HomeMy WebLinkAboutICA has been lifted for R-3421B Culvert Site 6 at STA 240+00+_- RT
This email was generated by the NCDOT ErCon (Erosion Control Management) system.
Carpenter,Kristi
From:Young, Joshua M
Sent:Wednesday, July 27, 2022 10:18 AM
To:Fine, Cary A; Cranford, Darren L; Owens, Lonnie H; Dunn, Thomas B
Cc:Norman, Patrick A; Blakley, Reuben; McKenzie, Michael L; King, Art C; LaBounty, Tim L;
Lawyer, Mike; Chapman, Amy; Conchilla, Ryan; Coco, Julie; Harris, David B; DeWit,
Benjamin J; Whitley, Kimball; Pettus, Martin
Subject:ICA has been lifted for R-3421B Culvert Site 6 at STA 240+00+/- RT
Attachments:InspectionReport_34542.3.6_7-26-2022.pdf; Culv 6 Sta 238+00 RT L 2022.07.27 3.jpg;
Culv 6 Sta 238+00 RT L 2022.07.27 2.jpg; Culv 6 Sta 238+00 RT L 2022.07.27 1.jpg
Please see attached EC report.
Thank you
Josh Young
Field Operations Engineer Div 7&8
NCDOT Roadside Environmental Unit
919-776-2279 (office)
919-796-1261 (mobile)
jmyoung@ncdot.gov
th
1530 South 7 Street
Sanford, NC 27330
Courier 14-45-23
Attached is the Inspection Report for the following Project:
InspectionReport_34542.3.6_7-26-2022.pdf
County: Richmond
I-73/74 From US-74 ByPass West of
Project Location Rockingham at SR-1109(Zion Church
Description: Rd) to North of SR 1304(Harrington
Rd)
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
1