Loading...
HomeMy WebLinkAbout20210816 Ver 1_2014-02098 NWP 39 Tearsheet_20220727U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2014-02098 County: Guilford U.S.G.S. Quad: NC-Guilford/Kernersville GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: PNK Holdings, LLC Attn: Park Mon Scout! Address: 1100 Peachtree Street NE, Suite 800 Atlanta, GA 30309 Size (acres) 118 Nearest Town High Point Nearest Waterway UT to West Fork Deep River River Basin Cape Fear USGS HUC 03030003 Coordinates 36.079388,-80.004132 Location description: The project area is located within the High Point North Industrial Center, east of Sandy Ridge Road, north of Joe Drive, and west and south of Adkins Road in High Point, Guilford County, North Carolina. Description of projects area and activity: This verification authorizes the permanent discharge of fill material into 0.0197 acre (158 linear feet) of stream channel and 0.027 acre of riparian non-riverine wetlands and the temporary discharge of fill material into 0.0026 acre (26 linear feet) of stream channel for construction of the PNK High Point industrial development. This activitv is considered nart of the High Point North Industrial Center single and comnlete nroiect. "Reference also the NWP 14 verification issued under separate cover on 7/27/2022, using the same Action ID (SAW-2014- 02098) for another portion of the High Point North Industrial Center single and complete proiect: the access road to the PNK High Point industrial develonment (also known as nhase 1 of the Gallimore Dairy Road extension). Applicable Law(s): ❑X Section 404 (Clean Water Act, 33 USC 1344) ❑ Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Nationwide Permit 39. Commercial and Institutional Developments SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached Conditions, your application signed and dated 5/24/2022, additional and revised information submitted via email on 6/27 and 7/7/2022, and the enclosed plans "High Point North Industrial Center" "Overall Impacts Mad' (Sheet No. EX1.10) dated 2/2/2022, "Utility Plan" (Sheet No. C5.0), "Impact Plan, PNK- High Point" dated 5/19/2022, and "French Drain, PNK- High Point" dated 5/18/2022. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide and/or regional general permit authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide and/or regional general permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide and/or regional general permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide and/or regional general permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide and/or regional general permit's expiration, modification or revocation, unless discretionary authority has been exercised on a case -by -case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (LAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact David E. Bailey at (919) 554-4884 X 30 or David.E.Bailev2(&usace.armv.mil. Corps Regulatory Official: Date: 2022.07.27 13:47:33-04'00' Date: 07/27/2022 Expiration Date of Verification: 3/14/2026 SAW-2014-02098 SPECIAL CONDITIONS 1. In order to compensate for impacts associated with this permit, mitigation shall be provided in accordance with the provisions outlined on the most recent version of the attached Compensatory Mitigation Responsibility Transfer Forms (2). The requirements of these forms, including any special conditions listed on these forms, are hereby incorporated as special conditions of this permit authorization. 2. Groundwater base flow to Stream MSB down -drainage of the authorized impact limits for the PNK-High Point project component must be maintained per the French drain detail as shown on the plan sheet labeled "French Drain, PNK- High Point" of the enclosed plans. 3. Stream and wetland impacts authorized herein are considered part of the High Point North Industrial Center single and complete project. Please note that future impacts and/or phases of the PNK-High Point and Gallimore Dairy Road extension project components, as well as future impacts and/or phases of the High Point North Industrial Center and related activities associated with Corps Action ID: SAW-2014-02098, may be considered part of a single and complete project. These impacts may be considered cumulative with impacts authorized during earlier phases with respect to compensatory mitigation and Nationwide Permit thresholds. Current cumulative impacts to waters of the US for the High Point North Industrial Center single and complete project include a total loss of 0.0197 acre (158 linear feet) of streams and 0.027 acre of wetlands, or a total of 0.0467 acre of waters of the US. Date: 2022.07.27 13:47:02-04'00' Corps Regulatory Official: Expiration Date of Verification: 3/14/2026 Date: 07/27/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at hgps://regulatory.ops.usace.army.mil/customer-service-survey. Copy furnished electronically: Brad Luckey, Pilot Environmental, Inc. Sue Homewood, NCDEQ-DWR U.S. ARMY CORPS OF ENGINEERS Wilmington District Compensatory Mitigation Responsibility Transfer Form Permittee: PNK Holdings, LLC Action ID: SAW-2014-02098 Project Name: High Point North Industrial Center - PNK-High Point project component County: Guilford Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one Mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate Mitigation Sponsors. Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released and are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements Permitted Impacts Requiring Mitigation*: 8-digit HUC and Basin: 03030003, Cape Fear River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 54 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03030003, Cape Fear River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 108 Mitigation Site Debited: EBX sponsored RES Cape Fear 03 Umbrella Mitigation Bank - Feed and Seed Site (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington District, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Page 1 of 2 Form Date July 7, 2020 U.S. ARMY CORPS OF ENGINEERS Wilmington District Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. When NCDMS provides mitigation for authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the District has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the District Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the District, the Sponsor must obtain case -by -case approval from the District Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios maybe applied, as per current District guidance and a new version of this form must be completed and included in the District administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: • A letter from RES, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility was provided. • The stream credits required correspond to 54 linear feet of impacts at 2:1,. This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4) the Wilmington District Mitigation Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC27587 (or by email to SAWMIT@usace.army.mil). Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office. USACE Project Manager: David E. Bailey USACE Field Office: Raleigh Regulatory Office US Army Corps of Engineers 3331 Heirtage Tade Drive, Suite 105 Wake Forest, North Carolina 27587 Email: David.E.Bailey2@usace.army.mil Date: 2022.07.27 13:46:44-04'00' Wilmington District Project Manager Signature July 27, 2022 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.army.mi1. Page 1 of 2 Form Date July 7, 2020 U.S. ARMY CORPS OF ENGINEERS Wilmington District Compensatory Mitigation Responsibility Transfer Form Permittee: PNK Holdings, LLC Action ID: SAW-2014-02098 Project Name: High Point North Industrial Center - PNK-High Point project component County: Guilford Instructions to Permittee: The Permittee must provide a copy of this form to the Mitigation Sponsor, either an approved Mitigation Bank or the North Carolina Division of Mitigation Services (NCDMS), who will then sign the form to verify the transfer of the mitigation responsibility. Once the Sponsor has signed this form, it is the Permittee's responsibility to ensure that Wilmington District Project Manager identified on page two is in receipt of a signed copy of this form before conducting authorized impacts, unless otherwise specified below. If more than one Mitigation Sponsor will be used to provide the mitigation associated with the permit, or if the impacts and/or the mitigation will occur in more than one 8-digit Hydrologic Unit Code (HUC), multiple forms will be attached to the permit, and the separate forms for each Sponsor and/or HUC must be provided to the appropriate Mitigation Sponsors. Instructions to Sponsor: The Sponsor verifies that the mitigation requirements (credits) shown below have been released and are available at the identified site. By signing below, the Sponsor is accepting full responsibility for the identified mitigation, regardless of whether they have received payment from the Permittee. Once the form is signed, the Sponsor must update the bank ledger and provide a copy of the signed form and the updated ledger to the Permittee, the Project Manager who issued the permit, the Bank Project Manager, and the District Mitigation Office (see contact information on page 2). The Sponsor must also comply with all reporting requirements established in their authorizing instrument. Permitted Impacts and Compensatory Mitigation Requirements Permitted Impacts Requiring Mitigation*: 8-digit HUC and Basin: 03030003, Cape Fear River Basin Stream Impacts (linear feet) Wetland Impacts (acres) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 104 *If more than one mitigation sponsor will be used for the permit, only include impacts to be mitigated by this sponsor. Compensatory Mitigation Requirements: 8-digit HUC and Basin: 03030003, Cape Fear River Basin Stream Mitigation (credits) Wetland Mitigation (credits) Warm Cool Cold Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal 208 Mitigation Site Debited: NCDMS (List the name of the bank to be debited. For umbrella banks, also list the specific site. For NCDMS, list NCDMS. If the NCDMS acceptance letter identifies a specific site, also list the specific site to be debited). Section to be completed by the Mitigation Sponsor Statement of Mitigation Liability Acceptance: I, the undersigned, verify that I am authorized to approve mitigation transactions for the Mitigation Sponsor shown below, and I certify that the Sponsor agrees to accept full responsibility for providing the mitigation identified in this document (see the table above), associated with the USACE Permittee and Action ID number shown. I also verify that released credits (and/or advance credits for NCDMS), as approved by the Wilmington District, are currently available at the mitigation site identified above. Further, I understand that if the Sponsor fails to provide the required compensatory mitigation, the USACE Wilmington District Engineer may pursue measures against the Sponsor to ensure compliance associated with the mitigation requirements. Mitigation Sponsor Name: Name of Sponsor's Authorized Representative: Signature of Sponsor's Authorized Representative Date of Signature Page 1 of 2 Form Date July 7, 2020 USACE Wilmington District Compensatory Mitigation Responsibility Transfer Form, Page 2 Conditions for Transfer of Compensatory Mitigation Credit: • Once this document has been signed by the Mitigation Sponsor and the District is in receipt of the signed form, the Permittee is no longer responsible for providing the mitigation identified in this form, though the Permittee remains responsible for any other mitigation requirements stated in the permit conditions. • Construction within jurisdictional areas authorized by the permit identified on page one of this form can begin only after the District is in receipt of a copy of this document signed by the Sponsor, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. When NCDMS provides mitigation for authorized impacts conducted by the North Carolina Department of Transportation (NCDOT), construction within jurisdictional areas may proceed upon permit issuance; however, a copy of this form signed by NCDMS must be provided to the District within 30 days of permit issuance. NCDOT remains fully responsible for the mitigation until the District has received this form, confirming that the Sponsor has accepted responsibility for providing the mitigation requirements listed herein. • Signed copies of this document must be retained by the Permittee, Mitigation Sponsor, and in the USACE administrative records for both the permit and the Bank/ILF Instrument. It is the Permittee's responsibility to ensure that the District Project Manager (address below) is provided with a signed copy of this form. • If changes are proposed to the type, amount, or location of mitigation after this form has been signed and returned to the District, the Sponsor must obtain case -by -case approval from the District Project Manager and/or North Carolina Interagency Review Team (NCIRT). If approved, higher mitigation ratios maybe applied, as per current District guidance and anew version of this form must be completed and included in the District administrative records for both the permit and the Bank/ILF Instrument. Comments/Additional Conditions: • A letter from NCDMS, confirming they are willing and able to accept the applicant's compensatory mitigation responsibility was provided. • The stream credits required correspond to 104 linear feet of impacts at 2:1,. This form is not valid unless signed below by the District Project Manager and by the Mitigation Sponsor on Page 1. Once signed, the Sponsor should provide copies of this form along with an updated bank ledger to: 1) the Permittee, 2) the District Project Manager at the address below, 3) the Bank Manager listed in RIBITS, and 4) the Wilmington District Mitigation Office, 3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587 (or by email to SAWMIT@usace.army. mil). Questions regarding this form or any of the permit conditions may be directed to the District Mitigation Office. USACE Project Manager: David E. Bailey USACE Field Office: Raleigh Regulatory Office US Army Corps of Engineers 3331 Heirtage Tade Drive, Suite 105 Wake Forest, North Carolina 27587 Email: David.E.Bailey2@usace.army.mil Date: 2022.07.27 13:46:28-04'00' Wilmington District Project Manager Signature July 27, 2022 Date of Signature Current Wilmington District mitigation guidance, including information on mitigation ratios, functional assessments, and mitigation bank location and availability, and credit classifications (including stream temperature and wetland groupings) is available at http://ribits.usace.armV.mil. Page 2 of 2 01 0 LL 0 z dVVA SIDVdWI 71tRi3n0 0 a a %NI�Ob%O H-N - A noo Od0 ,no -1NIOd HOIH AO ALIO m N r 2i31N3D ividisn(INI H12iON 1NIOd HJIH 11- a o0=s9 :1„ 11 g n, „oo=9s9EE,3� o« , vo43.,aonosE3.n,,a.ew, =9 o oa a3,3I y olsl a 0a •• d n O b J S N O W W I 1 •.,,.. 4 r i tA "o /lI�9AIH fa1J " NOISN3iX30VO2 A2IVG32ONIMVO VNIMVO Hi2ONA1Nf10002oOV i10LO 1NIOdHOIH-ANd N Q _ U ewe " NVldAiniin �g ur — la _ -i-ILA -LiIJI W i 8 I ITT --- tT--- -----_ -_-_- o LL LL r cl)O o o L o L OU .� V �O] �� U)2i N O - - l 0--� S ) ErLu U W U W— LL Z z z \ LL ❑ LL LL WLL t oo� 1 Oop"�Om / LA am �Q / > o��m o E W �G oo LL Z— Z II W11 Er(O /Q tw z z w EL �OaU)aO� LL ���oa s w� LuLu ��� wwOfLUW12 LL W '� LL Z / J Z Q Z J Z Mz ��� / LL z DO u) Q<Q<Q< 12- Q / ) [ON —mN HG H[2r F W CDv _ �❑ �� s � �a�d�� �� aO a rLL ) A ) i m W�ii / } O } _�� / // Q ❑ / _ _ / l x Lu 0 Of LU CO LU Z\ w/A O �z mom- OOA N LLI LO CL= O U 7� — - l U) i �— — �LL / M OOv -j H Q z Q � I a CO f �w<LU owe < Z U 0- Z G_ U Q rn / ( Q o<P:U) <z l ��w > z w T (D ) 1 �: LU JO ctUUU W ZU UUOfO\LL W ) ) �� LLI Z / a LL NF HcoZU UZQU crCc DW W c ,,< / r LL z LL � W i LL U W Q - z ❑ J Z\ m m LL W \ ` 2 _ W _ LL O g > Q - t Z g_ O J v LL - w - VA NO �OOT-W-c)[IfD- ��� Z W Uwv H❑m LL W O_UO_ - LU >LLHX UZN \\ HH LLLi�LLJ `� �QC7� = ( ��H� �< W ) V aX mLU< 0°2izLL \„` walk �LU 00_ -� w LL Z L L Q \ CO Q' W H J W e � 10 LL Q � � i " > � z - � �� �❑ - zw 0 LL wo ww m ' -� 2O z / � Uwe Oz w ) c a2 / [if \ Z Q ) r �o) LU Q w ��- ON �� �, Ir I \ Q� co F- -/ ��� �L/� / �� _ _� w 0 SIR W, M.'m �w 0 w z� lid oz) a3ddna z 3NOz I- III I II III II =1 I �I I� I II I I I II II I 7—ll 111 III =IT_i III NI II — I• I=11 III II �•;•;•;• :III II —II II IIII IIII IIII �'•••�•�• I=11 III II _IiIII IIII IIII IIII (13 o£) 2i333n9 43NOz ''-_IIII IIII •'•'•'•'•' IIII III �'�'�':•:�;: I Til IIII o� ; IIII III N IIII � • ICI I� LL _ m,• IIII+�II I 1=, t -III 1{ 1111111•.�,II�II A'dVONn09 WV3Fi1S 1N3111W2i31N1 WV3diS 1N3111W2i31N1 3H130 3NM:OiN30 - A'dVONn09 WV3diS 1N3111W831NI .I •1, •I• 0 w w0 w (l=l 0£) d3=i=in9 3NOz al is •• a Z a �a uC) w. cr, L� z (i 0 z 0 0 oQ w wo W W 0 wz o I zo O w Y O 4 d Q m o w 4 F 0 U Q J ozx, LL W m w w w � 0 O O M 0 2 o a 0 o �>¢O �a4m w LL o a wX w zW z- r w� N U � o\ O W I J U w Hw w o'o, w a _ w ¢ F- o � 3 5 w Z, O w 0 W z w ~ Z i w Q ? w w W w O a O d w 0 o 0 w U w 00 U z < F- O 0§ U W I (1=1 oZ) d3=1-�n9 Z 3NOZ + � � o m m m (1333)m m m m Z iQ 0 N 0= o )) N � V \ 00 W _ L Q LL 1 Z 0— Action ID Number: SAW-2014-02098 County: Guilford Permittee: PNK Holdings, LLC (Attn: Park Mun Seon2) Project Name: High Point North Industrial Center — PNK-High Point proiect component Date Verification Issued: 07/27/2022 Project Manager: David E. Bailey Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: David E. Bailey Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or David.E.Bailey2@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date SAW-2014-02098 A. Determination of Jurisdiction: 1. ® There are waters including wetlands, on the above -described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. 2. ❑ There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). This determination may be relied upon for a period not to exceed five years from the date of this notification, provided there is no change in law or our published regulations or new information that warrants revision of this determination. 3. ❑ There are waters including wetlands, within the above -described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). This determination may be relied upon for a period not to exceed five years from the date of this notification, provided there is no change in law or our published regulations or new information that warrants revision of this determination. 4. A jurisdiction determination was not completed with this request. Therefore, this is not an appealable action. However, you may request an approved JD, which is an appealable action, by contacting the Corps for further instruction. 5. ❑ The jurisdictional areas within the above -described project area have been identified under a previous action. Please reference jurisdictional determination issued _. Action ID: _. B. Basis For Determination: See the Preliminary Jurisdictional Determination form dated 07/27/2022. C. Remarks: Note that the Approved Jurisdictional Determination issued for portions of this property expired on 11/19/2019. D. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. E. Appeals Information for Approved Jurisdiction Determinations (as indicated in A2 and A3 above). If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Philip Shannin, Appeal Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 AND PHILIP.A. SHANNINgUSACE.ARMY.MIL In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence. Date: 2022.07.27 Corps Regulatory Official: 13:46:10-04'00' David E. Bailey Date of JD: 07/27/2022 Expiration Date of JD: Not applicable NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Pilot Environmental, Inc. File Number: SAW-2014-02098 Date: 07/27/2022 Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D ❑X PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.army.miUMissions/CivilWorks/ReaulatoryProgramandPenuits.asi) OZI& Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer, Wilmington Regulatory Division MR. PHILIP A. SHANNIN Attn: David E. Bailey ADMINISTRATIVE APPEAL REVIEW OFFICER Raleigh Regulatory Office CESAD-PDS-O U.S Army Corps of Engineers 60 FORSYTH STREET SOUTHWEST, FLOOR M9 3331 Heritage Trade Drive, Suite 105 ATLANTA, GEORGIA 30303-8803 Wake Forest, North Carolina 27587 PHONE: (404) 562-5136; FAX (404) 562-5138 EMAIL: PHILIP.A.SHANNIN(aUSACE.ARMY.MIL RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15-day notice of any site investigation, and will have the opportum to participate in all site invest] ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: David E. Bailey, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Philip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137