Loading...
HomeMy WebLinkAboutNCC222726_ESC Approval Submitted_20220729ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director Town of Pembroke NORTH CAROLINA Environmental Quality July 9, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Attn: Tyler Thomas, Town Manager 98 Union Chapel Road Pembroke, NC 28372 RE: Project Name: Transportation Investment for Revitalization Acres Approved: 11 Project ID: ROBES-2022-024 County: Robeson, City: Pembroke, Address: NC711 River Basin: Lumber Stream Classification: Other Submitted By: The Wooten Company Date Received by LQS: June 10, 2022 Plan Type: New Dear Mr. Thomas: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at danny.smith&ncdenr.gov or Paul Clark at Paul.clark&ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. E Q�� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Regional Office 1225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 NORTH CAROLINA - oewnmwtoiEnviro�memalaual� /`� 910.433.3300 Letter of Approval with Modifications Town of Pembroke July 9, 2022 Page 2 of 3 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincere, Jodi Pace, EI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO1 Fact Sheet cc: Lester Lowe, The Wooten Company (electronic copy) Dixon Ivey, Building Inspector (electronic copy) DEMLR - Fayetteville Regional Office File Letter of Approval with Modifications Town of Pembroke July 9, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: TRANSPORTATION INVESTMENT FOR REVITALIZATION Project Number: ROBES-2022-024 County: ROBESON Show all the erosion control measures on the legend. The symbols on the legend must match the ones on the plan and the names must match the detail names. Sheet G-01.2, Erosion Control Notes 95 — Hay bales are not allowed as an erosion control measure. Remove that reference. The Project Description says there will be a rock check dam and rip rap outlet protection but neither is shown on the plan, nor are there details for either. Provide outlet protection calculations. Provide a construction entrance, check dam and rip rap apron detail, construction specifications and maintenance requirements. Provide specific maintenance requirements for each erosion control measure. Provide two frill size copies each of revised plan sheet only, showing all the Modifications required for approval, prior to beginning any land -disturbing activity. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities