Loading...
HomeMy WebLinkAboutNCC222413_ESC Approval Submitted_20220727ROY C00I0ER Governor ELIZABETH S. BISER Secretary BRAN WRENN Director NORTH CAROLINA Environmental Quality .Tune 9, 2022 LETTER OF APPROVAL WITH MODIFICATIONS American Racing Headers and Exhaust, Inc_. Attention: Paul J. Thau, Chief Financial Officer 880 Grand Boulevard Deer Park, New York 11729 RE: Project Name: American Racing Headers and Exhaust, Inc. Project ID: STANL-2022-035 Acres Approved: 7.1 County: Stanly City: Stanfield Location: Nance Road River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: The Isaacs Group, P.C. Date Received by LQS: June 7, 2022 Plan Type. Revised Dear Mr. Thau: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: I. The approved E&SC plan as well as any approved deviation_ 2. The NCGO 1 permit and the COC, once it is received_ 3. Records of inspections made during the previous 30 days. D � North Carolina Department Df Environmental Quality DivIision o£ Energy, Mineral and Resources Mooresville Reginal office 1610 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 ��1 704.663,1699 �w�wm cs�nvvunmand4uaii� Letter of Approval with Modifications American Racing Headers and Exhaust Inc. June 9, 2022 Page 2 of 3 Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan_ North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, A, ! Michael aclntyre, PE Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCG01 Fact Sheet The Isaacs Group, P.C. 8720 Red Oak Boulevard, Suite 420 Charlotte, North Carolina 28217 Letter of Approval with Modifications American Racing Headers and Exhaust Inc. June 9, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: American Racing Headers and Exhaust, Inc. Project ID: STANL-2022-035 County: Stanly Reviewed by: Michael Maclntyre, PE 1. It is likely that a temporary pipe will be needed under the construction entrance. Alternately, the permanent pipe can be installed in an earlier phase if field conditions allow it. Please plan accordingly. 2. Basin 2 may be needed in Phase 3 of the erosion control plans. The contractor needs to maintain the basin until given approval from the inspector for its removal (as noted on Sheet C4.2) 3. All disturbed areas not built upon will be provided with permanent groundcover. [N.C.G.S. 113A-57(2)1 4. Additional measures maybe necessary during this project. [15A NCAC 4B .01151