HomeMy WebLinkAbout20140650 Ver 1_More Info Received_20140806Homewood, Sue
From: Crystal Fox <CFox @smeinc.com>
Sent: Wednesday, August 06, 2014 11:17 AM
To: Homewood, Sue
Subject: RE: Re- Routes Line T021
Attachments: 338.pdf
Sue — see the attached map where you requested language regarding the bridging be added. The other map I owe will
be affected by the re-routes. I will forward with the modification letter. Thank you ma'am
M.
From: Homewood, Sue [ mailto :sue.homewood(a)ncdenr.gov]
Sent: Tuesday, August 05, 2014 8:03 AM
To: Crystal Fox
Subject: RE: Re- Routes Line T021
Yes, that will be fine. Thanks.
E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be
disclosed to third parties.
From: Crystal Fox [mailto:CFox(a)smeinc.com]
Sent: Tuesday, August 05, 2014 7:35 AM
To: Homewood, Sue; Brown, Craig J SAW
Subject: Re- Routes Line T021
Good Morning,
Just a heads up that there will be a submittal for two minor re- routes for this project. In both cases they are going back
to existing ROW. Sue, for your submittal — can I address the 50 -feet and the re -route in one?
Thanks - Crystal
Crystal Fox, CE
Staff Scientist II
1
ENGINEERING INTEGRITY.
S &ME, Inc.
9751 Southern Pine Boulevard
Charlotte NC 28273
Ph: 704 - 523 -4726
Fax: 704-525-3953
Mobile: 704.302.7890
cfox smeinc.com
www.smeinc.com
This electronic message is subject to the terms of use set forth at www.smeinc.com /email. If you received this message in error please advise the
sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email.
STREAM S33 TOTAL JORDAN LAKE BUFFER IMPACTS
PERM. IMPACT
ZONE 1
ZONE 2
PERM. IMPACT
0 SQ. FT.
0 SQ. FT.
TEMP. IMPACT
11,051 SO. FT.
5,576 SQ, FT.
tiry
�0^ 0,
V�
i
Ln
9�
,2
0
7
Or"
9
1'A- IM 1 &VL
EXISTING TREE LINE
TEMPORARY IMPACT AREA
PERMANENT
NOTE:
1. PIPELINE TO BE INSTALLED
BY OPEN CUT METHOD
ENERGYY MANAGEMENT
k SERVICES Co,
CORPORATE OFFICE:
109 FIELDVIEW DRIVE
P,0, BOX 1007
VERSAILLES, KY 40383
TEL(859) 873 -0076 • FAX:(859) 873 -5872
BRANCH OFFICES:
HOUSTON, TX DETROIT, MI
CHARLESTON, WV • TULSA, OK
BAY CRY, MI
www.emseng.com
1
�? N
N \
� Z2
\Ii \ N
STREAM S33 TOTAL IMPACTS
PERM. IMPACT
0 SO. FT.
0.000 AC.
TEMP, IMPACT
85 SQ. FT.
0.002 AC,
IMPACT AREA
Bridging, in accordance with the approved E&SC plan, shall be installed in areas where the stream parallels pipeline
install where banks may be disturbed as a result of construction activities. Additionally, sections where the stream 50 25 0 50
parallels will be pumped around during activities in the area to prevent any inadvertent discharge attributable to bank
slumping or roll off from the bridging. A pipeline professional familiar with NC environmental regulations and SCALE IN FEET
construction will monitor this crossing and it will be specifically evaluated prior to install.
DRAWN BY: GAG 06/02/14
PSNC ENERGY
DRAFTING CK: SFS 06/03/14
MATE JURISDICTIONAL BOUNDARIES OF 16" T•021B PIPELINE I ENVIRONMENTAL CK:
ENGINEERING CK:
STREAM CROSSING S33
@ STATION 646 +15, M.P 12.24
ORANGE COUNTY, NORTH CAROLINA
(ALIGNMENT SHT: 58701124 1
DRAWING NO,:
58703338
SCALE: 1* = 50' 1 REV. A
SHEET 1 OF 1 IDATE OF PLOT: 06/N/2014