HomeMy WebLinkAbout310397_Compliance Evaluation Inspection_20220419Division of Water Resources
Division of Soil and Water Conservation
Other Agency
Facility Number: 310397
Facility Status: Active
Permit: AWS310397 Denied Access
Inspection Type: Compliance Inspection Inactive Or Closed Date:
Reason for Visit: Routine
County:
Duplin
Region:
Date of Visit: 04/19/2022 Entry Time: 09:00 am Exit Time: 4:00 pm Incident #:
Farm Name: S-3 / S-4 Owner Email:
Wilmington
Owner: Murphy -Brown LLC Phone: 910-296-1800
Mailing Address: PO Box 487
Physical Address: 669 Kenan Loop Rd
Facility Status:
Location of Farm:
Compliant Not Compliant
Integrator:
Latitude:
Warsaw NC 283980487
Wallace NC 28466
Murphy -Brown LLC
34°44'31"
Longitude:
78° 06' 00"
West of Wallace. West side of SR 1156 (Kenan Loop Rd) approx. 1 mile South of Hwy 41 and Western intersection of SR 1156.
Question Areas:
▪ Dischrge & Stream Impacts
▪ Records and Documents
▪ Waste Col, Stor, & Treat
▪ Other Issues
Waste Application
Certified Operator:
Secondary OIC(s):
Operator Certification Number:
On -Site Representative(s): Name Title Phone
24 hour contact name Michael Norris
Primary Inspector:
Inspector Signature:
Secondary Inspector(s):
Brian S West
Phone: 910-796-7341
Date:
Inspection Summary:
Site inspection 4/19. Records reviewed at home office 4/27. Need sludge POA #S4 (2/22). Continue work S4 bare areas (no
significant erosion noted)
Page 1 of 5
Permit: AWS310397
Owner: Murphy -Brown LLC
Inspection Date: 04/19/22 Inspection Type: Compliance Inspection
Facility Number: 310397
Reason for Visit: Routine
Regulated Operations
Design Capacity
Current promotions
Swine
Swine - Farrow to Wean
Waste Structures
Type
3,506
3,173
Identifier
Effective
Date
Total Design Capacity:
Total SSLW:
Built
Date
3,506
1,518,098
Closed Designated Observed
Date Freeboard Freeboard
Lagoon
S3
03/24/2005
19.90
79.00
Lagoon
S4
08/05/2005
19.90
24.00
Page 2 of 5
Permit: AWS310397
Inspection Date: 04/19/22
Owner: Murphy -Brown LLC
Facility Number: 310397
Inspection Type: Compliance Inspection Reason for Visit: Routine
Discharges & Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at:
Structure
Application Field
Other
a. Was conveyance man-made?
b. Did discharge reach Waters of the State? (if yes, notify DWQ)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does discharge bypass the waste management system? (if yes, notify DWQ)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to Waters of the
State other than from a discharge?
Waste Collection, Storage & Treatment
4. Is storage capacity less than adequate?
If yes, is waste level into structural freeboard?
5. Are there any immediate threats to the integrity of any of the structures observed (I.e./ larc
trees, severe erosion, seepage, etc.)?
6. Are there structures on -site that are not properly addressed and/or managed through a
waste management or closure plan?
7. Do any of the structures need maintenance or improvement?
8. Do any of the structures lack adequate markers as required by the permit? (Not applicablE
to roofed pits, dry stacks and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
maintenance or improvement?
11. Is there evidence of incorrect application?
If yes, check the appropriate box below.
Excessive Ponding?
Hydraulic Overload?
Frozen Ground?
Heavy metals (Cu, Zn, etc)?
PAN?
Is PAN > 10%/10 lbs.?
Total Phosphorus?
Failure to incorporate manure/sludge into bare soil?
Outside of acceptable crop window?
Evidence of wind drift?
Application outside of application area?
Crop Type 1
Yes No NA NE
❑ • ❑ ❑
❑ ❑ • ❑
❑ ❑ • ❑
❑ ❑ • ❑
❑ • ❑ ❑
❑ • ❑ ❑
Yes No NA NE
❑ • ❑ ❑
❑ • ❑ ❑
❑ • ❑ ❑
❑ • ❑ ❑
❑ • ❑ ❑
❑ • ❑ ❑
Yes No NA NE
❑ • ❑ ❑
❑ • ❑ ❑
Page 3 of 5
Permit: AWS310397
Inspection Date: 04/19/22
Owner: Murphy -Brown LLC
Facility Number: 310397
Inspection Type: Compliance Inspection Reason for Visit: Routine
Waste Application
Crop Type 2
Crop Type 3
Crop Type 4
Crop Type 5
Crop Type 6
Soil Type 1
Soil Type 2
Soil Type 3
Soil Type 4
Soil Type 5
Soil Type 6
14. Do the receiving crops differ from those designated in the Certified Animal Waste
Management Plan(CAWMP)?
15. Does the receiving crop and/or land application site need improvement?
16. Did the facility fail to secure and/or operate per the irrigation design or wettable acre
determination?
17. Does the facility lack adequate acreage for land application?
18. Is there a lack of properly operating waste application equipment?
Records and Documents
19. Did the facility fail to have Certificate of Coverage and Permit readily available?
20. Does the facility fail to have all components of the CAWMP readily available?
If yes, check the appropriate box below.
WUP?
Checklists?
Design?
Maps?
Lease Agreements?
Other?
If Other, please specify
21. Does record keeping need improvement?
If yes, check the appropriate box below.
Waste Application?
Weekly Freeboard?
Waste Analysis?
Soil analysis?
Waste Transfers?
Weather code?
Rainfall?
Stocking?
Crop yields?
Yes No NA NE
❑ • ❑ ❑
❑ • ❑ ❑
Yes No NA NE
❑ • ❑ ❑
❑ • ❑ ❑
❑ • ❑ ❑
Page 4 of 5
Permit: AWS310397
Inspection Date: 04/19/22
Owner: Murphy -Brown LLC
Facility Number: 310397
Inspection Type: Compliance Inspection Reason for Visit: Routine
Records and Documents Yes No NA NE
120 Minute inspections? ❑
Monthly and 1" Rainfall Inspections ❑
Sludge Survey ❑
22. Did the facility fail to install and maintain a rain gauge? ❑ • ❑ ❑
23. If selected, did the facility fail to install and maintain a rainbreaker on irrigation equipmen DEED
(NPDES only)?
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ • ❑ ❑
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check the � ❑ ❑ ❑
appropriate box(es) below:
Failure to complete annual sludge survey ❑
Failure to develop a POA for sludge levels ❑
Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance: Need POA#s4 (2/22)
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ • ❑ ❑
27. Did the facility fail to secure a phosphorous loss assessment (PLAT) certification? ❑ ❑ • ❑
Other Issues Yes No NA NE
28. Did the facility fail to properly dispose of dead animals within 24 hours and/or document ❑ N ❑ ❑
and report mortality rates that exceed normal rates?
29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, ❑ • ❑ ❑
contact a regional Air Quality representative immediately.
30. Did the facility fail to notify regional DWQ of emergency situations as required by Permit % DEED
(i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? ❑ ❑ ❑ •
If yes, check the appropriate box below.
Application Field ❑
Lagoon / Storage Pond ❑
Other ❑
If Other, please specify
32. Were any additional problems noted which cause non-compliance of the Permit or ❑ • ❑ ❑
CAW M P?
33. Did the Reviewer/Inspector fail to discuss review/inspection with on -site representative? ❑ ❑ ❑
34. Does the facility require a follow-up visit by same agency? ❑ • ❑ ❑
Page 5 of 5