HomeMy WebLinkAboutNC0047597_Permit (Issuance)_20110919ATA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
September 19, 2011
Robert Dodson, Superintendent
City of Durham Department of Water Management
101 City Hall Plaza
Durham, North Carolina 27701
Dear Mr. Dodson:
9 2011
SEp 2
Re
Subject: Issuance of Permit NC0047597
South Durham WRF
Class IV Facility
Durham County
Division of Water Quality (Division) personnel have reviewed and approved your application for
renewal of the subject permit. Accordingly, we are forwarding the attached NPDES discharge permit.
It is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and the
Memorandum of Agreement between North Carolina,and the U.S. Environmental Protection Agency
dated October 15, 2007.
There were several changes to your permit from the draft permit issued June 8, 2011. They include
the following:
• Quarterly monitoring requirements for copper and selenium were removed. A review of additional
monitoring results shows that there is no reasonable potential for these pollutants to cause an
exceedance of water quality standards.
• Quarterly monitoring for bis(2-ethylhexyl)phthalate was also removed. The laboratory has
confirmed that the only sample result above detection limits for this pollutant should be discarded,
since there is zero confidence in its accuracy.
• As a result of the revised reasonable potential analysis, daily and monthly limits were implemented
for total mercury, with a monitoring frequency of once per month. These limits are conditioned with
a 12-month compliance period, such that they will not go into effect until November 1, 2012.
Additionally, the City may petition for a reduction to quarterly monitoring after 12 consecutive
months of sampling results under the water quality standard of 12 nglL.
• The special condition concerning nitrogen optimization was deleted. The Division is reviewing its
policy on this subject.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919-807-63001 FAX: 919-807-6492 \ Customer Service: 1-877-623-6748
Internet: www.ncwaterquality.org
An Equal Opportunity Alternative Action Employer
NorthCarolina
Natural!,
The following modifications from the draft permit remain in effect:
• In accordance with the Jordan Lake nutrient management strategy, a new annual mass discharge
limit for total nitrogen of 185,345 pounds per year, effective January 1, 2016, was added.
• Limits for fluoride were removed, due to the results of the reasonable potential analysis.
If any parts, measurement frequencies, or sampling requirements contained in this permit are
unacceptable, you have the right to an adjudicatory hearing upon written request within thirty (30) days
after receiving this letter. Your request must take the form of a written petition conforming to Chapter
150B of the North Carolina General Statutes, and must be filed with the Office of Administrative
Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such demand is
made, this permit remains final and binding.
This permit is not transferable except after notifying the Division of Water Quality. The Division may
modify and re -issue, or revoke this permit. Please notice that this permit does not affect your legal
obligation to obtain other permits required by the Division of Water Quality, the Division of Land
Resources, the Coastal Area Management Act, or other federal or local governments.
If you have questions, or if we can be of further assistance, please contact Mr. Gil Vinzani at
[gil.vinzani @ ncdenr.gov] or call (919) 807-6395.
Sincerely,
tea,
leen H. Sullins
Enclosure: NPDES Permit FINAL NC0047597
Cc: US EPA Region IV, Pamala Myers*
Raleigh Regional Office, Surface Water Protection Section
Environmental Services Section, Aquatic Toxicology Unit, Susan Meadows*
NPDES Files
Central Files
*E-mail Copy
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919-807.63001 FAX: 919.807-64921 Customer Service: 1-877-623-6748
Internet www.ncwaterquality.org
An Equal Opporlurdly 1 Affirmative Action Employer
NorthCarolina
Naturally
Permit No. NC0047597
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
PERMIT
TO DISCHARGE WASTEWATER UNDER THE
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provisions of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, as amended, the
City of Durham
is hereby authorized to discharge wastewater from a facility located at the
South Durham Water Reclamation Facility
6605 Farrington Road
Chapel Hill, NC
Durham County
to receiving waters designated as an unnamed tributary to New Hope Creek in the Cape Fear River
Basin
in accordance with effluent limitations, monitoring requirements, and other conditions set forth in Parts
I, ll, III, and IV hereof.
This permit shall become effective November 1, 2011.
This permit and authorization to discharge shall expire at midnight on April 30, 2016.
Signed this day September 19, 2011:
p'41
een H. Sullins, Director
y Division of Water Quality
V By Authority of the Environmental Management Commission
Permit No. NC0047597
SUPPLEMENT TO PERMIT COVER SHEET
All previous NPDES Permits issued to this facility, whether for operation or discharge are hereby
revoked. As of this permit issuance, any previously issued permit bearing this number is no longer
effective. Therefore, the exclusive authority to operate and discharge from this facility arises under the
permit conditions, requirements, terms, and provisions included herein.
The City of Durham
is hereby authorized to:
1. Continue to operate an existing 20.0 MGD wastewater treatment facility consisting of the following:
• Mechanically cleaned bar screens
• Long channel grit chambers
• Primary clarifiers
• Aeration basins
• Final clarifiers
• Flocculation basins
• Traveling bridge effluent sand filters
• UV disinfection
• Anaerobic digesters
• Aerobic digesters
• Gravity belt thickener
• Clarifier
• Sand drying beds
• Belt filter press
Facility is located at 6605 Farrington Road, Chapel Hill, NC, in Durham County, and
2. Discharge from said treatment works at the location specified on the attached map into an unnamed
tributary to New Hope Creek, classified WS-IV NSW waters in the Cape Fear River Basin.
South Durhard?, FT NC0047597
;�-
Lat.: 35°58'18"
Long.: 78°58:28"
HUC: 03020101
0 0
Permit No. NC0047597
A (1) EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS
Beginning upon the effective date of this permit and lasting until expiration, the Permittee is authorized
to discharge treated wastewater from Outfall 001. Such discharges shall be limited and monitored by
the Permittee as specified below:
EFFLUENT LIMITATIONS
MONITORING REQUIREMENTS
EFFLUENT
CHARACTERISTICS
Monthly
Average
Weekly
Average
Daily
Maximum
Measurement
Frequency
Sample Type
Sample
Location1
Flow
20.0 MGD
Continuous
Recording
I or E
Total Monthly Flow (MG)
Monitor & Report
Monthly
Recordedor
Calculated
I or E
BOD, 5-day, (20°C) 2
(April 1 — October 31)
5.0 mg/L
7.5 mg/L
Daily
Composite
I & E
BOD, 5-day, (20°C) 2
(November 1 — March 31)
7.0 mg/L
10.5 mglL
Daily
Composite
I & E
Total Suspended Solids2
30.0 mg/L
45.0 mg/L
Daily
Composite
1 & E
NH3 as N (April 1-October 31)
1.0 mg/L
3.0 mg/L
Daily
Composite
E
NH3 as N (November 1-March
31)
2.0 mg/L
6.0 mg/L
Daily
Composite
E
Dissolved Oxygen3
Daily
Grab
E
pH 4
Daily
Grab
E
Total Residual Chlorines
17.0 pg/L
Daily
Grab
E
Temperature (°C)
Daily
Grab
E
Fecal Coliform
(geometric mean)
200/100 ml
400/100 ml
Daily
Grab
E
TKN
Monitor & Report (mglL)
Weekly
Composite
E
NO3-N + NO2-N
Monitor & Report (mg/L)
Weekly
Composite
E
Total Nitrogen, TN 6
Monitor & Report (mg/L)
Weekly
Composite
E
TN Load �'$
Monitor & Report (Ib/mo)
334,705 lb/yr (until 12/31/2015)
185,345 lb/yr (effective 1/1/2016)
Monthly
Annually
Annually
Calculated
E
Total Phosphorus, TP
Monitor & Report (mg/L)
Weekly
Composite
E
TP Load''$
Monitor & Report (Ib/mo)
14,053 Iblyr
Monthly
Annually
Calculated
E
Total Mercury 9
12 ng/L
36 ng/L
Monthly
Grab
E
Total Zinc
Quarterly
Composite
E
Chronic Toxicity 1°
Quarterly
Composite
E
Annual Pollutant Scan11
Annually
See A (5)
E
Footnotes are shown on the next page.
() 0
Permit No. NC0047597
Footnotes to Table A (1) on the previous page:
1. I = Influent; E = Effluent. See Condition A (2) for instream monitoring requirements.
2. The monthly average effluent B0D5 and Total Suspended Solids concentrations shall not exceed 15% of the
respective influent value (85% removal).
3. The daily average dissolved oxygen effluent concentration shall not be less than 6.0 mg/L.
4. The pH shall not be less than 6.0 standard units nor greater than 9.0 standard units.
5. Monitoring requirement and limit applies only if chlorine is added for disinfection. The Division shall consider
all effluent TRC values reported below 50 pg/L to be in compliance with the permit. However, the Permittee
shall continue to record and submit all values reported by a North Carolina certified laboratory (including field
certified), even if these values fail below 50 Ng/L.
6. TN = TKN + NO3-N + NO2-N, where TN is total nitrogen, TKN is Total Kjeldahl Nitrogen, and NO3-N and NO2-
N are Nitrate and Nitrite Nitrogen, respectively.
7. TN or TP Load is the mass quantity of Total Nitrogen and Total Phosphorus discharged in a given period of
time. See Special Condition A (8) Calculations of Total Nitrogen or Total Phosphorus Loads.
8. Compliance with mass limits shall be determined in accordance with Special Condition A (7), Annual Limits
for Total Nitrogen or Total Phosphorus.
9. Total mercury shall be sampled using low-level Method 1631 E. Both limits will take effect November 1, 2012.
Monthly monitoring commences November 1, 2011. After 12 consecutive months of monitoring with no
sample results above water quality standards (12 ng/L), the Permittee may petition for a reduction to quarterly
monitoring.
10. Chronic Toxicity (Ceriodaphnia) P/F @ 90%; January, April, July, and October (See A (4) Special Conditions
of the Supplement to Effluent Limitations).
11. See Special Condition A (5) Effluent Pollutant Scan.
There shall be no discharge of floating solids or foam in other than trace amounts.
A (2) INSTREAM MONITORING REQUIREMENTS
Monitoring Locations: Upstream - New Hope Creek at 1-40
Downstream - At NCSR 1107
Parameter
Frequency
Sample Type
Dissolved Oxygen
3/week, June 1— September 30; 1/week, October 1 — May 31
Grab
Fecal Coliform
3/week, June 1 — September 30; 1/week, October 1 — May 31
Grab
Temperature
3/week, June 1 — September 30; 1/week, October 1 — May 31
Grab
Conductivity
3/week, June 1 — September 30; 1/week, October 1 — May 31
Grab
pH
3/week, June 1 — September 30; 1/week, October 1 — May 31
Grab
Total Phosphorus
1/week, June 1 — September 30
Grab
NO3-N + NO2-N
1/week, June 1 — September 30
Grab
TKN
1/week, June 1 — September 30
Grab
PO4
1/week, June 1 — September 30
Grab
A (3) PROVISIONAL WAIVER OF INSTREAM MONITORING REQUIREMENTS
Instream monitoring requirements in A (2) above shall be provisionally waived so long as the Permittee
remains a member of the Upper Cape Fear River Basin Association and the Association continues to
function as approved by the Division and Environmental Management Commission. If the Permittee
does not participate in the Association or if the Association ceases to function, the instream monitoring
requirements in this permit become effective immediately; and the Division may reopen this permit by
administrative letter to establish additional instream monitoring requirements it deems necessary to
adequately characterize the effects of the discharges on water quality in the receiving stream.
Permit No. NC0047597
A (4) CHRONIC TOXICITY PASS/FAIL PERMIT LIMIT
The effluent discharge shall at no time exhibit observable inhibition of reproduction or significant
mortality to Ceriodaphnia dubia at an effluent concentration of 90%.
The permit holder shall perform at a minimum, quarterly monitoring using test procedures outlined in
the "North Carolina Ceriodaphnia Chronic Effluent Bioassay Procedure," Revised February 1998, or
subsequent versions or "North Carolina Phase II Chronic Whole Effluent Toxicity Test Procedure"
(Revised -February 1998) or subsequent versions. The tests will be performed during the months of
January, April, July, and October. Effluent sampling for this testing shall be performed at the NPDES
permitted final effluent discharge below all treatment processes.
If the test procedure performed as the first test of any single quarter results in a failure or ChV below
the permit limit, then multiple -concentration testing shall be performed at a minimum, in each of the two
following months as described in "North Carolina Phase II Chronic Whole Effluent Toxicity Test
Procedure" (Revised -February 1998) or subsequent versions.
The chronic value for multiple concentration tests will be determined using the geometric mean of the
highest concentration having no detectable impairment of reproduction or survival and the lowest
concentration that does have a detectable impairment of reproduction or survival. The definition of
"detectable impairment," collection methods, exposure regimes, and further statistical methods are
specified in the "North Carolina Phase II Chronic Whole Effluent Toxicity Test Procedure" (Revised -
February 1998) or subsequent versions.
All toxicity testing results required as part of this permit condition will be entered on the Effluent
Discharge Monitoring Form (MR-1) for the months in which tests were performed, using the parameter
code TGP3B for the pass/fail results and THP3B for the Chronic Value. Additionally, DWQ Form AT-3
(original) is to be sent to the following address:
NCDENR/ DWQ/ Environmental Sciences Section
1621 Mail Service Center
Raleigh, North Carolina 27699-1621
Completed Aquatic Toxicity Test Forms shall be filed with the Environmental Sciences Section no later
than 30 days after the end of the reporting period for which the report is made.
Test data shall be complete, accurate, include all supporting chemicaVphysical measurements and all
concentration/response data, and be certified by laboratory supervisor and ORC or approved designate
signature. Total residual chlorine of the effluent toxicity sample must be measured and reported if
chlorine is employed for disinfection of the waste stream.
Should there be no discharge of flow from the facility during a month in which toxicity monitoring is
required, the permittee will complete the information located at the top of the aquatic toxicity (AT) test
form indicating the facility name, permit number, pipe number, county, and the month/year of the report
with the notation of "No Flow" in the comment area of the form. The report shall be submitted to the
Environmental Sciences Section at the address cited above.
Should the permittee fail to monitor during a month in which toxicity monitoring is required, monitoring
will be required during the following month. Should any test data from this monitoring requirement or
tests performed by the North Carolina Division of Water Quality indicate potential impacts to the
receiving stream, this permit may be re -opened and modified to include alternate monitoring
requirements or limits.
NOTE: Failure to achieve test conditions as specified in the cited document, such as minimum control
organism survival, minimum control organism reproduction, and appropriate environmental controls, shall
constitute an invalid test and will require immediate follow-up testing to be completed no later than the last
day of the month following the month of the initial monitoring.
Permit No. NC0047597
A (5) EFFLUENT POLLUTANT SCAN
The Permittee shall perform an annual Effluent Pollutant Scan for all parameters listed in the attached
table. The analytical methods shall be in accordance with 40 CFR Part 136 and shall be sufficiently
sensitive to determine whether parameters are present in concentrations greater than applicable
standards and criteria. Samples shall represent seasonal variations. Unless otherwise indicated,
metals shall be analyzed as "total recoverable."
Ammonia (as N) Trans-1,2-dichloroethyiene Bis (2-chloroethyl) ether
Chlorine (total residual, TRC) 1,1-dichloroethylene Bis (2-chloroisopropyl) ether
Dissolved oxygen 1,2-dichloropropane Bis (2-ethylhexyl) phthalate
Nitrate/Nitrite 1,3-dichloropropylene 4-bromophenyl phenyl ether
Kjeldahl nitrogen Elhylbenzene Butyl benzyl phthalate
Oil and grease Methyl bromide 2-chloronaphthalene
Phosphorus Methyl chloride 4-chlorophenyl phenyl ether
Total dissolved solids Methylene chloride Chrysene
Hardness 1,1,2,2-tetrachloroethane Di-n-butyl phthalate
Antimony Tetrachloroethylene Di-n-ociyl phthalate
Arsenic Toluene Dibenzo(a,h)anthracene
Beryllium 1 ,1 ,1-trichloroethane 1 ,2-dichlorobenzene
Cadmium 1,1,2-trichloroethane 1 ,3-dichlorobenzene
Chromium Trichloroethylene 1 ,4-dichlorobenzene
Copper Vinyl chloride 3,3-dichlorobenzidine
Lead Acid -extractable compounds: Diethyl phthalate
Mercury* P-chloro-m-cresol Dimethyl phthalate
Nickel 2-chlorophenol 2,4-dinitrotoluene
Selenium 2,4-dichlorophenol 2,6-dinitrotoluene
Silver 2,4-dimethylphenol 1 ,2-diphenylhydrazine
Thallium 4,6-dinitro-o-cresol Fluoranthene
Zinc 2,4-dinitrophenol Fluorene
Cyanide 2-nitrophenol Hexachlorobenzene
Total phenolic compounds 4-nitrophenol Hexachlorobutadiene
Volatile organic compounds: Pentachlorophenol Hexachlorocyclo-pentadiene
Acrolein Phenol Hexachloroethane
Acrylonitrile 2,4,6-trichlorophenol Indeno(1,2,3-cd)pyrene
Benzene Base -neutral compounds: lsophorone
Bromoform Acenaphthene Naphthalene
Carbon tetrachloride Acenaphthylene Nitrobenzene
Chlorobenzene Anthracene N-nitrosodi-n-propylamine
Chlorodibromomethane Benzidine N-nitrosodimethylamine
Chloroethane Benzo(a)anthracene N-nitrosodiphenylamine
2-chloroethylvinyl ether Benzo(a)pyrene Phenanthrene
Chloroform 3,4 benzofluoranthene Pyrene
Dichlorobromomethane Benzo(ghi)perylene 1,2,4-hichlorobenzene
1,1-dichloroethane Benzo(k)fluoranthene
1,2-dichloroethane Bis (2-chloroethoxy) methane
Test results shall be reported to the Division in DWQ Form- DMR-PPA1 or in a form approved by the
Director within 90 days of sampling. The report shall be submitted to the following address:
NCDENR/ DWQ/ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
* Mercury samples shall be analyzed using EPA Method 1631.
Permit No. NC0047597
A (6) NUTRIENT ALLOCATIONS
(a)
The following table lists the Total Nitrogen (TN) and Total Phosphorus (TP) allocations
assigned to, acquired by, or transferred to the Permittee in accordance with the Jordan Lake
nutrient management rule (T15A NCAC 02B .0270) and the status of each as of permit
issuance. For compliance purposes, this table does not supersede any TN or TP limit
established elsewhere in this permit or in the NPDES permit of a compliance association of
which the Permittee is a Co-Permittee Member.
Total Nitrogen Allocation
ALLOCATION
TYPE
SOURCE
DATE
ALLOCATION AMOUNT (1)
STATUS
Delivered (Ibtyr)
Discharge (Ibtyr)
Base
Assigned by Rule
(T15A NCAC 02B
.0270)
8/11 /09
139,009
185,345
Active
TOTAL
139,009
185,345
Active
Footnote:
(1) Nitrogen Transport Factor = 75%
ALLOCATION
TYPE
Total Phosphorus Allocation
SOURCE
Base
DATE
ALLOCATION AMOUNT (1)
Delivered (Ibtyr)
Assigned by Rule
(T15A NCAC 02B
.0270)
8/11/09
TOTAL
9,415
Discharge (Ibtyr)
STATUS
14,053
9,415
Footnote:
(1) Phosphorus Transport Factor = 67%
14,053
Active
Active
(b) Any addition, deletion, or modification of the listed allocation(s) (other than to correct
typographical errors) or any change in status of any of the listed allocations shall be
considered a major modification of this permit and shall be subject to the public review
process afforded such modifications under state and federal rules.
0
Permit No. NC0047597
A (7) ANNUAL LIMITS FOR TOTAL NITROGEN OR TOTAL PHOSPHORUS
(a) Total Nitrogen (TN) and Total Phosphorus (TP) allocations and Toad limits for NPDES
dischargers in the Jordan Lake watershed are annual limits and apply on a calendar year basis.
(b) For any given calendar year, the Permittee shall be in compliance with the annual TN (or TP)
Load limit in this Permit if:
(i) the Permittee's annual TN (or TP) Load is less than or equal to the effective limit, or
(ii) the Permittee is a Co-Permittee Member of a compliance association.
The TN (or TP) Load limit in this Permit may be modified as the result of allowable changes in
the Permittee's allocations.
Allowable changes include those resulting from purchase of TN (or TP) allocation from
an authorized mitigation banker, the Ecosystem Enhancement Program, or other source
allowed under applicable regulations; purchase, sale, trade, or lease of allocation
between the Permittee and other dischargers; regionalization; and other transactions
approved by the Division.
(ii) The Permittee may request a modification of the TN (or TP) Load limit in this Permit to
reflect allowable changes in its allocation(s).
(A) Upon receipt of timely and proper application, the Division will modify the permit as
appropriate and in accordance with state and federal program requirements.
(B) Changes in TN (or TP) limits become effective on January 1 of the year following
permit modification. The Division must receive application no later than August 31 for
changes proposed for the following calendar year.
(iii) Any requests for modification should be sent to:
NCDENR/ DWQ/ NPDES Programs
Attn: Jordan Lake Watershed Coordinator
1617 Mail Service Center
Raleigh, NC 27699-1617
(d) If the Permittee is a member and co-permittee of an approved compliance association on
January 1 of a given year, its TN and TP discharges during that year are governed by that
association's group NPDES permit and the limits therein.
(i)
(i)
The Permittee shall be considered a Co-Permittee Member for any given calendar year
in which it is identified as such in Appendix A of the association's group NPDES permit.
(ii) Association roster(s) and members' TN and TP allocations will be updated annually and
in accordance with state and federal program requirements.
(iii) If the Permittee intends to join or leave a compliance association, the Division must be
notified of the proposed action in accordance with the procedures defined in the
association's NPDES permit.
(A) Upon receipt of timely and proper notification, the Division will modify the permit as
appropriate and in accordance with state and federal program requirements.
(B) Membership changes in a compliance association become effective on January 1 of
the year following modification of the association's permit.
(e) The TN and TP monitoring and reporting requirements in this Permit remain in effect throughout
the term of the Permit and are not affected by the Permittee's membership in a compliance
association.
Permit No. NC0047597
A (8) CALCULATION OF TOTAL NITROGEN OR TOTAL PHOSPHORUS LOADS
(a) The Permittee shall calculate monthly and annual TN Loads as follows:
(i) Monthly TN (or TP) Load (Ib/mo) = TN (or TP) x TMF x 8.34
where:
TN or TP = the average Total Nitrogen or Total Phosphorus concentration
(mg/L) of the composite samples collected during the month
TMF = the Total Monthly Flow of wastewater discharged during the
month (MG/mo)
8.34 = conversion factor, from (mg/L x MG) to pounds
(ii) Annual TN (or TP) Load (Ib/yr) = Sum of the 12 Monthly TN (or TP) Loads for the
calendar year
(b) The Permittee shall report monthly Total Nitrogen and Total Phosphorus results (mg/L and
Ib/mo) in the appropriate discharge monitoring report for each month and shall report each
calendar year's results (Ib/yr) with the December report for that year.
A (9) NUTRIENT MONITORING REOPENER
Pursuant to N.C. General Statute Section 143-215.1 and the implementing rules found in Title 15A of
the North Carolina Administrative Code, Subchapter 2H, specifically, 15A NCAC 2H.0112(b) (1) and
2H.0114(a), and Part II, Sections B-12 and B-13 of this permit, the Director of DWQ may reopen this
permit to require supplemental nutrient monitoring of the discharge. The additional monitoring will be to
support water quality modeling efforts within the Cape Fear River Basin, and shall be consistent with a
monitoring plan developed jointly by the Division and affected stakeholders.
0 0
NPDIr - rmit Standard Conditions
Page 1 of 18
PART II
STANDARD CONDITIONS FOR NPDES PERMITS
Section A. Definitions
2/ Month
Samples are collected twice per month with at least ten calendar days between sampling events. These samples
shall be representative of the wastewater discharged during the sample period.
3/ Week
Samples are collected three times per week on three separate calendar days. These samples shall be representative
of the wastewater discharged during the sample period.
Act or "the Act"
The Federal Water Pollution Control Act, also known as the Clean Water Act (CWA), as amended, 33 USC 1251, et.
seq.
Annual Average
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar year. In the case of fecal
coliform, the geometric mean of such discharges.
Arithmetic Mean
The summation of the individual values divided by the number of individual values.
Bypass
The known diversion of waste streams from any portion of a treatment facility including the collection system,
which is not a designed or established or operating mode for the facility.
Calendar Day
The period from midnight of one day until midnight of the next day. However, for purposes of this permit, any
consecutive 24-hour period that reasonably represents the calendar day may be used for sampling.
Calendar Week
The period from Sunday through the following Saturday.
Calendar Quarter
One of the following distinct periods: January through March, April through June, July through September, and
October through December.
Composite Sample
A sample collected over a 24-hour period by continuous sampling or combining grab samples of at least 100 ml in
such a manner as to result in a total sample representative of the wastewater discharge during the sample period.
The Director may designate the most appropriate method (specific number and size of aliquots necessary, the time
interval between grab samples, etc.) on a case -by -case basis. Samples may be collected manually or automatically.
Composite samples may be obtained by the following methods:
(1) Continuous: a single, continuous sample collected over a 24-hour period proportional to the rate of flow.
(2) Constant time/variable volume: a series of grab samples collected at equal time intervals over a 24 hour
period of discharge and combined proportional to the rate of flow measured at the time of individual
sample collection, or
(3) Variable time/constant volume: a series of grab samples of equal volume collected over a 24 hour period
with the time intervals between samples determined by a preset number of gallons passing the sampling
point. Flow measurement between sample intervals shall be determined by use of a flow recorder and
totalizer, and the preset gallon interval between sample collection fixed at no greater than 1/24 of the
expected total daily flow at the treatment system, or
(4) Constant time/constant volume: a series of grab samples of equal volume collected over a 24-hour period
at a constant time interval. Use of this method requires prior approval by the Director. This method may
Version 10/29/2010
NPDES Permit Standard Conditions
Page 2 of 18
only be used in situations where effluent flow rates vary less than 15 percent. The foIIowing restrictions
also apply:
➢ Influent and effluent grab samples shall be of equal size and of no less than 100 milliliters
➢ Influent samples shall not be collected more than once per hour.
➢ Permittees with wastewater treatment systems whose detention time < 24 hours shall collect effluent
grab samples at intervals of no greater than 20 minutes apart during any 24-hour period.
➢ Permittees with wastewater treatment systems whose detention time exceeds 24 hours shall collect
effluent grab samples at least every six hours; there must be a minimum of four samples during a 24-
hour sampling period.
Continuous flow measurement
Flow monitoring that occurs without interruption throughout the operating hours of the facility. FIow shall be
monitored continually except for the infrequent times when there may be no flow or for infrequent maintenance
activities on the flow device.
Daily Discharge
The discharge of a pollutant measured during a calendar day or any 24-hour period that reasonably represents the
calendar day for purposes of sampling. For pollutants measured in units of mass, the "daily discharge" is
calculated as the total mass of the pollutant discharged over the day. The "daily discharge" concentration
comprises the mean concentration for a 24-hour sampling period as either a composite sample concentration or the
arithmetic mean of all grab samples collected during that period. (40 CFR 122.2)
Daily Maximum
The highest "daily discharge" during the calendar month.
Daily Sampling
Parameters requiring daily sampling shall be sampled 5 out of every 7 days per week unless otherwise specified in
the permit. Sampling shall be conducted on weekdays except where holidays or other disruptions of normal
operations prevent weekday sampling. If sampling is required for all seven days of the week for any permit
parameter(s), that requirement will be so noted on the Effluent Limitations and Monitoring Page(s).
DWQ or "the Division"
The Division of Water Quality, Department of Environment and Natural Resources.
EMC
The North Carolina Environmental Management Commission
EPA
The United States Environmental Protection Agency
Facility CIosure
Cessation of all activities that require coverage under this NPDES permit. Completion of facility closure will allow
this permit to be rescinded.
Geometric Mean
The Nth root of the product of the individual values where N = the number of individual values. For purposes of
calculating the geometric mean, values of "0" (or "< [detection level]") shall be considered = 1.
Grab Sample
Individual samples of at least 100 mI collected over a period of time not exceeding 15 minutes. Grab samples can be
collected manually. Grab samples must be representative of the discharge (or the receiving stream, for instream
samples).
Hazardous Substance
Any substance designated under 40 CFR Part 116 pursuant to Section 311 of the CWA.
Instantaneous flow measurement
A measure of flow taken at the time of sampling, when both the sample and flow will be representative of the total
discharge.
Version 10/29/2010
NPDI"�rmit Standard Conditions
`` Page 3 of 18
Monthly Average (concentration Iimit)
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar month. In the case of
fecal coliform, the geometric mean of such discharges.
Permit Issuing Authority
The Director of the Division of Water Quality.
Quarterly Average (concentration limit)
The average of all samples taken over a calendar quarter.
Severe property damage
Substantial physical damage to property, damage to the treatment facilities which causes them to become
inoperable, or substantial and permanent loss of natural resources which can reasonably be expected to occur in
the absence of a bypass. Severe property damage excludes economic loss caused by delays in production.
Toxic Pollutant:
Any pollutant listed as toxic under Section 307(a)(1) of the CWA.
Upset
An incident beyond the reasonable control of the Permittee causing unintentional and temporary noncompliance
with permit effluent limitations and/or monitoring requirements. An upset does not include noncompliance
caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of
preventive maintenance, or careless or improper operation.
Weekly Average (concentration limit)
The arithmetic mean of all "daily discharges" of a pollutant measured during the calendar week. In the case of
fecal coliform, the geometric mean of such discharges.
Section B. General Conditions
I. Duty to Comply
The Permittee must comply with all conditions of this permit. Any permit noncompliance constitutes a
violation of the CWA and is grounds for enforcement action; for permit termination, revocation and
reissuance, or modification; or denial of a permit renewal application [40 CFR 122.41].
a. The Permittee shall comply with effluent standards or prohibitions established under section 307(a) of the
CWA for toxic pollutants and with standards for sewage sludge use or disposal established under section
405(d) of the CWA within the time provided in the regulations that establish these standards or
prohibitions or standards for sewage sludge use or disposal, even if the permit has not yet been modified
to incorporate the requirement.
b. The CWA provides that any person who violates section's] 301, 302, 306, 307, 308, 318 or 405 of the Act, or
any permit condition or limitation implementing any such sections in a permit issued under section 402,
or any requirement imposed in a pretreatment program approved under sections 402 (a) (3) or 402 (b) (8)
of the Act, is subject to a civil penalty not to exceed $37,500 per day for each violation. [33 USC 1319 (d)
and 40 CFR 122.41 (a) (2)]
c. The CWA provides that any person who negligently violates sections 301, 302, 306, 307, 308, 318, or 405 of
the Act, or any condition or limitation implementing any of such sections in a permit issued under section
402 of the Act, or any requirement imposed in a pretreatment program approved under section 402(a)(3)
or 402(b)(8) of the Act, is subject to criminal penalties of $2,500 to $25,000 per day of violation, or
imprisonment of not more than 1 year, or both. In the case of a second or subsequent conviction for a
negligent violation, a person shall be subject to criminal penalties of not more than $50,000 per day of
violation, or by imprisonment of not more than 2 years, or both. [33 USC 1319 (c) (1) and 40 CFR 122.41 (a)
(2)]
d. Any person who knowingly violates such sections, or such conditions or limitations is subject to criminal
penalties of $5,000 to $50,000 per day of violation, or imprisonment for not more than 3 years, or both. In
the case of a second or subsequent conviction for a knowing violation, a person shall be subject to criminal
Version 1 D/29/2010
NPDES Permit Standard Conditions
Page 4 of 18
penalties of not more than $100,000 per day of violation, or imprisonment of not more than 6 years, or
both. [33 USC 1319 (c) (2) and 40 CFR 122.41 (a) (2)1
e. Any person who knowingly violates section 301, 302, 303, 306, 307, 308, 318 or 405 of the Act, or any permit
condition or limitation implementing any of such sections in a permit issued under section 402 of the Act,
and who knows at that time that he thereby places another person in imminent danger of death or serious
bodily injury, shall, upon conviction, be subject to a fine of not more than $250,000 or imprisonment of not
more than 15 years, or both. In the case of a second or subsequent conviction for a knowing endangerment
violation, a person shall be subject to a fine of not more than $500,000 or by imprisonment of not more
than 30 years, or both. An organization, as defined in section 309(c)(3)(B)(iii) of the CWA, shall, upon
conviction of violating the imminent danger provision, be subject to a fine of not more than $1,000,000 and
can be fined up to $2,000,000 for second or subsequent convictions. [40 CFR 122.41 (a) (2)1
f. Under state law, a civil penalty of not more than $25,000 per violation may be assessed against any person
who violates or fails to act in accordance with the terms, conditions, or requirements of a permit. [North
Carolina General Statutes § 143-215.6A]
Any person may be assessed an administrative penalty by the Administrator for violating section 301, 302,
306, 307, 308, 318 or 405 of this Act, or any permit condition or limitation implementing any of such
sections in a permit issued under section 402 of this Act. Administrative penalties for Class I violations are
not to exceed $16,000 per violation, with the maximum amount of any Class I penalty assessed not to
exceed $37,500. Penalties for Class II violations are not to exceed $16,000 per day for each day during
which the violation continues, with the maximum amount of any Class II penalty not to exceed $177,500.
[33 USC 1319 (g) (2) and 40 CFR 122.41 (a) (3)1
2. Duty to Mitigate
The Permittee shall take all reasonable steps to minimize or prevent any discharge or sludge use or disposal in
violation of this permit with a reasonable likelihood of adversely affecting human health or the environment
[40 CFR 122.41 (d)].
3. Civil and Criminal Liability
Except as provided in permit conditions on "Bypassing" (Part II. C. 4), "Upsets" (Part II. C. 5) and "Power
Failures" (Part II. C. 7), nothing in this permit shall be construed to relieve the Permittee from any
responsibilities, liabilities, or penalties for noncompliance pursuant to NCGS 143-215.3, 143-215.6 or Section 309
of the Federal Act, 33 USC 1319. Furthermore, the Permittee is responsible for consequential damages, such as
fish kills, even though the responsibility for effective compliance may be temporarily suspended.
4. Oil and Hazardous Substance Liability
Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the Permittee
from any responsibilities, liabilities, or penalties to which the Permittee is or may be subject to under NCGS
I43-215.75 et seq. or Section 311 of the Federal Act, 33 USG 1321. Furthermore, the Permittee is responsible for
consequential damages, such as fish kills, even though the responsibility for effective compliance may be
temporarily suspended.
5. Property Rights
The issuance of this permit does not convey any property rights in either real or personal property, or any
exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor
any infringement of Federal, State or local laws or regulations [40 CFR 122.41 (g)].
6. Onshore or Offshore Construction
This permit does not authorize or approve the construction of any onshore or offshore physical structures or
facilities or the undertaking of any work in any navigable waters.
7. Severability
The provisions of this permit are severable. If any provision of this permit, or the application of any provision
of this permit to any circumstances, is held invalid, the application of such provision to other circumstances,
and the remainder of this permit, shall not be affected thereby [NCGS 150B-231.
g.
Version 10/29/2010
NPD ormit Standard Conditions
Page 5 of 18
8. Duty to Provide Information
The Permittee shall furnish to the Permit Issuing Authority, within a reasonable time, any information which
the Permit Issuing Authority may request to determine whether cause exists for modifying, revoking and
reissuing, or terminating this permit or to determine compliance with this permit. The Permittee shall also
furnish to the Permit Issuing Authority upon request, copies of records required by this permit [40 CFR 122.41
(h)].
9. Duty to Reapply
If the Permittee wishes to continue an activity regulated by this permit after the expiration date of this permit,
the Permittee must apply for and obtain a new permit [40 CFR 122.41 (b)].
10. Expiration of Permit
The Permittee is not authorized to discharge after the expiration date. In order to receive automatic
authorization to discharge beyond the expiration date, the Permittee shall submit such information, forms, and
fees as are required by the agency authorized to issue permits no later than 180 days prior to the expiration
date. Any Permittee that has not requested renewal at least I80 days prior to expiration, or any Permittee that
does not have a permit after the expiration and has not requested renewal at least 180 days prior to expiration,
will subject the Permittee to enforcement procedures as provided in NCGS 143-215.6 and 33 USC 1251 et. seq.
11. Signatory Requirements
All applications, reports, or information submitted to the Permit Issuing Authority shall be signed and
certified [40 CFR 122.41 (k)].
a. All permit applications shall be signed as follows:
(1) For a corporation: by a responsible corporate officer. For the purpose of this Section, a responsible
corporate officer means: (a) a president, secretary, treasurer or vice president of the corporation in
charge of a principal business function, or any other person who performs similar policy or decision
making functions for the corporation, or (b) the manager of one or more manufacturing, production,
or operating facilities, provided, the manager is authorized to make management decisions which
govern the operation of the regulated facility including having the explicit or implicit duty of making
major capital investment recommendations, and initiating and directing other comprehensive
measures to assure long term environmental compliance with environmental laws and regulations;
the manager can ensure that the necessary systems are established or actions taken to gather complete
and accurate information for permit application requirements; and where authority to sign documents
has been assigned or delegated to the manager in accordance with corporate procedures .
(2) For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
(3) For a municipality, State, Federal, or other public agency: by either a principal executive officer or
ranking elected official [40 CFR 122.22].
b. All reports required by the permit and other information requested by the Permit Issuing Authority shall
be signed by a person described in paragraph a. above or by a duly authorized representative of that
person. A person is a duly authorized representative only if:
(1) The authorization is made in writing by a person described above;
(2) The authorization specified either an individual or a position having responsibility for the overall
operation of the regulated facility or activity, such as the position of plant manager, operator of a well
or well field, superintendent, a position of equivalent responsibility, or an individual or position
having overall responsibility for environmental matters for the company. (A duly authorized
representative may thus be either a named individual or any individual occupying a named position.);
and
(3) The written authorization is submitted to the Permit Issuing Authority [40 CFR 122.22]
c. Changes to authorization: If an authorization under paragraph (b) of this section is no longer accurate
because a different individual or position has responsibility for the overall operation of the facility, a new
authorization satisfying the requirements of paragraph (b) of this section must be submitted to the
Director prior to or together with any reports, information, or applications to be signed by an authorized
representative [40 CFR 122.22]
Version 10/29/2010
NPDES Permit Standard Conditions
Page 6of18
d. Certification. Any person signing a document under paragraphs a. or b. of this section shall make the
following certification [40 CFR 122.22]. NO OTHER STATEMENTS OF CERTIFICATION WILL BE
ACCEPTED:
"I certijij, under penalty of law, that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the possibility of fines and imprisonment for knowing violations."
12. Permit Actions
This permit may be modified, revoked and reissued, or terminated for cause. The filing of a request by the
Permittee for a permit modification, revocation and reissuance, or termination, or a notification of planned
changes or anticipated noncompliance does not stay any permit condition [40 CFR 122.41 (f)].
13. Permit Modification, Revocation and Reissuance, or Termination
The issuance of this permit does not prohibit the permit issuing authority from reopening and modifying the
permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and
regulations contained in Title 40, Code of Federal Regulations, Parts 122 and 123; Title 15A of the North
Carolina Administrative Code, Subchapter 2H.0100; and North Carolina General Statute 143-215.1 et. al.
14. Annual Administering and Compliance Monitoring Fee Requirements
The Permittee must pay the annual administering and compliance monitoring fee within thirty days after
being billed by the Division. Failure to pay the fee in a timely manner in accordance with 15A NCAC 2H.0105
(b) (2) may cause this Division to initiate action to revoke the permit.
Section C. Operation and Maintenance of Pollution Controls
1. Certified Operator
Upon classification of the permitted facility by the Certification Commission, the Permittee shall employ a
certified water pollution control treatment system operator in responsible charge (ORC) of the water pollution
control treatment system. Such operator must hold a certification of the grade equivalent to or greater than the
classification assigned to the water pollution control treatment system by the Certification Commission. The
Permittee must also employ one or more certified Back-up ORCs who possess a currently valid certificate of
the type of the system. Back-up ORCs must possess a grade equal to (or no more than one grade less than) the
grade of the system [15A NCAC 8G.0201].
The ORC of each Class I facility must:
➢ Visit the facility as often as is necessary to insure proper operation of the treatment system; the
treatment facility must be visited at least weekly
➢ Comply with all other conditions of 15A NCAC 8G.0204.
The ORC of each Class II, III and IV facility must:
➢ Visit the facility as often as is necessary to insure proper operation of the treatment system; the
treatment facility must be visited at least five days per week, excluding holidays
➢ Properly manage and document daily operation and maintenance of the facility
➢ Comply with all other conditions of 15A NCAC 8G.0204.
Once the facility is classified, the Permittee shall submit a letter to the Certification Commission designating
the operator in responsible charge:
a. Within 60 calendar days prior to wastewater being introduced into a new system
b. Within 120 calendar days of:
➢ Receiving notification of a change in the classification of the system requiring the designation of a new
ORC and back-up ORC
➢ A vacancy in the position of ORC or back-up ORC.
Version 10/29/2010
NPDlermit Standard Conditions
l Page7of18
2. Proper Operation and Maintenance
The Permittee shall at all times provide the operation and maintenance resources necessary to operate the
existing facilities at optimum efficiency. The Permittee shall at all times properly operate and maintain all
facilities and systems of treatment and control (and related appurtenances) which are installed or used by the
Permittee to achieve compliance with the conditions of this permit. Proper operation and maintenance also
includes adequate laboratory controls and appropriate quality assurance procedures. This provision requires
the Permittee to install and operate backup or auxiliary facilities only when necessary to achieve compliance
with the conditions of the permit [40 CFR 122.41 (e)].
NOTE: Properly and officially designated operators are fully responsible for all proper operation and
maintenance of the facility, and all documentation required thereof, whether acting as a contract operator
[subcontractor] or a member of the Permittee's staff.
3. Need to Halt or Reduce not a Defense
It shall not be a defense for a Permittee in an enforcement action that it would have been necessary to halt or
reduce the permitted activity in order to maintain compliance with the condition of this permit [40 CFR 122.41
(c)].
4. Bypassing of Treatment Facilities
a. Bypass not exceeding limitations [40 CFR 122.41 (m) (2)]
The Permittee may allow any bypass to occur which does not cause effluent limitations to be exceeded,
but only if it also is for essential maintenance to assure efficient operation. These bypasses are not subject
to the provisions of Paragraphs b. and c. of this section.
b. Notice [40 CFR 122.41 (m) (3)]
(I)
Anticipated bypass. If the Permittee knows in advance of the need for a bypass, it shall submit prior
notice, if possible at least ten days before the date of the bypass; including an evaluation of the
anticipated quality and effect of the bypass.
(2) Unanticipated bypass. The Permittee shall submit notice of an unanticipated bypass as required
Part II. E. 6. (24-hour notice).
c. Prohibition of Bypass
(I)
in
Bypass from the treatment facility is prohibited and the Permit Issuing Authority may take
enforcement action against a Permittee for bypass, unless:
(A) Bypass was unavoidable to prevent loss of life, personal injury or severe property damage;
(B) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities,
retention of untreated wastes or maintenance during normal periods of equipment downtime.
This condition is not satisfied if adequate backup equipment should have been installed in the
exercise of reasonable engineering judgment to prevent a bypass which occurred during normal
periods of equipment downtime or preventive maintenance; and
(C) The Permittee submitted notices as required under Paragraph b. of this section.
(2) Bypass from the collection system is prohibited and the Permit Issuing Authority may take
enforcement action against a Permittee for a bypass as provided in any current or future system -wide
collection system permit associated with the treatment facility.
The Permit Issuing Authority may approve an anticipated bypass, after considering its adverse effects,
if the Permit Issuing Authority determines that it will meet the three conditions listed above in
Paragraph c. (1) of this section.
(3)
5. Upsets
a. Effect of an upset [40 CFR 122.41 (n) (2)]:An upset constitutes an affirmative defense to an action brought
for noncompliance with such technology based permit effluent limitations if the requirements of
paragraph b. of this condition are met. No determination made during administrative review of claims
that noncompliance was caused by upset, and before an action for noncompliance, is final administrative
action subject to judicial review.
Version 10/29/2010
NPDISS Permit Standard Conditions
Page 8 of 18
b. Conditions necessary for a demonstration of upset: Any Permittee who wishes to establish the
affirmative defense of upset shaII demonstrate, through properly signed, contemporaneous operating logs,
or other relevant evidence that:
(1) An upset occurred and that the Permittee can identify the cause(s) of the upset;
(2) The Permittee facility was at the time being properly operated; and
(3) The Permittee submitted notice of the upset as required in Part II. E. 6. (b) of this permit.
(4) The Permittee complied with any remedial measures required under Part II. B. 2. of this permit.
c. Burden of proof [40 CFR 122.41 (n) (4)]: The Permittee seeking to establish the occurrence of an upset has
the burden of proof in any enforcement proceeding.
6. Removed Substances
Solids, sludges, filter backwash, or other pollutants removed in the course of treatment or control of
wastewaters shall be utilized/disposed of in accordance with NCGS 143-215.1 and in a manner such as to
prevent any pollutant from such materials from entering waters of the State or navigable waters of the United
States. The Permittee shall comply with all existing Federal regulations governing the disposal of sewage
sludge. Upon promulgation of 40 CFR Part 503, any permit issued by the Permit Issuing Authority for the
utilization/disposal of sludge may be reopened and modified, or revoked and reissued, to incorporate
applicable requirements at 40 CFR 503. The Permittee shall comply with applicable 40 CFR 503 Standards for
the Use and Disposal of Sewage Sludge (when promulgated) within the time provided in the regulation, even
if the permit is not modified to incorporate the requirement. The Permittee shall notify the Permit Issuing
Authority of any significant change in its sludge use or disposal practices.
7. Power Failures
The Permittee is responsible for maintaining adequate safeguards (as required by 15A NCAC 2H.0124) to
prevent the discharge of untreated or inadequately treated wastes during electrical power failures either by
means of alternate power sources, standby generators or retention of inadequately treated effluent.
Section D. Monitoring and Records
1. Representative Sampling
Samples collected and measurements taken, as required herein, shall be characteristic of the volume and
nature of the permitted discharge. Samples collected at a frequency less than daily shall be taken on a day and
time that is characteristic of the discharge over the entire period the sample represents. All samples shall be
taken at the monitoring points specified in this permit and, unless otherwise specified, before the effluent joins
or is diluted by any other wastestream, body of water, or substance. Monitoring points shall not be changed
without notification to and the approval of the Permit Issuing Authority [40 CFR 122.41 (j)].
2. Reporting
Monitoring results obtained during the previous month(s) shall be summarized for each month and reported
on a monthly Discharge Monitoring Report (DMR) Form (MR 1, 1.1, 2, 3) or alternative forms approved by the
Director, postmarked no later than the last calendar day of the month following the completed reporting
period.
The first DMR is due on the last day of the month following the issuance of the permit or in the case of a new
facility, on the last day of the month following the commencement of discharge. Duplicate signed copies of
these, and all other reports required herein, shall be submitted to the following address:
NC DENR / Division of Water Quality / Surface Water Protection Section
ATTENTION: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
3. Flow Measurements
Appropriate flow measurement devices and methods consistent with accepted scientific practices shall be
selected and used to ensure the accuracy and reliability of measurements of the volume of monitored
discharges. The devices shall be installed, calibrated and maintained to ensure that the accuracy of the
Version 1029/2010
NPD1( ?rmit Standard Conditions
Page 9 of 18
measurements is consistent with the accepted capability of that type of device. Devices selected shall be
capable of measuring flows with a maximum deviation of less than 10% from the true discharge rates
throughout the range of expected discharge volumes. FIow measurement devices shall be accurately calibrated
at a minimum of once per year and maintained to ensure that the accuracy of the measurements is consistent
with the accepted capability of that type of device. The Director shall approve the flow measurement device
and monitoring location prior to installation.
Once -through condenser cooling water flow monitored by pump logs, or pump hour meters as specified in
Part I of this permit and based on the manufacturer's pump curves shall not be subject to this requirement.
4. Test Procedures
Laboratories used for sample analysis must be certified by the Division. Permittees should contact the
Division's Laboratory Certification Section (919 733-3908 or http://portal.ncdenr.org/web/wq/lab/cert) for
information regarding laboratory certifications.
Facilities whose personnel are conducting testing of field -certified parameters only must hold the appropriate
field parameter laboratory certifications.
Test procedures for the analysis of pollutants shall conform to the EMC regulations (published pursuant to
NCGS 143-215.63 et. seq.), the Water and Air Quality Reporting Acts, and to regulations published pursuant to
Section 304(g), 33 USC 1314, of the CWA (as amended), and 40 CFR 136; or in the case of sludge use or
disposal, approved under 40 CFR 136, unless otherwise specified in 40 CFR 503, unless other test procedures
have been specified in this permit [40 CFR 122.41].
To meet the intent of the monitoring required by this permit, all test procedures must produce minimum
detection and reporting levels that are below the permit discharge requirements and all data generated must
be reported down to the minimum detection or lower reporting level of the procedure. If no approved
methods are determined capable of achieving minimum detection and reporting levels below permit discharge
requirements, then the most sensitive (method with the lowest possible detection and reporting Ievel)
approved method must be used.
5. PenaIties for Tampering
The CWA provides that any person who falsifies, tampers with, or knowingly renders inaccurate, any
monitoring device or method required to be maintained under this permit shaII, upon conviction, be punished
by a fine of not more than $10,000 per violation, or by imprisonment for not more than two years per violation,
or by both. If a conviction of a person is for a violation committed after a first conviction of such person under
this paragraph, punishment is a fine of not more than $20,000 per day of violation, or by imprisonment of not
more than 4 years, or both [40 CFR 122.41].
6. Records Retention
Except for records of monitoring information required by this permit related to the Permittee's sewage sludge
use and disposal activities, which shall be retained for a period of at least five years (or longer as required by
40 CFR 503), the Permittee shall retain records of all monitoring information, including:
➢ all calibration and maintenance records
➢ all original strip chart recordings for continuous monitoring instrumentation
➢ copies of all reports required by this permit
➢ copies of all data used to complete the application for this permit
These records or copies shall be maintained for a period of at least 3 years from the date of the sample,
measurement, report or application. This period may be extended by request of the Director at any time [40
CFR 122.41].
7. Recording Results
For each measurement or sample taken pursuant to the requirements of this permit, the Permittee shall record
the following information [40 CFR 122.41]:
a. The date, exact place, and time of sampling or measurements;
b. The individual(s) who performed the sampling or measurements;
Version 10/29/2010
NPDES Permit Standard Conditions
Page 10 of 18
c. The date(s) analyses were performed;
d. The individual(s) who performed the analyses;
e. The analytical techniques or methods used; and
f. The results of such analyses.
8. Inspection and Entry
The Permittee shall allow the Director, or an authorized representative (including an authorized contractor
acting as a representative of the Director), upon the presentation of credentials and other documents as may be
required by law, to;
a. Enter upon the Permittee's premises where a regulated facility or activity is located or conducted, or
where records must be kept under the conditions of this permit;
b. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this
permit;
c. Inspect at reasonable times any facilities, equipment (including monitoring and control equipment),
practices, or operations regulated or required under this permit; and
d. Sample or monitor at reasonable times, for the purposes of assuring permit compliance or as otherwise
authorized by the CWA, any substances or parameters at any location [40 CFR 122.41 (i)].
Section E Reporting Requirements
I. Change in Discharge
All discharges authorized herein shall be consistent with the terms and conditions of this permit. The
discharge of any pollutant identified in this permit more frequently than or at a level in excess of that
authorized shall constitute a violation of the permit.
2. Planned Changes
The Permittee shall give notice to the Director as soon as possible of any planned physical alterations or
additions to the permitted facility [40 CFR 122.41 (l)]. Notice is required only when:
a. The alteration or addition to a permitted facility may meet one of the criteria for new sources at 40 CFR
122.29 (b); or
b. The alteration or addition could significantly change the nature or increase the quantity of pollutants
discharged. This notification applies to pollutants subject neither to effluent limitations in the permit, nor
to notification requirements under 40 CFR 122.42 (a) (1).
c. The alteration or addition results in a significant change in the Permittee's sludge use or disposal
practices, and such alteration, addition or change may justify the application of permit conditions that are
different from or absent in the existing permit, including notification of additional use or disposal sites not
reported during the permit application process or not reported pursuant to an approved land application
plan.
3. Anticipated Noncompliance
The Permittee shall give advance notice to the Director of any planned changes to the permitted facility or
other activities that might result in noncompliance with the permit [40 CFR 122.41 (l) (2)].
4. Transfers
This permit is not transferable to any person without approval from the Director. The Director may require
modification or revocation and reissuance of the permit to document the change of ownership. Any such
action may incorporate other requirements as may be necessary under the CWA [40 CFR 122.41 (I) (3)].
5. Monitoring Reports
Monitoring results shall be reported at the intervals specified elsewhere in this permit [40 CFR 122.41 (I) (4)].
a. Monitoring results must be reported on a Discharge Monitoring Report (DMR) (See Part II. D. 2) or forms
provided by the Director for reporting results of monitoring of sludge use or disposal practices.
Version 10/29/2010
NPDrermit Standard Conditions
`` Page 11 of 18
b. If the Permittee monitors any pollutant more frequently than required by this permit, the results of such
monitoring shaII be included in the calculation and reporting of the data submitted on the DMR.
6. Twenty-four Hour Reporting
a. The Permittee shall report to the Director or the appropriate Regional Office any noncompliance that
potentially threatens public health or the environment. Any information shaII be provided orally within 24
hours from the time the Permittee became aware of the circumstances. A written submission shall also be
provided within 5 days of the time the Permittee becomes aware of the circumstances. The written
submission shall contain a description of the noncompliance, and its cause; the period of noncompliance,
including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is
expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the
noncompliance [40 CFR 122.41 (1) (6)].
b. The Director may waive the written report on a case -by -case basis for reports under this section if the oral
report has been received within 24 hours.
c. Occurrences outside normal business hours may also be reported to the Division's Emergency Response
personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300.
7. Other Noncompliance
The Permittee shall report all instances of noncompliance not reported under Part II. E. 5 and 6. of this permit
at the time monitoring reports are submitted. The reports shaII contain the information listed in Part II. E. 6. of
this permit [40 CFR 122.41 (1) (7)].
8. Other Information
Where the Permittee becomes aware that it failed to submit any relevant facts in a permit application, or
submitted incorrect information in a permit application or in any report to the Director, it shall promptly
submit such facts or information [40 CFR 122.41 (1) (8)].
9. Noncompliance Notification
The Permittee shall report by telephone to either the central office or the appropriate regional office of the
Division as soon as possible, but in no case more than 24 hours or on the next working day following the
occurrence or first knowledge of the occurrence of any of the following:
a. Any occurrence at the water poIIution control facility which results in the discharge of significant amounts
of wastes which are abnormal in quantity or characteristic, such as the dumping of the contents of a
sludge digester; the known passage of a slug of hazardous substance through the facility; or any other
unusual circumstances.
b. Any process unit failure, due to known or unknown reasons, that render the facility incapable of adequate
wastewater treatment such as mechanical or electrical failures of pumps, aerators, compressors, etc.
c. Any failure of a pumping station, sewer line, or treatment facility resulting in a by-pass without treatment
of all or any portion of the influent to such station or facility.
Persons reporting such occurrences by telephone shall also file a written report within 5 days following first
knowledge of the occurrence.
10. Availability of Reports
Except for data determined to be confidential under NCGS 143-215.3 (a)(2) or Section 308 of the Federal Act, 33
USC 1318, all reports prepared in accordance with the terms shall be available for public inspection at the
offices of the Division. As required by the Act, effluent data shall not be considered confidential. Knowingly
making any false statement on any such report may result in the imposition of criminal penalties as provided
for in NCGS 143-215.1 (b)(2) or in Section 309 of the Federal Act.
11. PenaIties for Falsification of Reports
The CWA provides that any person who knowingly makes any false statement, representation, or certification
in any record or other document submitted or required to be maintained under this permit, including
monitoring reports or reports of compliance or noncompliance shall, upon conviction, be punished by a fine of
not more than $25,000 per violation, or by imprisonment for not more than two years per violation, or by both
[40 CFR 122.41].
Version 10/29/2010
NPDES Permit Standard Conditions
Page 12of18
12. Annual Performance Reports
Permittees who own or operate facilities that collect or treat municipal or domestic waste shall provide an
annual report to the Permit Issuing Authority and to the users/customers served by the Permittee (NCGS 143-
215.1C). The report shall summarize the performance of the coIIection or treatment system, as well as the
extent to which the facility was compliant with applicable Federal or State laws, regulations and rules
pertaining to water quality. The report shall be provided no later than sixty days after the end of the calendar
or fiscal year, depending upon which annual period is used for evaluation.
The report shall be sent to:
NC DENR / Division of Water Quality / Surface Water Protection Section
ATTENTION: Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Version 10/29/2010
PART III
OTHER REQUIREMENTS
Section A. Construction
NPDI`armit Standard Conditions
Page 13 of 18
The Permittee shall not commence construction of wastewater treatment facilities, nor add to the plant's treatment
capacity, nor change the treatment process(es) utilized at the treatment plant unless the Division has issued an
Authorization to Construct (AtC) permit. Issuance of an AtC will not occur until Final Plans and Specifications for
the proposed construction have been submitted by the Permittee and approved by the Division.
Section B. Groundwater Monitoring
The Permittee shall, upon written notice from the Director, conduct groundwater monitoring as may be required
to determine the compliance of this NPDES permitted facility with the current groundwater standards.
Section C. Changes in Discharges of Toxic Substances
The Permittee shall notify the Permit Issuing Authority as soon as it knows or has reason to believe (40 CFR
122.42):
a. That any activity has occurred or will occur which would result in the discharge, on a routine or frequent
basis, of any toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the
following "notification levels";
(1) One hundred micrograms per liter (100 µg/L);
(2) Two hundred micrograms per liter (200 µg/L) for acrolein and acrylonitrile; five hundred micrograms per
liter (500 µg/L) for 2.4-dinitrophenol and for 2-methyl-4.6-dinitrophenol; and one milligram per liter (l
mg/L) for antimony;
(3) Five times the maximum concentration value reported for that pollutant in the permit application.
b. That any activity has occurred or will occur which would result in any discharge, on a non -routine or
infrequent basis, of a toxic pollutant which is not limited in the permit, if that discharge will exceed the highest
of the following "notification levels';
(1) Five hundred micrograms per liter (500 µg/L);
(2) One milligram per liter (1 mg/L) for antimony;
(3) Ten times the maximum concentration value reported for that pollutant in the permit application.
Section D. Evaluation of Wastewater Discharge Alternatives
The Permittee shall evaluate all wastewater disposal alternatives and pursue the most environmentally sound
alternative of the reasonably cost effective alternatives. If the facility is in substantial non-compliance with the
terms and conditions of the NPDES permit or governing rules, regulations or laws, the Permittee shall submit a
report in such form and detail as required by the Division evaluating these alternatives and a plan of action within
60 days of notification by the Division.
Section E. Facility Closure Requirements
The Permittee must notify the Division at Ieast 90 days prior to the closure of any wastewater treatment system
covered by this permit. The Division may require specific measures during deactivation of the system to prevent
adverse impacts to waters of the State. This permit cannot be rescinded while any activities requiring this permit
continue at the permitted facility.
Version 10/29/2010
NPDES Permit Standard Conditions
Page 14of18
PART IV
SPECIAL CONDITIONS FOR MUNICIPAL FACILITIES
Section A. Definitions
In addition to the definitions in Part II of this permit, the following definitions apply to municipal facilities:
Indirect Discharge or Industrial User
Any non -domestic source that discharges wastewater containing pollutants into a POTW regulated under section
307(b), (c) or (d) of the CWA. [40 CFR 403.3 (i) and (j)]
Interference
Inhibition or disruption of the POTW treatment processes; operations; or its sludge process, use, or disposal which
causes or contributes to a violation of any requirement of the POTW's NPDES Permit or prevents sewage sludge
use or disposal in compliance with specified applicable State and Federal statutes, regulations, or permits. [15A
NCAC 2H.0903 (b) (13)]
Pass Through
A discharge which exits the POTW into waters of the State in quantities or concentrations which, alone or with
discharges from other sources, causes a violation, including an increase in the magnitude or duration of a
violation, of the POTW's NPDES permit, or of an instream water quality standard. [15A NCAC 2H.0903 (b) (23)]
Publicly Owned Treatment Works (POTW)
A treatment works as defined by Section 212 of the CWA, owned by a State or local government entity. This
definition includes any devices and systems used in the storage, treatment, recycling and reclamation of municipal
sewage or industrial wastes of a liquid nature. It also includes sewers, pipes, and other conveyances only if they
convey wastewater to a POTW. The term also means the local government entity, or municipality, as defined in
section 502(4) of the CWA, which has jurisdiction over indirect discharges to and the discharges from such a
treatment works. [15A NCAC 2H.0903 (b) (27)]
"Significant Industrial User" or "SIU"
An industrial user that discharges wastewater into a publicly owned treatment works and that [15A NCAC
2H.0903 (b) (34)1:
(a) discharges an average of 25,000 gallons or more per day of process wastewater to the POTW (excluding
sanitary, noncontact cooling and boiler blowdown wastewaters) or;
(b) contributes more than 5 percent of the design flow of the POTW treatment plant or more than 5 percent of the
maximum allowable headworks Loading of the POTW treatment plant for any pollutant of concern, or;
(c) is required to meet a national categorical pretreatment standard, or;
(d) is, regardless of Parts (a), (b), and (c) of this definition, otherwise determined by the POTW, the Division, or
the EPA to have a reasonable potential for adversely affecting the POTW's operation or for violating any
pretreatment standard or requirement or POTW's receiving stream standard, or to limit the POTW's sludge
disposal options.
Section B. Publicly Owned Treatment Works (POTWs)
All POTWs are required to prevent the introduction of pollutants into the POTW which will interfere with the
operation of the POTW, including interference with its use or disposal of municipal sludge, or pass through the
treatment works or otherwise be incompatible with such treatment works. [40 CFR 403.2]
All POTWs must provide adequate notice to the Director of the foIIowing [40 CFR 122.42 (b)]:
1. Any new introduction of pollutants into the POTW from an indirect discharger, regardless of the means of
transport, which would be subject to section 301 or 306 of CWA if it were directly discharging those
pollutants; and
2. Any substantial change in the volume or character of pollutants being introduced by an indirect discharger as
influent to that POTW at the time of issuance of the permit.
Version 10/29/2010
Section C. Municipal Control of Pollutants from Industrial Users.
1. Effluent limitations are listed in Part I of this permit. Other poIIutants attributable to inputs from industries
using the municipal system may be present in the Permittee's discharge. At such time as sufficient information
becomes available to establish limitations for such pollutants, this permit may be revised to specify effluent
limitations for any or all of such other pollutants in accordance with best practicable technology or water
quality standards.
2. Prohibited Discharges
a. Under no circumstances shall the Permittee allow introduction of pollutants or discharges into the waste
treatment system or waste collection system which cause or contribute to Pass Through or Interference as
defined in 15A NCAC 2H.0900 and 40 CFR 403. [40 CFR 403.5 (a) (1)]
b. Under no circumstances shall the Permittee allow introduction of the following wastes in the waste
treatment or waste collection system 140 CFR 403.5 (b)]:
(1) Pollutants which create a fire or explosion hazard in the POTW, including, but not limited to,
wastestreams with a closed cup flashpoint of less than 140 degrees Fahrenheit or 60 degrees
Centigrade using the test methods specified in 40 CFR 261.21;
(2) Pollutants which cause corrosive structural damage to the POTW, but in no case discharges with pH
Iower than 5.0, unless the works is specifically designed to accommodate such discharges;
Solid or viscous pollutants in amounts which cause obstruction to the flow in the POTW resulting in
Interference;
(4) Any pollutant, including oxygen demanding pollutants (BOD, etc.) released in a Discharge at a flow
rate and/or pollutant concentration which will cause Interference with the POTW;
Heat in amounts which will inhibit biological activity in the POTW resulting in Interference, but in no
case heat in such quantities that the temperature at the POTW Treatment Plant exceeds 40°C (104°F)
unless the Division, upon request of the POTW, approves alternate temperature limits;
(6) Petroleum oil, non -biodegradable cutting oil, or products of mineral oil origin in amounts that will
cause Interference or Pass Through;
Pollutants which result .in the presence of toxic gases, vapors, or fumes within the POTW in a quantity
that may cause acute worker health and safety problems;
Any trucked or hauled pollutants, except at discharge points designated by the POTW.
NPDEr rmit Standard Conditions
Page 15 of 18
3. For purposes of this paragraph, adequate notice shall include information on (1) the quality and quantity of
effluent introduced into the POTW, and (2) any anticipated impact that may result from the change of the
quantity or quality of effluent to be discharged from the POTW.
(3)
(5)
(7)
(8)
c. The Permittee shall investigate the source of aII discharges into the POTW, including slug loads and other
unusual discharges, which have the potential to adversely impact the permittee s Pretreatment Program
and/or the operation of the POTW.
The Permittee shall report such discharges into the POTW to the Director or the appropriate Regional
Office. Any information shall be provided orally within 24 hours from the time the Permittee became
aware of the circumstances. A written submission shall also be provided within 5 days of the time the
Permittee becomes aware of the circumstances. The written submission shall contain a description of the
discharge, the investigation into possible sources; the period of the discharge, including exact dates and
times; and if the discharge has not ceased, the anticipated time it is expected to continue; and steps taken
or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance,
3. With regard to the effluent requirements listed in Part I of this permit, it may be necessary for the Permittee to
supplement the requirements of the Federal Pretreatment Standards (40 CFR, Part 403) to ensure compliance
by the Permittee with all applicable effluent limitations. Such actions by the Permittee may be necessary
regarding some or all of the industries discharging to the municipal system.
4. The Permittee shall require any Industrial User discharging to the POTW to meet Federal Pretreatment
Standards developed under Section 307(b) of the Act as amended (which includes categorical standards and
Version 10/29/2010
NPDES Permit Standard Conditions
Page 16 of 18
specific local limits, best management practices and narrative requirements). Prior to accepting wastewater
from any Significant Industrial User, the Permittee shall either develop and submit to the Division a new
Pretreatment Program or a modification of an existing Pretreatment Program, for approval as required under
section D below as well as 15A NCAC 2H.0907 (a) and (b). [40 CFR 122.44 (j) (2)]
5. This permit shall be modified, or alternatively, revoked and reissued, to incorporate or modify an approved
POTW Pretreatment Program or to include a compliance schedule for the development of a POTW
Pretreatment Program as required under Section 402 (b) (8) of the CWA and implementing regulations or by
the requirements of the approved State pretreatment program, as appropriate.
Section D. Pretreatment Programs
Under authority of sections 307 (b) and (c) and 402 (b) (8) of the CWA and implementing regulations 40 CFR 403,
North Carolina General Statute 143-215.3 (14) and implementing regulations 15A NCAC 2H.0900, and in
accordance with the approved pretreatment program, all provisions and regulations contained and referenced in
the Pretreatment Program Submittal are an enforceable part of this permit. [40 CFR 122.44 (j) (2)]
The Permittee shall operate its approved pretreatment program in accordance with Section 402 (b) (8) of the CWA,
40 CFR 403, 15A NCAC 2H.0900, and the legal authorities, policies, procedures, and financial provisions contained
in its pretreatment program submission and Division approved modifications thereof. Such operation shall
include but is not limited to the implementation of the following conditions and requirements. Terms not defined
in Part II or Part IV of this permit are as defined in 15A NCAC 2H.0903 and 40 CFR 403.3.
1. Sewer Use Ordinance (SUO)
The Permittee shall maintain adequate legal authority to implement its approved pretreatment program. [15A
NCAC 2H.0905 and .0906; 40 CFR 403.8 (f) (1) and 403.9 ( b) (1), (2)]
2. Industrial Waste Survey (IWS)
The permittee shall implement an IWS consisting of the survey of users of the POTW, as required by 40 CFR
403.8 (f) (2) (i-ni) and 15A NCAC 2H.0905 [also 40 CFR 122.44 (j) (1)], including identification of all industrial
users that may have an impact on the POTW and the character and amount of pollutants contributed to the
POTW by these industrial users and identification of those industrial users meeting the definition of SIU. The
Permittee shall submit a summary of its IWS activities to the Division at least once every five years, and as
required by the Division. The IWS submission shall include a summary of any investigations conducted under
paragraph C.2.c. of this Part.
3. Monitoring PIan
The Permittee shall implement a Division -approved Monitoring Plan for the collection of facility specific data
to be used in a wastewater treatment plant Headworks Analysis (HWA) for the development of specific
pretreatment Ioca1 limits. Effluent data from the Plan shall be reported on the DMRs (as required by Part II,
Section D, and Section E.5.). [15A NCAC 2H.0906 (b) (2) and .09051
4. Headworks Analysis (HWA) and Local Limits
The Permittee shall obtain Division approval of a HWA at least once every five years, and as required by the
Division. Within 180 days of the effective date of this permit (or any subsequent permit modification) the
Permittee shall submit to the Division a written technical evaluation of the need to revise local Iimits (i.e., an
updated HWA or documentation of why one is not needed) [40 CFR 122.44]. The Permittee shall develop, in
accordance with 40 CFR 403.5 (c) and 15A NCAC 2H.0909, specific Local Limits to implement the prohibitions
listed in 40 CFR 403.5 (a) and (b) and 15A NCAC 2H.0909. Pursuant to 40 CFR 403.5, local limits are
enforceable Pretreatment Standards as defined by 40 CFR 403.3(1).
5. Industrial User Pretreatment Permits (IUP) & Allocation Tables
In accordance with NCGS 143-215.1, the Permittee shall issue to all significant industrial users, permits for
operation of pretreatment equipment and discharge to the Permittee's treatment works. These permits shall
contain limitations, sampling protocols, reporting requirements, appropriate standard and special conditions,
and compliance schedules as necessary for the installation of treatment and control technologies to assure that
their wastewater discharge wiII meet all applicable pretreatment standards and requirements. The Permittee
shall maintain a current Allocation Table (AT) which summarizes the results of the HWA and the limits from
Version 10/29/2010
NPDI'ermit Standard Conditions
Page 17 of 18
all IUPs. Permitted IUP loadings for each parameter cannot exceed the treatment capacity of the POTW as
determined by the HWA. [15A NCAC 2H.0909, .0916, and .0917; 40 CFR 403.5, 403.8 (f) (1) (iii); NCGS 143-
215.67 (a)]
6. Authorization to Construct (AtC)
The Permittee shall ensure that an Authorization to Construct permit (AtC) is issued to all applicable
industrial users for the construction or modification of any pretreatment facility. Prior to the issuance of an
AtC, the proposed pretreatment facility and treatment process must be evaluated for its capacity to comply
with all Industrial User Pretreatment Permit (IUP) limitations. [15A NCAC 2H.0906 (b) (6) and .0905; NCGS
143-215.1 (a) (8)]
7. POTW Inspection & Monitoring of their IUs
The Permittee shall conduct inspection, surveillance, and monitoring activities as described in its Division
approved pretreatment program in order to determine, independent of information supplied by industrial
users, compliance with applicable pretreatment standards. [15A NCAC 2H .0908(d); 40 CFR 403.8(f)(2)(v)]
The Permittee must:
a. Inspect all Significant Industrial Users (SIUs) at Least once per calendar year; and
b. Sample all Significant Industrial Users (SIUs) at least twice per calendar year for all permit -limited
pollutants, once during the period from January 1 through June 30 and once during the period from July 1
through December 31, except for organic compounds which shall be sampled at least once per calendar
year; For the purposes of this paragraph, "organic compounds" means the types of compounds listed in
40 CFR 136.3(a), Tables IC, ID, and IF, as amended.
8. IU Self Monitoring and Reporting
The Permittee shall require all industrial users to comply with the applicable monitoring and reporting
requirements outlined in the Division -approved pretreatment program, the industry's pretreatment permit, or
in 15A NCAC 2H .0908. [15A NCAC 2H .0906(b)(4) and .0905; 40 CFR 403.8(f)(1)(v) and (2)(iii); 40 CFR
122.44(j)(2) and 40 CFR 403.12]
9. Enforcement Response Plan (ERP)
The Permittee shall enforce and obtain appropriate remedies for violations of all pretreatment standards
promulgated pursuant to section 307(b) and (c) of the Clean Water Act (40 CFR 405 et. seq.), prohibitive
discharge standards as set forth in 40 CFR 403.5 and 15A NCAC 2H .0909, and specific Local limitations. All
remedies, enforcement actions and other, shall be consistent with the Enforcement Response Plan (ERP)
approved by the Division. [15A NCAC 2H .0906(b)(7) and .0905; 40 CFR 403.8(0(5)]
10. Pretreatment Annual Reports (PAR)
The Permittee shall report to the Division in accordance with 15A NCAC 2H .0908. In lieu of submitting
annual reports, Modified Pretreatment Programs developed under 15A NCAC 2H .0904 (b) may be required to
submit a partial annual report or to meet with Division personnel periodically to discuss enforcement of
pretreatment requirements and other pretreatment implementation issues.
For all other active pretreatment programs, the Permittee shall submit two copies of a Pretreatment Annual
Report (PAR) describing its pretreatment activities over the previous twelve months to the Division at the
following address:
NC DENR / Division of Water Quality / Surface Water Protection Section
Pretreatment, Emergency Response, and Collection Systems (PERCS) Unit
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
These reports shall be submitted according to a schedule established by the Director and shall contain the
following:
a.) Narrative
A brief discussion of reasons for, status of, and actions taken for all Significant Industrial Users (SlUs) in
Significant Non -Compliance (SNC);
Version 10/29/2010
P
NPDES Permit Standard Conditions
Page 18of18
b.) Pretreatment Program Summary (PPS)
A pretreatment program summary (PPS) on specific forms approved by the Division;
c.) Significant Non -Compliance Report (SNCR1
The nature of the violations and the actions taken or proposed to correct the violations on specific forms
approved by the Division;
d.) Industrial Data Summary Forms (IDSF)
Monitoring data from samples collected by both the POTW and the Significant Industrial User (SIU) in
SNC. These analytical results must be reported on Industrial Data Summary Forms (IDSF) or other specific
format approved by the Division;
e.) Other Information
Copies of the POTW's allocation table, new or modified enforcement compliance schedules, public notice
of SIUs in SNC, and any other information, upon request, which in the opinion of the Director is needed to
determine compliance with the pretreatment implementation requirements of this permit;
11. Public Notice
The Permittee shall publish annually a list of Significant Industrial Users (SIUs) that were in Significant Non -
Compliance (SNC) as defined in the Permittee's Division -approved Sewer Use Ordinance with applicable
pretreatment requirements and standards during the previous twelve month period. This list shall be
published within four months of the applicable twelve-month period. [15A NCAC 2H .0903(b)(35), .0908(b)(5)
and .0905 and 40 CFR 403.8(f)(2)(viii)]
12. Record Keeping
The Permittee shall retain for a minimum of three years records of monitoring activities and results, along
with support information including general records, water quality records, and records of industrial impact on
the POTW. [15A NCAC 2H .0908(f); 40 CFR 403.12(o)]
13. Funding and Financial Report
The Permittee shall maintain adequate funding and staffing levels to accomplish the objectives of its approved
pretreatment program. [15A NCAC 2H .0906(a) and .0905; 40 CFR 403.8(f)(3), 403.9(b)(3)1
14. Modification to Pretreatment Programs
Modifications to the approved pretreatment program including but not limited to local limits modifications,
POTW monitoring of their Significant Industrial Users (SIUs), and Monitoring Plan modifications, shall be
considered a permit modification and shall be governed by 40 CFR 403.18,15 NCAC 2H .0114 and 15A NCAC
2H .0907.
Version 10/29/2010