Loading...
HomeMy WebLinkAboutICA has been lifted for R-3421B Culvert Site 6 at STA 240+00+_- RT This email was generated by the NCDOT ErCon (Erosion Control Management) system. Carpenter,Kristi From:Young, Joshua M Sent:Wednesday, July 27, 2022 10:18 AM To:Fine, Cary A; Cranford, Darren L; Owens, Lonnie H; Dunn, Thomas B Cc:Norman, Patrick A; Blakley, Reuben; McKenzie, Michael L; King, Art C; LaBounty, Tim L; Lawyer, Mike; Chapman, Amy; Conchilla, Ryan; Coco, Julie; Harris, David B; DeWit, Benjamin J; Whitley, Kimball; Pettus, Martin Subject:ICA has been lifted for R-3421B Culvert Site 6 at STA 240+00+/- RT Attachments:InspectionReport_34542.3.6_7-26-2022.pdf; Culv 6 Sta 238+00 RT L 2022.07.27 3.jpg; Culv 6 Sta 238+00 RT L 2022.07.27 2.jpg; Culv 6 Sta 238+00 RT L 2022.07.27 1.jpg Please see attached EC report. Thank you Josh Young Field Operations Engineer Div 7&8 NCDOT Roadside Environmental Unit 919-776-2279 (office) 919-796-1261 (mobile) jmyoung@ncdot.gov th 1530 South 7 Street Sanford, NC 27330 Courier 14-45-23 Attached is the Inspection Report for the following Project: InspectionReport_34542.3.6_7-26-2022.pdf County: Richmond I-73/74 From US-74 ByPass West of Project Location Rockingham at SR-1109(Zion Church Description: Rd) to North of SR 1304(Harrington Rd) Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1