Loading...
HomeMy WebLinkAboutSW4220501_Plansheet - SCM Detail_20220510LL I 1_ z ry WATAUGA COUNTY VALLE CRUCIS SCHOOL BROADSTONE ROAD VALLE CRUCIS, NC SCO # CODE: ITEM: 10 C L A R K N E X S E N .Jv i vvLL—CvL_ v i i �.L_` i. JVi i 300 ASHEviL-t-i-, ivvix1 i i vri�w�iiV�\ 28801 828.232.0608 CLARK NEXSEN LICENSE NUMBER: C-1028 CONSULTANT C'4D Civil Design Concepts, PA ASHEVILLE OFFICE 168 PATTON AVENUE ASHEVILLE, NC 28805 PHONE (828) 252-5388 FAX (828) 252-5365 NCBELS LICENSE H: C-2184 WKFU iA I L SEAL PROFESSIONAL SEAL 04/08/2022 WAYNESVILLE OFFICE 52 WALNUT STREET - SUITE 9 WAYNESVILLE, NC 28786 PHONE (828) 452-4410 FAX (828) 456-5455 www.eivildesignconcepts.com PERMIT DRAWINGS REVISIONS 1 01/13/2022 DESIGN DEVELOPMENT 2 04/01/2022 EC / STORM / NCDOT SUBMITTAL KEY PLAN SITE DETAILS C921 DESIGN: GRH DRAWN: SAK REVIEW: GRH CN 6832 1 2 3 4 5 6 E I•' C� SLOPE INSTALLATION 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES STAKES SPACED APPROXIMATELY 12" 30cm APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM"", STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2"-5" (5cm-12.5cm) OVERLAP DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH -ON THE PREVIOUSLY INSTALLED BLANKET. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5cm) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30cm) APART ACROSS ENTIRE BLANKET WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15cm) MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. EROSION CONTROL SLOPE MATTING INSTALLATION NOT TO SCALE CHANNEL INSTALLATION 12" 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN, 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30cm) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30cm) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4"-6" (10cm-15cm) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5cm-12.5cm) (DEPENDING ON BLANKET TYPE) AND STAPLED. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH ON THE BLANKET BEING OVERLAPPED 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9m-12m) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10cm) APART AND 4" (10cm) ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30cm) APART IN A 6" (15cm) DEEP X 6" (15cm) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. NOTE: CRITICAL POINTS * HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF A. OVERLAPS AND SEAMS NECESSARY TO ALLOW STAPLES TO SECURE THE CRITICAL B. PROJECTED WATER LINE POINTS ALONG THE CHANNEL SURFACE. C. CHANNEL BOTTOM/SIDE SLOPE VERTICES **IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR A A� STAKE LENGTHS GREATER THAN 6" (15 cm) MAY BE B B NECESSARY TO PROPERLY ANCHOR THE BLANKETS. C C 14649 HIGHWAY 41 NORTH, EVANSVILLE, INDIANA 47725 USA 1-800-772-2040 cANADA 1-800-443-2040 www."a9�ee".�om CHANNEL LINER INSTALLATION NOT TO SCALE CONSTRUCTION SEQUENCE 1. CONTACT THE DEMLR WINSTON-SALEM REGIONAL OFFICE AT LEAST 48 HOURS PRIOR TO COMMENCING THE LAND -DISTURBING ACTIVITY. THE CONTACT NUMBER IS (336) 776-9800. 2. EROSION AND SEDIMENT CONTROL (E&SC) PERMIT AND CERTIFICATION OF COVERAGE (COC) MUST BE OBTAINED BEFORE AND LAND DISTURBING ACTIVITIES OCCUR. 3. NO WORK SHALL OCCUR IN FLOWING WATER. 4. THE BOUNDARY OF ALL WETLAND AREAS ARE TO BE MARKED. DISTURBANCE WITHIN THE WETLANDS IS PROHIBITED UNLESS NOTED ON THE PERMITTED WETLAND REMOVAL PLANS. 5. INSTALL SITE CONSTRUCTION ENTRANCE, STONE STAGING, AND MOBILIZATION AREA. 6. INSTALL ALL PERIMETER EROSION CONTROL MEASURES AS REQUIRED BY THE APPROVED PLANS, INCLUDING SILT FENCES, BARRIERS AND DIVERSION DITCHES AS NEEDED. 7. INSTALL THE PHASE 1 SEDIMENT TRAP. NOTE, SEDIMENT TRAP WILL BE MODIFIED THROUGHOUT THE VARIOUS PHASES OF THE EROSION AND SEDIMENT CONTROL PLAN AS FILL IS BROUGHT TO THE SITE. 8. CLEARING AND GRUBBING ONLY NEEDED FOR MINIMUM DESIGN. 9. STABILIZE BANKS AS EARLY AS POSSIBLE. 10. PROCEED WITH IMPORTING OF FILL, GRADING, CLEARING AND GRUBBING. 11. CONSTRUCT PROPOSED STORM DRAINAGE SYSTEM. 12. APPLY TEMPORARY AND PERMANENT SEEDING, RIP RAP AND STABILIZATION MEASURES. 13. ALL BASINS SHALL BE MARKED WITH PERMANENT SIGNAGE THAT CORRESPONDS TO THE BASIN LABELS IN THE APPROVED PLAN. 14. SILT FENCE OUTLETS SHALL BE MARKED WITH SIGNAGE (SUCH AS PAINT ON THE ADJACENT SILT FENCE) THAT CORRESPONDS TO THE SILT FENCE OUTLET LABELS IN THE APPROVED PLAN. 15. THE CURRENT VERSION OF THE DEMLR MONITORING FORM IS TO BE USED FOR SELF INSPECTION OF THIS PROJECT. 16. PERIMETER MEASURES MUST BE LEFT IN PLACE UNTIL ALL UPLAND AREAS ARE PERMANENTLY STABILIZED. AFTER SITE IS PERMANENTLY STABILIZED, REMOVE ALL TEMPORARY EROSION CONTROL MEASURES AND PROVIDE PERMANENT SEEDING WHERE TEMPORARY MEASURES HAVE BEEN REMOVED AND GROUND COVER IS NOT ADEQUATE. SEDIMENT BASINS MAY NOT BE REMOVED OR CONVERTED TO PERMANENT BMPS UNTIL ALL UPLAND AREAS ARE PERMANENTLY STABILIZED. ALL EROSIONS CONTROL MEASURES INCLUDING SEDIMENT BASINS MUST BE REMOVED. IF DEWATERING IS NECESSARY TO ABANDON SEDIMENT BASINS, USE PUMP AND DEWATERING BAG. SEE C933 FOR DETAILS. 17. PER NPDES REQUIREMENTS, A RAIN GAUGE, SELF -INSPECTIONS RECORDS, PERMIT, CERTIFICATE OF COVERAGE, AND S&E PLAN ARE REQUIRED TO BE MAINTAINED ON SITE AND ACCESSIBLE DURING INSPECTION. IT IS RECOMMENDED THAT THESE ITEMS BE PLACED IN A PERMITS BOX AT THE BEGINNING OR ENTRANCE OF PROJECT. 18. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENT CONTROL MEASURES AND COMPLETE THE FOLLOWING COMBINED SELF -INSPECTION FORM FOUND ON THE DEMLR WEBSITE. HTTPS: //FILES.NC.GOV/NCDEQ/ENERGY%20MINERAL %20AND%20LAND%20RESOURCES/STORMWATER/NPDES%20GENERAL%20PERMITS/DEMLR -CSW-MONITORING-FORM-REV-AUGUST-8-2019.PDF. TWELVE MONTHS OF COMPLETE INSPECTION FORMS SHALL BE KEPT ON -SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED A COPY BE KEPT IN A PERMITS BOX. 19. SELF INSPECTIONS FOR EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY RAIN EVENT OF GREATER THAN 1 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL ESC MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE FOR MONITORING. 20. PERMANENT GROUND COVER SHALL BE ESTABLISHED IN 90 CALENDAR DAYS. HOWEVER, NPDES GROUNDCOVER REQUIREMENTS TAKE PRECEDENCE. 21. ALL BARE SOILS ARE TO BE STABILIZED UNDER CONDITIONS OUTLINED IN THE CURRENT NPDES PERMIT OR, IF IT A CRITICAL AREA, BY THE END OF THE DAY. 22. TREES OUTSIDE THE LIMITS OF DISTURBANCE MAY NOT BE REMOVED SO AS TO ALLOW ADDITIONAL SUNLIGHT TO HIT THE SOLAR PANELS. 23. REMAINING MEASURES MUST BE REMOVED AND RESULTING BARE AREAS STABILIZED BEFORE PERMIT CAN BE CLOSED. 24. WHEN THE PROJECT IS COMPLETE, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE E&SC PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISITDEQ.NC.GOV/NCGO1 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (E-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E-NOT HAS BEEN FILLED OUT. MAINTENANCE INSPECTIONS SHALL BE PERFORMED WEEKLY AND AFTER EACH RAINFALL. ALL REPAIRS NECESSARY SHOULD BE MADE IMMEDIATELY AND IN STRICT ACCORDANCE WITH NCDEQ STANDARDS AND NPDES PERMIT. NCDEQ EROSION CONTROL NOTES GENERAL: ALL EROSION CONTROL MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH REQUIREMENTS OF NCDEQ. THE FOLLOWING CONSTRUCTION SEQUENCE SHALL BE COMPLIED WITH FOR ALL WORK. 1. OBTAIN PROVISIONAL PERMIT. 2. INSTALL ALL EROSION CONTROL MEASURES AS REQUIRED. 3. OBTAIN GRADING PERMIT THROUGH ON -SITE INSPECTION BY A REPRESENTATIVE OF NCDEQ. 4. PROCEED WITH GRADING, CLEARING, AND GRUBBING. 5. SEED AND MULCH DENUDED AREA WITHIN EITHER 7 CALENDAR DAYS (SLOPES GREATER THAN 3:1) OR 14 CALENDAR DAYS (3:1 OR FLATTER). AFTER FINISHED GRADE ARE ESTABLISHED, TEMPORARY SEEDING AND SOIL AMENDMENTS SHALL BE PLACED ON A PREPARED SEEDBED AT THE FOLLOWING RATES PER ACRE. LIME 2,000 LBS FERTILIZER (10-10-10) 1,000 LBS STRAW MULCH 4,000 LBS FOR LATE WINTER/EARLY SPRING SEEDING ADD TO THE ABOVE: RYE GRAIN 120 LBS SWITCHGRASS 50 LBS (OMIT IF COVER IS NOT TO EXTEND BEYOND JUNE) FOR SUMMER SEEDING ADD: GERMAN MILLET 40 LBS FOR FALL ADD: RYE GRAIN 120 LBS IF HYDROSEEDING IS USED, WOOD CELLULOSE MAY BE SUBSTITUTED FOR STRAW MULCH AT THE RATE OF 1,000 LBS PER ACRE. 6. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 7. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREA. 8. REQUEST FINAL APPROVAL BY NCDEQ. 1) GROUND STABILIZATION SITE AREA DESCRIPTION STABILIZATION STABILIZATION TIME TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, 7 DAYS NONE DITCHES, AND SLOPES HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE SLOPES GREATER THAN 3:1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR FLATTER 14 DAYS 7-DAYS FOR SLOPES GREATER THAT 50' IN LENGTH ALL OTHER AREAS WITH 14 DAYS NONE (EXCEPT FOR SLOPES FLATTER THAN 4:1 PERIMETERS AND HQW ZONES) *EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE -SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE. (SECTION II.B(2)(B)) 2) BUILDING WASTE HANDLING • NO PAINT OR LIQUID WASTE IN STREAM OR STORM DRAINS. • DEDICATED AREAS FOR DEMOLITION, CONSTRUCTION AND OTHER WASTES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE. • EARTHEN -MATERIAL STOCKPILES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE. • CONCRETE MATERIALS MUST BE CONTROLLED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS, OR BUFFERS. 31 DISCHARGES TO FEDERALLY -LISTED WATERS • REQUIREMENTS ARE THE SAME AS IN PREVIOUS PERMIT. • THE PERMIT ALLOWS REDUCTION FROM THE 20 ACRE MINIMUM IF THE DIRECTOR OF DWQ DETERMINES THAT OTHER BMPS PROVIDE EQUIVALENT PROTECTION. 4) SELF -INSPECTION REQUIREMENTS • SAME WEEKLY INSPECTION REQUIREMENTS. • SAME RAIN GAUGE & INSPECTIONS AFTER 0.5" RAIN EVENT. • INSPECTIONS ARE ONLY REQUIRED DURING "NORMAL BUSINESS HOURS." • RECORDS MUST BE KEPT FOR 3 YEARS AND AVAILABLE ON -SITE DURING BUSINESS HOURS UNLESS A SITE -SPECIFIC EXEMPTION IS APPROVED. • RECORDS MUST BE KEPT FOR 3 YEARS AND AVAILABLE UPON REQUEST. • ELECTRONICALLY -AVAILABLE RECORDS MAY BE SUBSTITUTED UNDER CERTAIN CONDITIONS. • ALL EROSION CONTROL MEASURES SHALL BE INSPECTED AND CONDITIONS RECORDED ON NCDEQ SELF -INSPECTION AND SELF -MONITORING COMBINED FORM LOCATED AT HTTPS: //DEQ.NC.GOV/ABOUT/DIVISIONS/ ENERGY-MINERAL-LAND-RESOURCES/EROSION-SEDIMENT-CONTROL/FORMS 51 IMPLEMENTATION OF NEW PERMIT CONDITIONS • PROJECTS PERMITTED UNDER THE PREVIOUS PERMIT CAN CONTINUE TO FOLLOW THE PREVIOUSLY -PERMITTED CONDITIONS. • COMPLETE APPLICATIONS RECEIVED PRIOR TO AUGUST 3, 2011 CAN FOLLOW CONDITIONS OF APPROVED APPLICATION. • APPLICATIONS RECEIVED AFTER AUGUST 2, 2011 MUST COMPLY WITH NEW PERMIT CONDITIONS. 6) CONDITIONS IN EROSION & SEDIMENTATION CONTROLPLANS • DESIGNATION ON THE PLANS WHERE 7 AND 14-DAY GROUND STABILIZATION REQUIREMENTS ON THE NPDES PERMIT APPLY. • DESIGNATION ON THE PLANS WHERE BASINS THAT COMPLY WITH THE SURFACE -WITHDRAWAL REQUIREMENTS OF THE NPDES PERMIT ARE LOCATED. 7) SEDIMENT BASINS • OUTLET STRUCTURES MUST WITHDRAW FROM BASIN SURFACE UNLESS DRAINAGE AREA IS LESS THAN 1 ACRE. • USE ONLY DWQ-APPROVED FLOCCULANTS. PERMANENT SEEDING MEASURES GENERAL EROSION CONTROL NOTES 1. ALL GRADING AND SOIL EROSION CONTROL MEASURES ON THIS SITE MUST BE AUTHORIZED BY PERMITS ISSUED BY NCDEQ. ALL SITEWORK SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL REGULATORY STANDARDS AND ALL REQUIREMENTS IN THE PROJECT TECHNICAL SPECIFICATIONS. 2. CONTRACTOR TO VERIFY WITH ENGINEER THAT THE REQUIRED GRADING, EROSION CONTROL, LAND DISTURBANCE, AND ASSOCIATED NON -GRADING PERMITS HAVE BEEN OBTAINED PRIOR TO BEGINNING CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE UNDER THE INSPECTION OF THE ENGINEER, THE OWNER, AND NCDEQ. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 72 HOURS PRIOR TO BEGINNING WORK. ANY WORK COVERED PRIOR TO ENGINEER'S INSPECTION IS SUBJECT TO UNCOVERING AND BACKFILLING AT THE CONTRACTOR'S EXPENSE. 4. ALL WORK MUST BE PERFORMED BY A NORTH CAROLINA LICENSED CONTRACTOR. 5. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND VERIFYING THE EXACT LOCATION AND ELEVATION FOR ALL UTILITIES PRIOR TO CONSTRUCTION; AND TO NOTIFY ENGINEER OF ANY CONFLICTS OR DISCREPANCIES. THE LOCATION OF SOME UTILITIES SHOWN ON THE PLANS HAVE BEEN APPROXIMATED. ALL BURIED UTILITIES HAVE NOT BEEN SHOWN ON THE PLANS AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR LOCATION PRIOR TO CONSTRUCTION. 6. PROTECT EXISTING SITE FEATURES (SHOWN TO REMAIN) AND NEWLY COMPLETED WORK DURING CONSTRUCTION. ANY DAMAGE INCURRED DURING OR RESULTING FROM CONSTRUCTION ACTIVITY IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS TO BE REPAIRED IN ACCORDANCE WITH APPLICABLE STANDARDS OF APPROPRIATE AGENCIES, AS WELL AS THE PROJECT PLANS AND SPECIFICATIONS, AT THE CONTRACTOR'S EXPENSE. 7. THE CONTRACTOR IS TO NOTIFY ALL UTILITY COMPANIES AT LEAST 72 HOURS BEFORE CONSTRUCTION ACTIVITY IS TO BEGIN. THE CONTRACTOR SHALL NOTIFY NC ONE CALL AT 811, 48 HOURS BEFORE CONSTRUCTION BEGINS. NOTIFY THE ENGINEER AT LEAST 72 HOURS BEFORE STARTING CONSTRUCTION ACTIVITIES, 8. EROSION CONTROL IS A FIELD PERFORMANCE BASED ACTIVITY; AND ADDITIONAL SILT FENCES, TEMPORARY SEDIMENT BASINS, AND ALL OTHER MEASURES MAY NEED TO BE ADDED IN ADDITION TO THE APPROVED PLAN A MEASURES A I E DT S NECESSARY. S SHOWN CAN AND SHOULD BE ADJUSTED TO ASSURE MAXIMUM PROTECTION ON SITE. CONTRACTOR SHALL ADD ADDITIONAL MEASURES AS NEEDED IN ENVIRONMENTALLY SENSITIVE AREAS. 9. CONTRACTOR IS RESPONSIBLE FOR INSTALLING, MAINTAINING, AND REMOVING ALL NECESSARY EROSION AND SEDIMENTATION CONTROL MEASURES. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ADJUSTMENT OF ALL UTILITY SURFACE ACCESSES WHETHER THE CONTRACTOR PERFORMS THE WORK OR A UTILITY COMPANY PERFORMS THE WORK. 11. ALL AREAS WHERE THERE IS EXPOSED DIRT SHALL BE SEEDED, FERTILIZED AND MULCHED ACCORDING TO THE SPECIFICATIONS NOTES IN THE PLANS. SITE STABILIZATION IS A PERFORMANCE BASED REQUIREMENT, AND THE SITE WILL NOT BE ACCEPTED UNTIL PERMANENT VEGETATION IS ESTABLISHED TO THE SATISFACTION OF THE ENGINEER. 12. CONTRACTOR RESPONSIBLE FOR KEEPING ACCURATE LOG OF SITE CONDITIONS IN ACCORDANCE WITH NPDES PERMIT. MAINTENANCE INSPECTIONS SHALL BE PERFORMED WEEKLY AND AFTER EACH RAINFALL. ALL REPAIRS NECESSARY SHOULD BE MADE IMMEDIATELY AND IN STRICT ACCORDANCE WITH NCDEQ STANDARDS AND NPDES PERMIT. CONTRACTOR SHALL SUPPLY THE ENGINEER WITH RECORD OF DEVIATIONS FROM PLANS FOR PREPARATION OF FINAL RECORD DRAWINGS. 13. ALL SLOPES GREATER THAN 2:1 SLOPE AND OVER 5' IN HEIGHT SHALL BE CERTIFIED BY A LICENSED PROFESSIONAL AS REQUIRED BY NCDEQ. 14. CONTRACTOR IS REQUIRED TO OBTAIN AND PROVIDE A COPY OF THE EROSION CONTROL PERMIT FOR ANY OFFSITE BORROW/ SPOIL AREA. CONTRACTOR MUST PROVIDE COPY OF PERMIT TO NCDEQ INSPECTOR PRIOR TO CONSTRUCTION. 15. IF BORROWED OR WASTE FILL MATERIAL IS GENERATED, AN APPROVED GRADING PERMIT MUST BE SECURED FOR THE BORROW OR WASTE MATERIAL SITE PRIOR TO INITIATION OF ANY LAND DISTURBING ACTIVITY 16. ALL FILL SLOPES SHALL BE COMPACTED FULL DEPTH TO NOT LESS THAN 95% MAXIMUM DENSITY (STANDARD PROCTOR), SHALL BE PLACED ON A SURFACE CLEARED OF GROWTH AND DEBRIS, AND BE PROPERLY BENCHED AND DRAINED. 17. ALL FILL MATERIAL, UNLESS A PERMIT FROM NCDEQ DIVISION OF WASTE MANAGEMENT TO OPERATE A LANDFILL IS ON FILE FOR THE OFFICAL SITE, SHALL BE FREE OF ORGANIC OR OTHER DEGRADABLE MATERIALS, MASONRY, CONCRETE AND BRICK SIZES EXCEEDING 12 INCHES, AND ANY MATERIALS WHICH COULD CAUSE THE SITE TO BE REGULATED AS A LANDFILL BY THE STATE OF NORTH CAROLINA. EROSION CONTROL MAITENANCE NOTES: 1. INSPECT EROSION CONTROL MEASURES ONCE A WEEK AND AFTER EVERY SIGNIFICANT RAINFALL. CONTRACTOR TO INSPECT MEASURES FOR COMPLIANCE WITH PLANS AND DETAILS; INCLUDING SEDIMENT ACCUMULATION BEYOND DETAIL ALLOWANCE, AND ALSO DAMAGE OR FAILURE OF MEASURES. 2. WHEN SEDIMENT ACCUMULATION EXCEEDS DETAIL ALLOWANCE, CONTRACTOR TO REMOVE SEDIMENT AND/OR DEBRIS, AND RELOCATE TO ANOTHER AREA WITH SEDIMENT CONTROLS. 3. WHEN MEASURES ARE FOUND TO BE DAMAGED, CONTRACTOR TO REPAIR IMMEDIATELY TO BRING MEASURE BACK INTO COMPLIANCE WITH PLANS AND DETAILS. 4. IF MEASURES ARE FOUND TO BE INSUFFICIENT, CONTRACTOR TO INSTALL ADDITIONAL MEASURES AS NEEDED TO ENSURE SEDIMENT REMAINS CONTROLLED ONSITE AS REQUIRED. 5. CONTRACTOR TO REMOVE MEASURES AND BRING AREA TO GRADE ONCE CONFORMATION OF SITE STABILIZATION HAS BEEN REQUESTED AND RECEIVED FROM PROJECT ENGINEER. ALL PERMANENT MEASURES ARE TO BE PERFORMED IN STRICT ACCORDANCE WITH REQUIREMENTS OF NCDEQ. THE FOLLOWING APPLY TO AREAS WITHIN NCDEQ PERMANENT SEEDING MIXTURE AREA #1M: SEEDING MIXTURE: SPECIES RATE (LB/ACRE) TALL FESCUE 100 PANICUM VIRGATUM 10 REDTOP 5 KENTUCKY BLUEGRASS 5 NURSE PLANTS: BETWEEN MAY 1 AND AUG. 15, ADD 10 LB/ACRE GERMAN MILLET OR 15 LB/ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15, ADD 40 LB/ACRE RYE (GRAIN). IT MAY BE BENEFICIAL TO PLANT THE GRASSES IN LATE SUMMER AND OVERSEED THE SWITCHGRASS IN MARCH. SEEDING DATES: BEST POSSIBLE BELOW 2500 FT: AUG. 15 - SEPT. 1 JULY 25 - SEPT 15 MAR. 1 - APR. 1 MAR. 1 - MAY 10 ABOVE 2500 FT: JULY 25 - AUG. 15 JULY 15 - AUG. 30 MAR. 20 - APR. 20 MAR. 5 - MAY 15 COMPLETE SEEDING EARLIER IN FALL, AND START LATER IN SPRING ON NORTH- AND EAST -FACING SLOPES. SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO THE RESULTS OF A NC DEPARTMENT OF AGRICULTURE SOIL TEST MULCH: APPLY 4,000-5,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCHING MATERIAL. ANCHOR MULCH BY TACKING WITH ASPHALT, ROVING, OR NETTING. NETTING IS THE PREFERRED ANCHORING METHOD ON STEEP SLOPES. MAINTENANCE: MOW NO MORE THAN ONCE A YEAR. REFERTILIZE IN THE SECOND YEAR UNLESS GROWTH IS FULLY ADEQUATE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. 4't COM 1�1PACTED SOIL 2' MIN EXISTING GROUND IILL111 =�-III 18" MIN 1' DITCH DEPTH IN 1111 1�=llilll' I�I ORIGINAL GROUND -_ 11=11I1i1- -II� CONSTRUCTION SPECIFICATIONS: 6' TYP 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS THE SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE RE -GRADING AND CLEAN OUT. 5. CONSTRUCT ALL TEMPORARY DIVERSION DITCHES WITH A MINIMUM 2% SLOPE. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. TEMPORARY DIVERSION DITCH NOT TO SCALE 12" OF NCDOT #5 OR #57 WASHED STONE CLASS B RIPRAP FILTER FABRIC ? 7 24" MAX. AT CENTER cp 4' TO 6' - NOTE: MAXIMUM 100' SPACING BETWEEN CHECK DAMS EXCEPT ON ROADS GREATER THAN 10% GRADE IN WHICH CASE MAXIMUM SPACING OF 50' BETWEEN CHECK DAMS IS REQUIRED A B L - SECTION A -A STONE CHECK DAM: STONE SHOULD BE PLACED OVER THE CHANNEL BANKS TO KEEP WATER FROM CUTTING AROUND THE DAM. L = THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION THE FOLLOWING CRITERIA SHOULD BE USED WHEN DESIGNING A CHECK DAM: - ENSURE THAT THE DRAINAGE AREA ABOVE THE CHECK DAM DOES NOT EXCEED 0.5 ACRES. - KEEP THE MAXIMUM HEIGHT AT 2 FT AT THE CENTER OF THE DAM. - KEEP THE CENTER OF THE CHECK DAM AT LEAST 9 INCHES LOWER THAN THE OUTER EDGES AT NATURAL GROUND ELEVATION. - KEEP THE SIDE SLOPES OF THE DAM AT 2:1 OR FLATTER. FILTER - ENSURE THAT THE MAXIMUM SPACING BETWEEN DAMS PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME ELEVATION AS THE TOP OF THE DOWNSTREAM DAM. - STABILIZE OVERFLOW AREAS ALONG THE CHANNEL TO RESIST EROSION CAUSED BY CHECK DAMS. - USE NCDOT CLASS B STONE AND LINE THE UPSTREAM SIDE OF THE DAM WITH NCDOT #5 OR #57 STONE. - KEY THE STONE INTO THE DITCH BANKS AND EXTEND IT BEYOND THE ABUTMENTS A MINIMUM OF 1.5 FEET TO AVOID WASHOUTS FROM OVERFLOW AROUND THE DAM. STONE CHECK DAM FACE VIEW WATAUGA COUNTY VALLE CRUCIS SCHOOL BROADSTONE ROAD VALLE CRUCIS, NC SCO ## CODE: ITEM: DESIGNER CLARKNEXSEN CLARK NEXSEN LICENSE NUMBER: C-1028 CCCl Design COncepits.PA ASHEVILLE OFFICE WAYNESVILLE OFFICE 168 PATTON AVENUE 52 WALNUT STREET - SUITE 9 ASHEVILLE, NC 28805 WAYNESVILLE, NC 28786 PHONE (828) 252-5388 PHONE (828) 452-4410 FAX (828) 252-5365 FAX (828) 456-5455 NCBELS LICENSE #: C-2164 www.civildesignconcepts.com GURPURATESEAL PROFESSIONAL SEAL 000ti���2 =, 9� SEAL 035093 00= o \ O,Q pF Y N REVISIONS 1 01/13/2022 DESIGN DEVELOPMENT 2 04/01/2022 EC / STORM / NCDOT SUBMITTAL "r:Y PI "AI ROUGH GRADING AND ROSION CONTROL DETAIL C931 0 LLI I- Z_ ry n NOT TO SCALE DESIGN: GRH DRAWN: SAK CN 6832 REVIEW: GRH 1 2 3 4 5 6 W KA0Y E C LLI I- Z_ ry n MAINTENANCE NOTES: INSPECT TEMPORARY SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN IT ACCUMULATES TO ONE-HALF THE DESIGN DEPTH. PLACE REMOVED SEDIMENT IN AN AREA WITH SEDIMENT CONTROLS. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREA. BAFFLE (TYP.) + EARTHEN EMBANKMENT I I I P7 ,� � =III IIIIIIII �r -III .III Ili i -III=111- �x. ' -III III I I i -III=III- -1 INLET ZONE 25% OF SURFACE AREA \ FIRST CHAMBER 25% OF SURFACE AREA SECOND CHAMBER 25% OF SURFACE AREA NOTES: OUTLET ZONE 1. POROUS BAFFLE USING JUTE NET BACKED 25% OF SURFACE AREA BY COIR EROSION BLANKET (OR EQUIVALENT). 2. SEE FIGURE 6.65B OF NCDENR MANUAL OUTLET STRUCTURE FOR CROSS SECTION OF POROUS BATTLE. WITH RISER BARREL (SEE DETAIL) D3.o� SEDIMENT TRAP / BASIN BAFFLE DETAIL NOT TO SCALE SEDIMENT TRAP / BASIN BAFFLE MAITENANCE NOTES: 1. INSPECT SEDIMENT BASIN AND BAFFLES ONCE A WEEK AND AFTER EVERY RAINFALL. CONTRACTOR TO INSPECT SEDIMENT BASIN AND BAFFLES FOR COMPLIANCE WITH PLANS AND DETAILS; INCLUDING SEDIMENT ACCUMULATION BEYOND DETAIL ALLOWANCE, AND DAMAGE OR FAILURE OF MEASURES. 2. WHEN SEDIMENT ACCUMULATION EXCEEDS DETAIL ALLOWANCE, CONTRACTOR TO REMOVE SEDIMENT AND/OR DEBRIS, AND RELOCATE TO ANOTHER AREA WITH SEDIMENT CONTROLS. 3. WHEN BAFFLES ARE FOUND TO BE DAMAGED, CONTRACTOR TO REPAIR IMMEDIATELY TO BRING BAFFLES BACK INTO COMPLIANCE WITH PLANS AND DETAILS. 4. IF SEDIMENT BASIN IS FOUND TO BE INSUFFICIENT, CONTRACTOR TO INSTALL ADDITIONAL MEASURES OR INCREASE BASIN SIZE AS NEEDED TO ENSURE SEDIMENT REMAINS CONTROLLED ONSITE AS REQUIRED. 5. CONTRACTOR TO REMOVE MEASURES AND BRING AREA TO GRADE ONCE CONFORMATION OF SITE STABILIZATION HAS BEEN REQUESTED AND RECEIVED FROM PROJECT ENGINEER. SCH 40 COUPLING CONNECTION (TYP) VENT (TYP) INLET (TYP) PROPOSED NYLON ROPE (ROPE TO RUN EMBANKMENT TO PROVIDE METHOD TO PULL SKIMMER) INLET EXTENSION SCH 40 SOLID PVC BARREL OR "ARM" SUPPLIED BY USER (TYP) HOSE (TYP) NOTES: 1. SKIMMER SHOWN IN FLOATING POSITION 2. FAIRCLOTH SKIMMER OR APPROVED EQUIVALENT 3. SKIMMER TO BE REMOVED UPON REMOVAL OF SEDIMENT TRAP 4. COUPLING CONNECTION INTO PROPOSED OUTLET STRUCTURES MUST BE SEALED UPON REMOVAL OF SKIMMER POND SKIMMER DETAIL D3.O8 NOT TO SCALE POND SKIMMER MAITENANCE NOTES: 1. INSPECT POND SKIMMER ONCE A WEEK AND AFTER EVERY RAINFALL. CONTRACTOR TO INSPECT FOR COMPLIANCE WITH PLANS AND DETAILS. ENSURE SKIMMER DOES NOT GET STUCK TO BOTTOM OF POND. 2. IF SKIMMER IS FOUND TO BE DAMAGED, CONTRACTOR TO REPAIR IMMEDIATELY OR REPLACE TO BRING THE SKIMMER BACK INTO COMPLIANCE WITH PLANS AND DETAILS. 3. IF SKIMMER IS FOUND TO BE INSUFFICIENT, CONTRACTOR TO CONTACT PROJECT ENGINEER. 4. CONTRACTOR TO REMOVE MEASURES AND BRING AREA TO GRADE ONCE CONFORMATION OF SITE STABILIZATION HAS BEEN REQUESTED AND RECEIVED FROM PROJECT ENGINEER. SUPPORT POST, CIIPPORT RC)PF TC) ')A" INTn POTTr)KA C`TA VC Tn TRENCHED INTO BOTTOM OR SIDE D3.09 BAFFLE DETAIL NOT TO SCALE BAFFLE MAITENANCE NOTES: 1. REFERENCE DETAIL D3.07 BAFFLE MATERIAL 11 GAUGE LANDSCAPING STAPLE STEEL POST BAFFLE MATERIAL SHOULD BE SECURED TO THE BOTTOM OF THE SIDES AND BASIN USING 12" LANDSCAPE STAPLES REFERENCE NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL SECTION 6.55 ROCK PIPE INLET PROTECTION CLAS`. F� 0� SEDIMENT STORAGE ZONE FLOOD STORAGE ONE MAX SEDIMENT DEPTH RIPRAP HEADWALL, 1' MIN. HEIGHT FROM 1' 3' ROAD SHOULDER MAX DOT #57 WASHED STONE CLASS B RIP RAP PIPE RIP RAP HEADWALL ILTER BERM NC DOT �57 WASHED STONE ROCK PIPE INLET PROTECTION D3.OS NOT TO SCALE ROCK INLET PROTECTION MAINTENANCE NOTES: 1. INSPECT ROCK INLET PROTECTION ONCE A WEEK AND AFTER EVERY RAINFALL. CONTRACTOR TO INSPECT FOR COMPLIANCE WITH PLANS AND DETAILS. 2. WHEN SEDIMENT ACCUMULATION EXCEEDS DETAIL ALLOWANCE, CONTRACTOR TO REMOVE SEDIMENT AND/OR DEBRIS, AND RELOCATE TO ANOTHER AREA WITH SEDIMENT CONTROLS. 3. IF ROCK INLET PROTECTION IS FOUND TO BE DAMAGED, CONTRACTOR TO REPAIR IMMEDIATELY OR REPLACE TO BRING THE INLET PROTECTION BACK INTO COMPLIANCE WITH PLANS AND DETAILS. 4. IF ROCK INLET PROTECTION IS FOUND TO BE INSUFFICIENT, CONTRACTOR TO ADD ADDITIONAL STONE AS NEEDED TO PROTECT THE INLET OF THE PIPE FROM SEDIMENT. 5. CONTRACTOR TO REMOVE MEASURES AND BRING AREA TO GRADE ONCE CONFORMATION OF SITE STABILIZATION HAS BEEN REQUESTED AND RECEIVED FROM PROJECT ENGINEER. 2"-3" COARSE AGGREGATE (SUCH AS7 �11 RAILROAD BALLAST) IrZS NOTES: 1. A STABILIZED PAD OF CRUSHED STONE SHALL BE LOCATED WHERE TRAFFIC WILL BE ENTERING OR LEAVING A CONSTRUCTION SITE TO OR FROM AN EXISTING ROAD. 2. FILTER FABRIC SHALL BE PLACED UNDER. THE ENTRANCE/EXIT AND SHALL BE MIRAFI 500 OR EQUAL. 3. STONE TO BE 2 - 3 INCH WASHED STONE. 4. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC STREETS OR EXISTING PAVEMENT. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 5. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO PUBLIC STREETS MUST BE REMOVED IMMEDIATELY. 6. WHEN NECESSARY WHEELS MUST BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTERING A PUBLIC STREET, WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN APPROVED SEDIMENT BASIN D3.06 STABILIZED CONSTRUCTION ENTRANCE NOT TO SCALE FINISHED GRADE VARIES' In w S150/S75BN OR EQUAL DITCH LINER TEMPORARY DIVERSION DITCH NOT TO SCALE D3.04 TEMPORARY DIVERSION DITCH MAINTENANCE NOTES: 1. INSPECT DITCHES ONCE A WEEK AND AFTER EVERY RAINFALL. CONTRACTOR TO INSPECT FOR COMPLIANCE WITH DITCH LOCATION AND SIZE SHOWN ON APPROVED PLANS. 2. IF SEDIMENT ACCUMULATION WITHIN DITCH BEGINS TO REDUCE WATER FLOW CAPACITY, CONTRACTOR TO REMOVE SEDIMENT AND/OR DEBRIS, AND RELOCATE TO ANOTHER AREA WITH SEDIMENT CONTROLS. 3. IF DITCH IS FOUND TO BE DAMAGED BY EROSION, CONTRACTOR TO REPAIR IMMEDIATELY TO BRING THE DITCH BACK INTO COMPLIANCE WITH PLANS AND DETAILS. 4. IF DITCH IS FOUND TO BE INSUFFICIENT, CONTRACTOR TO INCREASE THE OVERALL SIZE OF THE DITCH OR ADD ADDITIONAL LENGTH AS NEEDED. 5. CONTRACTOR TO REMOVE MEASURES AND BRING AREA TO GRADE ONCE CONFORMATION OF SITE STABILIZATION HAS BEEN REQUESTED AND RECEIVED FROM PROJECT ENGINEER. MIN. 10 GA. LINE WIRES (TYP) VARIABLE AS DIRECTED BY ENGINEER i WOVEN WIRE FABRIC SII T FFN(.F FII TFR FARRIO FRONT VIEW �- STEEL POST PLASTIC OR WIRE TIES (TYP) MIN. 12-1/2 GA INTERMEDIATE WIRES (TYP) EX. GRADE STEEL POST WOVEN WIRE FABRIC SILT FENCE FILTER FABRIC N � � 0 N IIIII FILL SLOPE N IIIII Ill➢ EX. GRADE ANCHOR 12" LONG SKIRT IN TRENCH 8" DEEP AND 4" WIDE* SIDE VIEW CONSTRUCTION NOTES: MATERIALS NOTES: 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD 1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER WEIGHT OF POLYOLEFINS OR POLYESTER, WHICH IS FABRICS. CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING TO THE REQUIREMENTS IN ASTM D 6461, 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES WHICH IS SHOWN IN PART IN TABLE 6.62b OF THE NOT EXCEED 24" ABOVE THE GROUND SURFACE. (HIGHER NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO DESIGN MANUAL. CAUSE FAILURE OF THE STRUCTURE.) 2 SYNTHETIC FILTER FABRIC SHOULD CONTAIN ULTRAVIOLET 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID OF 6 MONTHS OF EXPECTED USUABLE CONSTRUCTION LIFE JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY AT A TEMPERATURE RANGE OF 0 TO 120°F. FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4' MIN. OVERLAP TO THE NEXT POST. 3. ENSURE THAT POSTS FOR SEDIMENT FENCES ARE 1.33 LB/LINEAR FT STEEL WITH A MINIMUM LENGTH OF 5 FEET. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MAKE SURE THAT STEEL POSTS HAVE PROJECTIONS TO MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE FACILITATE FASTENING THE FABRIC. POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE 4. FOR REINFORCEMENT OF STANDARD STRENGTH FILTER RENFORCEMENT, THEN THE FABRIC ON THE UPSLOPE SIDE FABRIC, USE WIRE FENCE WITH A MINIMUM 14 GAUGE AND OF THE FENCE POST. WIRE OR PLASTIC TIES SHOULD A MAXIMUM MESH SPACING OF 6 INCHES. HAVE A MIN. 50 lb TENSILE STRENGTH. 5. EXCAVATE A TRENCH APPROXIMATELY 4" WIDE AND 8" NOTES: DEEP ALONG THE PROPOSED LINE OF POSTS AND USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT UPSLOPE FROM THE BARRIER. EXCEED 1/4 ACRE AND NEVER IN AREAS OF 6. PLACE 12" OF THE FABRIC ALONG THE BOTTOM AND SIDE CONCENTRATED FLOW OF THE TRENCH. * FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED 7. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE STONE. AS AN ANCHOR WHEN SILT FENCE IS PROTECTING FILTER FABRIC AND COMPACT. THOROUGH COMPACTION CATCH BASIN. OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 8. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. D3.01 SILT FENCE NOT TO SCALE WOVEN FILTER FABRIC WIRE FENCING i-STEEL POST -STEEL POST WIRE FENCING -STEEL POST WIRE FENCING -CLASS I RIP RAP -45 WASHED STONE CONCENTRATED FLOW OUTLETS - D3.03 SILT FENCE NOT TO SCALE CONCENTRATED FLOW OUTLET MAINTENANCE NOTES: 1. INSPECT CONCENTRATED FLOW OUTLET ONCE A WEEK AND AFTER EVERY RAINFALL. CONTRACTOR TO INSPECT FOR COMPLIANCE WITH PLANS AND DETAILS. 2. WHEN SEDIMENT ACCUMULATION EXCEEDS DETAIL ALLOWANCE, CONTRACTOR TO REMOVE SEDIMENT AND/OR DEBRIS, AND RELOCATE TO ANOTHER AREA WITH SEDIMENT CONTROLS. 3. IF CONCENTRATED FLOW OUTLET IS FOUND TO BE DAMAGED, CONTRACTOR TO REPAIR IMMEDIATELY OR REPLACE TO BRING THE INLET PROTECTION BACK INTO COMPLIANCE WITH PLANS AND DETAILS. 4. IF CONCENTRATED FLOW OUTLET IS FOUND TO BE INSUFFICIENT TO DRAIN FILTERED WATER FROM BEHIND SILT FENCE, CONTRACTOR TO ADD ADDITIONAL CONCENTRATED FLOW OUTLETS TO THE SILT FENCE AS NEEDED TO PROTECT THE SILT FENCE FROM BEING OVERTOPPED BY WATER. 5. CONTRACTOR TO REMOVE MEASURES AND BRING AREA TO GRADE ONCE CONFORMATION OF SITE STABILIZATION HAS BEEN REQUESTED AND RECEIVED FROM PROJECT ENGINEER. PIPE OUTLET TO WELL-DEFINED CHANNEL PLAN La La o f ;n �_ e.- f FILTER BLANKET FILTER BLANKET SECTION AA SECTION AA NOTES: 1. La IS THE LENGTH OF THE RIP RAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" (MINIMUM IS 24" DEEP IF STONE IS CLASS II) 3. IN A WELL-DEFINED CHANNEL, EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP AND SOIL FOUNDATION. 5. COMPACT ANY REQUIRED FILL TO DENSITY OF SURROUNDING UNDISTURBED MATERIAL. 6. RIP RAP MAY BE FIELDSTONE OR ROUGH QUARRY STONE AND SHALL BE HARD. ANGULAR AND WELL -GRADED. 7. CONSTRUCT APRON AT ZERO GRADE. TOP OF RIP RAP SHALL BE LEVEL WITH THE RECEIVING CHANNEL OR SLIGHTLY LOWER. 8. ALIGN APRON WITH RECEIVING CHANNEL OR STREAM. ASSURE APRON IS STRAIGHT THROUGHOUT ITS LENGTH. 9. END WIDTH OF APRON TO BE EQUAL TO WIDTH OF RECEIVING CHANNEL. D3.02 RIP -RAP APRON NOT TO SCALE RIP -RAP APRON MAINTENANCE NOTES: 1. INSPECT RIP -RAP APRON ONCE A WEEK AND AFTER EVERY RAINFALL. CONTRACTOR TO INSPECT FOR COMPLIANCE WITH PLANS AND DETAILS. 2. WHEN SEDIMENT ACCUMULATION EXCEEDS DETAIL ALLOWANCE, CONTRACTOR TO REMOVE SEDIMENT AND/OR DEBRIS, AND RELOCATE TO ANOTHER AREA WITH SEDIMENT CONTROLS. 3. IF RIP -RAP APRON IS FOUND TO BE DAMAGED, CONTRACTOR TO REPAIR IMMEDIATELY OR REPLACE TO BRING THE APRON BACK INTO COMPLIANCE WITH PLANS AND DETAILS. 4. IF RIP -RAP APRON IS FOUND TO BE INSUFFICIENT, CONTRACTOR TO ADD ADDITIONAL STONE AND INCREASE THE OVERALL SIZE OF THE RIP -RAP APRON AS NEEDED. 5. CONTRACTOR TO REMOVE MEASURES AND BRING AREA TO GRADE ONCE CONFORMATION OF SITE STABILIZATION HAS BEEN REQUESTED AND RECEIVED FROM PROJECT ENGINEER. WATAUGA COUNTY VALLE CRUCIS SCHOOL BROADSTONE ROAD VALLE CRUCIS, NC SCO ## CODE: ITEM: DESIGNER C L A R K N E X S E N CLARK NEXSEN LICENSE NUMBER: C-1028 C C Civil Design Concepts, PA ASHEVILLE OFFICE WAYNESVILLE OFFICE 168 PATTON AVENUE 52 WALNUT STREET - SUITE 9 ASHEVILLE, NC 28805 WAYNESVILLE, NC 28786 PHONE (828) 252-5388 PHONE (828) 452-4410 FAX (828) 252-5365 FAX (828) 456-5455 NCBELS LICENSE #: C-2184 www.eivildesignconcepts.com CORPORATESEAL PROFESSIONAL SEAL SEAL 0 035 3 0� 2 �;?Y R .° nl REVISIONS 1 01/13/2022 DESIGN DEVELOPMENT 2 04/01/2022 EC / STORM / NCDOT SUBMITTAL KEY PLAN ROUGH GRADING AND ROSION CONTROL DETAIL C932 DESIGN: GRH DRAWN: SAK REVIEW: GRH CN 6832 1 2 3 4 5 6 WATAUGA COUNTY VALLE CRUCIS SCHOOL E C 191 PEAK ROOF TRASHRACK 10.0' SKIMMER BERM TOP (SEE DETAIL) 1.0' MIN EMERGENCY SPILLWAY RISER CREST 1.0' MIN ELEV. 2672.7' FREEBOARD -11 SELECTED FILL�kl =WITH EMBANKMENT STABILIZED VEGETATION =SEDIMENT REMOVAL MARK - I PLACED IN LAYERS =I.IIi 2.5:1 SLOPE MAX. ELEV. 2668.8' AND COMPACTED -Illillllf 6' MIN. RISER INVERT -III III- ELEV. 2668.4' _ I I III1 I I1 i / CMP BARREL CLASS B STONE PAD I- i 111 I I1 I I1 11�� � r (4'x4'x1' MIN) ANTI -SEEP COLLAR FLEXIBLE CONNECTION TO (SEE DETAIL) SKIMMER (SEE DETAIL) L CUT-OFF TRENCH CONCRETE 2' DEEP, 3' BOTTOM ANTI -FLOATATION 2:1 SIDE SLOPES PAD SECTION THROUGH EMBANKMENT RIP RAP APRON AT OUTLET 1. LOCATE THE SEDIMENT INLETS TO THE BASIN THE GREATEST DISTANCE FROM THE PRINCIPLE SPILLWAY. 2. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 3. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH NCDEQ PRACTICE STANDARD 6.65. 4. INSTALL SKIMMER AND COUPLING TO RISER STRUCTURE OR DIRECTLY INTO THE EMBANKMENT 1 FT. FROM BOTTOM OF BASIN 5. THE ARM PIPE SHALL HAVE A MINIMUM LENGTH OF 6 FT. BETWEEN THE SKIMMER AND THE COUPLING. 6. ALLOW THE MAXIMUM REASONABLE DETENTION PERIOD BEFORE THE BASIN IS COMPLETELY DE -WATERED (AT LEAST 10 HOURS). 7. REDUCE THE INFLOW VELOCITY AND DIVERT ALL SEDIMENT -FREE RUNNOFF. ELEVATION OF OVERFLOW (SEE PLAN VIEW FOR ELEVATIONS) CONCRETE RISER STRUCTURE (SEE PLAN VIEW FOR SIZING) BOTTOM OF SEDIMENT TRAP 4" SCH 40 COUPLING FROM POND SKIMMER TO BE CONNECTED TO 4" SCH 40 PIPE E 11 SEDIMENT BASIN NOT TO SCALE E 10 TRASH RACK N ELEV 1' BELOW TRAP BOTTOM REINFORCED CONCRETE SLAB 5' WIDE BERM 1% MIN ---> TEMPORARY RISER STRUCTURE AT TEMPORARY SEDIMENT BASIN NOT TO SCALE TEMPORARY HDPE PIPE PIPE TO TIE INTO STORM STRUCTURE (SEE PLAN) BROADSTONE ROAD VALLE CRUCIS, NC SCO ## CODE: ITEM: DESIGNER C L A R K N E X S E N CLARK NEXSEN LICENSE NUMBER: C-1028 'ONSULTANT 0 Civil Design Concepts, PA ASHEVILLE OFFICE WAYNESVILLE OFFICE 168 PATTON AVENUE 52 WALNUT STREET - SUITE 9 ASHEVILLE, NC 28805 WAYNESVILLE, NC 28786 PHONE (828) 252-5388 PHONE (828) 452-4410 FAX (828) 252-5365 FAX (828) 456-5455 NCBELS LICENSE #: C-2184 www.eivildesignconcepts.com CORPORATESEAL PROFESSIONAL SEAL REVISIONS 1 01 /13/2022 2 04/01 /2022 'FY PLAN S/ 0"' SEAL 0 035093 0� 2 Ry NSF \, DESIGN DEVELOPMENT EC / STORM / NCDOT SUBMITTAL EROSION CONTROL SEDIMENT TRAP DETAILS C933 LLJI I_ z Ir In DESIGN: GRH DRAWN: SAK CN 6832 REVIEW: GRH 1 2 3 4 5 6 WATAUGA COUNTY VALLE CRUCIS SCHOOL E C 191 PEAK ROOF TRASHRACK 10.0' SKIMMER BERM TOP (SEE DETAIL) 1.0' MIN EMERGENCY SPILLWAY RISER CREST 1.0' MIN ELEV. 2672.7' FREEBOARD -11 SELECTED FILL�kl =WITH EMBANKMENT STABILIZED VEGETATION =SEDIMENT REMOVAL MARK - I PLACED IN LAYERS =I.IIi 2.5:1 SLOPE MAX. ELEV. 2668.8' AND COMPACTED -Illillllf 6' MIN. RISER INVERT -III III- ELEV. 2668.4' _ I I III1 I I1 i / CMP BARREL CLASS B STONE PAD I- i 111 I I1 I I1 11�� � r (4'x4'x1' MIN) ANTI -SEEP COLLAR FLEXIBLE CONNECTION TO (SEE DETAIL) SKIMMER (SEE DETAIL) L CUT-OFF TRENCH CONCRETE 2' DEEP, 3' BOTTOM ANTI -FLOATATION 2:1 SIDE SLOPES PAD SECTION THROUGH EMBANKMENT RIP RAP APRON AT OUTLET 1. LOCATE THE SEDIMENT INLETS TO THE BASIN THE GREATEST DISTANCE FROM THE PRINCIPLE SPILLWAY. 2. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 3. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH NCDEQ PRACTICE STANDARD 6.65. 4. INSTALL SKIMMER AND COUPLING TO RISER STRUCTURE OR DIRECTLY INTO THE EMBANKMENT 1 FT. FROM BOTTOM OF BASIN 5. THE ARM PIPE SHALL HAVE A MINIMUM LENGTH OF 6 FT. BETWEEN THE SKIMMER AND THE COUPLING. 6. ALLOW THE MAXIMUM REASONABLE DETENTION PERIOD BEFORE THE BASIN IS COMPLETELY DE -WATERED (AT LEAST 10 HOURS). 7. REDUCE THE INFLOW VELOCITY AND DIVERT ALL SEDIMENT -FREE RUNNOFF. ELEVATION OF OVERFLOW (SEE PLAN VIEW FOR ELEVATIONS) CONCRETE RISER STRUCTURE (SEE PLAN VIEW FOR SIZING) BOTTOM OF SEDIMENT TRAP 4" SCH 40 COUPLING FROM POND SKIMMER TO BE CONNECTED TO 4" SCH 40 PIPE E 11 SEDIMENT BASIN NOT TO SCALE E 10 TRASH RACK N ELEV 1' BELOW TRAP BOTTOM REINFORCED CONCRETE SLAB 5' WIDE BERM 1% MIN ---> TEMPORARY RISER STRUCTURE AT TEMPORARY SEDIMENT BASIN NOT TO SCALE TEMPORARY HDPE PIPE PIPE TO TIE INTO STORM STRUCTURE (SEE PLAN) BROADSTONE ROAD VALLE CRUCIS, NC SCO ## CODE: ITEM: DESIGNER 0 C L A R K N E X S E N CLAKK IvtxSEN LICENSE NUMBER: C-1028 Civil Design Concepts, PA ASHEVILLE OFFICE WAYNESVILLE OFFICE 168 PATTON AVENUE 52 WALNUT STREET - SUITE 9 ASHEVILLE, NC 28805 WAYNESVILLE, NC 28786 PHONE (828) 252-5388 PHONE (828) 452-4410 FAX (828) 252-5365 FAX (828) 456-5455 NCBELS LICENSE #: C-2184 www.eivildesignconcepts.com CORPORATESEAL PROFESSIONAL SEAL REVISIONS 1 01 /13/2022 2 04/01 /2022 KEY PLAN SEAL 0 035093 0� 2 O,Q y NpF R. DESIGN DEVELOPMENT EC / STORM / NCDOT SUBMITTAL EROSION CONTROL SEDIMENT TRAP DETAILS PHASE 2 C934 LLJI I_ z Ir In DESIGN: GRH DRAWN: SAK CN 6832 REVIEW: GRH 1 2 3 4 5 6 WATAUGA COUNTY VALLE CRUCIS SCHOOL E C 191 PEAK ROOF TRASHRACK 10.0' SKIMMER BERM TOP (SEE DETAIL) 1.0' MIN EMERGENCY SPILLWAY RISER CREST 1.0' MIN ELEV. 2672.7' FREEBOARD -11 SELECTED FILL�kl =WITH EMBANKMENT STABILIZED VEGETATION =SEDIMENT REMOVAL MARK - I PLACED IN LAYERS =I.IIi 2.5:1 SLOPE MAX. ELEV. 2668.8' AND COMPACTED —Illillllf 6' MIN. RISER INVERT —III III- ELEV. 2668.4' _ I I III1 I I1 i / CMP BARREL CLASS B STONE PAD I— i 111 I I1 I I1 11�� � r (4'x4'x1' MIN) ANTI —SEEP COLLAR FLEXIBLE CONNECTION TO (SEE DETAIL) SKIMMER (SEE DETAIL) L CUT—OFF TRENCH CONCRETE 2' DEEP, 3' BOTTOM ANTI —FLOATATION 2:1 SIDE SLOPES PAD SECTION THROUGH EMBANKMENT RIP RAP APRON AT OUTLET 1. LOCATE THE SEDIMENT INLETS TO THE BASIN THE GREATEST DISTANCE FROM THE PRINCIPLE SPILLWAY. 2. SEED AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 3. INSTALL A MINIMUM OF 3 COIR FIBER BAFFLES IN ACCORDANCE WITH NCDEQ PRACTICE STANDARD 6.65. 4. INSTALL SKIMMER AND COUPLING TO RISER STRUCTURE OR DIRECTLY INTO THE EMBANKMENT 1 FT. FROM BOTTOM OF BASIN 5. THE ARM PIPE SHALL HAVE A MINIMUM LENGTH OF 6 FT. BETWEEN THE SKIMMER AND THE COUPLING. 6. ALLOW THE MAXIMUM REASONABLE DETENTION PERIOD BEFORE THE BASIN IS COMPLETELY DE —WATERED (AT LEAST 10 HOURS). 7. REDUCE THE INFLOW VELOCITY AND DIVERT ALL SEDIMENT —FREE RUNNOFF. ELEVATION OF OVERFLOW (SEE PLAN VIEW FOR ELEVATIONS) CONCRETE RISER STRUCTURE (SEE PLAN VIEW FOR SIZING) BOTTOM OF SEDIMENT TRAP 4" SCH 40 COUPLING FROM POND SKIMMER TO BE CONNECTED TO 4" SCH 40 PIPE E 11 SEDIMENT BASIN NOT TO SCALE E 10 TRASH RACK N ELEV 1' BELOW TRAP BOTTOM REINFORCED CONCRETE SLAB 5' WIDE BERM 1% MIN ---> TEMPORARY RISER STRUCTURE AT TEMPORARY SEDIMENT BASIN NOT TO SCALE TEMPORARY HDPE PIPE PIPE TO TIE INTO STORM STRUCTURE (SEE PLAN) BROADSTONE ROAD VALLE CRUCIS, NC SCO ## CODE: ITEM: DESIGNER 0 C L A R K N E X S E N CLAKK IvtxSEN LICENSE NUMBER: C-1028 Civil Design Concepts, PA ASHEVILLE OFFICE WAYNESVILLE OFFICE 168 PATTON AVENUE 52 WALNUT STREET - SUITE 9 ASHEVILLE, NC 28805 WAYNESVILLE, NC 28786 PHONE (828) 252-5388 PHONE (828) 452-4410 FAX (828) 252-5365 FAX (828) 456-5455 NCBELS LICENSE #: C-2184 www.eivildesignconcepts.com CORPORATESEAL PROFESSIONAL SEAL SEAL 0 03 093 � 2 o �Fo G'o ° 1�� o;,y oaN�F REVISIONS 1 01 /13/2022 2 04/01 /2022 KEY PLAN DESIGN DEVELOPMENT EC / STORM / NCDOT SUBMITTAL EROSION CONTROL SEDIMENT TRAP DETAILS PHASE 2 C934 LLJI I_ z Ir In DESIGN: GRH DRAWN: SAK CN 6832 REVIEW: GRH 1 2 3 4 5 6 0 LLI z Ir E C A NEENAH R-1975-B SCORIATED LID HANDHOLE FRAME & LID LETTERED "STORM" EXTERNAL DOWN SPOUT ALL NON-FERROUS UNDERGROUND LINES OR APPROVED EQUAL OR "SEWER" NEENAH R-1975-B HANDHOLE FRAME & LID SCORIATED LID (SEE ARCHITECTURAL OUTSIDE BUILDING FOOTPRINT SHALL BE FINAL BACKFILL OR APPROVED EQUAL "� LETTERED "STORM" PLANS) REQUIRED TO HAVE A MAGNETIC -TYPE (SEE SPECIFICATION FOR FINISH GRADE WARNING TAPE INSTALLED IN THE BACKFILL AT LEAST 6" BELOW GRADE. COMPACTION REQUIREMENT) FINISH GRADE 6" UNIVERSAL DOWN SPOUT N CONNECTION PLUG z (FERNCO USDS-6P OR J .,..ro ..a.. APPROVED EQUIVALENT) N z 4" THREADED Q '' w o CLEAN -OUT PLUG M 0_ 6" DOWN SPOUT COLLECTION w 11J N z 4" THREADED PIPE (CONTRACTOR TO D CO 45° BEND 45° WYE BRANCH OR 45' J 0 CLEAN -OUT PLUG COORDINATE WITH ARCHITECT 00 �(If BEND AS REQUIRED BY z cr) FOR ANY SUPERCEDING DOWN w z Of z SITE PLAN D 45° BEND SPOUT CONNECTION DESIGNS o Ld > w ~ z w 45° WYE BRANCH OR AND LOCATIONS) O 0 > a0 O PROVIDE STONE BEDDING Q O Q 45° BEND AS REQUIRED � o_ FROM 6" BELOW PIPE TO TOP O BY SITE PLAN D o w 00 PROVIDE STONE BEDDING o OF PIPE FOR FULL TRENCH z m N FROM 6" BELOW PIPE TO TOP z �_ WIDTH ON ALL PVC PIPE. ? x o OF PIPE FOR FULL TRENCH g Li WIDTH. _j 1.0% MIN. 1.0% MIN. INITIAL BACKFILL 45° BEND (TYP) (COMPACTED TO 98% (AS REQUIRED) SPRINGLINE - OF STANDARD PROCTOR) NOTES: HAUNCH NOTES: (COMPACTED TO 98% 1. CLEAN -OUT PIPE AND FITTINGS SHALL BE SAME MATERIAL AS THE DOWNSPOUT COLLECTION PIPE. SEE OF STANDARD PROCTOR) PLAN FOR PIPE SIZES. CLEAN -OUT WYE TO BE SAME DIAMETER AS LATERAL. RISER, PIPE AND 1. CLEAN -OUT PIPE AND FITTINGS SHALL BE SAME MATERIAL AS THE DOWNSPOUT COLLECTION PIPE. SEE BEDDING THREADED PLUG TO BE 4". PLAN FOR PIPE SIZES. CLEAN -OUT WYE TO BE SAME DIAMETER AS LATERAL. RISER, PIPE AND. 2. WHERE CLEAN -OUTS ARE LOCATED IN SIDEWALKS OR PAVEMENT, CAST HANDHOLE LID IN PLACE AND THREADED PLUG TO BE 4". (COMPACTED TO 98% FLUSH WITH FINISH GRADE. 2. WHERE CLEAN -OUTS ARE LOCATED IN SIDEWALKS OR PAVEMENT, CAST HANDHOLE LID IN PLACE AND OF STANDARD PROCTOR) FLUSH WITH FINISH GRADE. w w 3. CONTRACTOR TO COORDINATE WITH ARCHITECT FOR ANY SUPERCEDING EXTERNAL DOWN SPOUT a- o COLLECTION SYSTEM CONNECTION DESIGNS AND LOCATIONS a o SUITABLE D5.08 PIPE CLEANOUT DETAIL N 0 FOUNDATION NOT TO SCALE DOWN SPOUT COLLECTION PIPE AND CLEANOUT ^' MIN. TRENCH WIDTH _ DS.OS N 0 (SEE TABLE) ro NOT TO SCALE 0. 0' 00 TOP OF WEIR MANHOLE FRAME AND LID TO BE nl nnrn nlnC/"`TI V PRECAST OR 8" BRICKS W/ 1/2" 1:2 MORTAR ON OUTSIDE AND INSIDE STORM DRAIN RIM INV. SEE PLAN INTERIOR INV. ELEV. SEE PLAN PORTION OF STRUCTURE UNDERGROUND (SEE STRUCTURE & PIPE TABLE) NOTE: CORE OPENINGS TO ACCOMMODATE PROPOSED PIPES. (REFER TO PLAN SHEET FOR SIZE AND LOCATION OF PIPE) ROUND OPEN THROAT DETAIL NOT TO SCALE STANDARD SCHEDULE TOP O.D. HEIGHT 6 $ SLAB WT./LBS 702 940 O.D. HEIGHT 0.67' 1.33' 2.67 RISER WT./LBS 503 998 2,003 SOLID O.D. HEIGHT 3.0' 3.5' BASE WT./LBS 1,934 2,161 INCOMING PRECAST OR 8" BR W/ 1 /2" 1: 2 MORT) ON OUTSIDE AND IN NOTE: CORE OPENINGS TO ACCOMMODATE PROPOSED PIPES. (REFER TO PLAN SHEET FOR SIZE AND LOCATION OF PIPE) D5.06 TYPICAL OPEN THROAT DETAIL NOT TO SCALE PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL PIPE OUTLET TO WELL-DEFINED CHANNEL VARIES MINIMUM TRENCH WIDTHS PIPE DIAMETER MIN. TRENCH WIDTH 12" 30" 15" 34" 18" 39" 24" 48" 30" 56" 36" 64" 42" 72" 48" 80" 54" 88" 60" 96" MAXIMUM COVER PIPE DIAMETER CLASS 1 CLASS II CLASS III 12 43' 28' 20' 15" 43' 28' 20' 18" 43' 28' 20' 24" 34' 23' 17' 30" 34' 23' 17' 36" 34' 23' 16' 42" 34' 23' 16' 48" 31' 21' 15' 54" 31' 21' 15' 60" 31' 21' 15' w w co *ASSUMED PIPE BACKFILL IS PLACED AND COMPACTED TO THE REQUIRED 98% OF THE STANDARD PROCTOR NOTES: 1. ALL PIPE SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH LATEST EDITION OF ASTM D2321, "STANDARD PRACTICE FOR UNDERGROUND INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND OTHER GRAVITY FLOW APPLICATIONS", AND THE PROJECT SPECIFICATIONS. 2. MEASURES SHOULD BE TAKEN TO PREVENT MIGRATION OF NATIVE FINES INTO BACKFILL MATERIAL, WHEN REQUIRED. 3. FOUNDATION: WHERE THE TRENCH IS UNSTABLE, THE CONTRACTOR SHALL EXCAVATE TO A DEPTH REQUIRED BY THE ENGINEER AND REPLACE WITH SUITABLE MATERIAL AS SPECIFIED BY THE ENGINEER. AS AN ALTERNATIVE AND AT THE DISCRETION OF THE DESIGN ENGINEER, THE TRENCH BOTTOM MAY BE STABILIZED USING A GEOTEXTILE MATERIAL. 4. BEDDING: SUITABLE MATERIAL SHALL BE CLASS I, II, OR, III. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. UNLESS OTHERWISE NOTED BY THE ENGINEER, MINIMUM BEDDING THICKNESS SHALL BE 4"(100 mm) FOR 12"-24" (100 mm - 600 mm); 6"(150 mm) FOR 30"-60" (750 mm - 900 mm). 5. HAUNCHING/INITIAL BACKFILL: SUITABLE MATERIAL SHALL BE CLASS I, II, OR III IN THE PIPE ZONE EXTENDING NOT LESS THAN 6" ABOVE CROWN OF PIPE. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. MATERIAL SHALL BE INSTALLED AS REQUIRED IN ASTM D2321, LATEST EDITION. 6. MINIMUM COVER: MINIMUM COVER, H, IN NON -TRAFFIC APPLICATIONS (GRASS OR LANDSCAPE AREAS) IS 12" FROM THE TOP OF PIPE TO GROUND SURFACE. ADDITIONAL COVER MAY BE REQUIRED TO PREVENT FLOTATION. FOR TRAFFIC APPLICATIONS, MINIMUM COVER, H, IS 12" UP TO 48" DIAMETER PIPE AND 24" OF COVER FOR 54"-60" DIAMETER PIPE, MEASURED FROM TOP OF PIPE TO BOTTOM OF FLEXIBLE PAVEMENT OR TO TOP OF RIGID PAVEMENT. HEAVY CONSTRUCTION LOADS MAY REQUIRE ADDITIONAL COVER TO PROTECT THE PIPE. CONTRACTOR TO VERIFY THAT CONSTRUCTION LOADS WILL NOT DAMAGE INSTALLED PIPES AND PROTECT INSTALLED PIPES IF REQUIRED. 7. MAXIMUM COVER: MAXIMUM COVER SHALL BE MEASURED FROM THE FINISHED SURFACE OF THE GROUND TO THE TOP OF THE PIPE, AND SHALL BE LESS THAN THE MAXIMUM VALUES SHOWN IN THE CHART WITHIN THIS DETAIL. D5.01 HDPE TRENCH INSTALLATION DETAIL NOT TO SCALE NOTE: REFER TO GEOTECHNICAL REPORT FOR MORE INFORMATION 24 D5.03 FRENCH DRAIN NOT TO SCALE FACE OF - BUILDING PLAN a FLARED END PLAN SEE PLAN SECTION MATERIAL La FOR TO MATCH MATERIAL REMAINING LIFTING OF INCOMING PIPE La WIDTH RISER HOLES (4) 0 '---- SEE SCHEDULE LIFTING 24 HOLES (4) 0 WAFFLE BASE SEE SCHEDULE 3" 3" 36" 6 36 Y NOTES: 1. CONCRETE: 28 DAY COMPRESSIVE STRENGTH f'e= 4,000 psi 2. STEEL REINFORCEMENT: ASTM A-615, GRADE 60 3. WAFFLE BOXES MEET N.C.D.O.T. APPROVAL TO 10' DEPTH 4. SOLID BOXES MEET H-20 LOADING TO 15' DEPTH 5. SOLID BOXES APPROVED FOR N.C.D.O.T STANDARDS: 840.01, 840.02, 840.04, 840.05, 840.11, 840.12, 840.14, 840.15, 840.17, 840.18, 840.19, 840.26, 840.27, 840.28, 840.31, 840.32, 840.41, 840.45 TX T YARD INLET D 5. 10 NOT TO SCALE )R ACCESS SEE SCHEDULE S REQUIRED TOP SLAB SEE PLAN STRUCTURAL DRAWING FILTER BLANKET FILTER BLANKET 7" SECTION AA SECTION AA NOTES: 1. La IS THE LENGTH OF THE RIP RAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" (MINIMUM IS FLOOR 24" DEEP IF STONE IS CLASS II) SLAB 3. IN A WELL-DEFINED CHANNEL, EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP NOTES: AND SOIL FOUNDATION. 1. THE DIMENSION OF THE THE FLARED END 5. COMPACT ANY REQUIRED FILL TO DENSITY OF SURROUNDING UNDISTURBED MATERIAL. SECTION SHALL BE PER MANUFACTURER'S 6. RIP RAP MAY BE FIELDSTONE OR ROUGH QUARRY STONE AND SHALL BE HARD. SPECIFICATIONS. ANGULAR AND WELL -GRADED. BUILDING 7. CONSTRUCT APRON AT ZERO GRADE. TOP OF RIP RAP SHALL BE LEVEL WITH THE FOOTER 2. THE SKIRT SECTION OF THE FLARED END RECEIVING CHANNEL OR SLIGHTLY LOWER. SECTION SHOULD BE JOINED TO THE INCOMING 8. ALIGN APRON WITH RECEIVING CHANNEL OR STREAM. ASSURE APRON IS STRAIGHT PIPE PER MANUFACTURER'S SPECIFICATIONS. THROUGHOUT ITS LENGTH. 9. END WIDTH OF APRON TO BE EQUAL TO WIDTH OF RECEIVING CHANNEL. FLARED END SECTION WITH EXISTING GRADE D5.07 RIP -RAP APRON NOT TO SCALE niono nin cu rn STONE WITH %ND OVERLAP SHED STONE AGGREGATE 'ERFORATED DRAIN PIPE (SIZE TO BE DESIGNATED BY ENGINEER) FE: E SHALL BE SLOPED TOWARDS FILET AS INDICATED ON PLANS UNDISTURBED EARTH OR COMPACTED EARTH FILL GEOTEXKI FILTER FABRIC 19" DEPTH AT BEGINNING POINT 6" PERFORATED PVC W/ FILTER SOCK SLOPE AT 1% TO OUTLET (SEE PLAN) 8" SOLID PVC BETWEEN FRENCH DRAIN & OUTLET- SCH. 80 PVC IF UNDER ROADWAY TO OUTLET #57 STONE NONWOVEN GEOTEXTILE FABRIC- SEE SPECS 6" TOP DRESS W/ 3/4" SIZE/ SPEC'D STONE 4" DEPTH RIVER ROCK- (LANDSCAPE SUBCONTRACTOR) 1"-3" STONE (SEE SPEC) NONWOVEN GEOTEXTILE FABRIC- SEE SPECS (LANDSCAPE SUBCONTRACTOR) -2% MIN. 3/16" X 5.5" METAL EDGING REQUIRED AT STONE iv PERIMETER (EXCEPT WHEN ADJACENT TO CONC. WALK OR WALL)- SEE SPECS ADJACENT SURFACE (SEE PLAN FOR TYPE) D5.04 FRENCH DRAIN DETAIL NOT TO SCALE GENERAL NOTES FOR STORM 1. ALL STORM INSTALLATION ON THIS SITE MUST BE AUTHORIZED BY PERMITS ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY (NCDEQ). ALL SITEWORK SHALL BE IN ACCORDANCE WITH ALL LOCAL, STATE, AND NATIONAL REGULATORY STANDARDS AND ALL REQUIREMENTS IN THE PROJECT TECHNICAL SPECIFICATIONS. 2. CONTRACTOR TO VERIFY WITH ENGINEER THAT THE REQUIRED STORMWATER, AND ASSOCIATED NON -GRADING PERMITS HAVE BEEN OBTAINED PRIOR TO BEGINNING CONSTRUCTION. 3. ALL CONSTRUCTION SHALL BE UNDER THE INSPECTION OF THE ENGINEER, THE OWNER, AND NCDEQ. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 72 HOURS PRIOR TO BEGINNING WORK. ANY WORK COVERED PRIOR TO ENGINEER'S INSPECTION IS SUBJECT TO UNCOVERING AND BACKFILLING AT THE CONTRACTOR'S EXPENSE. 4. ALL WORK MUST BE PERFORMED BY A NORTH CAROLINA LICENSED CONTRACTOR. 5. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND VERIFYING THE EXACT LOCATION AND ELEVATION FOR ALL UTILITIES PRIOR TO CONSTRUCTION; AND TO NOTIFY ENGINEER OF ANY CONFLICTS OR DISCREPANCIES. THE LOCATION OF SOME UTILITIES SHOWN ON THE PLANS HAVE BEEN APPROXIMATED. ALL BURIED UTILITIES HAVE NOT BEEN SHOWN ON THE PLANS AND IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR LOCATION PRIOR TO CONSTRUCTION. 6. PROTECT EXISTING SITE FEATURES (SHOWN TO REMAIN) AND NEWLY COMPLETED WORK DURING CONSTRUCTION. ANY DAMAGE INCURRED DURING OR RESULTING FROM CONSTRUCTION ACTIVITY IS THE RESPONSIBILITY OF THE CONTRACTOR AND IS TO BE REPAIRED IN ACCORDANCE WITH APPLICABLE STANDARDS OF APPROPRIATE AGENCIES, AS WELL AS THE PROJECT PLANS AND SPECIFICATIONS, AT THE CONTRACTOR'S EXPENSE. 7. THE CONTRACTOR IS TO NOTIFY ALL UTILITY COMPANIES AT LEAST 72 HOURS BEFORE CONSTRUCTION ACTIVITY IS TO BEGIN. THE CONTRACTOR SHALL NOTIFY NC ONE CALL AT 811, 48 HOURS BEFORE CONSTRUCTION BEGINS. NOTIFY THE ENGINEER AT LEAST 72 HOURS BEFORE STARTING CONSTRUCTION ACTIVITIES. 8. EROSION CONTROL IS FIELD PERFORMANCE BASED AND CONTRACTOR SHALL INSTALL AND MAINTAIN ANY EROSION CONTROL MEASURES NECESSARY TO ASSURE MAXIMUM PROTECTION OF THE SITE. CONTRACTOR IS RESPONSIBLE FOR EROSION CONTROL MEASURES REQUIRED TO CONTROL SEDIMENT DURING INSTALLATION ALL STORM PIPES AND APPURTENANCES.. 9. CONTRACTOR IS RESPONSIBLE FOR INSTALLING, MAINTAINING, AND REMOVING ALL NECESSARY EROSION AND SEDIMENTATION CONTROL MEASURES. 10. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ADJUSTMENT OF ALL UTILITY SURFACE ACCESSES WHETHER THE CONTRACTOR PERFORMS THE WORK OR A UTILITY COMPANY PERFORMS THE WORK. 11. ALL HIGH DENSITY POLYETHYLENE (HDPE) CORRUGATED STORM SEWER DETENTION PIPE SHALL BE TYPE "S" HANCOR SURELOK ADSN12 OR APPROVED EQUIVALENT WITH WATER TIGHT JOINTS MEETING AASHTO M252, M294 OR MP7. ALL HDPE PIPE IS TO BE INSTALLED ACCORDINGLY TO MANUFACTURERS SPECIFICATIONS AND IN ACCORDANCE WITH ASTM D2321 WITH THE EXCEPTION THAT MINIMUM COVER IN TRAFFIC LOAD AREA SHALL BE 24" FOR 4"-48" AND 18" FOR 60". PIPE MATERIAL SHALL MEET THE PRODUCT SPECIFICATIONS OF ASTM F667 AND SHALL HAVE A SMOOTH WALL INTERIOR. FOR ALL STORM SYSTEMS, WORK MUST BEGIN AT THE LOW POINT OF THE SYSTEMS. NOTIFY THE ENGINEER IMMEDIATELY OF ANY VARIANCES FROM EXPECTED CONDITIONS. 12. CURB INLET FRAME, GRATE AND HOOD SHALL CONFORM TO NCDOT 840.03E. DROP INLET FRAME AND GRATE SHALL CONFORM TO NCDOT 840.16. FIELD INLET COVER SHALL CONFORM TO NCDOT STANDARD DETAIL 840.03, OPENING FACING UPSTREAM. MANHOLE RING AND LID TO CONFORM TO NCDOT 840.54. OPEN THROAT INLETS TO CONFORM TO NCDOT 840.04 WITH A MANHOLE RING AND LID INSTALLED IN THE TOP FOR ACCESS TO THE STRUCTURE. SET ACCESS POINT ADJACENT TO A STRUCTURE WALL AS TO ALLOW ACCESS TO STEPS. 13. CONCRETE AND MASONRY SHALL MEET THE REQUIREMENTS OF APPROPRIATE SECTION OF NCDOT STANDARD SPECIFICATIONS FOR ROAD AND STRUCTURES (LATEST EDITION). CONCRETE SHALL BE CLASS A OR B, 4000 PSI MINIMUM, MEETING THE REQUIREMENTS OF SECTION 900, CONSTRUCTED IN ACCORDANCE WITH SECTION 825. MASONRY SHALL MEET THE REQUIREMENTS OF SECTION 940, CONSTRUCTED IN ACCORDANCE WITH SECTION 830 AND/OR 834. 14. TRENCH BACKFILL AND COMPACTION TESTING SHALL BE PERFORMED BY A CERTIFIED SOILS LABORATORY UNDER ALL PAVED AREAS. 15. COMPACTION REPORTS MUST BE PROVIDED TO NCDEQ STORMWATER SERVICES DIVISION INDICATING THAT FILL HAS BEEN COMPACTED TO NOT LESS THAN 95% MAXIMUM DENSITY (STANDARD PROCTOR). SHALLOW TYPE (5 FEET OR LESS IN DEPTH) INTERMEDIATE TYPE (4'X4' INTERIOR) (5 FEET TO 20 FEET IN DEPTH) o STANDARD STANDARD C� s" MIN 36" STEPS 16" STEPS 16" ON r ON CENTER CENTER / 6" MIN. � 0 '�/Z N1151, r MIN 6" WASHED N � STONE BEDDING SEE NOTE 'B' BELOW SEE NOTE 'B' BELOW 5" Mir 6" Mir SEE NOTE 'B' BELOW - STONE BEDDING NOTE 'A' FOR CURB INLET: FRAME, GRATE & HOOD PER D.O.T. STD. 840.03E FOR GRATE INLET: FRAME, GRATE & HOOD PER D.O.T. STD. 840.16 FOR JUNCTION BOX: FRAME & COVER PER D.O.T. STD. 840.54 FOR CONVEX INLET: FRAME, GRATE & HOOD PER NEENAH CONVEX INLET GRATE R-2577 NOTE 'B': STRUCTURE BOTTOM DEPTHS 2'X3' CURB/GRATE INLET: 6" 4'X4' JUNCTION BOX: 12" 4' ROUND CURB/GRATE INLET: 24" 5' ROUND CURB/GRATE INLET: 24" 6' ROUND CURB/GRATE INLET: 36" NOTES: 60" 1. CONCRETE SHALL BE 4000 PSI MIN. FOR ALL PRECAST CONCRETE CATCH BASINS. 2. PRECAST CONCRETE STRUCTURES MAY ONLY BE INSTALLED 26" TO DEPTHS CERTIFIED AS ACCEPTABLE BY THE 60" MANUFACTURER. 3. "WAFFLE" BOXES ARE ACCEPTABLE FOR SHALLOW TYPE CATCH BASINS UP TO 10' DEEP PER D.O.T. 4. PRECAST CONCRETE CATCH BASINS SHALL CONFORM TO SLAB DETAIL NCDOT STD. 840.02. 36" -48"- O, yy.1<5, 1r REINFORCED CONCRETE SLAB MIN. 6" WASHED STONE BEDDING SEE NOTE 'B' BELOW J _ 6" SLAB THICKNESS AND REINFORCEMENT FOR SOIL AND 36" TRAFFIC LOADING BY AN ENGINEER PRECAST CONCRETE CATCH BASIN DETAILS FOR D5.02 GRATE INLETS, CURB INLETS, AND JUNCTION BOXES NOT TO SCALE WATAUGA COUNTY VALLE CRUCIS SCHOOL BROADSTONE ROAD VALLE CRUCIS, NC SCO ## CODE: ITEM: DESIGNER I I I I CLA_R_KN_EXSEN _J CLARK INtxSEIV LICENSE NUMBER: C-1028 ONSULTANIT 1111 C C Civil Design Concepts, PA ASHEVILLE OFFICE WAYNESVILLE OFFICE 168 PATTON AVENUE 52 WALNUT STREET - SUITE 9 ASHEVILLE, NC 28805 WAYNESVILLE, NC 28786 PHONE (828) 252-5388 PHONE (828) 452-4410 FAX (828) 252-5365 FAX (828) 456-5455 NCBELS LICENSE #: C-2184 www.eivildesignconcepts.com CORPORATESEAL PROFESSIONAL SEAL oQ �o SEAL 035093 0o= ° _ 04/08/2022 PERMIT DRAWINGS REVISIONS 1 01/13/2022 DESIGN DEVELOPMENT 2 04/01/2022 EC / STORM / NCDOT SUBMITTAL STORM DRAINAGE DETAILS DESIGN: GRH DRAWN: SAK REVIEW: GRH C951 CN 6832 LLI 1_ z Ir WATAUGA COUNTY VALLE CRUCIS SCHOOL BROADSTONE ROAD VALLE CRUCIS, NC SCO # CODE: ITEM: DESIGNER — - CLA_R-KN-E_SEN CLARK INtxSEIV LICENSE NUMBER: C-1028 Civil Design Concepts, PA ASHEVILLE OFFICE WAYNESVILLE OFFICE 168 PATTON AVENUE 52 WALNUT STREET - SUITE 9 ASHEVILLE, NC 28805 WAYNESVILLE, NC 28786 PHONE (828) 252-5388 PHONE (828) 452-4410 FAX (828) 252-5365 FAX (828) 456-5455 NCBELS LICENSE #: C-2184 www.eivildesignconcepts.com CORPORATESEAL PROFESSIONAL SEAL 0 oQ o ; SEAL 03 093 _ ��� o�,y o°NoF 04/08/2022 PERMIT DRAWINGS REVISIONS 1 01/13/2022 DESIGN DEVELOPMENT 2 04/01/2022 EC / STORM / NCDOT SUBMITTAL KEY PLAN STORM BMP DETAILS C952 DESIGN: GRH DRAWN: SAK CN 6832 REVIEW: GRH LLI 1_ z Ir E 0 C 0 u WATAUGA COUNTY VALLE CRUCIS SCHOOL BROADSTONE ROAD VALLE CRUCIS, NC SCO # CODE: ITEM: DESIGNER CLA_R-KN-E_SEN CLAkK INtxSEIV LICENSE NUMBER: C-1028 Civil Design Concepts, PA ASHEVILLE OFFICE WAYNESVILLE OFFICE 168 PATTON AVENUE 52 WALNUT STREET - SUITE 9 ASHEVILLE, NC 28805 WAYNESVILLE, NC 28786 PHONE (828) 252-5388 PHONE (828) 452-4410 FAX (828) 252-5365 FAX (828) 456-5455 NCBELS LICENSE #: C-2184 www.eivildesignconcepts.com CORPORATESEAL PROFESSIONAL SEAL A�l rSEAL o 0 035093 00= Ry000o NoF 04/08/2022 PERMIT DRAWINGS REVISIONS 1 01/13/2022 DESIGN DEVELOPMENT 2 04/01/2022 EC / STORM / NCDOT SUBMITTAL KEY PLAN STORM BMP DETAILS C953 DESIGN: GRH DRAWN: SAK CN 6832 REVIEW: GRH 1 2 5 WATAUGA COUNTY VALLE CRUCIS SCHOOL E C 191 0 LLI Z_ !Y MOUND STABILRATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH "HE NCG01 0ONSTRUCTIC1114 GENERAL PERMIT nplementing the details and specifications on this plan sheet will result in the construction ctivity being considered compliant with the Ground Stabilization and Materials Handling ectlons of the NCG01 Construction General Permit (Sections E and F. respectively), The ermittee small comply with the Erosion and Sediment Control plan approved by the Delegated authority having jurisdiction. All details and specifications shown on this sheet day not apply depending on site conditions and the delegated authority having jurisdiction. IECTION E. GROUND STABiUZATiON Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timefrime variations days after ceasing land disturbance i;aj Perimeter dikes, swales, ditches, and 7 None perimeter slopes i b) High Quality Water 7 None [HQW) Zones r;c) Slopes steeper than If slopes are 10' or less in lerrm ant arc 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, id') $lopes 3:1 to a 14 ditches, perimeter slopes and HQ%V Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swble ;, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4.1 14 -10 days for Falls Lake Watershed unless there is zero slope late: After the permanent cessation of construction activities, any areas with temporary ;round stabilization shall be converted to permanent ground stabilization as soon as practicable but in no use longer than 90 calendar days after the last land disturbing ctivity. Temporary ground stabilization shall be maintained in a manner to render the urface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION tabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the echniques in the table below: TnnpOrary Stibillmlfon_ • Temporary grass Seed covered with straw or older mulches. acid tackiliers • Wdroseed ing ■ Roiled crown control products with or without temporary brass seed • Appropriately applied straw or other mulch • Pticstic sheatin& Pwmanavt SlobilizWon ■ Permanent ,glass Seed Covered with straw Ix other matches and tackiliiers a Geotextile tabrics such as perrAerlent soil reinforcement nsatting Hi ,droseeding e Shrubs or other permanem plantings covered wi th rriuich e Uniform And overtly de-tributed grtumd cawr sufficient to restrain erosion a Structurar mathads such as conc(ete, asphalt 1:1 r retaining wdlls . Roied erosion controlproducts with grass -3'n rl POLYAC - LAMiDES (PAPS) AND FLOCCULANTS t Select tic€cuiants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List vf Approved PAMSIFiocrccrlbnrs. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures, 3. Apply flocculants at the concentrations specified in the NC D1+10R List of Approved PAMS,#focculbnrs and in accordance with the manufacturer's instructions. . Provide ponding area for containment of treated 5tormwate► before discharging e ffsite. 5. Store floccufants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE I. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly d ispose as hazardoos waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Sting used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LETTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1, Never buryor bum waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers [e-gdumpster, trash receptacle) on site to contain construction and domestic wastes. 3- Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. S. Cover waste containers at the and of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. C Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow, Clean up immediately if containers overflow. 8. 01spose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste container`s. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetiaros 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site, 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from constructron sites. PORTABLE TOILETS i. Install portable toilets on level ground, at least 50 fact away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or In high foot traffic areas. 3. Monitr t portable toilets for leaking and properiV dispose of any leaked material_ Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT �__■■.a, •-ram ?. r ►ii ail wr - i�J c CONCRETE WASHOUTS 1. Cn not oischarge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local a nd state solid waste regulations and at a n a pproved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter sift fence. 4. install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts forde:watering or staringdefective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least So feet from storm drain Inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlets) closest to the washout which could receive spills or overflow. 7, Locate washouts in an easily accessible area, on level ground and insta11 a stone entrance pad in front of the washout- Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete tucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washoutwhen at approximately 75%capanty to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, it applicable, and stabilize any disturbance caused by removal of washout, HERBICIDES, PESTICIDES AND RODEN'TICIDES 1, Store and apply herbicides, pesticides and rodenticides in accordance with labe restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers wins the label, which hats directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or. surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsrte. WARDOUSAND TOXIC WASTE 1. Create designated hazardous waste tollectoon areas on -site. 2_ Place hazardous waste containers undercover or in secondary containment. r NORTH GAROLI NA a. Do not store hazardous chemicals, drums or bagged materials directly on the ground. Environmental Quality NCGOI GROUND STABILIZATION AND MATFRIALS HANDLING PART III SELF -INSPECTION, RE CORD KEEPING AND REPOftTING SECTION A: SELF -INSPECTION Setf-inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be In jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch oevurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frepyr<ncy Impett (dur" rwm W In"wertion march retie inck4e.- tsuaimns hours) tl Rain Raurr DON "N rainrall ammants marntawnedit if no diuy ra•n &uili• e6wreallnns are made dunrl wrrlend or e006 workil; ilcllday periods, aid no irehiduai day rainfall inlmmatfon is 7d4of ava7ahir. rergrd the t4muwrtre rain mea!wrovow for die>,se• up Attwoesad 0AY9, tans this *All deeermlne if a woe nspection is eerdvd� Days con which no raw+fall occurred sh411 brsecorded as -sera " the permi"e may use anoltw rvin•manitwru demg appgoved.by the ohWon 121 E&SC Rt k-ast once pn I S. IkerArkAJon of Uta measures inspected. molasvfes 7 tWr%l r drys x Wtc card twe c or the Inspe coon. and within 24 1 Name cA the perm+ po rikarr+ing the imprceion, Mots Ora rain S, todtatiM or wtwthrr the rneepwas weft opetmiks gwgnt t 1.0 inch a+ property, 34 hours S. Description of w aittmance needs for the n i eawte. & Wurwion. edd~. and dam of cortmo c actions taken. 131 Stornv razz At bast once per 1 kW01$cvkw or die dhdi4rje outlalh, inspected, sscI-QW 7 cah"Wriv drys 2. Dare ar.d tirir of tho inspection, •1tl61k (soesl and within 24 3, flame df the prrwn performing the Inspection. lmur%ceA rAin 4. Evk1mv-►al Ind co:nrs of star rrwarrr polkatm Stich Rs Olt evert 2 U0 inch in gicen. floati'e or s,- p cd sdkws or discckwadcok 24 tows S. lndk atia+ of s+siue sadirriem kasing the sale. 6. Msrri ion, evidence w d date ae wivwwa aeriam Iaken. ci Puimntrr or Ae Ira►! once par Ir ►isitrlr W dWrWritation is found outride site IiWee, then a retard +tc 7 okendar days 01 the'k+tiov*v *411 be made: and within 24 L ActiiBM takes+ to elfin up ar rtabdeo the tedinwo thin has loft Bevis of a rain t" she limits. 8we nt 2 i o inch in ] IYlsrrwplion. •tadRYF raid dAle of rOfrrKf lrr achcrr[ lal,an, and 24 taws 3- An empicioartion as to the actions ukr+n to control future rNnasers. ' ) ,0'earns 4r M %*"I once per If tt* ftieari at wrtbod has Increased vkibie 3r4k%*ntatW or a r,ntiands drag 7 eaan+dar days stream has Yltbhr LO(reaW4 turbidity hem ire 9oinvuction -■ otfsite and within 24 aUl ft tlr.en a record or the soltoweng %Isar be wade- ncrers• Man Or A rain t prenrlplkm. *reduce and date of cnrrrurrr taken, and imcm0blel c%*Pt! 10 inch in Z. Rocorck of the required roporu to ttse appropriate owmaan 24 t►eaars R nM OMre per Part u l 5e [lien C. ttrm;x 1 of errs perm[ 7. tie phmo of gracirs tinvAlbu*0 of pneimalar 4Asc 1481aratln41 Idler each phut ctahllimian of gradirlR nwsufes, (lniri 4 and wubbwrt. mtrallatiorl of storm mnssures dralnrge racll"WL compleme at as qnd erstrrhrig actf.ky, tan►1tudiw or radave6 mcnt, painunent tround cover). ]. namwentaeion tkat the rrgsand emend onAbScsuinn mauures hate brm piovidm wthh the rep. wed umefraW or an a$Wrawe chit they wsa be yromded as xrnn rr p�.t;lrk . NOTE: The rain inspection resets the required 7 calendar day Inspection requlrernent, 1. Show stockpile locations on plans. Locate carthen•material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless It can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence Installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the tmeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. PART III SELF -INSPECTION, RECOROIKEEPING AND REPORTING SECION B: RECOROxEEPiNG 1, E&SC Plan Documentation The approved F&SC plan as well as any approved deviation shall be kept on the site_ The approved E&SC plan must be kept up-tGAate throughout the coverage under this permit The following items pertaining to the E&SC plan shall be inept on site and available for inspection at all times during normal business hours. Item to Document Documentation Re*drements fa) Each E&SC measure has been Installed Initial and date each E&SC measure on a copy and does not sillnirscandy deviate from the of the approved E&SC plan or complete, date locations, dimenuons and relatne eifwttioru and sign an inspection report that lists each shown on the approved E&SC plan. E&SC measure shown on the approved E&SC plan. Thh. documentation is required upon the initial installation of the E&SC measures or 4 the 9&SC measures are modified after initial knstallatiom (b) A phew of grading has keen completer#. tnitialand date acopy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. 40 Ground cover is located and installed Initial and date a copy of thfr approved E&SC In accordance with the approved EaSC plan or complete, date and sign an Inspection plan. report to indicate compliance with approved ground cover specifications. 01i The maintvnanco and repair cornplote, data and sign an inspft on reporr. requirements for all E&SC measures have boon porkemrd, (el Corrective atxians have been taken initial and Bate a copy of the approved [&SC to E&SC rneawres. plan or complete, date and sign an inspectcon report to indicate the completion of the corrective action. 2- Additlonai Documentation to be Kept on Site In addition to the E&SC pie documents above, the following items shall be kept on the site and available for inspectors at all times du ring nor ma I business hours, u n less the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after It is received. (b) Records of Inspections made during the previous twelve months. The permlaee shall record the required observations on the inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available: records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3, Docurnentatian to be Retained for Three Years Ali data used to complete the a-NOI and ail Inspection records shall be maintained for a period of three years after project completion and made avallable upon request. 140 CFR 122,41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn doyen for maintenance or cbme out unless this is inferasible.. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for e:xampie., timers with extended cold wettthr.r),I Non -surface withdrawals from sediment basins shall be allowed only vAen all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not corrimmnce until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, item (2)[cI and [dI of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that Is removed from the sediment basin, Examples of appropriate controls Include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in ftem (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap a re provided at the discharge points of all dewateririg devices, and [f) Sediment removed from the dewatering treatment devices described in item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the Unfted States - EFFECTIVE: 04/01 / 19 PART III SELF4NSPECTION, RECORDI(EEPING AND REPORTING SECTION C: REPORTING 1, Occurrences that Must be Reported Permrttees shall report the following occurrences: (a) Visible sediment deposition in; stream or wetland. (b) OH spills if: • They are 25 gallons Or more, r They are less than 25 gallons but cannot be cleaned up within 24 hours, s They cause sheen on surface waters (regardless of volume), or a They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Art (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Rc:f: 40 CFR 302A) or 6S. 143.215.85. (d) Anticipated bypasses and unanticipated bypasses_ [e) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requiremertts After a permittee becomes aware of an occurrence that must be reported, he shall Ccntd the appropriate Division regional office within the tmeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858.036& Occurrence (a) Yaible sediment depos"o in a f1l MOM pr wiptl)n.I (b) 0HI spits and rc-* use of hazardous substances per item W Anticipated typasses I4o CrR 1Z2.4t(ml(3)) 0UnanWpated bypasses (40 CFR 122A 1(m)(3)) (e) Noncompliance v+tfeh the conditions of this permit that may endinger health at the onvironmant(40 CFR 122A2(1X711 Reporting TIrrlNrame$ JAher Dbooveryl and Either Requireen►ents a Wthrn 24 hours, in oral or electronic not lfkcation. • Within 7 torendar days, a report that contains 41 dose 6ption of tho sadimern and action: taken to address tree cause of the deposition. Division stmf may wbicvo the r"Uifemcnt fora wfitten report an a case -by -rase basis. • I the stream is narnrdon the NC 303(d) Iigt as Impaand for sedimeni- related causes, the permittee may be r4cquWc4 to prrlorm additiorwl mocvtoeirig, Inspections ot apply more strsngant practices if staff determine that additional requirements are needed torassura complonce with the rederal or state imaallmd-waters conditions. • IWfhlim 24 herrm, an anal or elearonie oat iTtcation. The notification Shall mckide inlormnion about the date, time, nature. volume and location al the spill ce relonle. a A report of least rm days before tht dare of the bypass, if possible. The ragert $hail include an aratualion of the anthtIpatrd quality and effM_ of the bypass. • within Z4 hour, an oral or electronic notirlcatio,. e WhAin 7 cal'endar dtfysi, a report that intrudes an evaluatcon of the quality and effect ofthe trypass. • Wirhin 24 hours, as oral or 0eafonic notification. ■ Within 7 om ndar do$. a report chat contains a description or the aoncomplibrce, and its. catdit; the period of ewncorriphance, iocluding a:aa dates aced tifnes. and if she noncompliance has riot been eoree ded, the anticipated time noncompliance is expected to continue, and steps taken or planned to reduce, eliminate, and prevent reoacurrancr of the noncompliance. (40 CFR 222A1(I)(6). • Oivkion staff may waive the fcquilemRnt lot a written report on a _PNORTH CAROLING+ Envirvnmenta! Quality NC01 BROADSTONE ROAD VALLE CRUCIS, NC SCO # CODE: ITEM: DESIGNER CLA_R-KN-E_XSEN GL_AKK IvtASEN LICENSE NUMBER: C-1028 r Civil Design Concepts, PA ASHEVILLE OFFICE WAYNESVILLE OFFICE 168 PATTON AVENUE 52 WALNUT STREET - SUITE 9 ASHEVILLE, NC 28805 WAYNESVILLE, NC 28786 PHONE (828) 252-5388 PHONE (828) 452-4410 FAX (828) 252-5365 FAX (828) 456-5455 NCBELS LICENSE #: C-2164 www.civildesignconcepts.coni CORPORATESEAL PROFESSIONAL SEAL �OQ�o 0�,9< �/ SEAL - o, 035093 0 = 04/08/2022 PERMIT DRAWINGS REVISIONS 1 01/13/2022 DESIGN DEVELOPMENT 2 04/01/2022 EC / STORM / NCDOT SUBMITTAL KEY PLAN C998 NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING I EFFECTIVE: 04/01/19I DESIGN: GRH DRAWN: SAK CN 6832 REVIEW: GRH