Loading...
HomeMy WebLinkAbout20140834 Ver 1_401 Application_20140814HARRIS ENGINEERING 1325 Harding Place Charlotte, North Carolina 28204 Phone (704) 334 -1325 Fax (704) 334 -1330 To: NCDWR 401 Buffer & Permitting 1617 Mail Service Center Raleigh, NC 2 7699-16 70 [LIEVV 2 @[F 4 ° H(MDCTU&L DATE: July 28, 2014 JOB NO. 21213/Wetlands ATTENTION: Buffer & Permitting Unit RE: Sharon Ave. Property 1 Agent Authorization Form 6 -14 -14 1 WE ARE SENDING VIA US MAIL THE FOLLOWING ITEMS: ❑ Attached ❑ Plans ❑ Prints ❑ Copy of Letter ❑ Samples ❑ Change Order ❑ Shop Drawings ❑ Specifications E NOTED COPIES DATE No. of SHEETS DESCRIPTION 5 5 5 5 5 5 1 n/a I Corps Submittal Cover Sheet 3 -3 -14 1 Agent Authorization Form 6 -14 -14 1 NCDWQ Stream Classification Form 7 -28 -14 10 PCN Form 7 -28 -14 3 EEP Forms n/a 3 Proposed Site Plan & Exhibits 7129114 1 Fee — Howey /Lanier check #1004, 5570.00 THESE ARE TRANSMITTED as checked below: ® For Approval ❑ For Review and Comment ❑ For Your Use ❑ For Your Information COMMENTS: COPY TO: William Elliot (COE) w/ I set encls. Eric Lanier w/ I set encls. ❑ As Requested ❑ For Your Signature FROM: Wayne M. Harris, P.E. If enclosures are not as noted, kindly notify us at once. H Corps Submittal Cover Sheet Please provide the, following info: 1. Project Name Lot 3, Block 2 MB 4, Pg 597 Tax Parcel# 181- 131 -02 (partial) 2. Name of Property Owner /,Applicant: Eric Lanier / Howey Lanier LLC 3. Name of Consultant/Agent: Wayne M. Harris, P.E./ Harris Engineering *Agent authorization needs to'be attached 4 Related/Previous Action ID number(s). N/A 5. Site Address. 2126 Sharon Ave., Charlotte, NC 28211 6. Subdivision Name: Brookwood,Hills (1941 plat) 7. City: Charlotte 8. County Mecklenburg 9. Lat: 35•i677 Long: -'80.1677 (Decimal Degrees Please ) 10. Quadrangle Name: USGS Charlotte East 11. Waterway-.- unnamed trib. of'L'ittle Sugar Creek 12. Watershed: Briar 13. Requested Action: X Nationwide Permit,# 29 General Permit,# _ Jurisdictional,Determination Request _ Pre - Application Request The following information will be completed by Corps office: AID: Prepare File Folder Assign number in ORM Authorization: Section 10 Section 404 Project Description/ Nature of Activity/ Project Purpose: Site /Waters Name- Keywords: _ Begin Date AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION LOT NO -.3, Block 2 PLAN NO ty1B 4. P,, 597 PARCEL ID- 181 - 131 -02 (paiteal) STREET ADDRESS 2126Shalon Ave., Chailotte, NC 28211 Please ,print PROPERTY OWNER. Eric Lanier PROPERTY OWNER The undersigned, registered property owner(s)�of the above noted property, do hereby authorize Wayne M. Hari-is, P.E. of — Harris Engineerinz (Contractor! Agent) (Nam&of Consulting Firm) to act on my behalf and take all actions necessary for the processing, Issuance and acceptance of this permit or certification and any and all standard and special conditions attached Property Owner's Address (If different than property above) A O. Box 1028, Pineville NC 28134 Telephone. (704) 587 =3022 We hereby certify the above Information submitted in this application Is true and accurate to the best of our knowledge, S %USACOE INFO AGENT AUTHORIZATION FORM DOCX -ionzed Signature NC DWO Stream Identification Form Versinn 4.11 Date: - ��' L J Project/Site `G Latitude. -3S- & % Evaluator: /� S County Longitude: —6.117 % Total Points: w Stream is at least intermittent Stream Determi (circle one) Other 1_4S aim Z d 2 19 or perennial d 2:30* G Ephemeral I itte t Perennial e g Quad Name: . .-.r A. Geomorphology Subtotal = /X. S Absent Weak Moderate Strong 1a'Continuity,of °channel bed and bank 01 1 _ _ 2 3 2 Sinuosity of channel along thalweg 0 1 5 3 3 In- channel structure ex riffle -pool, step -pool, ripple-pool se uence 0 1 2 1.5 4 Particle size of stream substrate 0 1 2 15 5 Active /relict floodplain 0 1 1 3 6 Depositional bars,or benches 0 1 3 7 'Recent alluvial deposits 0 1 2P 3 8 Headcuts 0 25 Algae 2 3 9 Grade control _ 0 05 1 1 5 10 Natural valley 0 .perennial streams may also be identified, using,other;methods Seep 35,of manual 1 15 11 ,Second or greater order channel a o = 0 Yes = 3 ague uai unuies are nor rareu „see discussions in manual T B Hvdroloov (Subtotal = .4441 12 Presence of'Baseflow 0 1 3 13 Iron oxidizing bacteria 0, 3 v _ _ 2 3 14. Leaf litter 0 1 5 0 15.,.Sediment on plantsiorrdebns -.15 0 3 1 1.5 16 Orgamc,debris hnes,or piles 0 2 1 15 17 Sod -based evidence of high water tables o =,v Yes = 3 18. Fibrous roots in-streambed 3 2 1 0 19 Rooted upland plants in streambed 3 v 2 1 _ _' 0 20 Macrobenthos (note diversely and abundance) 1 2 3 21 Aquatic Mollusks 1 2 3 22 Fish 0` 05 1 1.5 23 Crayfish 05 1 15 24 Amphibians 0 05 1 _ 15 25 Algae 0,5 1 15 26 Wetland plants in streambed FACW = 0 75, OR .perennial streams may also be identified, using,other;methods Seep 35,of manual Notes Sketch L'0T ST/z 15 M °FWA7F9 Office Use PAID o� oG Corps actio n Onl n ID. 2 0 1 4 0 8 3 4 DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ® Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: (,A or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ® Yes ❑ No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Lot 3, Block 2 MB 4, Pg. 597 Tax Parcel 181 -131 -02 (partial) 2b. County: Mecklenburg 2c. Nearest municipality / town: Charlotte 2d. Subdivision name: Brookwood Hills (1941 plat) 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Howey /Lanier LLC Attn. Eric Lanier - 1AUG 3b. Deed Book and Page No. DB 28992, Pg 936 3c. Responsible Party (for LLC if applicable): Eric Lanier - +WA fill 3d. Street address: P.O. Box 1028 3e. City, state, zip: Pineville, NC 28134 3f. Telephone no.: (704) 587 -3022 39. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if'different from owner) 4a Applicant is: X❑ Agent ❑ Other, specify., 4b Name. Wayne Harris 4c Business name (if, applicable). Harris Engineering 4d Street address 1325 Harding Place 4e City, state, zip Charlotte, NC 28204 4f Telephone no" (704) 334 -1325 4g Fax�no : (704) 334 -1330 4h Emall�address 5. Agent/Consultant Information (if applicable) 5a. Name. 5b. Business name (if applicable): 5c. Street address 5d. City, state, zip: 5e. Telephone no.. 5f. Fax no.: 5g Email address: Page 2 of 1`0 B. Project Information and Prior Project History 1. Property Identification 1a Property Identification no (tax PIN,or parcel ;ID) 181131,02 (partial) 1b. Site coordinates (in decimal degrees): Latitude. 35 16786 Longitude. - 80.8203 1c Property size: 0.43 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: unnamed tributary of Little Sugar Creek 2b Water Quality Classification of nearest receiving water. 2c. River basin Catawba 3. Project Description 3a Describe the existing conditions on the site and the general landluse,in the vicinity of'the project at the time,of this application: Existing condition of the site is a,grassy lawn, area, with, some trees General land' use in the vicinity of the prolect�is mostly � houses 3b. List the total estimated acreage of all existing wetlands on the property:, 0 3c. List'the total estimated linear feet of all existing streams (Intermittent and perennial) on the property: 200 3d. Explain the,purpose of the,proposed project: To reasonably use a1ot that was plattedin 1941 to build on for the first time 3e. Describe the overall projectin detail, including the type of equipment to be used. To'pipe the stream channel around a loi;m order to,reasonably use the'lot Will use standard equipment, i e tractors, bulldozers„track;hoes 4. Jurisdictional Determinations 4a. Have junsdictional wetland or stream determinations by the Corps or, State been requested or obtained for this property /' project includin ,all prior phases) in the past? ® Yes ❑ No ❑ Unknown Comments. 4b. If the Corps made the jurisdictional °determination, what type of determination was made? X Preliminary []'Final ❑ ry ❑ 4c: If yes; who delineated the jurisdictional areas? Name (if known). William Elliot Agency /Consultant,Company: Other- 4d. If yes, list the dates of the Corps jurisdictional determinations or State determination&and attach documentation'. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (Including all,pnor phases),in the past? ❑ Yes ®No ❑ Unknown 5b If yes, explain in detail according to "help file" Instructions 6. Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes, explain Page 3 of 10 PCN Form — Version 1 4 January 2009 C. Proposed Impacts Inventory 1. Impacts "Summary 1a' Which sections were completed below for your project (check all that apply) ❑ Wetlands Q Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are•wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 'Wetland impact, number Permanent (P) or Temporary T 2b Type of"impact 2c. Type of'wetland 2d. Forested 2e Type,of jurisdiction Corps (404;10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose,one Choose one Yes/No - ' W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No - VV4 - Choose one Choose one Yes/No - 'W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete'this question for all stream sites impacted. 3a: Stream impact number Permanent (P) or Temporary (T) 3b. Type of'impacf 3c Stream name 3d Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g_ Impact length (linear feet) S1 P Type In (Pipe) unnamed'tnb INT Corps 2 200 S2 - Choose one - S3 - Choose;one _ S4 - Choose one - S5 - Choose one _ - S6 - Choose one 3h. Total stream and tributary impacts 200 3i. Comments- Page 4 of 10 PCN Form — Version 14 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, Qnbutanes, sounds, the Atlantic Ocean, or any other open water of the U.S. then indiv ually list all open water impacts below 4a Open water impact number Permanent (P) or Temporary T 4b Name of waterbody, (if °applicable) 4c. Type of, impact 4d. Waterbody type 4e Area-of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 - Choose one Choose 04 - Choose,one Choose 4f. Total open water impacts 4g Comments: 5. Pond or Lake Construction If pond,or lake construction proposed, the com lete4he,chart,below. 5a. Pond, ID number 5b: Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: '51 Expected pond surface area (acres)- '5j. Site of pond watershed (acres): 5k. Method of construction: 6. Buffer impacts (for DWQ) If project Will impact,a protected riparian buffer,,then complete the chart below If yes, then'individually listall buffer impacts, below. If any impacts require mitigation, then you MUST fill out,Secbon D of4his form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other 6b Buffer Impact number — Permanent (R) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet ) 69. Zone 2 impact (square feet 131 Yes/No ,62 Yes /No B3 Yes /No B4 - Yes /No B5 Yes/No B6 Yes/No 6h. Total_ Buffer Impacts: 61., Comments Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Due to the location of the stream there is no way to have reasonable access and use of Lot 3, while maintaining the,existmg location 1 b. Specifically describe measures taken to,avoid or minimize the proposed impacts through construction techniques. Plans for storm drainage improvements and related erosion control measures will be prepared in accordance with City of CharlotWstandards, and will be, reviewed and approved by the City Engineering Dept prior to commencement of "construction activities 2. Compensatory Mitigation for Impacts to Waters of the U.S.,or Waterssof',the State 2a. Does the project °require Compensatory Mitigation for impacts to Waters of the U.S.,or Waters of the State? ® Yes ❑ No 2b. 'If yes, mitigation is required by (check all that, apply). 0 DWQ ® Corps 2c If 'yes, which mitigation option will be used for this project? ❑ Mitigation bank ©Payment to in -lieu fee program ❑ Permlttee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of MitigationiBank: 3b Credits Purchased (attach receipt;and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity Quantity,. 3c. Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: 50 linear feet 4c. If using stream mitigation, stream temperature warm 4& Buffer mitigation requested (DWQ only)* square feet 4e. Riparian wetland mitigation requested: acres 4f Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested acres 4h Comments* 5. Complete,if Using a Permittee Responsible Mitigation Plan 5a If'using a permittee responsible mitigation plan, provide a description of the.proposed mitigation plan Based on the.fact that portions of the stream have been previously, impacted by a City of Charlotte stormwater project (rip rap channel lining), and because the existing stream alignment renders Lot 3 unusable, we are proposing to,mitigate for impacts only greater than 150'(1 a 50') which ,is, consistent with conversations between thefCOE agent'and the applicant's representative at the time of jurisdictional determination Page 6, of 10 PCN Form — Version 1 4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result`in an impact;within a protected riparian buffer that requires Yes X No buffer mitigation? 6b If yes, then identify, the square feet of impact to each zone of,the riparian buffer that requires mitigation. Calculate the amount ofrmitigation required: 6c. 6d 6e. Zone Reason for impact Total impact Multiplier Required mitigation ( square,feet) (square,feet) Zone 1 3 (2 for Catawba) Zone 2 15 6f. Total buffer mitigation required: 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h. Comments Page 7 of 10 E. Stormwater Management and Diffuse�Flow Plan (required by DWQ) 1. Diffuse Flow Plan la Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 16 If yes, then is a diffuse flow, plan included? If no,,explain why ❑ Yes ❑ No 2. Stormwater'Mana ement Plan 2a What is the overall percent imperviousness of this project? 20+/-% 2b. Does this project require a Stormwater Management Plan? ❑ Yes No 2c If this,project DOES NOT require a Stormwater Management Plan, explain °why. Below City and County requirements 2d If this project DOES require a Stormwater Management, Plan; then provide a brief, narrative description of the plan. 2e Who will be responsible for the review of the Stormwater,Management Plan? 3. Certified Local Government Stormwater Review 3a In'which local government's jurisdiction Is this project? Cdy,of'Charlotte. ❑ Phase II ❑ NSW 3b. Which of the following locally - implemented stormwater management programs ❑ USMP apply (check all that apply)- ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of'approval been ❑ Yes ® No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006 -246 ❑Other - 4b. Has the approved Stormwater Management'Plan with proof of approval been ❑ Yes Q No attached? 5. DWQ 401 Unit Stormwater Review 5a ,Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes X❑ No 5b Have all of the 401 Unit submittal requirements been,met? ❑ Yes ❑X No Page 8Aof 10 PCN Form— Version 1 4 January 20091 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a Does the project involve,an expenditure of public,(federal /state /local) funds or the ❑ Yes Q No use of public (federal /state) land 1b, If you answered "yes" to the above, does, the project, regw re, preparation of an environmental document pursuant to the requirements of the National or'State El Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c If you,answered "yes" to4he above, has the document review been finalized by the State Cleanng House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules,(15A NCAC-2H .1300), DWQ Surface Water orWetland Standards, 'F] Yes ®�No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. 'Is this an after - the -fact permit application? ❑Yes ®No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3. Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past,and reasonably,anticipated future1mpacts) resuUn ❑Yes ® No additional development, which could Impact nearby downstream water quality? 3b If you answered "yes" to,the, above, submit a,qualltative or quantitative cumulative impact analysis In accordance with the rriost'recent DWQ policy.'If you answered "no," provide a short narrative description 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate,treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility The protect will use current, in place, wastewater treatment Page 9 of 10 PCN Form — Version 1 4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a Will this project,occur•in or near an area with federally protected species or E] Yes ❑X No habitat 5b Have,you checked with the USFWS concerning Endangered Species Act Yes X No Impacts? 5c. If yes, indicate the USFW,S Field Office you have contacted - 5d What data sources did you use to determine whether your site would impact Endangered Species or ,Designated Critical Habitat? US,Fish and Wildlife websrte 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or,near an area designated as�essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact,Essential Fish'Habdat? US Fish and Wildlife websrte 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project.occur`in or near an area that the,state, federal or tribal governments have designated as having historic or cultural preservation Yes ® No status (e.g., National Historic Trust designation or properties sigrnficant,m North Carolina history and archaeology)? 7b. What data sources did'you use to determine whether your site would impact,historic or archeological resources NC State, Histonc Preservation webste , B. Flood Zone Designation (Corps Requirement) 8a. Will this project occurin a FEMA- designated 100 -year floodplain? ❑ Yes © No 8b 'If yes, explain how project meets FEMA requirements* 8c. What source(s) did you use,to make the floodplain determination? FEMA websrte 1,U4Y14 /;i 4�- 7 /at A pllcan =3i ignature (Agen s signatur ly 'if an authorization Applican _gent's` anted Name letter from'the applicant is provided Page 10 of 10 Print Statement of Compliance with Session Law 2009 -337 An Act to Promote the Use of Compensatory Mitigation Banks and SL 2011-343. (link,to SL.2009T33V) (link to,SL 2011343/ Prior to accessing ,fhe Ecosystem Enhancement'Program (EEP) In -Lieu' Fee Mitigation Program, all applicants requesting wetlands, stream and /or riparian buffer mitigation are now required ,by,law to comply with Session' Law 2009 =337 An Act to Promote the Use of Compensatory Mitigation Banks and Session Law 2011 -343. All requests submitted on or after June 27, 2011 MUST include this form signed and dated by the, permit applicant or,an authorized agent. Please refer to DENR's ,ImOementation_Policy for more detailed guidance. Compliance Statement: 'I have read and understand SL- 2009 -337 and SL- 2011 -343 and have, to the best of my knowledge, complied with their requirements. I understand that participation in the NCEEP is voluntary and subject to approval by permitting agencies. Please check all that apply: Applicant is a Federal or State Government Entity or a unit of local government meeting the requirements set forth in G.S. 143- 214.11 (as amended by SL 2011- 343) and is not requited to purchase credits from a mitigation bank. There are no listed mitigation banks with the credit type I, need located in the hydrologic unit where this impact will take place (link-to DWR;list) p Mitigation bank(s) ,in the hydrologic unit where the impacts will occur have been contacted and credits are not currently available. The DWR or the Corps of Engineers, did not approve ,of the use of a mitigation bank for the required compensatory mitigation for this project. p This is a renewal request and the permit application is under review. Bank credits were not,available at the time the, application was submitted. Enter date permit application was submitted for review: Note: It is the applicant's responsibility to document any inquiries made to private mitigation banks regarding credit availability. `i'have fead�arid- understand EEP's.refLii d:DOlicies`(atti36hed) irntial,liere Wayne,Hams Printed Name Date Lot 3, Block 2 MB 4, Pg. 597 Tax Parcel 181- 131 -02 (partial) Charlotte, NC Project Name Location NORTH CAROLINA ECOSYSTEM ENHANCEMENT PROGRAM, NCEEP IN -LIEU FEE REQUEST FORM Revised June 18, 2014 Complete requested,information, sign and date, email to kelly Williams gncdenr gov Attachments are acceptable for clarification purposes,(location map, address or lat long is required) Information submitted is subject to NC Public Records, Law and maybe reauested by third parties Review meetinos are held on Tbesdav afternoons CONTACT INFORMATION APPLICANT'S AGENT APPLICANT 1. Business /Company Name Harris Engineering Eric Lanier/ Howey Lanier LLC 2. Contact Person Wayne Harris _ _ Eric Lanier 3. Street Address or P O Box 1325 Harding Place P.O. Box 1028 4. City, State, Zip Charlotte, NC 28204 Pineville, NC 28134 5. Telephone Number (704) 334 -1325 (704) 587 -3022 6. E -Mail Address PROJECT INFORMATION 7. Project Name Lot 3, Block 2 MB 4, Pg 597 Tax Parcel 181 -131 -02 (partial) 8. Project Location (nearest-town, city) 2126,Sharon Ave. Charlotte, NC 9. Lat -Long Coordinates or attach a map 35.16786 - 80:8203 10. County Mecklenburg 11. River Basin.& Cataloging Unit (8- digit) Catawba 03050103 (See Note 1) 12. Project Type "indicate owner,type and Owner T 13 Government El Pnvate yam' write in protect type (e g school, church, retail, residential, apartments, road, utilities, military,, Project Type: Residential etc "' - - 13. Riparian Wetland Impact (ac.) (e.g., 0.13) 14. Non - Riparian Wetland,lmpact (ac.) 15. Coastal Marsh'Impact (ac.) 16. Stream Impact (ft.) (e.g. 1,234) Warm Cool Cold 50 17. Riparian Buffer Impact (sq. ft.) Include subwatershed if Jordan or Falls Lake: Zone 1 Zone 2 18. Regulatory Agency Staff Contacts NCD,W R: USACE William Elliot Other: Check (�) below if this request is for a By signing below; --the applicant is-confirm ftlhey'have ❑ revision to a current acceptance read and understand °,EEP's `refund policywposted at nceep.net,and attached to�this for m. ❑ renewal of an expired acceptance Si a of App !cant or Authorized Agent: ❑ extension of unexpired, acceptance y 2 I L Date: 7 Note 1 For help in determining the Cataloging Unit, visit www nceea net or contact EEP Direct questions to Kelly Williams at 919- 707 -8915 or kelly williams(oncdenr gov or to EEP's'front desk ,,at 919 - 707 -8976 Refund Policy for Fees Paid to EEP's In -Lieu Fee Programs (9/21/2009) Purpose: The purpose of this policy is to make,,clear the•ciicumstances and process under which a permitted, can obtain, a refund while simultaneously balancing customer service, and responsible business practices. This policy applies to all refund requests made on or after,the publication date of this policy. 1. All refund requests must be made in writing to ESP's In -Lieu Fee Program Coordinator at kelly.williams(a_ncdenr.gov 2. All refund requests are subject to fund availability. EEP does not guarantee fund availability for any request. 3. The request must either come from the entity that made the payment or from an authorized agent. Third parties requesting refunds must provide written authorization from the entity that made the' payment specifying the name and address of the authorized refund recipient. 4. Refund requests related to unintended overpayments, typographical errors or incorrect invoices should be brought ,the attention of the In -Lieu Fee Program Coordinator as soon as possible. Such requests are, typically approved without delay. 5. Payments made under EEP's incremental payment procedure are not eligible for refunds. 6. Refund requests made within.nine months of payment to EEP will only be considered for requests associated with projects that have been °terminated or,modified where the permittee's mitigation requirements have been reduced. Such requests,must be accompanied by written verification from the permitting agency that the project has been cancelled, the permits have been rescinded or have been modified, or the mitigation requirements have been,reduced. 7. Refund requests made °morerthan nine months from the payment date will only be considered for permits that were terminated or modified to not require any mitigation. Such, requests-must be accompanied by`written verification from the permitting agency that the project has been cancelled, the permits have been rescinded and/or mitigation is no longer required. 8. Refund requests not meeting the criteria specified above are not eligible for a refund. 9. Refund requests that meet the criteria above will be elevated, to EEP Senior Management for review. The following considerations apply to all refund requests: a. availability of funds after consideration of all existing project and regulatory obligations b. the date the payment was made c. the likelihood EEP can,use the mitigation procured using the payment to�meet other' mitigation requirements 10. Once a refund has been approved, the refund recipient must provide a completed W -9 form to EEP's In -Lieu fee Program Coordinator within two weeks in order to process the refund though the State, Controller's Office. 11. All decisions shall be final. (�R EXHIBIT #1 SHARON AVENUE PROPERTY ,� ON BULLETIN DWG. #5 -19 -14 HE JOB #21213, SCALE: 1" = 40' 1 A portion of LOT 7 J r' ` BROOKWOOD HILLS A portion of LO LOT B �j LOT 6 / I BROOKWOOD 4 PGD MB 4 PG 597 '! 5 +( MB 4 P D HILLS G / r LOT NO. BROOKWOOD HILLS MB 4 PG 597 J r r r LOT 5 N 85'49'44 - E N 85'49'44' E l BROOKWOOD HILLS MB 4 PG 597 PROP. OUTLET STRUCT. W/ RIP RAP APRON PER \ CITY Of CHARLOTTE STDS. f. t r------- - - - --1 I r------- - - - --� jN #2126 j� = t #2126 Z LOT 4 f r LOT 3 N I� TP pal - 131 -02 TP pal - 131 -02 I I� 18.998 sF I 1 I 18,808 SF I I( tl I r g LOT I I i t CHANNEL I I r" BMoB WoPOGD597L5 rL PROP. PIPE Qc STORM DRAINAGE I I ( g g I ESMT., TV. (ESMT. I e 8 I SHOWN SHADED) I I I N Ch I I' I I Iw a Lso_rrta+l KMAc W oeID leW_ TT- J l\- i Iw `\ PROP. JUNCTION ' BOX / MH 48't EX. RIP RAP CHANNEL k APRON EX. 15' RCP S 8548'30" W 100.00' S 86'01'52' W 97.87' Lit. _ _ PROP. JUNCTION - - - - - _ — — — — — — BOX O EX. HW Sharon Avenue \ \ EX. EOP EX. THAN 48' RCP'S TO —DL CONC. HW Y�f EX ARYD I INLE J J J S: \21273 - SHARON AVE \ENGR \5 -20 BASE PLAN.dwg IL O Ch A. ur O o ny 21 C 3., C� U O Z r.. C O C� C 4� V ts. c� M O I-N,