Loading...
HomeMy WebLinkAboutRE_ ICA Issued for R-3421B Culvert Site 6 at STA 240+00 RTCarpenter, Kristi From: Fine, Cary A Sent: Wednesday, July 27, 2022 9:47 AM To: Young, Joshua M; Cranford, Darren L; Owens, Lonnie H; Dunn, Thomas B Cc: Norman, Patrick A; Blakley, Reuben; McKenzie, Michael L; King, Art C; LaBounty, Tim L; Lawyer, Mike; Chapman, Amy; Conchilla, Ryan; Coco, Julie; Harris, David B; DeWit, Benjamin J; Whitley, Kimball; Pettus, Martin Subject: RE: ICA Issued for R-3421 B Culvert Site 6 at STA 240+00 RT Attachments: Culy 6 Sta 238+00 RT L 2022.07.27 3jpg; Culy 6 Sta 238+00 RT L 2022.07.27 2jpg; Culy 6 Sta 238+00 RT L 2022.07.27 1 jpg Josh, The contractor has removed the noted silt bags in their entirety and seeded and mulched any disturbed area beyond the project limits. Please see the attached pictures for review. This has been addressed with the contractor to prevent future issues and offsite disturbance. If you have any questions or require additional information please let me know. Thanks, Cary Fine, PE Resident Engineer NCDOT Highway Division 8 District 1 - Construction Office 336 318 4020 office 336 225 4237 mobile cafine ncdot.gov 300 DOT Drive Asheboro, NC 27204 From: Young, Joshua M <jmyoung@ncdot.gov> Sent: Wednesday, July 27, 2022 8:49 AM To: Fine, Cary A <cafine@ncdot.gov>; Cranford, Darren L <dlcranford@ncdot.gov>; Owens, Lonnie H <Ihowens@ncdot.gov>; Dunn, Thomas B <tbdunn@ncdot.gov> Cc: Norman, Patrick A <pnorman@ncdot.gov>; Blakley, Reuben <rblakley@ncdot.gov>; McKenzie, Michael L <mlmckenziel@ncdot.gov>; King, Art C <acking@ncdot.gov>; LaBounty, Tim L <tim.labounty@ncdenr.gov>; Lawyer, Mike <mike.lawyer@ncdenr.gov>; Chapman, Amy <amy.chapman@ncdenr.gov>; Conchilla, Ryan <ryan.conchilla@ncdenr.gov>; Coco, Julie <julie.coco@ncdenr.gov>; Harris, David B <davidharris@ncdot.gov>; DeWit, Benjamin J <bjdewit@ncdot.gov>; Whitley, Kimball <kwhitley3@ncdot.gov>; Pettus, Martin <mpettus@ncdot.gov> Subject: ICA Issued for R-3421B Culvert Site 6 at STA 240+00 RT Please see attached EC report and handle as needed. Thankyou r � `{• •- -. _ • • ,ram • .�'t _ '1.. '� �h �. _ ~fir ,'�. INI ' "Y+ 'i t • y T, i NP yyZ...Tr l � .. 'fit ri � . f ��. �'ii `+.�• + { ''"' - 17 1-73/74 From US-74 ByPass West of Project Location Rockingham at SR-1109(Zion Church Description: Rd) to North of SR 1304(Harrington Rd) This email was generated by the NCDOT ErCon (Erosion Control Management) system. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.