Loading...
HomeMy WebLinkAboutNCC213370_NOT Closeout Documents_20220726North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215 County: Duplin Project: Brick City Solar Person financially responsible: Pure Power Contractors, LLC - Justin Taylor, President Address: 2812 Gray Fox Road, Monroe, NC 28110 1. Project Location: Old Wilmington Road, Wallace Pictures: No 2. Weather and soil conditions: 90s clear dry River basin: Cape Fear Project #: DUPLI-2021-010 Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: June 16, 2022 Yes 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Brian Lambe Others present: Date of inspection: June 15, 2022 Time arriving on site: 12:30 PM Time leaving site: 12:45 PM cc: