Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG140510_Ste Plan Calculations_20220728
U2579AB:lw TEMPORARY C'ONC.RETE BATCH PLANT N DOTWinston-Salem Belt,Nay Future 1-74 Contractor -Wgibber " .......................... .......................... .......................... .......................... .......................... .......................... .......................... .......................... .......................... .......................... r . . . . . . . . . . . . . . . . . . . . . . . . . .......................... .......................... r . . . ....................... . . . . . . . . . . . . . . . . . . . . . .... .......................... r . . . . . . . . . . . . . . . . . . . . . . . . . .......................... r . . . . . . . . . . . . . . . . . . . . . . . . . .......................... r . . . . . . . . . . . . . . . . . . . . . . . . . r • • • • . • . . . • . . .... . . • . • • • . r • . • . . . . . . . . . • . • . • • . • . r . . • • • • • • • • • • • • • . . • . . . . . . . r • s . • • • • . • • • . . . . . . . . . . . . . r e . • . . . . . . • • • • • • • • • • • • • . . r . . • • • • • • • • . . . . . . . . . . . • . r • . • • . . . . . . • • • • • • • . . . . . . . . • . . . . • e • • . • • • . . .. .. . .. . • . r • • . . . . . . . . • • • • • • • • . . • . .. r . . • . • • • . • • • . . • . . . • • • . . r . . • . . • • . . . . . • • . . • . • • . • . r . . . • • . • . • . . . . . . . . . . • • . . r . . • . • • • . . . . . . • • • • . . • • . . . r . • . • . . . . . • . • • . • . • . • . • • • . 04 SKIMMER BASIN AND STORMWATER DETAINMENT skimmer basin will be utilized for batch plant construction and retained for stormwater management and spill containment. (ESTIMATES �.r. w AREA=9.06 P,` a ; ; skimmer Basin "Drainage Area (Plant) = 10 acres * 71 -ength = 156' ;Nidth = 52' Depth (from weir) _ 3' Orl irP 0amP$Pr = 2 14