HomeMy WebLinkAboutNCC201782_NOT Closeout Documents_20220727North Carolina Department of Environmental Quality
Ladd Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200
County: Wake Project: UT to Smith Creek Stream Restoration River basin: Neuse
Person financially responsible: Piedmont Conservation Council: Inc. -Eddie Project #: WAKE-2020-047
Culberson, PCC Chair
Address: 201 E. Main Street. 5th Floor, Durham, NC 27701
1. Project Location: Minna Road, Wake Forest
Pictures: No
2. Weather and soil conditions: sunny, dry, workable Initial inspection: No
3. Is site currently under notice of violation? No
4. is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No IfYes, where? (check all that apply)
Degree of damage:
S. Contact made with (name): no one Title:
Inspection report: Sent Report Date given/sent: July 22, 2022
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self monitoring or self inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edoes.deq.ne,gov/For-nisNCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Kimberly Summers Others present:
Date of inspection. July 19, 2022 Time arriving on site: 10:10 AM Time leaving site: 10:30 AM
cc: