HomeMy WebLinkAboutNC0026557_Annual Wastewater Performance Report_20220720July 20, 2022
Attn: System Performance Annual Report
North Carolina Division of Water Quality
1617 Mail Service Center
Raleigh, NC 27699-1617
Ref: Annual Report for Collection Permit No. WQCS001170
Annual Report for Wastewater Permit No. NCO026557
North Carolina General Statute Chapter 143, Article 21, Part 1, 143-215.1 C requires
municipalities that operate wastewater collection and treatment systems to publish an annual
report summarizing the performances of their collection system and treatment works and the
extent to which the system has violated their permit, federal or state laws, regulations, or rules
related to the protection of water quality.
Enclosed please find the annual report for the Town of Bryson City for January 1, 2021-
December 31, 2021. We believe the report to be complete and accurate. The customers will be
notified of the availability of the report through the local newspaper and the Town website.
If you have any questions, please contact me at 828-488-3335 or email at
reeinam athi snbrvsoncitvnc. n ov.
Si cerely,
i
ViMiathis"V�;<)
anager
Cc: North Carolina Division of Water Quality
2090 U.S.70 Highway
Swannanoa, NC 28778
Town of Bryson City
Annual Performance Report
I. General Information
Facility System Name: Town of Bryson City
315 Riverview Drive
Swain County
Permit Wastewater Treatment: NC0026557
Collections Permit: WQCS00170
Person in Charge: Wastewater Plant ORC-Environmental, Inc.
Collection System ORC-Tom Shook
Description of System:
Bryson City operates a 0.6 MGD wastewater treatment facility located at 315 Riverview Road southwest
of Bryson City in Swain County. The treatment components include: mechanical bar screen, two contact
stabilization treatment units consisting of influent pumping, reaeration zones, secondary clarifiers, sludge
digester, belt press, sludge dry storage, chlorination, and dechlorination. Discharge from the treatment
enters into the Tuckasegee River, a class B water within the Little Tennessee River Basin. The Town
operates a sanitary sewer system composed of gravity sewer lines, constructed of various materials,
including vitrified clay, PVC and ductile iron. Seven lift stations are presently operating within the
collection system.
IL Notice of Violations: Summary of Svstem Performance from January 1. 2021-December 31.
2021
January 2021
Notice of violation on 1/26/2021 at the wastewater treatment plant influent pump station. There was a
500-gallon spill due to equipment failure.
February 2021
On February 25, 2021, during a compliance inspection of the wastewater treatment plant the following
violations were found
1) Bar Screens were not functioning adequately to maintain continuous facility compliance.
Response: The bar screens will be monitored and cleaned on a regular basis. The Town of
Bryson City is working with McGill Associates and USDA to design and fund either a new plan
or the complete rehabilitation of the existing plant. The bar screen will be addressed during this
process.
2) Pumps -The return pump was not working because there was a hole in the line. Response: The
Town purchased 3 pumps and 160 ft of hose as a temporary fix. Environmental Inc. repaired the
hole.
3) Disinfection -Liquid- The chlorine contact chamber had excess solids and a high sludge blanket.
Response: The chlorine contact chamber will be cleaned more frequently.
4) Effluent Sampling- The composite sampler was not working and the thermometer was broken at
the time of inspection. Response: A new thermometer was ordered to replace the broken one.
The sampler was replaced with a new one.
5) Flow Measurement -Effluent -The effluent weir plate was breaking loose from the concrete.
Response: The effluent weir plate was repaired by the Town.
Notice of violation on 2/28/2021 due to exceeding the monthly average of flow through the wastewater
treatment plant. The limit is .6 and the reported value was .65.
March 2021
Notice of violation and intent to access civil penalty for violation on 3/312021 due to exceeding the
monthly average of flow through the wastewater treatment plant. The limit is .6 and the reported value
was .68. We had several days of heavy rain during the month of March. Due to the inflow and
infiltration in our system, the plant exceeded the flow limit. We have continued to work with McGill and
Associates on an Asset Inventory and Assessment Grant (AIA) totally $150,000 to conduct
comprehensive inflow/infiltration evaluation of our sanitary sewer collection system. The Town has also
secured $8,780,000 from USDA to begin Phase I of the Sewer Collection system Rehabilitation Project.
This project will specifically dilapidated lines in our system to correct areas of the inflow and infiltration.
In addition, we were awarded $1,492,000 from a Community Development Block Grant (CDBG) for the
Carringer Street Sewer Improvement Project which includes replaced of 4, 100 linear fee of dilapidated
clay sewer lines.
111. Work Performed
Date
Work Performed
Location
inn i
Jetted and camera sewer line
Joe and Kate Laundry Mat
1/8/21
Pulled Pump #2 and cleared debris
W WTP
1/13/21
Repaired 4" PVC sewer line & installed cleanout Behind Madison's on Main
1126/21
Pulled pumps at and cleaned well and pumps
W WTP
1/27/21
Worked on Recreation Park lift station
Recreation Park Lift Station
Worked on wet well
W WTP
1129/21
Jetted sewer line
Behind First Citizens Bank
2/221
Changed Floats at Lift Station
Governor's Island
2/8/21
Installed 6" sewer tap
Mtn Layers
Installed 4" sewer tap
Rice Wagon at Mtn Layers
2/10/21
Pulled pump #3
W WTP
2/19/21
Jetted sewer line
Fry Street
Jetted sewer line
Collins Street
3/4/21
Installed new pump
W WTP
3115/21
Jetted sewer line
Hwy 19
3/16/21
Pulled pump#3
WWTP
Jetted sewer line
Fry Street
3/25/21
Pulled pump #3
W WTP
4/8/21
Jetted sewer line
Arlington Avenue
4/12/21
Changed starter contact at lift station
Rec Park Lift Station
Jetted sewer line
Lemons Branch Rd
4/19/21
Jetted sewer line
Lemons Branch Rd
4/27/21
Installed two 4" sewer taps
Dunbar Street
5/10/21
Cleaned wet well
Lackey Hill Lift Station
5/11/21
Cleaned sewer line
Hwy 19
Replaced 50' of sewer line
Lemons Branch
5/21/21
Installed two 4" sewer taps
Hwy 19
5125/21
Pulled pumps
WWTP
5/26121
Cleaned wet well
W WTP
6/7/21
Camera sewer line
Bryson Walk
Camera sewer line
Hwy 19
6/8/21
Brought buried manhole up to grade
Hwy 19
6/15/21
Camera sewer line
Pine Street
Camera sewer line
Orchard Street
6/17/21
Replaced 140' old with new 8" PVC
Clifton Avenue
6/23/21
Replaced 140' old with new 8" PVC
Clifton Avenue
6/28/21
Installed 4" sewer tap
Grab= Street
6/30/21
Replaced 120' old with new 6" ductile
Pine Avenue
7/7/21
Cleaned wet well
Lackey Hill Lift Station
7/9/21
Installed new soft start on pump #3
W WTP
Pulled pump #2
W WTP
7/12/21
Pulled pump
Lackey Hill Lift Station
7/14/21
Changed floats
Campground Lift Station
7/22/21
Jetted sewer line
Veterans Blvd
7/23/21
Installed new suction lift pipe
See Park Lift Station
7/26/21
Pulled pump
Lackey Hill Lift Station
8/2/21
Located and repaired I&I
Main Street
9/7/21
Graded sewer cleanouts
Dunbar Street
9/23/21
Jetted sewer line
River Street
9127/21
Changed manhole ring and lid
Bennett Hill
1016/21
Camera sewer line
Florida Avenue
10/7/21
Camera sewer line
Franklin Grove
Camera sewer line
Johnson Branch
10/15/21
Cleaned sewer line
Behind First Citizens Bank
11/2/21
Cleaned manholes
Charter School driveway
Jenkins Branch Lane
Charleston Apartments
112221
Jetted sewer main
Arlington Avenue
1217/21
Jetted sewer line
Fontana Road
12/8/21
Jetted sewer line
Fontana Road
12/9/21
Jetted sewer line
Fontana Road
12/14/21
Jetted sewer line
Arlington Avenue
Jetted sewer line
River Street
12/20/21
Repair sewer service line
Alleyway on Blackhill
IV. Notification
This report has been made available by advertising in the Smoky Mountain Times and on the Town of
Bryson City's website www.brysoncitync.goov. A copy may also be picked up at the Bryson City Town
Hall Monday through Friday between 8:00 a.m-5:00 p.m.
V. Certification
I certify under the penalty of law that this report is complete and accurate to the best of my knowledge. I
further certify that this report has been made available to the public.
`Collection System Back-up ORC-Travis McCall
a6 aa--
Date
!�G z
Date
%1 --
120