HomeMy WebLinkAboutInspectionReport_34542.3.6_7-26-2022.pdfNorth Carolina Department of Transportation Roadside Environmental Unit Erosion & Sedimentation / Stormwater Report ICA Immediate Corrective Action This project does not comply with the North Carolina Erosion and Sedimentation Control laws. Immediate Corrective Action is needed to resolve the situation to full compliance with the Law: (T15A: 04B.0000). Project Information Inspection Date: 07/26/2022 Evaluator: Josh Young Project #: 34542.3.6 TIP #: R-3421A&B Contract #: C204368 Division #: 8 County: Richmond Project Type: Contract Engineer: Asheboro Resident Project Length: 6.10 Disturbed Acres: 0 River Basin: Yadkin HQW Zone: NO Trout Zone: NO Location 1-73/74 From US-74 ByPass West of Rockingham at SR-1109(Zion Church Rd) to North of SR Description: 1304(Harrington Rd) Proiect Evaluation Report Type: ❑Routine ❑✓ ICA ❑ICA Ex 1st ❑ICA Ex 2nd ❑CICA - SWO ❑ PCN ❑ ECPAR Installation Maintenance Effectiveness Plan Overall Project Length Section of BMPs of BMPs of BMPs Implementation Evaluation 1.8 R-3421 A -- -- -- -- -- 4.3 R-3421 B -- -- -- -- -- Culvert 6 6 6 6 6 6 Grading Scale: 0 - 6 = Immediate Corrective Action Required, 7 = Fair, 8 = Good, 9 = Very Good, 10 = Excellent Remarks and Recommendations: I reviewed the project today with Ben DeWit, Darren Cranford, and Lonnie Owens. The reason for the site visit was to assess whether a silt bag was placed off the right of way at STA 240+00 RT at culvert Site 6. It was determined onsite that that two silt bags were placed over 100 feet off the right of way onto private property. Silt bags were unable to be returned to right of way with equipment which resulted in EC crews having to manually shovel silt into wheel barrel and returning to right of way. This retrieval process was taking place during our onsite evaluation. I am issuing an ICA at this time based on silt bags being placed outside of right of way without following the Reclamation Plan Procedure. A better solution would have been to pump excess water from basin 143 into basin 140 instead of utilizing silt bags during basin clean out operation. I recommend removing both silt bags and any remaining silt from this location. I also recommend seeding and mulching all disturbed areas once all the material has been removed. After I have received final clean up photos of this location, I will lift ICA. 7/27/2022 8:27 AM Page 1 of 1