Loading...
HomeMy WebLinkAbout20010016 Ver 3_401 Application_20140808Montalvo, Sheri A From: Higgins, Karen Sent: Friday, August 08, 2014 12 20 PM To: Smith, Chern L, Strickland, Bev Cc: Montalvo, Sheri A Subject: FW RIVERWOOD ATHLETIC CLUB - PHASE 8_S&EC PCN_08-08-2014 (S&EC 3616 W5) Attachments: RIVERWOOD ATHLETIC CLUB - PH 8_S&EC PCN_08-08-14 pdf Chem — FYI. Haven't received the hardcopy yet so not in BIMS, but will be 01-0016 v3. Bev — I put this in Laserfiche Thanks - Karen Karen Higgins 401 & Buffer Permitting Unit Supervisor NC DENR - Division of Water Resources 1617 Mail Service Center, Raleigh, NC 27699-1617 *Note new Mail Service Center Number* Phone (919) 807-6360 Email karen higgins@ncdenr gov Website http //portal ncdenr org/web/wq/401bufferpermitting E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Kevin Martin [mailto:kmartin@sandec.com] Sent: Friday, August 08, 2014 11:50 AM To: Shaeffer, David L SAW (David.L.Shaeffer@usace.army.mil) Cc: Higgins, Karen Subject: RIVERWOOD ATHLETIC CLUB - PHASE 8_S&EC PCN_08-08-2014 (S&EC 3616.W5) David and Karen wanted to give you a heads up that the attached PCN will be delivered to your offices today, it is a very small wetland impact for a utility line for one of the last phases of a very old project that dates back to the late 1990's but has had very few impacts (only one previous NWP approved that I am are of details are in the PCN), this is a courtesy notification to DWR Let me know if you have questions or need anything else Thanks Kevin C Martin President Soil & Environmental Consultants, PA We've moved to: North Quarter Office Park 8412 Falls of Neuse Road, Suite 104 Raleigh, NC 27615 (919) 846-5900 Office Phone (919) 846-9467 Fax (919) 270-7941 Mobile kmartiN( sandec com Visit us at SandEC coml This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information This electronic communication may not have passed through our standard review/quality control process Design data and recommendations included herein are provided as a matter of convenience and should not be used for final design Rely only on final, hardcopy materials bearing the consultant's original signature and seal If you are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited If you have received this electronic communication in error, please notify the sender by return e-mail and delete the original communication from your system Thank you August, 8th, 2014 S&EC Project # 3616.W5 To: US Army Corps of Engineers NC DWR, 401 & Buffer Permitting Unit Raleigh Regulatory Field Office Attn: Karen Higgins th Attn: David Schaeffer Archdale Building – 9 Floor 3331 Heritage Trade Drive, Suite 105 512 North Salisbury Street Wake Forest, NC 27587 Raleigh, NC 27604 From: Kevin C. Martin Soil & Environmental Consultants, PA Riverwood Athletic Club-Phase 8 Re: Clayton, Johnston County, NC On behalf of the applicant, FSC IV (Attn: Fred Smith, Jr.) please find attached a complete application and supplemental information requesting written concurrence from the U.S. Army Corps of Engineers) that the activities proposed below may proceed under Nationwide Permit 12 and a courtesy notification to the N.C. Division of Water Resources (NCDWR . Please contact me at (919) 270-7941 if you have any questions or require additional information. PROJECT SUMMARY Project Name Riverwood Athletic Club-Phase 8 Project Type Residential Development Owner / Applicant FSC IV County Johnston Nearest Town Clayton Waterbody Name Neuse River Basin Neuse Index Number 27-(36) Class WS V; NSW IMPACT SUMMARY Stream Impact (acres): 0.0 Wetland Impact (acres): 0.02594 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0.02594 Total Stream Impact (linear feet): 0 Attachments: Pre-construction Notification (PCN) Application Form Impact Exhibit Agent Authorization Owner Certification Form USGS Topographic Map & NRCS Soil Survey Map DWR ONLY: Overall Development Site Plan Preliminary JD Request Form Wetland Data form Upland data form Office Use Only: Corps action ID no. _____________ DWQ project no. _______________ Form Version 1.4January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Yes No 1d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit 401 Water Quality Certification – Express Riparian Buffer Authorization For the record only for Corps Permit: 1e. Is this notification solely for the record For the record only for DWQ because written approval is not required? 401 Certification: Yes No Yes No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank Yes No or in-lieu fee program. 1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h Yes No below. 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No 2. Project Information RiverwoodAthleticClubPhase8A 2a. Name of project: Johnston 2b. County: Clayton 2c. Nearest municipality / town: RiverwoodAthleticClub 2d. Subdivision name: 2e.NCDOT only, T.I.P. or state project no: 3. Owner Information FSCIV 3a. Name(s) on Recorded Deed: 176000-83-9975(PIN) 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if FredJ.Smith,Jr. applicable): 400RiverwoodDr. 3d. Street address: Clayton,NC27527 3e. City, state, zip: 919-422-4092 3f. Telephone no.: 3g. Fax no.: fjsj@fredsmithcompany.com 3h. Email address: Page 1 of 10 PCN Form – Version 1.4January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: Agent Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5.Agent/Consultant Information (if applicable) KevinC.Martin 5a. Name: 5b. Business name Soil&EnvironmentalConsultants,PA (if applicable): 8412FallsofNeuseRd.,Unit104 5c. Street address: Raleigh,NC27615 5d. City, state, zip: 919-270-7941 5e. Telephone no.: 919-846-9467 5f. Fax no.: kmartin@sandec.com 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 176000-83-9975 1a. Property identification no. (tax PIN or parcel ID): -78.436132 35.684036 1b. Site coordinates (in decimal degrees): Latitude: Longitude: 9.8 1c. Property size: acres 2. Surface Waters NeuseRiver 2a. Name of nearest body of water to proposed project: WSV,NSW 2b. Water Quality Classification of nearest receiving water: Neuse 2c. River basin: 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Undevelopedparcelwithinanexistingsubdivision,mostlywooded,Surroundingareaisundevelopedorresidentialsubdivision 0.5 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: providesewerforPhase8A 3e. Describe the overall project in detail, including the type of equipment to be used: Typicalconstructionequipmentforsewerinstallation, 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Yes No Unknown Corps or State been requested or obtained for this property / Comments: preliminaryJDrequestedwiththisapplication project (including all prior phases) in the past? 4b. If the Corps made the jurisdictional determination, what type Preliminary Final of determination was made? S&EC,PA 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: StevenBall Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Nostreamsshowuponsoilsorusgsforthisphasesothereisnoneedforastatedetermination 5. Project History 5a. Have permits or certifications been requested or obtained for Yes No Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to “help file” instructions. In2001NWP39andNW12for0.045acresofpermanentwetlandimpactand76'ofperennialstreamimpact(AID#199821098)(DWQ#010016) 6. Future Project Plans 6a. Is this a phased project? Yes No 6b. If yes, explain. Remainingundevelopedportionsofthesubdivisionareshownontheattachedplans,atthistimenodevelopmentplanshavebeencompletedfor theseareas. Page 3 of 10 PCN Form – Version 1.4January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams – tributariesBuffersOpen Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a.2b.2c.2d.2e.2f. Wetland impact Type of impact Type of wetland ForestedType of jurisdiction Area of numberCorps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Temporary (T) P BottomlandHardwoodForestYesCorps0.00861 W1 Excavation TLandClearingBottomlandHardwoodForest YesCorps0.01733 W2 -ChooseoneChooseone W3 Yes/No- Chooseone -Chooseone W4 Yes/No- - W5 Yes/No- ChooseoneChooseone -ChooseoneChooseone Yes/No- W6 0.02594 Total Wetland Impacts: 2g. 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3g. 3a.3b.3c.3d.3e.3f. Impact Stream impact Type of impact Stream name Perennial (PER) or Type of Average length numberintermittent (INT)? jurisdictionstream (linear Permanent (P) or width feet) Temporary (T) (feet) - S1 Chooseone-- S2 -Chooseone-- Chooseone S3--- S4-Chooseone-- -Chooseone- - S5 -Chooseone-- S6 Total stream and tributary impacts 3h. 3i. Comments: Page 4 of 10 PCN Form – Version 1.4January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a.4b.4c.4d.4e. Open water Name of waterbody ) impact number (if applicable Type of impact WaterbodyArea of impact (acres) Permanent (P) or type Temporary (T) - O1 ChooseoneChoose Choose -Chooseone O2 -ChooseoneChoose O3 Chooseone -Choose O4 Total open water impacts 4f. 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a.5b.5c.5d.5e. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) FloodedFilledExcavated FloodedFilledExcavated Chooseone P1 Chooseone P2 Total: 5f. 5g. Comments: 5h. Is a dam high hazard permit required? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts MUST below. If any impacts require mitigation, then you fill out Section D of this form. . Neuse Tar-Pamlico Catawba Randleman Other: 6aProject is in which protected basin? 6b.6c.6d.6e.6f.6g. Buffer Impact Reason for impact Stream name BufferZone 1 Zone 2 number – mitigationimpactimpact Permanent (P) or required?(square(square Temporary (T) feet)feet) - B1 Yes/No -Yes/No B2 Yes/No B3 - -Yes/No B4 -Yes/No B5 -Yes/No B6 Total Buffer Impacts: 6h. 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. PermanentwetlandimpactsinRaven’sRidgePhase8Aareduetoaproposedgravityseweroutalllineatsouthwestportionothetract.Thegravity ff sewermustbelocatedasshowninordertotieintotheexistingmanholeatthesouthwestcorneroftheproperty.Sewertie-insatothermanholesto thenorthwouldimpactmorewetlands;andtherearenootherexistingmanholestothesouththatareontheproperty. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. ThemaintenancecorridoristhenarrowestallowedbytheTownolayton.clearinglimitsareasnarrowaspossibletoallowconstructionothesewer fCf line. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for Yes No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): DWQ Corps Mitigation bank 2c. If yes, which mitigation option will be used for this Payment to in-lieu fee program project? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Chooseone Type:Quantity: Chooseone 3b. Credits Purchased (attach receipt and letter) Type: Quantity: Chooseone Type:Quantity: 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. Yes 4b. Stream mitigation requested: linear feet Chooseone 4c. If using stream mitigation, stream temperature: 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form – Version 1.4January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires Yes No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c.6d.6e. Reason for impact Total impactMultiplierRequired mitigation Zone (square feet) (square feet) Zone 1 3 (2 for Catawba) 1.5 Zone 2 Total buffer mitigation required: 6f. 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the projectinclude or is it adjacent to protected riparian buffers identified Yes No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. Yes No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d.If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ThestormwaterplanhasbeenapprovedbythedelegatedlocalmunicipalityJohnstonountyonlayton'sbehal (CCf) JohnstonCounty 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review Clayton 3a. In which local government’s jurisdiction is this project? Phase II NSW 3b. Which of the following locally-implemented stormwater management programs USMP apply (check all that apply): Water Supply Watershed Other: 3c. Has the approved Stormwater Management Plan with proof of approval been Yes No attached? 4. DWQ Stormwater Program Review Coastal counties HQW 4a. Which of the following state-implemented stormwater management programs apply ORW (check all that apply): Session Law 2006-246 Other: 4b. Has the approved Stormwater Management Plan with proof of approval been Yes No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No 5b. Have all of the 401 Unit submittal requirements been met? Yes No Page 8 of 10 PCN Form – Version 1.4January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the Yes No use of public (federal/state) land? 1b. If you answered “yes” to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State Yes No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered “yes” to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval Yes No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, Yes No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? Yes No 2c.If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in Yes No additional development, which could impact nearby downstream water quality? 3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered “no,” provide a short narrative description. WehavereviewedtheDratInternalPolicy,umulativeimpactsandthe401WaterualityertiicationandIsolatedWetlandsPrograms”document “fCQCf preparedbytheNCDivisionofWaterQualityonApril10,2004,version2.1.Thedraftstatesthatmanyprivatedevelopmentsareunlikelytocause cumulativeimpacts,includingprojectssuchasurbanin-fill,mostresidentialsubdivisionsandsmallcommercialdevelopmentsaswellasagricultural andsilviculturaloperations.RiverwoodAthleticClubPhase8isaresidentialdevelopment. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. onnectiontomunicipalsewerasshownonattachedplans C Page 9 of 10 PCN Form – Version 1.4January 2009 Project Area 02,0004,0001,000 Project No. USGS Vicinity Map 3616.W2 Feet Project Mgr.: Riverwood Phase 8 KCM Johnston Co., NC Scale: 1" = 1,000' 2013 Clayton USGS Quadrangle 2014-06-23 Project Area 02,0004,0001,000 Project No. Soil Survey Map 3616.W2 Feet Project Mgr.: Riverwood Phase 8 KCM Johnston Co., NC Scale: 1" = 1,000' 1994 Printed Johnston Co. Soil Survey, Map Sheet 1 2014-06-23 SBWFO(T 9B QIBTF QSPQPTFE SJEHF EFWFMPQNFOU QMBOT TVCEJWJTJPO DVSSFOU SJWFSXPPE GVUVSF DMVC OP BUIMFUJD FYJTUJOH BSFB 9B JNQBDUT QI/ NBQ* SJEHF JNQBDU XFUMBOET SBWFO(T )TFF PROPOSEDSSSEWER LIMITSOFCONSTRUCTION DISTURBANCE PERMANENTWETLAND IMPACT=375SQ.FT. TEMPORARYWETLAND IMPACT=755SQ.FT. NEUSE RIVER