction 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? Polk County, NC ❑ Phase II ❑ NSW 3b Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 5. DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 11 of 13 PCN Form — Version 1 3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes El No letter ) Comments 2. Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit application? ❑ Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4. Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ❑ Raleigh 5c If yes, indicate the USFWS Field Office you have contacted ® Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Janet Mizzi ( USFWS) was contacted November 13, 2013 regarding the project site, and verified that no federally listed species of concern are on the subject property See attached letter in Appendix B Page 12 of 13 PCN Form — Version 1 3 December 10, 2008 Version 6. Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? Janet Mizzi (USFWS) was contacted November 13, 2013 regarding the project site, and verified that no essential fish habitat exists on the subject property See attached letter in Appendix B. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation Yes ® No status (e g , National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? Renee Gledhill - Earley with the North Carolina Department of Cultural Resources was contacted on June 26, 2013, and verified that there are no known recorded archeological sites within the project boundaries See attached letter Additionally, James Errante, a North Carolina Natural Resource Conservation Service (NRCS) Cultural Resources Specialist visited the site with Natalie Bouchard of Altamont Environmental on December 18, 2013 to complete a cultural resources inventory Mr Errante concluded that there was no evidence of cultural resources discovered inside the planned area of impact for the proposed project See attached Cultural Resources Inventory report in Appendix B 8. Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA - designated 100 -year floodplain? ®Yes ❑ No 8b. If yes, explain how project meets FEMA requirements The project reach is located within the floodway of the North Pacolet River Prior to initiating activities in the floodway, FEMA regulations require an evaluation of the impact to flood levels during the base flood (100 -year) discharge The impacts of the proposed streambank restoration project on floodway elevations and widths and 100 -year floodplain elevations will be evaluated by developing a revised existing conditions HEC -RAS model supplemented with surveyed cross - section data and subsequently developing a proposed conditions HEC -RAS model This study will be submitted to and approved by the Polk County Floodplain administrator prior to construction 8c What source(s) did you use to make the floodplain determination? The North Carolina Floodplain Mapping Information System (ncfloodmaps com) —Z G� ce_._ Applicant /Agents Signature Date Applicant /Agent's Printed Name (Agent's signature is valid only if an authorization letter from the applicant is provided ) Page 13 of 13 TABLES Table 1 — Property Owner and Parcel Information ,r yi[' �' tir .R,L 'r `^ - 'I •' _ ,i P it `14 etr nr r1rt .- i `` � �,' n ' ,11 l A ' r , A _ _ J , r ,/f ' ` - Y ` Hy •y - - � �� � �� `r. �� -�r r� '' r'`', �� � ��', - - r` 'vt _•° it '� �_ �1' � +.. -r ' "�- ���, ',J t,j �..- a ., ,.' � - ` - �` /, � ` L - _ {~ i, i ^ +'l - ^'� ; `� 1 •_ T ?n - Y t •M1f - F - T .. ., -., 'lr i " `lr , r - > ` , r'�'' y(; r_ , t = __� , - „ , v f l' t�• - i _,t� ,� +'r'I , f t r^o'('i a -J _� _, . ,+. "_ .y �' ` •f.� � cr •-r , j -, r- -' ; )•'�a+i` rT.� ' i J`4 ,I.v - •� '`,., _- x <. . : -# .` r, , t ` -_ •`i I . r•7't - , - � 's" ti , ( _ .. ( 'ye; _ _ - _ „ rT�' ='k - r _ ' ' ' � r • � a1 . ,,.i, . Y n - , � � 1 ~ �`♦ , - ( . _ ` , ^,', ? ' ` `y+' i , F�� � M1,� . , ( , r T , , 1 r ., r y- , +i• ` M1 ' ` -\ '' . s ~ = ,,. -� w ~4 -� +_ ^_G.• •' � ti. •ii r,+ r •\ r .- r. r' r• R _� _ ),' .. - �' r a „ 1 , ' � � rT T' �w. � It � 'f •_� � � - `, - •(� � �� �.1 i • S� ' f(. t' r r' ',' ,t' , K; � r � V �r . e- rrl � •_. �i "_ t � -. -�• ' .r ' � ri r+ +i _ � i ' + I,E a +� j_ ' .1 � + 1(, a � �.Tj _4 (`� Yi, l4_ 5 • �� - r,r r., r,J', r,. -y, � "`' � _1',lM1 r r �i� �' �`."'^ -. i •n, ``Y r (','�,♦ v`Yr �l' �,`r` 1 � „S "l�fr t„^ . tLit f- ,r'Vr ' ` - � T`t'`t ��� ``ti. T- A ,1` r -S -i� r u ,rt^ ,r _ t. "�rb`�r''('�i, w � r .-. r, `T' -) r o-,J} � 9t �t tJ r, •` ' � � t ,f , , j j + •1 ,. `T i r> , t y _ - i r v f `r „ _ , ` y+ � . - , ) _ ' r V , . ' 3 i •'' . , ; ' ` -1t .. f`� ' } ; -f� T It 'Y` '' '� ,, �f. ( � f.- . -y f ^- `r.'t` _ _? r .'e { ., � ^ ti , _ .,'t' •'l , c• >t ,,'i v`' ' - rtl�' < � C) r l - _ �2, `; i „ a? _ '^ '• `' .'1` . "i, = ii' 1'`f,•. , _ - .. ,` fx - • -r 1 0 rl i.a V � � 0 I"r`1 i.� 3 O Z �rq 0 060 V rrl r� V �I 0 0 �N 0 r� O Z i U 0! Z 0 U V) N 0 a E 0 U 0 V) _ E w a, 0 0 3 U O d 7 N N N N l�- OOH C� V) a 00 a0 00 00 00 t E 00 00 00 00 00 00 00 00 L i' a� m M 00 l0 C E i o v 00 C:> M v� cj ^ O ^ CQ w � w 4.. C� O O� O L CQ y y i i - � y EGA � cC v O 00 °O 7 O a L N 00' N 00 N 00 N 00 00 00 N O O N O N U O N U U U z U U z U z U z Q tc y o cq M M a cz x ct L cJ cd C C C m V1 x E ce 7 00 00 n n r� O Z i U 0! Z 0 U V) N 0 a r - FIGURES Figure I — Site Location Map (USGS) a Figure 2 — Site Map (Aerial) Figure 3 — BEHI Analysis Map N f 7 x V 4— 7 J.4 Fox " fL,- 44quf cluo Yn 'f f 't. �Cr �r t- �I� x- -� S � f_ _ 4 x do Oro" f o i X N Ch VO C T CIO Cr River Legend It Reach 4 Data Sources: USGS Topographic Map - Landrum Quadrangle 1987 REACH 4 FIGURE L E lGiNEERiNG & HYDROGLOI.Gy SITE LOCATION MAP 231 H-000 S, ... 1, A—E-111 f1C 28801 TEL 828 261 3350 r— e28 281 3351 NORTH PACOLET RIVER DRAWN BY: NATALIE BOUCHARD POLK COUNTY, NORTH CAROLINA PROJECT MANAGER: ZAN PRICE Feet CLIENT: PCSWD DATE: 07/03/2014 0 1,000 2,000 PAPOLK SWCD NRCS\NORTH PACOLET R4\SUBMITTALS\PERMITTING\2014 PCN\FiGURIS APPENDICES Appendix A — Existing Conditions Photographs . Appendix B — Letters and- Authorizations Appendix C — Assessment Data Appendix D — Plan Sheets and Details Sheets APPENDIX A - EXISTING CONDITIONS PHOTOGRAPHS North Pacolet Reach 4 Polk County Soil and Water Conservation District Photos Taken: 2013 and 2014 Page 1 Photograph 1: View from upstream extent of Reach 4, on Hunting Country Bridge Road, facing dowstream on the North Pacolet River. Photograph 2: Typical view of near vertical eroding bank on Reach 4. P: \Polk SWCD NRCS \North Pacolet Reach 4 \Submittals \Permitting \2014 PCN \Representative Photographs.Docx North Pacolet Reach 4 Polk County Soil and Water Conservation District Photos Taken: 2013 and 2014 Page 2 Photograph 3: Typical view of eroding banks on Reach 4. Photograph 4: View from Tryon Farm, LLC property on River Left facing downstream. Note the near vertical banks on River Left. P: \Polk SWCD NRCS \North Pacolet Reach 4 \Submittals \Permitting \2014 PCN \Representative Photographs. Docx North Pacolet Reach 4 Polk County Soil and Water Conservation District Photos Taken: 2013 and 2014 Page 3 Photograph 5: View facing banks on River Left on the Tryon Farm, LLC property, at the same location as Photograph 4. Photograph 6: Typical view of survey crew performing field topography survey and BEHI analysis. P: \Polk SWCD NRCS \North Pacolet Reach 4 \Submittals \Permitting \2014 PCN \Representative Photographs.Docx APPENDIX B — LETTERS AND AUTHORIZATIONS Signed Agent Authorization Letter Property Owner Conservation Easement Option Agreement or Letter of Intent Federally Endangered and, Threatened Species Assessment, US Fish and Wildlife Cultural Resources Inventory AGENT AUTHORIZATION LETTER REACH 4, NORTH PACOLET RIVER STREANIBANK STABILIZATION AND RIPARIAN CORRIDOR RESTORATION PROJECT 'The Polk County Soil and Water Conservation District hereby authorizes Altamont Environmental, Inc. (Agent /Consultant) to sign and execute all necessary permits and coordinate communications with the appropriate regulatory agencies in relation to the above referenced project. Authorized Printed Name Sa M& Date Polk County Soil and Water Conservation District AuthorizedSignature Date _t: :- 23 ° f Polk County Soil and Water Conservation District .. .. .. • . .... .. ...... ... ..r_�_ _.._ � .....,,. c i, rr.....,,... r�...�,.,,t �I`wnFA1�P1nT.nnh t�rn4v Ri.ar RPnrh d Avant OP'T'ION AGREEMENT FOR A CONSERVA'T'ION EASEMENT Prepared by: After Recording Return to: Restoration /Stormwater Project Manager North Carolina Clean Water Management Trust Fund 1651 Mail Service Center Raleigh, NC 27699 -1651 NORTH CAROLINA POY,K COUNTY Tax Parcel No. P88 -75 CWMTF No. 2008 -418 THIS OPTION AGREEMENT, hereinafter referred to as Option, is entered into this .2 l day of M on , 20 1-A- by and between Buy Sod, Inc., Hunting Country Road Tryon Worth Carolina 28782 ( "Grantor ") and the State of North Carolina ( "State" or "Grantee ") acting by and through the North Carolina Clean Water Management Trust Fund ( "Fund "), an independent State agency, with an address at 1651 Mail Service Center, Raleigh, North Carolina 27699 -1651. RECITALS & PURPOSES A. In consideration of the agreements contained in this Option, Grantor hereby grants to the Grantee, its successors and assigns, the exclusive right and option to receive a perpetual Conservation Easement over mutually agreed upon lands owned by the Grantor, hereinafter referred to as the Parent Tract. The Conservation Easement shall perpetually protect those lands hereinafter referred to as the Easement Area. The Parent Tract is located in Polk County, North Carolina and contains _135.01 acres, more or less. The Parent Tract subject to the Conservation Easement is more particularly described as follows: Tax Parcel Number (NCPIN) P88 -75 . B. Being a perpetual Conservation Easement, including right of ingress, egress and regress, that will allow the reconstruction of and permanently protect the restoration, enhancement or preservation of the North Pacolet River . The Easement Area is located in the eastern portion of the parent tract. The Easement Area begins at the centerline of the North Pacolet River and extends outwardly from the top of the stream bank as restored by work to be conducted by Polk Soil and Water Conservation District , a minimum distance of 50 feet from the top of the bank, or greater, as Grantor agrees to convey. Easement Area shall run as the restored stream meanders, estimated to be approximately 16,547` linear feet along the North Pacolet River and contains 7.14 acres, more or less. Be it known that existing irrigation infrastructure may exist in the proposed Easement Area (e.g. piping and concrete pads) and that for the project to move forward the Conservation Easement must allow for such infrastructure and maintenance thereof to exist within or be excluded from the Easement Area despite its potential existence within 50 feet from the top of the bank. The areas where irrigation infrastructure exist will be shown on a preliminary figure attached here to, and in a plat of the easement area to be surveyed by a North Carolina licensed surveyor and recorded with the Polk County, North Carolina Register of Deeds once the project is built. C. The Grantor grants to Polk Soil and Water Conservation District and its successors, assigns, agents, contractors, and employees the right to erect and use construction equipment at the site of the Easement Area herein described. D. Grantee has awarded a grant for the Reach 4 of the North Pacolet River Streambank Stabilization and Riparian Corridor Restoration to Polk Soil and Water Conservation District as Grant Agreement No. 2008 -418 , effective as of _March 21, 2011 , in consideration of which Polk Soil and Water Conservation District has agreed to conduct a technical assessment to provide design plans, specifications, and bid documents, obtain required permits, and record conservation easements in preparation for restoration of the project site which is approximately 1.2 miles of the North Pacolet River from Hunting Country Road (SR1501) downstream to the North Carolina state line ( "Project "). 2 TERMS, PROVISIONS, & CONDITIONS A. OPTION PERIOD. This Option shall remain in effect from the date that this Option has been executed by the Grantor until the 21 of March 2016. This Option shall be exercised upon posting, by certified mail, a written notice to the Grantor at the following address: Post Office Box 4089 Pinehurst, North Carolina 28374. Exercise shall be deemed timely if such written notice is mailed on or before the date first set forth in this paragraph. B. CONSERVATION EASEMENT. It is understood and agreed that the Conservation Easement herein granted further allows, binds by mutual agreement, that the Grantor shall convey and the Grantee shall receive a Conservation Easement in the form attached hereto as Exhibit A to perpetually protect the intent of said Project. The conveyance of the Conservation Easement shall occur at the completion of the Project and shall be based upon a metes and bounds description rendered by a Professional Land Surveyor. Said Easement Area shall run as the stream meanders, extending approximately 50 feet from the top of the stream bank of said stream as restored by work to be conducted by Polk Soil and Water Conservation District on the Project, where physically possible. - C. EVIDENCE OF TITLE. Upon receipt of this signed Option, Grantee may have title to the Easement Area examined, and if applicable, may obtain a preliminary title insurance commitment. The title examination and/or commitment must evidence the Grantor's ability to deliver title at closing as set forth below. All costs necessary to procure the title examination and, if applicable, the title commitment and final title insurance policy to be issued at closing, shall be the responsibility of the Grantee. D. TITLE. At closing, the Grantor shall convey good, insurable and marketable title to the Conservation Easement together with all rights necessary to protect the Easement Area in perpetuity, including legal access, all mineral rights and all development rights, to the Grantee free and clear of all liens, encumbrances, restrictions, rights, or exceptions except those of record that are acceptable to Grantee. E. TITLE DEFECTS. If for any reason the Grantor cannot deliver title at closing as required by Paragraph C of this Option, the Grantee may elect to a) accept the Conservation Easement with title as is; b) refuse to accept the Conservation Easement; or c) allow the Grantor additional time to pursue reasonable efforts to correct the problem, including bringing any necessary quiet title actions of other lawsuits. F. SUBJECT TO SURVEY AND DESIGN. It is understood and intended that the final Easement Area and Conservation Easement under this option is subject to final design, approval and survey by Grantee with these costs paid for as described in Grant Agreement 2008 -418 . 3 G. DOCUMENTS FOR CLOSING. The Grantor shall execute and deliver at closing a Conservation Easement, any owner's affidavits or documents required by a title insurance company to remove the standard title policy exceptions, and any other documents necessary to close in accordance with the terms of this Option. These documents will be prepared at the expense of those specified in Giant Agreement _2008- 418 . H. PROPERTY TAXES. Any delinquent real estate taxes and all levied assessments are the Grantor's responsibility and should be satisfied of record by the Grantor at or before closing. Any deferred taxes on the Easement Area, which become due as a result of this conveyance, shall be the responsibility of the Grantor. Real estate taxes for the year in which the transaction is closed shall be the responsibility of the Grantor and not prorated, as Grantee is not receiving fee simple title. I. MISCELLANEOUS CLOSING EXPENSES. The Grant Agreement 2008 -418 specifies who will pay any documentary stamp tax, real estate transfer fee or any similar charge, and recording fees. J. POSSESSION. The Grantor will deliver possession of the Easement Area to the Grantee at closing subject to no leases, mortgages, liens or other reserved lights. K. CONDITION OF PROPERTY/ RISK OF LOSS. The Grantor shall not transfer or .encumber any interests in the Easement Area prior to closing. The Grantor shall keep the Easement Area in its current condition until closing and shall prevent and refrain from any use of the Easement Area, for any purpose or in any manner that would diminish its value or adversely affect the intended uses of Grantee. In the event of any adverse change in the condition of the Easement Area, whether said change is caused by Grantor or by forces beyond Grantor's control, Grantee may elect to a) refuse to accept the property; b) accept the Property, or a portion thereof; or c) require restoration of the Property to its condition at the time this Option was granted. L. RIGHT OF ENTRY AND INSPECTION. Grantee and its agents shall have the right to enter upon the Property at reasonable times for surveying, engineering, conducting enviromnental inspections and assessments to detect hazardous or toxic substances, and other reasonable purposes related to this transaction. Based upon the results of the environmental inspections and assessments, or upon other conditions revealed to be unsuitable to Grantee, Grantee may elect to refuse to accept the Easement Area. M. REMEDIES. hi addition to any other remedy specifically set forth in this Option, Grantee has the right to enforce the provisions of this Option through an action for specific performance, injunctive relief, damages, contribution or any other available proceedings in law or equity. The election of any one remedy available under this Option shall not constitute a waiver of any other available remedies. 4 N. BINDING EFFECT. This Option becomes effective when signed by the Grantor and shall then apply to and bind the Grantor and Grantor's heirs, executors, administrators, successors, and assigns. O. COMPLETE AGREEMENT. This Option constitutes the sole and complete agreement between the parties and cannot be changed except by written agreement. P. NO WAIVER. No provision of the Option shall be deemed amended or waived unless such amendment or waiver is set forth in a writing signed by Grantee. No act or failure to act by Grantee shall be deemed a waiver of its rights hereunder, and no waiver in any one circumstance or of any one provision shall be deemed a waiver in other circumstances or of other provisions. Q. ASSIGNMENT. The Grantee has the right to assign this Option. In the event of such assignment, the assignee will have all the lights, powers, privileges and duties held by Grantee pursuant to this Option. IN TESTIMONY THEREOF, the parties have hereunto set their hands and seals, or if corporate have caused this instrument to be executed in their corporate names by their duly authorized representatives as of the dates indicated below. Grantor Buy Sod, Inc. CIO Clark Wooten NOR'T'H CAROLINA COUNTY OF 5amp5of1 1, j GtGU IoLo , a Notary Public in and for the County and State aforesaid, do hereby certify that CjarK WobfM , Grantor, personally appeared before me this day and acknowledged the execution of the foregoing instrument. IN WITNESS WHEREOF, I have hereunto set my hand and Notary Seal this the a I day of Alow 2012. Notary Public My commission expires W `1" Xd OPTION AGREEMENT FOR A CONSERVATION EASEMENT Prepared by: After Recording Return to: NORTH CAROLINA POLK COUNTY Tax Parcel No. P76 -55 CWMTF No. 2008 -418 Restoration /Stormwater Project Manager North Carolina Clean Water Management Trust Fund 1651 Mail Service Center Raleigh, NC 27699 -1651 THIS OPTION AGREEMENT, hereinafter referred to as Option, is entered into this 15tk day of "Sw%w,a.r , 20 1?- by and between Stanley and Barbara Mink, 5520 Hunting Country toad, Tryon, North Carolina 28782 ( "Grantor ") and North Carolina Clean Water Management Trust Fund, 1651 Mail Service Center , Raleigh, North Carolina 27699 -1651 ( "Grantee "). RECITALS & PURPOSES A. In consideration of the agreements contained in this Option, Grantor hereby grants to the Grantee, its successors and assigns, the exclusive right and option to receive a perpetual Conservation Easement over mutually agreed upon lands owned by the Grantor, hereinafter referred to as the Parent 'Tract. The Conservation Easement shall perpetually protect those lands hereinafter referred to as the Easement Area. The Parent Tract is located in _Polk_ County, North Carolina and contains _8.07 acres, more or less. The Parent Tract subject to the Conservation Easement is more particularly described as follows: Tax Parcel Number (NCPIN)_P76 -55_. B. Being a perpetual Conservation Easement, including right of ingress, egress and regress, that will allow the reconstruction of and permanently protect the restoration, enhancement or preservation of the North Pacolet River . The Easement Area is located in the _eastern_ portion of the parent tract. The Easement Area begins at N the centerline of the orth Pacolet River and extends outwardly from the top of the stream bank as restored by work to be conducted by Polk Soil and Water Conservation District , a minimum distance of 50 feet from the top of the bank, or greater, as Grantor agrees to convey. Easement Area shall run as the restored stream meanders, estimated to be approximately 1,330_ linear feet along the North Pacolet River and contains _1.51_ acres, more or less. C. The Grantor grants to Polk Soil and Water Conservation District and its successors, assigns, agents, contractors, and employees the right to erect and use construction equipment at the site of the Easement Area herein described. D. Grantee has awarded a giant for the Reach 4 of the North Pacolet River Streambank Stabilization and Riparian Corridor Restoration to Polk Soil and Water Conservation District as Grant Agreement No. _2008 -418_, effective as of _March 21, 2011 , in consideration of which Polk Soil and Water Conservation District has agreed to conduct a technical assessment to provide design plans, specifications, and bid documents, obtain required permits, and record conservation easernents in preparation for restoration of the project site which is approximately 1.2 miles of the North Pacolet River from Hunting Country Road (SR1501) downstream to the North Carolina state line ( "Project "). TERMS, PROVISIONS, & CONDITIONS A. OPTION PERIOD. This Option shall remain in effect from the date that this Option has been executed by the Grantor until the 21 of March 2016. This Option shall be exercised upon posting, by certified mail, a written notice to the Grantor at the following address: 5520 Hunting Country Road Tryon North Carolina 28782. 2 Exercise shall be deemed timely if such written notice is mailed on or before the date first set forth in this paragraph. B. CONSERVATION EASEMENT. It is understood and agreed that the Conservation Easement herein granted fiurther allows, binds by mutual agreement, that the Grantor shall convey and the Grantee shall receive a Conservation Easement in the foim attached hereto as Exhibit A to perpetually protect the intent of said Project. The conveyance of the Conservation Easement shall occur at the completion of the Project and shall be based upon a metes and bounds description rendered by a Professional Land Surveyor. Said Easement Area shall iun as the stream meanders, extending approximately _50 feet from the top of the stream bank of said stream as restored by work to be conducted by Polk Soil and Water Conservation District on the Project, where physically possible. C. EVIDENCE OF TITLE. Upon receipt of this signed Option, Grantee may have title to the Easement Area examined, and if applicable, may obtain a preliminary title insurance commitment. The title examination and /or commitment must evidence the Grantor's ability to deliver title at closing as set forth below. All costs necessary to procure the title examination and, if applicable, the title commitment and final title insurance policy to be issued at closing, shall be the responsibility of the Grantee. D. TITLE. At closing, the Grantor shall convey good, insurable and marketable title to the Conservation Easement together with all rights necessary to protect the Easement Area in perpetuity, including legal access, all mineral rights and all development rights, to the Grantee free and clear of all liens, encumbrances, restrictions, rights, or exceptions except those of record that are acceptable to Grantee. E. TITLE DEFECTS. If for any reason the Grantor cannot deliver title at closing as required by Paragraph C of this Option, the Grantee may elect to a) accept the Conservation Easement with title as is; b) refuse to accept the Conservation Easement; or c) allow the Grantor additional time to pursue reasonable efforts to correct the problem, including bringing any necessary quiet title actions or other lawsuits. F. SUBJECT TO SURVEY AND DESIGN. It is understood and intended that the final Easement Area and Conservation Easement under this option is subject to final design, approval and survey by Grantee with these costs paid for as described in Grant Agreement 2008 -418 . G. DOCUMENTS FOR CLOSING. The Grantor shall execute and deliver at closing a Conservation Easement, any owner's affidavits or documents required by a title insurance company to remove the standard title policy exceptions, and any other documents necessary to close in accordance with the terms of this Option. These documents will be prepared at the expense of those specified in Grant Agreement 2008- 418 . 3 H. PROPERTY TAXES. Any delinquent real estate taxes and all levied assessments are the Grantor's responsibility and should be satisfied of record by the Grantor at or before closing. Any deferred taxes on the Easement Area, which become due as a result of this conveyance, shall be the responsibility of the Grantor. Real estate taxes for the year in which the transaction is closed shall be the responsibility of the Grantor and not prorated, as Grantee is not receiving fee simple title. I. MISCELLANEOUS CLOSING EXPENSES. The Grant Agreement _2008 -418_ specifies who will pay any documentary stamp tax, real estate transfer fee or any similar charge, and recording fees. u J. POSSESSION. The Grantor will deliver possession of the Easement Area to the Grantee at closing subject to no leases, mortgages, liens or other reserved rights. K. CONDITION OF PROPERTY/ RISK OF LOSS. The Grantor shall not transfer or encumber any interests in the Easement Area prior to closing. The Grantor shall keep the Easement Area in its current condition until closing and shall prevent and refrain from any use of the Easement Area, for any purpose or in any manner that would diminish its value or adversely affect the intended uses of Grantee. In the event of any adverse change in the condition of the Easement Area, whether said change is caused by Grantor or by forces beyond Grantor's control, Grantee may elect to a) refuse to accept the property; b) accept the Property, or a portion thereof; or c) require restoration of the Property to its condition at the time this Option was granted. L. RIGHT OF ENTRY AND INSPECTION. Grantee and its agents shall have the right to enter upon the Property at reasonable times for surveying, engineering, conducting environmental inspections and assessments to detect hazardous or toxic substances, and other reasonable purposes related to this transaction. Based upon the results of the environmental inspections and assessments, or upon other conditions revealed to be unsuitable to Grantee, Grantee may elect to refuse to accept the Easement Area. M. REMEDIES. In addition to any other remedy specifically set forth in this Option, Grantee has the right to enforce the provisions of this Option through an action for specific performance, injunctive relief, damages, contribution or any other available proceedings in law or equity. The election of any one remedy available under this Option shall not constitute a waiver of any other available remedies. N. BINDING EFFECT. This Option becomes effective when signed by the Grantor and shall then apply to and bind the Grantor and Grantor's heirs, executors, administrators, successors, and assigns. O. COMPLETE AGREEMENT. This Option constitutes the sole and complete agreement between the parties and cannot be changed except by written agreement. 4 P. NO WAIVER. No provision of the Option shall be deemed amended or waived unless such amendment or waiver is set forth in a writing signed by Grantee. No act or failure to act by Grantee shall be deemed a waiver of its rights hereunder, and no waiver in any one circumstance or of any one provision shall be deemed a waiver in other circumstances or of other provisions. Q. ASSIGNMENT. The Grantee has the right to assign this Option. hi the event of such assignment, the assignee will have all the rights, powers, privileges and duties held by Grantee pursuant to this Option. IN TESTIMONY THEREOF, the parties have hereunto set their hands and seals, or if corporate have caused this instrument to be executed in their corporate names by their duly authorized representatives as of the dates indicated below. Grantor: r V. Slanlqj Mink By: �L04—A )t kLJZ--., 1 liarbat ! Mink NORTH CARqWA COUNTY OF gncn"-%�> I, k�-�, ��we ✓ , a Notary Public in and for the County and State aforesaid, do hereby certify that �aKej ryl, „k Grantor, personally appeared before me this day and acluiowledged the execution of the foregoing instrument. IN WITNESS WISE F, I have hereunto set my hand and Notary Seal this the _ day of :: JanLta v N 20 ID, Notary Public 's My commission expires �•�pverrs�e.� 1 oZ01 6 ,2012 Ms. Sandra Reid Polk County Soil and Water Conservation District Post Office Box 236 Columbus, North Carolina 28722 Subject: Letter of Intent Streambank Stabilization and Riparian Corridor Restoration Project North Pacolet River, Reach 4 Polk County, North Carolina Dear Ms. Reid, �� fmk' This signed letter represents that I, ') Ids , property ownerSof a parcel adjacent to Reach 4 of the North Pacolet River in Polk County, North rolina, intend to participate in the streambank stabilization and riparian corridor restoration project along Reach 4 by agreeing to sign an Option Agieement and to place riparian buffer lands into permanent conservation through recordation of a Conservation Easement, no less than 50 feet in width from the top of the North Pacolet River streambank landward onto my property. Sincerely, +0"� P 1-6 -16 ,2012 - Ms. Sandra Reid Polk County Soil and Water Conservation District Post Office Box 236 Columbus, North Carolina 28722 Subject: Letter of Intent Streambank Stabilization and Riparian Corridor Restoration Project North Pacolet River, Reach 4 Polk County, North Carolina Dear Ms. Reid, This signed letter represents that I, `k�� , property owner of a parcel adjacent to Reach 4 of the North Pacolet River in Polk County, North-Carolina, intend to participate in the streambank stabilization and riparian corridor restoration project along Reach 4 by agreeing to sign an Option Agreement and to place riparian buffer lands into permanent conservation through recordation of a Conservation Easement, no less than 50 feet in width from the top of the North Pacolet River streambank landward onto my property. Sincerely, � Z (signature) United States Department of the Interior FISH AND WILDLIFE SERVICE Asheville Field Office 160 Zillicoa Street Asheville, North Carolina 28801 November 27, 2013 Ms. Natalie Bouchard Altamont Environmental, Inc. 231 Haywood Street Asheville, North Carolina 28801 Dear Ms. Bouchard: Subject: Federally Endangered and Threatened Species Assessment, North Pacolet River Restoration Project, South of Columbus, Polk County, North Carolina On November 13, 2013, we received a letter from you (via e -mail) in which you requested our review and comments on the proposed project We have reviewed the information presented and we are providing the following comments in accordance with the provisions of the Fish and Wildlife Coordination Act, as amended (16 U.S.C. 661- 667e), and section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 -1543) (Act). According to the information provided, the project consists of constructing stream restoration and stream bank stabilization measures along 1.2 linear miles of the North Pacolet River. Measures will include re- sloping stream banks and restoring riparian vegetation within a 50 -foot corridor along the river. Your letter states that a Clean Water Act 404 Permit application will be submitted to the U.S Army Corps of Engineers for the project We have no objection to the proposed actions and support any efforts to restore and protect the water quality in the project area. Based on the information provided and a review of our records, no listed species or their habitats occur within the proposed project area. Therefore, we believe the requirements under section 7 of the Act are fulfilled. However, obligations under section 7 of the Act must be reconsidered i£ (1) new information reveals impacts of this identified action that may affect listed species or critical habitat in a manner not previously considered, (2) this action is subsequently modified in a manner that was not considered in this review, or (3) a new species is listed or critical habitat is determined that may be affected by the identified action. We appreciate the opportunity to provide these comments. If we can be of assistance or if you have any questions, please do not hesitate to contact Mr. Bryan Tompkins of our staff at 828/258 -3939, Ext. 240. In any future correspondence concerning this project, please reference our Log Number 4 -2 -14 -042. Sincerely, - - original signed - - Janet Mizzi Field Supervisor 2 North Carolina Department of Cultural Resources State Historic Preservation Office Ramona M Bartos, Administrator Go%emor Pat McCrory Secretary Susan Kluttz July 29, 2013 Natalie Bouchard Altamont Environmental, Inc. 231 Haywood Street Asheville, NC 28801 Re. North Pacolet River Stream Restoration, Polk County, ER 13 -1327 Dear Ms Bouchard: Thank you for your letter of June 26, 2013, concerning the above project Office of Archives and History Deputy Secretary Kevin Cherry There are no known recorded archaeological sites within the project boundaries However, the project area has never been systematically surveyed to determine the location or significance of archaeological resources. Based on the topographic and hydrological situation and the density of archaeological sites in the area, there is a high probability for the presence of prehistoric or historic archaeological sites We recommend that a comprehensive survey be conducted by an experienced archaeologist to identify and evaluate the significance of archaeological remains that may be damaged or destroyed by the proposed project Potential effects on unknown resources must be assessed prior to the initiation of construction activities Two copies of the resulting archaeological survey report, as well as one copy of the appropriate site forms, should be forwarded to us for review and comment as soon as they are available and well in advance of any construction activities A list of archaeological consultants who have conducted or expressed an interest in contract work in North Carolina is available at www archaeology ncdcr goy /ncarch /resource /consultants htm The archaeologists listed, or any other experienced archaeologist, may be contacted to conduct the recommended survey. We have determined that the project as proposed will not have an effect on any historic structures. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800 Location 109 East Jones Street, Raleigh NC 27601 Mailing Address 4617 Mail Sen ice Center, Raleigh NC 27699 -4617 Telephone /Fax (919) 807- 6570/807 -6599 Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill- Earley, environmental review coordinator, at 919 -807 -6579 or renee'ledhill- earley(,ncdcr.gov In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, 600(Ramona M Bartos United States Department of Agriculture o MRCS Natural Resources Conservation Service 1835 Assembly Street, Room 950 Columbia, SC 29201 Subject: ECS - Trip Report- Cultural Resources Inventory Date: 12/18/13 Proiect Location: Pacolet River, Reach 4, Polk Co. NC NRCS File Code: 420 Field Office: Polk Co. Undertakings: Channel bed stabilization, streambank stabilization and shoreline protection. Others Involved: Natalie Bouchard, Altamont Environmental Inc. Visit Date: 12/12/13 Procedures: The archeological survey of the planned APE included visual reconnaissance of surface soils inside and adjacent to the planned APE and close inspection of all accessible riverbank soils. Subsurface archeological investigation included deep shovel testing at 30 meter intervals along the APE of the riverbank. All excavated soils were screened through 1/4 inch mesh hardware cloth. This archeological investigation included portions of both sides of the river as depicted on the attached topo map showing the planned APE. Findings: These investigations revealed that soils inside the APE have been heavily affected by river dynamics. The majority of soils are primarily composed of river lain silty sand. Very little evidence of stratified soil layers was evident in river bank exposures or in shovel test pits. At the time of this survey the flood plain adjacent to this portion of the Pacolet River contained several areas of standing water. It was also reported by the landowner that the flood plain areas are very frequently flooded. As a result of the river dynamics in this area it is unlikely that intact cultural zones exist along the APE corridor. All visual reconnaissance inside the APE was negative for prehistoric cultural resources (CR's). Approximately 50 meters outside of the APE of the East side of the Pacolet on the surface one residual pottery sherd and two isolated quartz debitage flakes were discovered. Intensive visual inspection and subsurface testing in the portion of the APE adjacent to these finds were negative for any additional CR's. Helping People Help the Land An Equal Opportunity Provider and Employer %r�S Cultural Resources Inventory - Trip Report - Page 2 Visual reconnaissance revealed potential historic dikes dust outside of the APE along the east side of the river. These dikes range in height from about five feet to around 15 feet. The landowner believes they are natural formations and not man made. Several shovel tests were focused on the higher, larger and oval shaped portion of this dike. These shovel tests were conducted based on the assumption that if this landform was natural and in existence during prehistoric time there would be high potential for human occupation /utilization of this landform. Several large trees are present on the dike and appear to be around 100 years old. Several of the overturned tree root balls were closely inspected. No evidence of any CR's was discovered anywhere on the dike. The dike soils contain about five to seven centimeters of topsoil over gravely clay subsoil and show no evidence of human deposition. All subsurface archaeological shovel tests conducted for this project were negative for CR's. Follow -up and Recommendations: No evidence of cultural resources was discovered directly inside the planned APE. This investigation revealed that there is low potential for intact or meaningful cultural resources to be disturbed as a result of the planned undertakings. It is recommended that impacts to the dike that extends along the east side of the river be minimalized (i.e. don't use this structure for borrow soils, staging areas, do not breach it). It is recommended that caution and vigilance be used during any ground disturbing activities. Although it is low, there is still potential for previously undiscovered cultural resources and human remains to be present when working along a large river floodplain. Continue with planned assistance. Should any prehistoric or historic cultural resource(s) or human remains be uncovered during NRCS assisted activities, all work must cease in the area of the discovery. Steps should then be taken to secure and preserve the discovery and the Cultural Resources Specialist should be contacted ASAP. James Errante NRCS Cultural Resources Specialist, NC -SC cc: Michael A. Sigmon, District Conservationist, Polk /Rutherford Co, NC Matt Flint, State Resources Conservationist NI 3k1 o ' j L OKI. Q 1 °vim - r j ,' • Q Club • ' be Bndge All �l IP � `,1� � . { - ..,fie • a � .. I /�''..�,� .•, •� ' • . � �;'� • - - _ •z8z:r LAN VA �. ism co g N � • � _ _ 1 - - - - - - � SP ANBURG ART �NO+iyM �tYw River ' • • 777 • � -�.=' � r • i 295- -T .• �* � • � . • • • 1 ' • X83:?' Rl ��``�.. � �`�';�.. � 0 b APPENDIX C — ASSESSMENT DATA Bank Erosion Hazard Index (BEHI) Data Shear Stress Calculations Assessment of Existing Stream Condition North Pacolet Reach 4 Bank Erosion and Hazard Index River Left Station Start Station End BEHI Rating NBS Rating Bank Height (ft) Predicted Erosion Rate (ft /yr) Predicted Erosion Rate (ft ^3 /yr) Predicted Erosion Rate (lbs /yr /ft) 0 300 Moderate Low 14 002 84 34.72 300 350 Moderate Low 16 0.02 16 39.68 350 475 Very High Low 16 0.60 1200 119040 475 500 Moderate Low 14 0.02 7 3472 500 675 Low Low 2 0.01 3 1.98 675 750 Low Low 13 0.01 8 12.90 750 775 Moderate Moderate 14 005 18 86.80 775 850 Moderate Moderate 13 0.05 49 8060 850 875 High Low 13 0.10 33 161.20 875 1050 Moderate Low 12 0.02 42 29.76 1050 1100 Moderate Moderate 12 0.05 30 74.40 1100 1150 High Moderate 12 0.15 90 223.20 1150 1325 Very High Moderate 13 0.75 1706 1209.00 1325 1375 High Moderate 8 0.15 60 148.80 1375 1400 High Moderate 8 0.15 30 14880 1400 1425 Moderate Low 6 0.02 3 14.88 1425 1525 Low Low 7 0.01 6 6.94 1525 1600 Moderate Low 11 0.02 17 2728 1600 1700 High Low 10 0.10 100 124.00 1700 1800 High Low 13 0.10 130 161.20 1800 1875 Moderate Low 13 0.02 20 32.24 1875 2050 High Low 11 0.10 193 136.40 2050 2250 Moderate Low 10 0.02 40 24.80 2250 2400 Moderate Low 10 002 30 24.80 2400 2500 Moderate Low 17 002 34 4216 2500 2650 High Moderate 15 015 338 279.00 2650 2700 Moderate Moderate 12 0.05 30 74.40 2700 2775 Low Low 5 0.01 3 4.96 2775 2825 Moderate Low 4 0.02 4 9.92 2825 2875 High Low 5 0.10 25 6200 2875 2900 Very High Low 6 0.60 90 446.40 2900 3000 Very High Extreme 7 1.50 1050 1302.00 3000 3075 Moderate Extreme 7 0.35 184 303.80 3075 3100 High Extreme 7 0.35 61 30380 3100 3200 High Moderaate 9 0.15 135 167.40 3200 3325 High Low 12 0.10 150 148.80 3325 3630 Moderate Low 4 0.02 24 992 3630 3800 High Low 10 010 170 124.00 P \Polk SWCD NRCS \North Pacolet Reach 4 \Submittals \Permitting \2014 PCN \BEHI Existing 1 of 2 North Pacolet Reach 4 Bank Erosion and Hazard Index River Left Station Start Station End BEHI Rating NBS Rating Bank Height (ft) Predicted Erosion Rate (ft/yr) Predicted Erosion Rate (ft ^3 /yr) Predicted Erosion Rate' (lbs /yr /ft) 3800 3900 High Low 10 0.10 100 124.00 3900 3925 Very High Moderate 11 0.75 206 1023.00 3925 4050 High Moderate 10 0.15 188 186.00 4050 4325 Very High Moderate 10 0.75 2063 930.00 4325 4400 High Low 11 0.10 83 136.40 4400 4800 Moderate Low 3 0.02 24 7.44 4800 4925 High Moderate 10 0.15 188 18600 4925 5000 Very High Moderate 12 0.75 675 111600 5000 5075 High Low 2 0.10 15 24.80 5075 5400 High Low 12 0.10 390 148.80 5400 5500 Moderate Moderate 4 0.05 20 2480 5500 5600 High Extreme 5 035 175 217.00 5600 5700 High Extreme 10 0.35 350 43400 5700 6100 Very High Low 10 0.60 2400 744.00 6100 6116 High Low 10 0.10 16 12400 Total 1 13,101 Notes. 1 BEHI = Bank Erosion Hazard Index 2 NBS =Near Bank Shear Stress 3 BEHI analysis performed on June 4, 2013 4 Predicted erosion rates estimated from non published NRCS "North Carolina Stream Bank Erodobility" curve 5. Assummed soil density of 124 Ib /ft^3 P \Polk SWCD NRCS \North Pacolet Reach 4 \Submittals \Permitting \2014 PCN \BEHI Existing 2 of 2 North Pacolet Reach 4 Bank Erosion and Hazard Index River Right Station Start Station End BEHI Rating NBS Rating Bank Height (ft) Predicted Erosion Rate (ft /yr) Predicted Erosion Rate (ft ^3 /yr) Predicted Erosion Rate (Ibs /yr /ft) 0 200 Moderate Low 14 0.02 56 34.72 200 240 Very High Low 12 06 288 89280 240 325 Moderate Low 12 0.02 20 29.76 325 450 Low Low 4 0 008 4 3.97 450 525 Moderate Low 10 0.02 15 2480 525 600 Moderate Low 12 0.02 18 29.76 600 625 Extreme Moderate 13 2.3 748 3707.60 625 655 Very High Moderate 15 075 338 139500 655 690 Extreme Moderate 13 2.3 1047 3707.60 690 800 Moderate Low 2 0.02 4 4.96 800 875 Low Low 2 0.008 1 198 875 1100 Low Low 12 0.008 22 11.90 1100 1150 Moderate Low 2 0.02 2 4.96 1150 1375 Low Low 4 0 008 7 397 1375 1425 Moderate Low 10 0.02 10 24.80 1425 1450 Moderate Low 9 0.02 5 2232 1450 1550 Moderate Moderate 11 005 55 68.20 1550 1600 Moderate Moderate 14 0.05 35 8680 1600 1700 Low Low 14 0.008 11 1389 1700 1725 Low Low 4 0 008 1 3.97 1725 1775 Moderate Moderate 11 005 28 6820 1775 1825 Moderate Moderate 13 0.05 33 8060 1825 1850 High Low 13 01 33 161.20 1850 2000 Moderate Low 8 0.02 24 1984 2000 2325 High Low 12 0.1 390 14880 2325 2600 Moderate Low 3 002 17 7.44 2600 2650 Moderate Low 11 0.02 11 2728 2650 2675 High Moderate 10 0.15 38 186.00 2675 2800 Moderate Moderate 7 0.05 44 43.40 2800 2850 Moderate Moderate 10 005 25 62.00 2850 2900 Low Low 9 0.008 4 8.93 2900 3300 Moderate Low 4 0.02 32 9.92 3300 3340 High Moderate 11 0.15 66 20460 3340 3500 Very High Moderate 14 0.75 1680 1302.00 3500 3550 Very High Low 12 06 360 89280 3550 3650 High Low 10 0.1 100 12400 3650 3700 High Low 11 0.1 55 136.40 3700 3775 Moderate High 8 012 72 11904 P \Polk SWCD NRCS \North Pacolet Reach 4 \Submittals \Permitting \2014 PCN \BEHI Existing 1 of 2 North Pacolet Reach 4 Bank Erosion and Hazard Index River Right Station Start Station End BEHI Rating NBS Rating Bank Height (ft) Predicted Erosion Rate (ft /yr) Predicted Erosion Rate (ft ^3 /yr) Predicted Erosion Rate (Ibs /yr /ft) 3775 3825 High High 9 0.2 90 223.20 3825 3850 High High 9 0.2 45 223.20 3850 3925 Moderate Moderate 10 005 38 62.00 3925 4000 High Low 10 0.1 75 124.00 4000 4250 High Low 3 01 75 37.20 4250 4350 High Low 10 0.1 100 12400 4350 4450 Moderate Moderate 11 0.05 55 68.20 4450 4625 High Moderate 12 0.15 315 22320 4625 4700 High Moderate 13 015 146 241.80 4700 4750 Very High Moderate 11 0.75 413 102300 4750 4900 Very High Low 3 06 270 223.20 4900 5000 Very High Low 10 06 600 74400 5000 5075 High Moderate 10 015 113 186.00 5075 5200 Very High Moderate 11 0.75 1031 102300 5200 5275 Very High Moderate 4 0.75 225 37200 5275 5350 Very High Moderate 11 0.75 619 1023.00 5350 5500 High Moderate 11 015 248 204.60 5500 5600 High Low 2 0.1 20 2480 5600 5700 High Low 2 01 20 2480 5700 5850 High Low 10 01 150 12400 5850 6116 Moderate Low 9 002 48 22.32 Total 1 10,389 � Notes. 1 BEHI = Bank Erosion Hazard Index 2 NBS =Near Bank Shear Stress 3 BEHI analysis performed on June 4, 2013 4. Predicted erosion rates estimated from non published NRCS "North Carolina Stream Bank Erodobility" curve 5. Assummed soil density of 124 Ib /ft ^3 P \Polk SWCD NRCS \North Pacolet Reach 4 \Submittals \Permitting \2014 PCN \BEHI Existing 2 of 2 North Pacolet River Reach 4 - Cross - section #2 Streambank Shear Stress Calculations Find shear stress with z = yRHS where y = 62 4 lb /ft3 (density of water) RH = hydraulic radius (ft) S = average stream slope (ft /ft) Calculate shear stress for typical design cross - section for depths at the proposed bankfull bench and the top of the terrace. Using channel dimensions from a cross - section measured by Altamont personnel in the field (see Figure 1 below), calculate hydraulic radius for the following depth conditions ( *Note: depth measured from deepest part of channel) • Bankfull Depth 5 6 -ft • Top of Terrace Depth 12 6 -ft Set S = 0.00106 ft/ft (based on the longitudinal profile of Reach 4) Area RH _ Wetted Perimeter (WP) Adjust calculated shear stress values to account for straikht sections of channel Zmax = 1.5r (Equation 9 of "Stability Thresholds for Stream Restoration Materials — ERDC TN- EMRRP -SR- 29" prepared by Craig Fischenich of the USAE Research and Development Center, Environmental Laboratory, 3909 Halls Ferry Rd, Vicksburg, MS 39180, May 2001) - Adiiist calculated shear stress values to account for channel sinuosity. 1-0 5 r.. = 2.65-r R, 1-0 5 W Rc = Radius of Curvature: Measured Rc values in Reach 4 Minimum 75 -ft Median 183 -ft Maximum. 374 -ft W = Top Width of Channel (Equation 10 of "Stability Thresholds for Stream Restoration Materials — ERDC TN- EMRRP- SR-29" prepared by Craig Fischenich of the USAE Research and Development Center, Environmental Laboratory, 3909 Halls Ferry Rd, Vicksburg, MS 39180, May 2001) Table 1 below shows the calculated values for shear stress at various water elevations. P \Polk SWCD NRCS \North Pacolet Reach 4 \Submittals \Permitting \2014 PCN \Shear stress calculations doc Page 1 of 2 U c .2 / \ U \ & M |$ � \} . Q - 2 - � \ / � k $} \_ \ - $ � q @ $ � i �l m � $ Eg � $ m � 2\ ! �f - -- - - -j � \6 i / \ \ 0 \ 2 _ \}� � � & 7 — 2 ]� W x® & / l m j ° ki \ Cts {� } ƒ n / \ r \� � o / § � k / | z 2 g 10 2 ° § ( ` _ \ \ § C ; § ) / 2� § ° § En t / , \ ,� ) � , , $ ƒ ƒ [� G § 4-1 / \ \ 0 \ 2 _ E N 6 1 N I I It I N G SC H Y n R O G F O 1 O G Y 231 HAYWOOD STREET, ASHEVILLE, NC 28801 TEL 828 281 3350 FAc 828 281 3351 www altamontenv iron mental com ASSESSMENT OF EXISTING STREAM CONDITION SUMMARY OF "EXISTING CONDITION" CATEGORIES FOR LEVEL IIII INVENTORY Stream Name North Pacolet River, Reach 4 Location Polk County, North Carolina Riparian Vegetation Narrow to non - existent buffers provide little reinforcing root mass in several areas Common invasives present privet, multiflora rose, and honeysuckle Stream Size, Stream order-50 sq mi , 3`d Order Meander pattern Moderate Sinuosity Channel Stability Rating (BEHi) Low to Extreme Sediment supply (check appropriate category) Extreme X Very High High Moderate Low Streambed (vertical) stability Aggradmg X Degrading X Stable Width /depth ratio condition Normal (stable) High X Very high Streambank erosion Potential Bank erodibility Near -bank stress Extreme X Extreme X High X High X Moderate X Moderate X Low X Low X General Remarks Observers Z Price, N Bouchard Stream Type G4c to C5 Date 4/17/13 Flow regime Southern Appalachian Depositional pattern Channel Bars Debris /channel blockages Woody Debris Altered Channel State Unstable Riffle Bankfull Dimension /shape Width Min 56' Max 65' Median 61' Depth Min 3 8' Max 4 6' Median 4 1' Width /depth ratio Min 12 2 Max 163 Median 156 Patterns ( *show as funct Of bankfull width) Meander length ratio* Min 2 8 Max 117 Median 7 4 Radius of curve ratio* Min 12 Max 61 Median 3 0 Belt width ratio* Min 2 1 Max 6 0 Median 3 7 Sinuosity 131 Profile Water surface slope 00011 Valley slope 00014 Bed features Riffle /pool X Step /pool Conver /divrg Plane bed X Other Spacing* Describe alterations Streambanks on both sides of the river throughout much of Reach 4 are very steep, undercut, and rapidly eroding, Bank height ratios (Top of Bank / Bankfull Height) exceed 2 for the majority of the reach Therefore large flood events are not able to access a floodplain to dissipate energy This results in increased bank erosion rates Other mayor problems contributing to the degradation in water quality include the lack of a continuous riparian buffer zone and significant exotic invasive vegetation Historic landuse practices in the watershed have played a significant role in the lack of riparian vegetation as indicated by historical aerial photography from the 1930s which shows pasture and cropland cleared to the river's edge The tropical storms of late 2004 which exceeded a 100 -year recurrence interval, had a devastating effect on the river The storms caused instantaneous morphological changes through erosion of the stream channel and banks and accelerated rapid lateral and down valley migration These and more recent storms have resulted in the continuing degradation and migration of the river which is evident today P \Polk SWCD NRCS \North Pacolet Reach 4 \Submittals \Permitting \2014 PCN \Level IIi Assessment doc Page 1 o APPENDIX D - PLAN SHEETS AND DETAIL SHEETS / m F,y -'� �� - rf) u Z sts�l9z�az9�w� ��osas�lez ez9 i31 1099Z 3N '3111A3HSV '133VIS OOOMAVH I2Z AdV NH) A9 NOILdINJS30 31V0 'A38 OVJ \S3N0OIA— DINHJ31 \5 HJV3N 1310JVd H1NON\S3W OJMS 9lOd \'d '—d -A VNI-l0dV0 HAON 'AiNf100 N10d y3Ala 1l-103Vd HiKN }� �\� -/ �J / H J V l a f� \ O 1 I l�]H S a ] ! — ON 133HS OJMs A1NDO3 N' '1N3113 DAM H3"Y31V 'O:NOH road A03 NV93WA9 NMVNO A0010300N 0A H )V ON I N33 N 10 N3 041 M W 10 RMA LY U ol F C) a OMW C'V zi Q 11 � u co o S c J u JaF F x J z a Im � o � 30 3�V1HtlV1 -Hy I � % rQ L Z W — P U o Q a U Q N � w Q N Q -i ° J V N J W Z U W } Qo o Z w z Z U cr } Qp Q U Y Z cn J j Z � rnQ Z W CL � C w U O n Z F- ti �� J LL O0 W J JI��woFn OJ Z Q oz OIn�Zm4� '0oQ ? W m O WO EL ~ WN.CW�,U ���< Z Q Q�� O�WQQOWaW N Q N WJ 0 Z LU ^QQOQ o z z w Z�m OQp }�ZOQQtn�ZIJp a W J NOWNQZQn.VaOZ °W�2'�W a w J Z m rc W ^ �InFYUOPIn� OZN 1E 2c:): s o U O� ��ZQ0�In ^NV7QaN = ~Z� o �a0� -- 1���pQ >HF - LLI o a J U m tY Z � J Q W O°Zaa^�W��� #ZLu W W ALL' W o k LLJ U) Z < 0 rOfwC O�OZ� ZWZWOWWJH 3 g Q � � W O � � � W D Q Z_ O > O D in W I-ff u —mo CL -1 0- N FU UIL Ir0 0 < z L � O W ° w a a�aJ at; z =JN O ouo �m� wum °uw rorcwWH'ag rasr? owa�' $�w i�um4r �i w mi L i w�Laa rm _ ° ¢u vri ma 19, o w Rprzmru Iz a ind >$1�aaz rc F r &zm a�31a i a ox� LLj X60 �� , ME LL w i F LLJ N wiz. y od g c $ 4 3 A 55 u>zi�� > wo-Wria " _:xQ i'�u i -� ��; zV9rc++rww r Fpy2 = w IlJ a oz Wa 6�6 io�'� HH-6W J o� `'� z�L um�$. <°z Wraa° z� a 7 m r3 °z� d a °Wr ✓Li o O �.� �a� =wi °wOw�mNxi�ms a °NW�a3my W ~ e w�O L �wO Or5Zya�� .1Iz U J Nza m�aoyliJ jfWp >w ca Q > LL Iy ° wo & &r 3Wy¢Wy�6� °w 3iiaJ�W��u�'w U H Z u w Z W> Z W O C) Q V Z u J a m z W= w d miw z> �� -3Z: S- w' >O'6 $ _u l�ruNa wiaom u rn ~ino °$�� V / Vii w =¢1¢ ¢¢°p OOoQZ FW KZY�WI �y=Zr Z VN Q_ u z00 � W06�Fm Ny JpFr r pp ��uiWrW �m- '.Z LLQj LLZaw.1Y21�° � Gi rorc wz�zxz ��mgu F ° mN wigFw o3o Td$zz°�a Z z$ JF� zow%��Q�rJY, z z u$w Z zom ^ °w'✓¢+ ¢ \_a iu°Iliw %ZZ�wLLal�z��zyy °W°vAi QyZj�w ONOZr=i °J°rif0� °KQVIHM1WyJVaON Z i >L� wwg= zmw w$ryzw�W�oi_yniH -a out((J° z�y4grc °wpmJ°'a�woaaao���5oircj� W iw3 w-.- ogzih >l _ zV_r N a�FwI�i KW� 4ZRR0°�VO ZEE - wrv/I�Oif~Il ui �iwuo�ai�wnuri or WL�Ka3 °Q.m= Vlwrr� I — N f� � � W W W ~ ~ � J _ = W W F- = H (!1 (n Cn !n to — N Z p W W W W W f!) fn J J J W J J_ J_ J J Z Z O O W LL- LL LL � � O O � � — N ~ W���� �� U U � � W W = W p p p p p Ul (n U U 2 2 � (q p Z Z Z Z Z J J Z Z�� W� Z Q Q Q Q Q Q Q O O J J >� a a a a a�� o o�� O J J J J J�� d' �' W W U to ���� d. H F- W W p 0 0 0 0 0 0 0 0 0 0 0 0 0 0 wN M f Lo \O r, co � _O __ N_ M I I 1 1 1 1 1 I 1 1 I 1 1 = U U U U U U U U U U U U U I- � w�l/lVil�/1 L R '^ LL v/ V Z ,051 • .I 31VJ5 .o .e, ,..N,H..., .3A..H.A,..M. IS££'IBZ'8Z87tliA OSf S'IBZ'BZ B'l31 JN'3111A3HStl 133dIS OOOMAVH IfZ --?� ; q A00103'00'_!l0 k}i' �P ONIa.. '�. 9 � — AdV HHJ AB NOUdIN3S30 31VO 'AM (TV3 153bI91i /1V31NH331 /V H3V3B 1 M-M H1MON /SNV 0-M5 YIOJ %14 :.Id 3YA VNI�08VZ) HiHON 'AlNf100 �ooa 8�]A IO J 17 OJVO Hi dON '7 V i a / H�V70 1�3HS X34NI 311S 7 O• V VI /ZIZ '31V0 03M5 A1Nf103 Y10d :M3113 331WU30NV%31V'9 :HOW rOW A0f NV93N'AB NMVHO , , Q O a T ° ? 7i j u U , .\ . ; 1 I J � O W � o � V I J �. �... ✓ Y LU 1 11 l} j W U ~ U �y v Z ro a CL o� Y a - -./� r �zz= Go �•CO LLI LL a o � A W `� 1 o ^ ff CL �•:. J . 1, ° >IL CL Z t� f Q �f Q a� Ill r` =Z o :. i ° x.001 w [Y e ♦ CL z �� u .O9 • .I 3lv3s .os .� .o ...�. .���..,. ••• 154 fo182•8Z8']tli M,O Sf f'I8 Z'8Z 8'131 10iY2 ON '31 lAlHSy '1i3HIS 000MA>H I.2 _ A" LH] AB NOI LdlB]530 31tl0 'A3H Otl7I53NN9ldlltl]INH]3L /7 H]tl3tl 13100W HiMONIS3iN O]MS NIOd\ :d :H1Yd and C= N N N O O VN1-10M) HAON `AiNf100 vIOd 69AId- 13100V'd' HidON 0,0 '7 HW28 7 y/ I 11JHS 3�I�a2�d aN� N t �d ON 17]IIS 00 H V L9S "s£B c v c p,a y y rn p c L0 L£8 Q W Z male diva OOMS "N"M prod :1N3117 3]Nid tl3R+tlX31tl '9Y9H 1'Obd Zl9'S B LY are i I Z99 We 6 L'Ot8 O0 o :1 J la l • J •'•J �•I , :J J I •:, ,� J J: I I aI e :I I! :l/ �l�•l :III :III I l `� �••. Z \ \A v �J•.� ��'.• i. .Iii �, :� �•: I 1 I kl :I I + f l 1 :I IG � � • , yI � 1� l / _�'.�• 1. VII hJ > o 0 00 o: u ¢ u C ¢ 2 p v ° o C � W V V O ° o E a W C O ti N N U a v v y v O O 0 0 O O o o S o n I I �I $ ri ri \ H j O y U TU V V O V p m 0 y \ N E s N °'� t o c 0 0 1 C T pN ON O p>] m= a- -- m0 Nc m N u Nv % 0 v °u 0 o of o 00 00 0. aN a aw au am O V O V O V O J dW It 0. av a`v am af 0 I LL U O C= N N N O O --VD 00 H V O0 o :1 J la l • J •'•J �•I , :J J I •:, ,� J J: I I aI e :I I! :l/ �l�•l :III :III I l `� �••. Z \ \A v �J•.� ��'.• i. .Iii �, :� �•: I 1 I kl :I I + f l 1 :I IG � � • , yI � 1� l / _�'.�• 1. VII hJ > o 0 00 o: u ¢ u C ¢ 2 p v ° o C � W V V O ° o E a W C O ti N N U a v v y v O O 0 0 O O o o S o n I I �I $ ri ri \ H j O y U TU V V O V p m 0 y \ N E s N °'� t o c 0 0 1 C T pN ON O p>] m= a- -- m0 Nc m N u Nv % 0 v °u 0 o of o 00 00 0. aN a aw au am O V O V O V O J dW It 0. av a`v am af C R Z O U w I N O 0_ U O 0 I U O m Ih N N O O --VD 00 H V L9S "s£B c v c p,a y y rn p c L0 L£8 Q W Z V W Zl9'S B LY are i I Z99 We C R Z O U w I N O 0_ U O In If) r•1 M N ON R] oo 00 O) a a 4 N W .p � 5 O o O a0 p E m J Ci a2 U E� o •• 3u 0 3 s a m 0 n s 8 n g i � O Ih N N --VD 00 00 L9S "s£B L0 L£8 Zl9'S B LY are Z99 We 6 L'Ot8 9 L 6£B r 88'0£9 t90W9 s9'Ot8 r OR We - -- Y6'Ot9 Z I o Q > Y9B St9 J 00 1t8 w J J Ili YL6'St $18 0£8 Z Q m 596 sf8 t L'Ot8 f!1 0 I ° 0_ s Lo we is ore 990'9£8 I S8 0f8 91L We LZ'Ot9 Z O H- — Q L9l'9£8 w 9t We J W I � LIZ We J sL'Lt9 Q_ I C7 L9Z'9t8 91, IN F X W l f£'Ot8 B9£ 9re I 69'0£8 LY Wo Ys l£9 69f'9f8 I 4S' L£9 T- YS'L£8 I OL.; M - - - - - -� L9' L£8 LB I£9 6B l£B In If) r•1 M N ON R] oo 00 O) a a 4 N W .p � 5 O o O a0 p E m J Ci a2 U E� o •• 3u 0 3 s a m 0 n s 8 n g i ►_ J v ~) M Il •YA = •'' A{• LL OS • 1 3lV]S ,..«.......3...X9.,9 ... 109SZ C]NI'31BA3XSyi'133blS .00.82vH,'Z —As oio]ooaoAH '.. _ 9112 /G �31tl0 00MS AIM03 x104 1N3m 3]Iad 63Wtlx3 tl'9a9urod Adtl MH] A6 N011dla]630 31V0 'A3a Otl7 /S37lf191d /'N]INM]31 /9 H0tl3a 13107tld H1a0N/5]W OJMS xl0d)'d :Xlyd 313 06'8Z8 VNI-IOHV:) HiNON 'rl1Nf100 )4-lOd ��AIJ 1D�00dd HlaON O "]�—o 7 H :)Vg?J Z l�]HS ��1�02�d dNd Nd�d ON 133X5 104'4 60'628 ZS4'bfB g iS£'6L0 n I� I am 3�- o � lL N �, \ �n Y1 \ \\ {� Cpl � v7 J pp'� � Z 0 1: o � •% r U) 0Jw �•• \ / W Ir Q 1 I. o �I II• N 1 �� � � •.•. 1 II • o : . .� —\:11: � r •111; I 1• III •_ ,�. I� { �• � �•.11 I ; / • :1 II. `• /• r I+� 11 i o 0 � P 1 . ( w 1 1 x I a o 0 V .......•'11��'''f 11 c ° o 2 0 0 1 1•• H in V) U 1 `'• \ I c y H N N O N 1`` �• a s o_ a a � O U r l Il I I V) `i JI Of 2 U 1 U U U U 00 m r ° N \ U « r. E _ =t �s of m= a— r = m: 10 N x ♦ l\ o 0 o a C /Wc% / /. I aw° 3. �X c rn� 0 s o � u 0 w rna c rn I rn o x z o W Z N w Q W I v M Z O U I N Z 0 U W !n In N O U � W 0 CV W ol w op 2 c � � O m J Ci Qz U o s� N • )ol 3 00 r) Go . 00 00 tSf'4f9 p 0 I 06'8Z8 I 104'4 60'628 ZS4'bfB g iS£'6L0 n I� zog b _z 09'6Z0 H Iw I ZSS'bf9 N ££'620 I� Cr V 1091IN 6Z 6Z8 L199 "4C9 0 lL'BZ9 IL£'6L8 46'628 0 KR C6'6Z8 SS8'bf8 °o 5['628 m VCG SL 629 996 bf9 g C9 6Z8 Z 0 900' Zo'oC9 w Y Z Q m Z O I CL'6Z9 Q W J W 95l'Sf8 0 s'6Z8 J a U 42'620 Z x ssz'sfe $ 0 O )9t'Sf9 0 bS'Of8 L4'Of8 g i1 -/ = F LL Vi 2 .OS • .I 3'IV0$ .� .s ... ....................... lsfvl!z BZ B'aVi OSsf'IBZ'Bz8'l31 IOB9Z ON 3111A2H3V '131a1$ OGO..AVH __. AdV YHO AB N011dWSW 31V0 'hall OV7 /53a00iiIlVJMHJ31 /7 H7V 3tl 13'q]Vd H1a0N /SJM: O]MS LlOd1'd wi.d n�j VN1-l0dV0 HidON 'A1Nf100 )4-lOd dlAld 1910DVcl HAON }. �-/l / HO V 96 I��HS TlIAO�Id aNb' Nd�d C O ,J 11 /z /L :31V0 O]MSA1 1l0 301ad a30N AO 0 A JOT: - - -- -- 0 tl o C= as aCW cn O 1` r O Q T O O O V 2 P E o c e E" a FO- VI to V p I • • i0 8 89'LzS 0 0 0 0 .1 n CL CL a n n a ."- 0 0 0 o I II 1 a I I Ir 66'1.Z8 I I rn O 117 I O In O O o ,.., M M N ON a0 00 a0 OD - 04I'££9 g 0 N U V .01 'Q (J ~ U O V 's « v v m vl C4 - ; �� v c o u v v u u v w o l4L'FFB g ° N ° o m o u � on v o I S 1 8Z8 n � � o n_ I l . K; Z9'LZ9 trya �� L. 00 +9C ]WH3iVH 7z 11 f5'GZH W J In I W II : + > U 0 ; ( Ifn w o .I 'Q . v 10, l O II J _ Fbb'ffi8 a U -_ __ —�. -r— -_._- - < CZARS n 0 0 oc { \\ 1 I 7 H c E o c c m 1 _ o Z y w SO "9Z8 I +x m to W a- 99'LZB IL I 0 / I 95'LZB •.•� �' �•• S49'ff8 •� .rte% ' •' //. Ll'LZ9 n ' � I zo- -- I - — -- - -- - .................... 969 LZS I ( 1 LLJ V) 90CM 96Z VC9 948'££9 + 00 GL'9ZS l0 6L9 ol V . • S9'8Z8 m to QZ2 LOWS L9'8Z8 1 69 L'4f8 °o £f Sze n 66L VC9 It Sze ostSze a 40'8Z9 n I _ OOf'4f9 WKS O if'1 I O 04 O PO 00 00 W 00 00 LSCW9 °a O6 "BZB ._ u =u Il _ /�//�� L it y♦ = .09 • .I 3ltlJ$ .� os W H' • •• IOBBISff1B2B2 B J�OSffIB2'B28 'l31 Z JN 311IAiNStltl •133tl1$ 000MAVH I:Z AdV NH:) AR NOIIdINJ530 31tl0 'A3N OtlJ /S3NII91J/ Y31NHJ31 /V H3V3d 13103W H1 DNMUN OlMS 9l" J!H1Vd =VJ dN1-102d0 H120N '11Nf00 >iiOd -10O1d H16ON z3A16 13 •L/ 7 7 `d �// H / 1 J J H S I I 0 �.1 d a NV N Y I d 0 "9 -0 ON 133HS , ,z,l 31tla 07/AS Al-Q, wood '.lN311) 3JItld N30NVX31V '0:N9H fobs AOJ NV93N A9 NMVtlO Y O 04 W W-coe O a0 2 � � e 2 0 � � _..J �• od Q Z � o U c c s Al n 1 Y h 0 0 0 9 I 6Z8'l£B g B g r in VI U p I L£'9ZB 3 V u u u v O 3 0 O V 0 I Y O O O O a n n n = 6L8'I 4 6Z'SZB II I O n L I M N O O II co m 00 DO 00 00 O£6't£8 g c L0 "978 m oa g g �d 00 Q W I % u .1 1U, o 6j r I \` h 86'l V o m O U" / O LS "978 W �Ok ~ 00 A I w c. o o b o `o u 1 \ \ \\ �\ p O£O'Z£B 8 �' In l8'9Z8 ` o c u d u v an d m o :1 \ \\\ U c/1 m V u wt0 m o o O of 0 \ nN n ou ou ou o •! o` w° a` (L !� CL m `• �• II _ I tBO'Z£B -- - — £rz£B 8 99'979 � I'I I� \'I'• �� � � I I rn.(x % r Z£Z'Z£8 0 1 u o \ \� 90'LZ8 v 3a J W Q w Z In w ~ a W 1 T :1 1 •/ • • / m J £I cc US o •) F — W I (9 CL a- 9z,9z9 I �(Ltwfj) L N 4£rz£B ^ l.J _. ___... ___I ____ _ -_ _. w —.__ 98'978 Ln /a K U _.._ ...... _..._ .__ 4S8'9Z8 / sti .•'� I s£sz£a S I '• +' 16'929 B 60 4Z9 I (/'�} g Q ► ► L� ,� -- - LL Lza • / a¢ W 999'7 8 I to i� ~ W CD m I BZ'LZ9 I UW�o I t W � U L£C'Z£9 + 1 f J N 0 — "I 66 "978 0 I \ C�pZ O W o a o \ 91 "LZ8 F- N Of Z K6 U9 � ZS'LZB m I 6867£9 ./ � �� � � I 4o•BZa I 6£OY£B s • ( ( _ ............................ ___ BB'LZB + Mq TCyC/ • j iii � I 66 LZ8 00 N N p 004 0 00 041££B o+ £S'LZ8 ••• - "'••" aC M, LL i .05 • .1 3T/J5 .OS � .O ISf faIBZ•B2ByJV d ^Xi05ff•IBZ'9ZB'�31 10892 JN •9—A —V '193ai$ aaOMAVH I2Z - AdV NHJ All N011dIN3530 31W) 'A38 MIS391101d /R'JINHJ31 /7 43V3tl 1310ONd H1Y(NI /SJ OJMS N10d \Id -ld a11d O Ln O O M W U VNI�0dVO HiHON 'AiNnoo nod 2d3A18 13�0DVcl HidON }� 'jyy v / H`) V 3U 5 l3]HS ��1A02id (INV NV-ld ON 133H6 rl W 00 00 N 7 .p S a a J U o 2 ° 41121Z 31V0 OJMS Al 31l 3)Iad a30 I®. ad A a0 A90 IO - OU a UA H §' O VI JJJN . o J N w 0 U � c , e U I u ° o u c . u o 0 ISO c p o � � a U- o' C V �' 0 lq5 O In O Ln O O M W U oo 00 N0 00 rl W 00 00 N 7 .p S a a J U o 2 ° o J N w 0 U � c e U I u ° o u c . u o 0 a° o ` H In N U Q •• ^g U 01 1 O O O O O O o 0 N Il l a II o 'v Z 0 c u V a U O V W (/l o e OtYZB c — u c U o m w u — t V1 _ °o vl Z Q 'C O °N pN 00 0 0 0 K 6 'O 8 U "4Z8 0 ° � °° o °w o oo oo oo a o u o o o o o9z0eS'oZ£9 a 8 + a - an, C 0 8'0 8 £"o I26'Ot8 + 96 Sze Z 1 ° o C !- I I � U V IX Z W I S4 "SZ8 0 0 v o H \ u J W I W d pia °. � c c =« c° J Z ZZO'If8 0 + 0 Ly Q 8£�9Z8 S N m �ll Q W Z Ln Z Q IM I > J I I 1 t O I - ..., W a Ls'4z9 so sze rZZ'lr8 x 0 J I� v) fff 1 J Lo W N + N I Ot5Z8 I of Ln I PLZ'LM � � c ' �� I GtV-LV@ :,.• ob SZ4'lr8 `'� \J + n za • % ob 9Lt W9 o5g SZB //) 9ZS'lt8 0 eB "SZB .I �.• g + LS'l g 6Z9SZ9 t "9 LV8 LC gZR RIL l OS "9ZH ....... :I I 6Z8'l£8 0 MATCHUNE 48 +00 6Z SZ8 o 00 L N I o 00 O 00 0£6'lr8 0 [0'928 a+o v 00 ' _ = x• t �- Z .02 =.I 3,V75 oZ 01 o IS. ^'IB2'BZB'7Vd 04£FI BZ'a2B', 31 0892 ,, 3„ „H;7 I „_s oaM,.H I:z .. 0lO3 ONCA r. Iq 7A is 71NI'N3 Ad7 )IH] AS NOI1dWs9a 3170 'A3a OV]\53MIOId \l7OINH]31 \7 H3V3a 13103Vd H1aOMM" O]MS Y,Od\ d a,.d 31Id O v w CV 2 VNllObdO HAON '11Nno0) )4 83Alb 13lOOt1d HAON 7 HOd32� I SNOIl��S t7 U C) 71/S2/9 ' 31V0 3wddoN g] Od 1N3113 3�wd a3aHnx3,v9 -aou road AOd W53WAa NMVaO Fes= 05 O c I J o o n o LL O Cr o. LL O v w CV 2 t7 U C) Fes= 05 O c I J o o n o U I a 3@ � + g Y ° n r4i e + + p V O I It cI. m _ w .v W ° IY �' + O � 1 ar ... .. _. .. s + va + � oi7nl '.. 1 - $V _ — m * $� ' _ I + aw + i I I O O +, + O O O + (n N O + + (n vi cn I U) cn cn c c O _. + __. + cn ( O O O U 0O U U U =o U + o� o + 0 8 I o° '41 + + a` S w I I vi a I a ° I a` 0 u R I m W + > + _ + _. ._ .................. 3 ° - d o - - 2 w mW a ° € + ' n Yg _ ° o° + + + m + i w - w m o 8 O O m m m m m l 0 m m m l I I n no m m m i m m m m ,v m M Z �.._ s LLLLLL t v / 2 .OZ • .I 3-v3S .., AA .01 .., ,............ I ... ..,.... IO. :)NI'31eA3NSy�'133tl1S U00A:H'3Z Adtl NH3 AS NOUdIN3S30 31tl0 'ANN Otl3\S3tlf1OId\1tl01NN031\, 143tl34 13103tld H1WN1S3bN O3MS M30d�'d 'Hard 3114 VNI-10dVO HidON `AlNnoo )4-lOd 89AId lD -IOOVd HiHON '7 HOV98 Z S N O I 1 D I S d l d 1 0 '6 ON 133VIS Ned 71 /9219 31tl0 03M5 A1N0O3 x,Od 1N I3] 331Nd d"Mx3ltl .9 �aoH A03 NVO3, AS A9010390 N 0 A H W 9N1 a 3 3 N I0N P ILL N �04 i y 1 r Q O Ned P ILL N �04 i fma r> W J 2 Q p U EQ 30 mu n g m o m m m m 9 R m o m 1 °n m m m mo + m° n 22" m m mm m m m o + ' � I i I So + J I + + I 0 0 ` + + 00 I + c O I O + O + 4� + U + O N cU n cn c ( (n - _.. ...,_....__....... _+ (n O O o O (n U U O + + U IT 0.2 a + + m W o $ + 3 ` aEuo$ — = 0_ ° u ° o ol v o u + n v $ +n o a` a $ o o' - a + o + + Y � 5 � + W a W + _ _ - w + 0 I m + m W OD I O •�• m o � I + + o op 1 ° m m m m 1 � m m ap m } .�s u z % _ , ,: — ?L �•"�' "`�.� tl /S219 3170 L,Od 113113 33 AOd N773H AB NM ry ».,',. ». » »..,. ».. ». »..,. ».. ISSS'IBZ'BZB'37d OSSS'18 Z'BZS'l31 0962 3N B „IAiH57 133 »1$ oo »At 1. Adz W3 AB NOI1dIL]530 3170 'A3B O7O \S3MfN11! \1771NH]31 \t H]73tl 131O3vd H1LON,S� 03MS Al JO 'd 11 -16 311d VNI-10HVO HiZION 'J,1Nf100 iio i 213AN 13 -10OVd HiHON O �O ` *� HOt1321 S 10 N 0 �I 1 N 0 0 N O I S 0 2i 0H 133H5 Aoo,o- 3JO MCA H V ,1 + �7N1CN7 W — Q U ON 0 0 T v• c W O N W c', w O w �j m J 2 J Q U �r e i° J _< "rs ° &� R F yw s W�ua uOFk+ �o =F � Qu wj Fm x 151 wH $ �3 j� �� z�gF u° ro�wu $ w aw i1m - ° =P., i '� si �i��"F d - Q zdi�lw `Zip �S "'° JmFF1iJ -WW °w� F ~=° ZL� � 2 3w 3i L F' ��Z55C�¢ � ^N J 151 11 yLy��W am $ �o w�¢w¢ ww_ �wOa2_ iS L yip S mm W aa Z° 615111 NQ IS-�w p 4J� �4 it t= Jx Q lya a2r J au goxaau im a Qu Wiz- 33o u��� �~ "° c,,N% Zm So FaFerc zNW�°' za p a"- � T. ✓xi i3 aE °Z <Q° �aLL�% u $o i >aaw+' Foil rQdamma Quo K�UV QJ RmNm at�J QF LHJJJ Z �N �maFw ¢NJ JJJ W°ZS� 5 Q VV uiQa OQ Z¢�VFF QW a4 xK4Q Zam= "OFZUF 3 �o °�iQ�iWO $ mF AY4�zd w i =o L�axAz Ziywla, xxuwO rx =� �uwW$ u ¢ ¢ imw °wF rFmw� 3 �F i LH2F � t aFY z�wiU LZj i~ LLjQZ3 a°i� zdi '�- g N3wm u� z a �~Lpra aoO 2x51 Za 3 T mx 2 - aJ $r�mWOO.z z d6 ao3 -� miQ°aNm u�- L wm�ma�m u w_° ` Zz zO.3 w" z uB�a$ mm HE >� �Hir� wa°duo Nmauir ZZrO3o.z ¢¢ > a Q O Q _ Q O u C$ °w - u N �f- w o 0 L r ampU �W�-UJi LL Z O UIKN OUt�iZZ wZCjOLLQ °a0u °ua JJZ °L2 OJ 'Z~ ~0�=_2 wWZ��H2 Q ZQa y�6 COQ W .LL.� Q Z” O "LLZ ZQS O -> T ¢t7 ��pOW LZ"9 g� F ZQ Wi F Aw z Ho"T _ a -O� $ J��g °Q�Q° zm o�rigd ¢"m.u' g�i °� KK NJ >am - �Wi zw siYYY11 uui'a' "�ys rw u Ao - mW�LLOaZTa =NZ >ZH°ri p "a` ziiiQSyz im'om ° -o�aw w^.�io Z Z yea °z N$ 4 m Sy w m 651 J.�Q w O Z Q 4 1 N Z Q n U -° W NF w -K-6t m° z�`d'd.z ° > >ai$ °m$� a wxr °iJ ag- ° zmo�� Qwa aa> uWu w m p-F "boa "� F °oai z° o} x °� JL aw�c x .., �' �L ��'i��a z 2Q¢ov' JC � zd owJJJ"'aQ � 1"pp'"'Sl_ �'dW'a �� a'2�" ea�i` "92H 'o"oLLUpq c -.z i-Qa °oQO JJ " L$ ~l. �l'f0, y°j Zj Zw aQ" �4� °" aKW w� wy��J 2° ..1 Kz�F3 WQU2aF Q a Z Nmzw HF JJyy��¢mU NUS Um Wy, u2WFV Q wZ Z�Z� ��QQL24�2 ZOZwm OwQOUQC uQy� Rj Qm =x�LL O iW WUNpOW 0000 33 Wod O1 UYaY11U ZZ _ ��JZJO Z_LL>WYY y� Q _ a- W J Uz WWYIL IVY L QO inn m O1 °1uyQ _ °2V¢ agy W °ZOaZO OOFS --JJJ o" �¢¢ W YYII°� ww�NN J "Q¢ o0¢ Yl QXOw¢ NhQH¢ O¢ "m ry�jF mm d UC mm L >V»Jl "�U¢�0 2V U OQZ O a "N¢VI� �� p?WO 2 HQNOWI -H Y. JJ y F O o Iz �JJLL _ m o t E. z ` $zd < > oa A N F w 1 go'_^`�� z o _o?Qo°a hu°d`�= tgzd a oQa$�1Q °a$�ugQ = ° of m a6 w w I o ? i -3 �'•m a W zi yrmLL o of 9a3 iw$° °7�O ow$13 z- w ° u wY3ww u'u oz� Zi ~ w LL Z u p�3L�� r�l �'upZi LLx� F bTmz �i L z Z�xd yW* rZ LL¢F°y Z �w w nay ° ZaJ F FZ QYQC ZOOZw LLO1 tw]~Q Zww O mO ¢Q¢OZr O�yyn�� Q U Z €NU�Nm Q 6OL 3S Z< O a = 1 2 J rmwy�> >� aW0 ° OLOOw��U H L 30 °� Zw 00 U ° Z 1- a °J Z o. w w F �Q�QOa =w� Sa %` o =m~m� w 4 o °w >u'�`^ w� $?�� w �Q "a' g" L ; r° ¢¢ 11 O F S ZZ O J Z K uu uu K Z ¢¢ LL_ LL ZZ i O " ~O ✓ZJ �2 QdL ¢z -m mOw Q m�GF -oyLLO j O QQULLF� Z OO �"g 5 8� -z� mg°w N =� W<$ ? as woWL NN 5 J -F-W8 bwwm pp Zp LF a Z 3. °dwWi a ZW WiLO i "w $Q a z3UFm� W Q"a<�a.�ca WV ; �yC - QQ< o z Wino a yao am$'w^si4 ccaw. �ra�JL� °>¢NU', o wS"u22o aN�� 3zz aLJ a aim w� ouA� Z0 "WNQ ° WWw Qp TLLKZ Ylu p 'd�� C mU'aT pd WJ¢ 'a'?m" i3 L3 J� Qw °m 'fupN i � �mo i Lm� wrw� °w x$`o Q Qmm a $ �'awA z $ H wg c riQIB Sw it w ��w °O -u, F� nip �rwozF $ oam o AL.. 41 mi•~, a'i-' °w�� L�ii 'gym m�C <iwQaNiow VW� c =Y3a'o'za '6u °_ai a oaoz`a'oQ .g �w ��r a o "Q �a ;aa?viiw _ iwQu Q �a S,z JoWmioQ p Wpry?Wr S $~aa ZZWaZwz LL %Q= °2o mw ui a 3= o w ui ✓xi sS�� oo$��0 3i~ `S °wa�JW• -F iFZ rw�Q >2 iu m�o L awl JHwa_'" an. u�Q o ,493 w5 3t-Wi°.1,— ~z ua"w°wow`$uz zo u o "maFr °rc o3$am�Qd Lmw -m �� L , �wxp Z °20 rej H Wr °w Za pZw3zzo j Q wo ou "' u_ mzLL o z LS- � �u ox QN�13'k' J o am z zmw °vf �w- zd `^ T2' ~xd xwzO a ° za u ~ ° "A IEloa "zr"/Wa °w" z wm-{{ �zr z6 Q rc a'uwJZa"J"�-Q wa j ag Fs�w ALLW° �� 'yw�,3 Q=Qv, owww�u °wix_xtv1 i�$ Qd ai draw}��wxo 99z�NyJ� Na Azu~zi �QOiJpw.$u °w~ °w oz �m uzda z" °J� ¢aL =WUw3 ��ti .. 3 0 mow,- mi> zam z ai wJ °°$Q °um,EON�rw�y� Qd § f xOA$,., ouiiu "wm o_ °~ o�2_u �o m" z �za a iA aiFJQwa zug z� - $ > QL u3u t-SW z N 1OL i w�� "x c�`Jio z ��a ��= aacmwwwi$ Qd5 i y� zuiam °z� 'd"�'o$OJw$" u� °ziu`°w$�NW�eFeFwrcr° g W F m >° o%w " zw W° Oz4� ~ J ZWWO ozHw °r.z rc 3 � >g3px Rio gWwz$FF 6wwa Q'PaWT r. yj °w uuAia "' ZQVi z boa °JL QQaQ aaQa�wZQ �z OQt6 O,QO� x�Z OI N_ �QN QJ W O O WU y� pZ 151 HOm J O Q� �wm�m WSpLLLL4QU Z rmA yy Q iS 6 w> iQl°i�wQ "J�Z m"o Z OU Off' O ~~m- OwZmUjpO� ZZ°U 2 Q ¢O a LLLL a`i LL x �1w¢¢uQkF ¢OZmw w LW iuwowitnwm�m Fu '3' ZZoQJwm11 Q zru Z awwJ3 °_° $ LwH 1NyO�r 2LOZWW ¢ G ww a2 Om ti 3 <F mVO? Qw ~w° a �" OO" -QOUmy o aw u3 d nw- wwizzmp Qom-� .-go- -z 3i d u o a�� °STw zzui os r °ow o °OQOiQ- o �� ��t i� mm z wwp �T_wpNy w�A Qd $�¢ z� "�ii� cQ Qdw tl�1m °ww rQF °mwww gQ o LL�J sw roUi'o �W wy mmz�6" � ° a� wwi�w `�b'S�za�m�" p>mJQ "ooxmJUOJ"oQmdm _w o j F_ r' i o �a u �� aNJZ'orrw" aa"uzaJ, -�owLL iuiia -'51"6 �w 3�$wm'�Ta_i WWWuF uiw a Wmw WYwr1 i $aH iwaJ i �w$i SAS u Y iOg,3i >= Z°w"i�u�v"'w�o'uw ud oAJOJ° ymw a` °o 9z $ - �9w S A �$�oQJ� $�`� w�8 -°���° mi�w °war „�Ha3 mop�i�uurcw�y >z z Fa ii3� ud i'a� zorcioa �u 3.'?QOia o rc ro�W o z?oQU zar �Bsww uI~Om113�~au auwu� °0 -5z- T o 1 z W i -r _ m r�a�� om r3 �aw c S x xx�ww i�3u� Qd _ .n r 3 awwa ou Q gm��W �F� zd3r.,�JFU �'d~�_�_� » aw Q" 1aauw 2 Wwa x'QS' $x r E mamJO iww J irw Q "mr�,z L Qww =/ �a- w AA uaaF °ao- aQQ V2-w ,mJY�myJm °° =uW z Z F o Q-mw °w o "'� k'�¢JU�F" �w��LL� QF-- �_ wi $AFL a Izoo J =ami�ui _ ama -w a 'km_ Q�suQ zo °z Sp°FdJO oo"�� _ >�� Q .S OO�� Lauud °x�"?3 uui "?ww °rcw woo 3b� I Ix W s W Wmcda =- °9zma� „LLr�= �: �LL� _� ° °Q"J"o 3 w 3SJ, uxS u2im? -44`'`Mt aaww >Om»,n a Z4'Jl»;. u L,Jn a rc lz°do °n »ia-i o�nmaa�uo�t -ao_« z `�s_onwoo�.mua tt7t�N > L m Z o � z O w ijL o w A o w 3m3 � 13 if -,z, Z w ry v� r 7 rc ri T rp r d ;j� o i o Izd Fp w"?OZ aA io i°FZ �N} 51g m aui r �w �L z Q "� haw �w3 3m Qq3� x tau 3Zx�~�z =A w3 w> iim$o `wL ww oiw �H °u3 O'-wr ozd' wiw 3�m mwa Ow �y"mjm� " QZv ° ~� ' Z LL " mL p "Ta,mw �� mOW G<� oaf ¢ow Amu Q oFNw >w j_ F3FU' w wa y L .F zsOVi �i¢w Or }Oa .7i° a =yt 'Q` Ww<a �n �Wwa �Ci my um au�awd o$mo�zQ zz_ Q Nu2i w aurim3 W�.w TgQ z iA iw'»�, zmw iw� zdr O L " Er5 mz"w uwL zoT z• y 5 wo o eAO°a d., - Ww mW$ wNZ° "OOH w .�_z $x ¢ uw >z _�u �~ w u u�H x oZS m° m wwmm -> o�P� U14:z5 °r - o � �g�u oaC :( zm a zd Zd x o "u ¢¢ 513 w>�� xm a�w i W m°3w� uo1 L$Jd Z 1°z6" i'aa °dyau &'A zg `� z ZO xd n oa°T Oo ao Z'n wQV a= � aW "Z� $BOO QFFio �O N3Z p¢ 3 amen ¢- N LL � 3 Q .9 i €W �wW IE3O o - �M—o QaJxm ✓S,° 1° oAa o$a° 6O i�w w Jaw. gd�i 11yy �J5 = a ° �w�a =w �w °�� ems 3wJ v.ft- saW -62. u4 $ '"uaa mai iQ°j�r' m °zd w o zdm�im zJ mw3 $3g°> cm mdmo °w FwQ mom zmu w�-O a °- W Zzp So z I " - ° ZmmL �uow vwwiw iZQ J .z �ro F 33 mfK= 5zd it i Quiz �rm� A� �iw w� i�uJi�3 iwJA r u� m °i tyww� o_ LL7 c QxJ.m�x Q ��a Lz mwoQ �a ZttWOp 00 V HNm K QO F�7 W~2 Q O W � w _ �wm m zu�� Waw Q_� x✓i n1 Z omm 3',Qu "�� z> m° �m w zgl Q w 3- Sf s� -J mew �w . N��J =�c VV haw =zJ 9wi en ¢ -$ Z 'a FZw? L a~�u f o W_wi Sww w1Q- "=su a < a� -w 2� °O x ZZ yy arri LdiZZ :5 P� L?w Om oi�2Q =Q u�i0~ -_ > "HO 2 aF0 lzp4 O <~ cYjmaK �` 4wF QFL ud° w ` a z ZZ co aQ§ waa m� _= Q „+x✓, °zdm "-m NF z wud L o NJ° M i o z" $Q " ¢O NZ L° ¢xJ� Z Zm�J iw ww Z�iy i� �✓i OLL 00 3N a 3 ui��w A�oi ur w "� rF " m o r-o N$m J of _QdTE o¢�i "'M r "i _ ��w3oawmu §g FZw�uu Z z �"pp a a i "ffw��wd °�a 3°a ° °'o °w mOO a¢w.9ff Hwy ZJ ° J 1�i F Q W K z O UL Q�a wJ22yaLL 2 ZW�=aZ J" ZJ p �Z°w Ho myA 1LJo¢ Q U7Q zx wv_, ay �Si~Q ss a r QQ QQ - zo "�3'�aw ¢¢ zw gu i wW¢�¢Wo mgoi ai!°k uiwou�", o u °klm" u°� i$wQB JmJ J5 oaFUw zz JJJ - °� `$7i �iw �z yu"F'm"w yw O r 'p 8- C " W O H o w _ O- 'S °° a wm Q 'ewgu �rz za u$ °w �F7 °wzow zP�vusx_Vd9 .Z? mom� b w F � � �mi duo c °_- 2,,Szpz a Fp - ��ii-6Oa z � -�i�woNa ~O° </nia �W�" aJ°�o uwQ6_ - w is 3a��x "� °wQU, m _ ,c w asw w�-3z ' °�= a < o'3agO &'$o� °'� w°owA� g'-' w W oz o1ai °'^qg��+��"J °u; a$ =o� xw °w wok' - a"w � r "S g ` w dd w z �u �m w Sao I'LL W "m �rsm $ "z T6zz °..T J --pz uw 'O aza w3'� i z k'�aiu�mw of m S� mww wz u uw r ma g�" mui o° °$ o�W�z� iu$om >° Fix x awr z .- w Z W -z -� i zu z > N a�°nAww �wO F� Q�" §�- "u -rwu �o ia�z aO °m .. mi 22222SSSSSS �� .nJ a z a Qz p, awmu ggi w rw iiiJ o A T�~gw�f ml �u R"�ma g3 "'�a$iJ W >o$ 3 g �oa zzdurcii Na°zd F"w'�,F <a k�rc a w °aw°azQamx o` ud zo °zQ w "�` - " o o$°F 2 i $ �°d�Q mw o a= A� "gwiF�~o" aQwwr,�wr,Ow_.n� § m ?z p a o oL zd z ui o� �u and a wu ww -z z Zoa5ur a °uuwi� °w ��w -w�° �' $`330" zF $Li 'a' w-+w N waz w w w z �J z °O -azd >° u "> g� Q.- w -z = >L >�w Sw gwz z x ° a zmOQQ i > >Q ° o= J �'°' `$�W o �r Fi=x zaw WF'8� ��g Qd °2W°�u F, " °wYaur_u`a =� o$�3F oww >�' �zzyu mmF° �-3 Fxo i az`a' "o 000`,Y+ i °u3wa �O1 00',%�"wmuz r ?Jf.wm �zz -° TS zz$i �•`' ma ° ca'" 4- 3 � s wuwJ Foiw a` �d �eT ucW�� $$�� wt�o mom °= a ¢v° zd3 �w w J im Qu n ruwa3 T N Re 8 ¢¢ O A Jw �3�LLOw�W 3- u -mmw> JoU1 a�u x°w L Z F F¢ Zz �w" zd W1 °y H Zmo 2 X a�Q ¢ $ o Q' m Q U1 u >wZ m am WJJ z Vlamw .wF 6cvia i1C�Vi z _4wayi o0 AL�° off- Q4F¢ _ <J�ww r a a` F °i Q ° Q Z LZ? rc aw wa"Z Oar i i "'urc w zr�Z� x2w� zw °, w m aJ� 1 i zww �a i T6 L>ew >L3uiu L mLwaW zed¢ L o Z_ H O O W F O _ J _ r U a N O O 2 Q W Q NW " O O C F p LL "a Q J w O O> F¢ w m =•� - G Q Q C W Q W p.K E WF Q Q j u i w z�' i,n > 3?u$ $ �u� ,n mO z m `�w„� .a_ u mi.vamriH Z tt�� ¢¢ J Z,rjw J a_ _ n Z m a> uiN d 0 _ Q L dz 3 O w p a m Q m p0 w wo U T m } J t u t� i ••M� r^ w v, U Z ISSSoI'9z_9zvM]VAdN30 Sf S'I BZ'BZB "131 1099Z ON '3111A3HSV '133tl1S OOOMAIH ISZ AdV LN] AB NOI1dIN]530 31V0 A�1 MM3tl001A, IOJINHJ31\91 )v. 1dlOJVd HISONMUN OJMS ulOd d �w fnl �-/^ �1 VNI�08VO HidON '.,iNno:) N-iod HI AI�J 130 3Vd HAO N 7 H3V32i H I `�-II /�] `JyI S� I V 1l a � O lJ i N O V N O I S O �J ] ` 0 ," ON 13JHS 11 /SZ /0 31v0 3J3, tl30NY l,W 'O tl9H 311) O]MS AINDOJ MIOd -1 row 9 H N N A0010306kH T 9I33N13h] 1 U I 1 C P LL N � W O O Jo^j �A �U Y J Va W N t O i � 3 N wLL w u¢ i 3 i w° i o5 Z • �j _ 3 n o W i o Z go w H101M •'NIN.ZS ¢� a u�i a az �w xWw gu z a ?Ww wo o; ww W Hod U ° a iJ -L 3WOZ0,z LL Z� Zi LLi 3; i_ m=' aruTi'n vTi FZ ..< J~ FQ i2�LLw 4 ¢u 2 rva a Zo W LL N �$ do3i iow NwPwo ZO U c°- Nmzx ° zz oz o z z u \ i I z wO $3S Z. _ i owo i ago¢ 1- �9 ;d W =d w i m�p� _ DRIPLINE �; o -i 0 dg"u°�tu 3. ¢W rc ;uHdF�d O awWOF¢�?z U as a zn °Yi3� Q ° c ° �¢mtiw$ii¢ of tU UT ° Ov °° o. 0 v a�iQ'w`m'a ZO T i oN m g�mw qa �- � w _ — DRIPLINE z~vi5z C.i ��f f'x"uw¢ Z $moo sw W M§ rc Ja�>'a3m� O m <w� O v �- wE ¢ $ 9N�iyzjs°ioa _? w °w ¢o�iox IL "O� ¢ 3i o2¢NUZao3m= (n a dW mz °FU¢J¢w d' I- �, 'H! n�w2x °zWNrc U �z �r3i�x�rcu�d� LLJ rw.W Orcrc�iuti� E oia ..�wV�ooxw� J O~Iy W a N ;Z .. 1 i w W w> Z V W O FOZ ¢ww 0 Z >1-fL ww O1YU ¢JWd — =nn aoann Ih�l �a_w�rc°a3on Z -�,r u M i Z z U H., ,..N,N.o.,..�1..N..,.... IS£S'IBZ'BZB'0tli OSSf "IB2 B2B "ljl OBB2 ON '31lIA3NStl '13ia1$ OOOMAtlN I: Z AD010300tl0AH V 9NIH33N10Nj - - -- Ado NH3 All NOI1d100530 31Y0 'A3H OV3\S3M,01d\T!]INH]31 \9 H]Y3tl 13103 Ve Hlt 'S ]M+ O]MS VNI-10dVO HidON 'A1Nfl0O �4-iOd 61AI6 13�OObd H12i0N / HOV32i J V 11�� H S-1 I V 1 l 4 0'(7 ` ov 133Hs 91152/9 31V0 0]M$ Alwo] 1lW :1N311] d]IMd adoNV><dly _o �aoH rose t✓"~ Cf Cl-J �� o o < U ' t✓"~ Cf Cl-J �� o o < co 2 Q U ao �fYI a 3� U3Q 3; y pO 6 ~ O O R j•, j CO JZ 4O Z m Q � 1 Q V) Q CL Z LLJ Q 0 LU J — Z O_ Z Q H Q J Z 0 w N�I r ° om �n F a z¢ N 3 0 o la0 o °z 0 t zda as a xi '^ 7� xo Wu oa a I z i r a r ZQZQ � z J p V..J J D LU i �� 8 U LL 0 0 3W N �JJJJ�� 000 oop JJJuJJV� oo..... o � Z w Z OO w moo � W J a 3jT� x 0 W U Z kH wawa LU ;Lrco�o~ w a LpO �p� w F✓=iwmJ aqw a� _y yy 5 pa w�oii�iJ�Oa �"' ':v`i`...,....�;• � 4 f w k ( , u 2 ''•lN' °•�..••. v 1, v'alM ISSf 19Z'BZB �Vd OSf f'IBZ'BZB l31 IOBBZ 7N '3111A3 NSV '133a1S 000IAAWH ISZ MV N 3 AS NGIIJWS30 31VO 'A3a Otl] \53a001d \T�INIfJ31 \> Hi03tl 13,OJtld H1a0N150aN 07Mf YlOd1�d �Nlvd lL! f/N1�02lb'O HlaON `J.1Nf10O �lOd dBAla A�OOW HidON 7 HOV96 Z ll]HS �Id1Da T^ I oaV / ON 133H5 11 19219 31VU 3JI aoHroad S A- 001030 O8 0 A H V OH CN 3"2...'. 0 C� � � `� �.¢ 'ka w ' w �°w oz z z �°°"fizo�r o n W?x� wo°w° aY�i a J° � b•wo . o�°d,N n o wa(w , ] a O LL 1 M z�� o i 0 z w a 2� 5 t W Q 5 0 a ugh J ? OPZ �° I=LL rrhz ZNa U °3 ¢3Qw M. 3ooLLQ w rcow gu_°'°\'u a NQUUyJN3�uZ ��j-'X�i >�Q ° �Nwi-aw., U 41 yj O3.r- i�?.°3 °¢oi�r�z_��� °wvWiLLLL � 0 zgz� # a n z 2 d a w3 0 Fa $ 1. ° Ms ¢ E W u I x Q m Q W - -- o 0� Z a o � a awm 3 � U ¢ w wzo at m m < w¢ s- °4 w I w - � y N N 3 � o b 1 a J xa � = �w i =a Fm �a uu e �u W a- 0 J �° W W ua J > a Qa Q LU m _ p aW za �>L Q Y O U ° O Q / W ° o = > ° %� Z � � o � C7 •�/% a i�F m = 8 °•° a. m °W Z LL Q 3 ° m 0 ED ° � 0