Loading...
HomeMy WebLinkAboutNCC203552_NOT Closeout Documents_20220727North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 PNG - Cordova Expansion County: Richmond Project: Project - Phase I Person financially responsible: Piedmont Natural Gas - Randy Webb, Operation Supervisor Address: 5601 Cannon Drive, Monroe, NC 28110 1. Project Location: Old Cheraw Hwy, Rockingham Pictures: No River basin: Yadkin -Pee Dee Project #: RICHM-2021-001 NPDES NCGO10000 COC: NCC203552 2. Weather and soil conditions: sunny, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: June 24, 2022 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO10000) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Mike Lawyer Others present: Date of inspection: June 22, 2022 Time arriving on site: 11:24 AM Time leaving site: 11:34 AM cc: