HomeMy WebLinkAboutWQCS00195_Application Attachment_20210526THE TOWN OF RAMSEUR HAS ELEVEN [11] PUMP STATIONS
The town also has approximately 34 miles of sewer ranging from 6 inch to
12 inches in diameter and over 4 miles of force main .
PUMP STATION CAPACITIES AND LOCATION
[ All pump stations have emergency contact numbers and locked ]
4588 Huntingwood Rd-80 GPM -2 pumps -alarm light
4735 Roundleaf Road 160 GPM —2 pumps -alarm light -fenced and locked
And[ [ 60 KW generator ]
418 King Road 80 gpm Dialer and [ fenced ] - 2 pumps -alarm light
217 Holly Hill 30 gpm alarm and light - 2 pumps
5090 Foushee Road 175gpm alarm -light and dialer - 2 pumps
With Emergency By -Pass
217 NC Hwy 22 180 gpm alarm -light - 2 pumps
127 Reed Creek 150 gpm alarm -light and dialer -- 2-pumps
2512 Meagan Drive 30 gpm alarm -light --2 pumps
1341 West Ridge [Main PS] 1450 gpm 3 pumps alarm -light and dialer and
[100 KW Generator]
154 Brady Street 30 gpm alarm -light --2 pumps
5962 Jordan Road -US 64 — Tower Components 80 gpm dialer [fenced] --2
pumps
All pump stations have minimum of 2 pumps , we also have a portable 40
KW generator
GENERATORS
100 KW generator at 1341 west Ridge Street w/automatic transfer switch
60 KW generator at 4735 Roundleaf Road w/automatic transfer switch
40 KW portable generator
AERIAL SEWER LINES AND LOCATION
Old Factory Road off Main Street —approximately 140 Lf of inch -CIP
Old Factory Road off Main Street — two [2] sections approximately 50 feet
GREASE PROGRAM
The Town of Ramseur sends out grease control literature twice annually to
all customers in English and Spanish . We can enforce grease control
through our Sewer Use Ordinance .
SEWER RIGHTS OF WAY
The Town maintains our sewer rights of way with and mini -excavator with a
bush -hog attachment and with a tractor mounted bush hog . This is
performed a minimum of 3 times a year. All rights of way are accessible as
is all the sewage pump stations .
SEWER LINE MAINTENANCE
The Town cleans 10% or more of the collection system annually
concentrating on the worst areas . We also have a Root Control Program
with a reputable contractor who serves most of the United States .We keep
books in all pump stations with hour run times and other information .We
keep all main records at the Town Hall .
TOWN OF RAMSEUR 20 -YEAR CAPITAL IMPROVEMENT PLAN
CONSTRUCTION COST ESTIMATE
SEWER SYSTEM IMPROVEMENTS 0-6 YEAR HORIZON
Project Description
Quantity
Unit
Unit Cost
Extended Cost,
1.
Dig and Replace Watkins St. 8" DIP Outfall 0-8 ft
cut (deleted from 2007 CWMTF Grant)
950
LF
$175.00
$166,250
2.
Manhole Replacement
4
EA
$3,500.00
$14,000
3.
Road Bore
40
LS
$450.00
$18,000
,' , ', :, . '.,c' , ,., •' .-'• . :. : ,',r, - . , •,, ,. -- '
. , ' , . • ,.' ', i , ' ' ''.:' ''i ', ..:.'ri''.....:q ''' ' ., : ' : i ';'''' :,'; '',',:'.,1'.' ';,'
''', ':;':' : ' '' > ' ri' ::',." f ' l''.Sub-Total : „ 1 'If.,
-, *
.
'Art'.."; '''jl' 4 '' 'go
SLIP -LINE HWY 64 CLAY SEWER MAINS
1
Rehab existing 8" VCP gravity sewer lines along
I-Iwy 64 from Watkins St. to Holly Hill St.
7,000
LF
$55.00
$385,000
2.
Service Lateral Reconnections (internal)
30
EA
$250.00
$7,500
3.
Service Lateral Replacement (excavation required)
30
EA
$1,500.00
$45,000
4.
Point Repairs to Sewer Main (excavation required)
10
EA
$2,500.00
$25,000
5.
Service Lateral Replacement (excavation required)
High Density Areas
12
EA
$4,500.00
$54,000
. .
. ,
' l
SO -Total ' ' :. 4
'4‘ , .. $516;5,0
UPGRADE FOUSHEE ROAD PUMP STATION
Project Description
Quantity
Unit
Unit Cost
Extended Cost
1.
Rehab Foushee Road 5' diameter
Wetwell
950
LF
$125.00
$118,750
2.
Replace eixsting 30 hp pumps with lower
horsepower pumps to accommodate for the
upgraded force main on Foushee Road
1
LS
$30,000.00
$30,000
3.
New Gen Set Plug
1
LS
$2,500.00
$2,500
, - '9,P4: '
'.:51,59
PUMP STATION CONTROLS - REHAB AND UPGRADES
0-6 Year Sewer System Cost Estimate
Page 4 of 14
1.
East River Pump Station, Brady Street, Holly Hill,
Hwy 22, Foushee Rd., Huntington Wood Pump
Stations - Upgrade controls, add Auto Dialer
6
LS
$9,000.00
$54,000
Sub -Total
$54,000
EAST RIVER PUMP STATION RIVER CROSSING REPLACEMENT
1.
Replace 8" Cast Iron Deep River Sewer Force
Main Crossing with HDPE DR11 Pipe by
Directional Bore
425
LF
$425.00'
$180,625
2
Replace balance of Cast Iron force main with PVC
up to the WWTP Bar Screen
300
LF
$30.00
$9,000
Sub -Total
$189,625
MANHOLES AFFECTED BY HYDROGEN SULFIDE
1.
Rehabilitate interior of existing 4' manholes with
cement liner and epoxy coating affected by
Hydrogen Sulfide (5 Total)
100
VF
$215.00
$21,500
Sub -Total
$21,500
CLEAN AND CAMERA ENTIRE SYSTEM
Project Description
Quantity
Unit
Unit Cost
Extended Cost
1.
Clean and Camera 8" VCP Gravity Sewer Mains
114,000
LF
$2.50
$285,000
Sub -Total
$285,000
TOTAL 0 - 6 Year Sewer System Projects
$1,883,125
0-6 Year Sewer System Cost Estimate
Page 5 of 14