HomeMy WebLinkAbout20140591 Ver 2_Application_20140808
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
PAT L. MCCORY ANTHONY J. TATA
GOVERNOR SECRETARY
August 8, 2014
Washington Regulatory Field Office
US Army Corps of Engineers
2407 West 5th St.
Washington, North Carolina 27889
ATTENTION: Mr. Tom Steffens
NCDOT Coordinator
Dear Sir:
Subject: Permit Modification Request for Section 10 and a Section 404 Nationwide
Permit No. 23, Section 401 Water Quality Certification and Neuse River
Riparian Buffer Authorization for the proposed replacement of TIP No. B-
4565; Federal Aid Project No. BRSTP-70B(5); Debit $240 from
WBS No. 33773.1.1
References: Section 10 and a Section 404 Nationwide Permit No. 23, Section 401 Water
Quality Certification and Neuse River Riparian Buffer Authorization Application
dated June 11, 2014;
Section 401 Neuse Rules Authorization Certificate and Neuse River Buffer
Authorization issued July 24, 2014 (DWQ No. 20140591);
Section 404 Nationwide Permit 23 issued by default July 26, 2014.
Please see the enclosed revised utility permit drawings for the subject project. Due to the utility
contractor’s need for additional room to relocate the power lines, mechanized clearing will
increase hand clearing by 0.27 acre. This additional 0.27 acre increases the hand clearing due to
utility relocation on this project to 1.79 acres.
Regulatory approvals
Section 404 Permit: NCDOT requests that the U.S. Army Corps of Engineers (USACE) review
this permit modification request, as required for the above-described activities.
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1548 MAIL SERVICE CENTER
RALEIGH NC 27699-1548
TELEPHONE: 919-707-6100
FAX: 919-212-5785
WEBSITE: WWW.NCDOT.ORG
LOCATION:
CENTURY CENTER BUILDING B
1020 BIRCH RIDGE DR.
RALEIGH, NC 27610