Loading...
HomeMy WebLinkAbout20120810 Ver 1_Certification of Completion_20140808Action ID Nu m bier: SAW-2012-01642 County: Jobyston Permittee: NCDOTIB-4558 JStoney Fork L-reek / _13enson Date Permit Issued: 10/1.5/2012 Project Manager: Thomas Steffens Upon completion of the activity autburized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn., Thomas Steffens Washington Regulatory Field Of 2407 West 5''' Street Washington, North Carolina 27889 Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Perinittee Date NCDWQ Project No,: 2012081 1 County: Johnston Applicant: w. NCDOT . ....... . .......... ProjectNanie: _JB , q.86 on SR 4330 — TIP No, B-4558 _EiSj& _ ..... . . ....... Date of Issuance of 401 Water Quality Certification: ._ August 31, 2012 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Quality, 1650, Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to NCDWQ by the applicant, the applicant's authorized agent, or the prq ect engineer. It is not necessary to send certificates frorn all of these, Aj)plicant's Cerl flcodori 11 . . ....... hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Ageid's Certification 11 __ _, hereby state that, to the best of iny abilities, due care and diligence was used in (he observation of the construction such that the construction was observed to be built within substantial compliance and intent ofthe 401 Water Qua] ity Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature:... Engineer's Certy1cation Partial x Final 1, _gurge. P. as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules., the approved plans and specifications, and other supporting materials. Signature Registration No. 032142 Date.­ . August 4, 2014