HomeMy WebLinkAboutNCC215011_NOT Closeout Documents_20220726North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336)
776-9800
County: Surry Project: Mitchell River Bridge 44kV Relocation River basin: Yadkin-PeeDee
Person financially responsible: Duke Energy - Randy N Veltri Project #: SURRY-2021-014
Address: 526 S. Chruch St, PO Box 1007, Charlotte, NC 28202
1. Project Location: NC 268, Elkin
Pictures: Yes - Digital
2. Weather and soil conditions: Cloudy, Workable Soils
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Ryan Swaim
Inspection report: Sent Report
9. Corrective action needed:
Title: Field Superintendent
Date given/sent: March 30, 2022
Yes
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO 1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https:Hedoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Tyler Pearson Others present:
Date of inspection: March 30, 2022 Time arriving on site: 9:00 AM Time leaving site: 10:00 AM
cc: