Loading...
HomeMy WebLinkAbout20140822 Ver 1_Major Variance_20140204From: Higgins, Karen Sent: Tuesday, February 04, 2014 12:52 PM To: 8urdette, Jennifer a Subject: FVV: variance template Attachments: variance format' Kernersvi||e use l l4.pdf, final VA Variance Watershed report.pd� TOK Major VarianceApp'pdf Hey Jennifer- Here Thanks- Karen Karen Higgins 4U1& Buffer Permitting Unit Supervisor NCDENR Division of Water Resources Mailing Address: 16SU Mail Service Center, Raleigh, NCZ7699'16SU Physical Address: S1Z N. Salisbury 3t, 4 942'E, Raleigh, NC 27604 Phone: (919)OU7'636U Email: VVebshe: E-mail correspondence tocndƒrom this address may besubject to the North Carolina Public Records Low and may be disclosed to third parties. From: Homewood, Sue Sent: Thursday, ]anuary]O,2O141:42PM To: Higgins, Karen Subject: FW: variance template Sue Homewood NC DENKVVinston-Sa|em Regional Office DivisionofVVaterKesources — VVater[Wa|ityPrograms 585VVaughtovvnStreet Winston-Salem, NC 27107 1 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Ana ]anami|lo Sent: Thursday, ]anuary]O 201411:32AM To: Homewood, Sue Cc: ]effHating Subject: RE: variance template Good morning Sue. In Accordance with our conversation last week and the below e-mail, I have attached pdf files containing copies of: (a)Request for a Major Variance from Randleman River Riparian Area Protection Rules format provided by your office; (b)Major Variance Request Watershed Report adopted by the Town of Kernersville Watershec� Review Committee and (c)Town of Kernersville Major Variance Request Application by Blue Diamond Investment Company, LLC with attached information. I will be in vacation this afternoon and tomorrow Friday, January 31, 2014. 1 will come back to my office, Monday, February 3,2O14. Town of Kernersville Engineering Division Direct (336) 564-1615 P.[). Box 728 From: Homewood, Sue Sent: Friday, ]anuary24, 2014 1:35 PM To: Ana ]anamiUo Subject: variance template Here's the format we'd like you to fill out (yellow areas are where you fill it in with the current info) and add to the documents you send tous next week. You don't need to change anything you already have, just add this to it. Thanks Ana. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. T his *mallmwmsao and any m«mmmwm(S)hwwm.mmwwnmm ally *llmwssmgo(s)ma� 'nay u*eommwqwneomx. may u*omsia*wapuumpZcoord. and mm such all muNwmmwquws�m for wwww nvou are nmmwm�cnawawolplwn,.plwmeoawshmvmImmw,smo* and mmnnmweona*, mmwala�clv Thwmmnna�mn oon,mmwammIm*mmn 'nay u*oonna*nnml and, m any cvcn,.imm�cna*a only for mwueommw*nnl:yo, individual mwhomximaddressed Thmnkvou Request for a Major Variance from the Randleman River Riparian Area Protection Rules Blue Diamond Property adjacent to the Veterans Admi nistrat ion Hospital site (There is no specific named project at histime for this property) Blue Diamond Investment Company, LLC Town of Kernersville January 30, 2014 Blue Diamond Property adjacent to the Veterans Administ ration Hospital site has requested the Water Quality Committee (WQG') grant a Major Variance from the Pandleman Rparian Area Protection Fbles (15A NCAC 02B .0250) "Diffuse Row Fbquirements" for a Medical Business Park (MBP) type project in the Pre- Developed or undeveloped condition located at the intersection of Kernersville Medical Parkway and Macy Grove Fbad, Kernersville, NC The proposed facility will impact six hundred (600) square feet of Zone 1 and four hundred (400) square feet of Zone 2. Accordingly, pursuant to 15ANCACO2B.0250(12), the local government makes the preliminary finding that the major variance request demonstrates the following: • Practical difficulties or unnecessary hardships are present; • The harmony and spirit of buffer protection requirements are met; and • The protection of water quality and substantial justice has been achieved. 15A NCACO2B.0250 (12)(a)(i) statesthe following: "For any variance request, the local government shall make a finding of fact as to whether there are practical difficulties or unnecessary hardships that prevent compliance with the riparian buffer protection requirements A finding of practical difficulties or unnecessary hardships shall require that the following conditions are met: A. If the applicant complies with the provisions of this Rile, helshe can secure no reasonable return from, nor make reasonable use of, hislher property. Merely proving that the variance would permit a greater profit from the property shall not be considered adequate justification for a variance. Moreover, the local government shall consider whether the variance is the minimum possible deviation from the terms of this Bale that shall make reasonable use of the property possible, B. The hardship results from application of this Bale to the property rather than from other factors such as deed restrictions or other hardship, C The hardship is due to the physical nature of the applicant's property, such as its size, shape, or topography, such that compliance with provisions of this rule would not allow reasonable use of the property. D. The applicant did not cause the hardship by knowingly or unknowingly violating this Iii/e. E The hardship is rare or unique to the applicant's property The Town of Kernersville findsthe following: There are practical difficulties that prevent compliance with the strict letter of the riparian buffer protection requirements. A. The applicant cannot make reasonable use of the property without impacting the protected riparian buffer. There are practical difficulties or unnecessary hardships to meet Diffuse Row, therefore, a stormwater BMPmust be installed outside the buffer to comply with the Pandleman Rparian Buffer Piles. Nevertheless, a development plan has not been prepared for the Blue Diamond property and Blue Diamond Investments is requesting a variance just to delay installation of the BMP until such time as development of the Blue Diamond property begins. The compliance with the provision of the ordinance, which is the installation of the BMP on Blue Diamond undeveloped property, represents no make reasonable use of the property; moreover, the Variance to delay installation of the BMP device is the minimum possible deviation from the terms of the Rparian Buffer Protection Ordinance that shall make reasonable use of the Blue Diamond property. B. The hardship results from the application of this rule rather than from other factors. There are practical difficulties or unnecessary hardships that prevent compliance with the riparian buffer protection requirement about Diffuse Row. The NC BM PS Manual requirements for linear footage of the level spreader and the several number of required discharge points for the large flow coming from the contributing drainage area is totally impractical. Therefore, a stormwater BMPmust be installed outside the buffer to comply with the Pandleman Rparian Buffer Piles. O The hardship is due to the physical nature of the applicant's property. According with the North Carolina Best Management Practices Manual, the maximum flow from the contributing drainage basin that can be handled by a Level treader under the Diffuse Row per Buffer PUIe application is 2cfs; hence, there is not practical alternative to convert the flow coming from Blue Diamond property (around 29 cfs accounting for ultimate build -out of the property) during the 1 inch /hour storm to diffuse flow. Also, the Mate BM P Manual requires 50 linear feet of level spreader per cfs of flow to provide diffuse flow from a drainage area. At 1.0 in./ hr. rainfall, more than 1500 linear feet of level spreader would be required for the flow from the bypass line and the maximum length of a Level treader allow by the BM P manual is 100 feet. With this limitation, the flow from the bypass line would have to be split into several discrete discharge points. Both the required linear footage of level spreader, and the number of required discharge points make converting the flow from this pipe to diffuse flow impractical. D. The applicant did not cause the hardship by knowingly or unknowingly violating this Rile. E The hardship is unique to the applicant's property. The Veterans Administration (VA) Hospital site lays downslope of the Blue Diamond Investments property (Blue Diamond property is undeveloped with 0% built upon area). A stormwater bypass system must be constructed to convey stormwater runoff from the Blue Diamond property through the VA site, for consideration of earthwork operations and to keep runoff from Blue Diamond property separate from that of the VA site. 15ANCACO2113.0250 (12)(b) "The variance is in harmony with the general purpose and intent of the State's riparian buffer protection requirements and preserves its spirit," The Town of Kernersville finds the following: The Pandleman Fbles require that concentrated runoff from manmade conveyances be converted to diffuse flow before the runoff enters Zone 2 of the buffer, unless a stormwater management facility is installed to control nutrients and attenuate flow before the conveyance discharges through the riparian buffer. But to convert the by -pass flow coming from Blue Diamond property to diffuse flow is impractical; therefore, a stormwater BM Pmust be installed outside the buffer to comply with the Pandleman Rparian Buffer Rules. The applicant is proposing a variance to delay installation of the BMP until such time as development of the Blue Diamond property begins. Given the characteristics of the Blue Diamond property and other upslope properties (The Blue Diamond property, 28.8 acres, is undeveloped, with 0% built upon area; the remaining drainage area, 19.2 acres, upslope of the Blue Diamond property is very sparsely developed as large lot residential, Low Density Fbsidential as for Town of Kernersville Land Use Plan, currently has approximately 7% BUA. The aggregate BUA of all properties upslope of the VA site is 2.79 0/0. Runoff from this area flows overland through wooded areas and vegetated conveyances to the point where the bypass system through the VA site would intercept this water. The shortest flow path of stormwater from the nearest BUA is over /through at least 700 feet of vegetation/ undeveloped area) and the designed storm drainage bypass line outlet (outlet consist of a rip - rap channel, energy dissipater device, that istying into the stream to protect stream bank and discharge point from erosion providing flow to the stream at non - erosive velocities) the Town of Kernersville believes that water quality will not be compromised by deferring installation of the stormwater management BMP until development of the Blue Diamond property occurs, and that the intent of the Pandleman Fules will be satisfied. Therefore, the variance is in harmony with the general purpose and intent of the Mate's riparian buffer protection requirementsand the Town's Ordinance and preserves its spirit. 15ANCACO2113.0250 (12)(c) "In granting the variance, the public safety and welfare have been assured, water quality has been protected, and substantial justice has been done." The Town of Kernersville findsthe following- The variance is am i nor deviation from the requirements of the Pandleman Fbles, since it only requests that implementation of the stormwater management plan is deferred until development of the Blue Diamond property. The requirement for implementation of stormwater management prior to development of property is rare and could involve a high cost without representing improvement to water quality. Therefore, in granting the variance, the public safety and welfare have been assured, water quality has been protected, and substantial justice has been done. Reoommendat ion: Based on the information submitted, the Town of Kernersville supportsthis request for a Major Variance from the F;andleman Rparian Area Protection Fines because practical difficulties or unnecessary hardships are present; the harmony and spirit of buffer protection requirements are met; and the protection of water quality and substantial justice has been achieved as required in 15A NCACO2B .0250 (12) provided the conditions listed below are required. If the Water Quality Committee approves this request for a Major Variance from the F;andleman Rparian Area Protection %les, the Town of Kernersville recommends approval with the following conditionsor stipulations [pursuant to 15A NCACO2B .0250 (12)(e)]: 1. This major exception shall only apply to the applicant for the "Blue Diamond Investments ", to the specific property and for specific uses identified in the applicant's supporting information. 2. The BMP to be designed and built when the development of Blue Diamond property take place shall be able to treat the runoff for the total Blue Diamond property basin area draining to the bypass system (approximately 28.8 acres) for the maximum built upon area allow under the Town of Kernersville Environmental regulations. Blue Diamond can under their choice design and build the BMP structure to consider the existing runoff coming for the drainage area upslope of their property or just by -pass that flow. 3. Prior to issuance of any watershed (Low density or High Density) or /and building permit for the Blue Diamond property (or part of this property), Blue Diamond or its successors and assigns forever shall submit to the Town of Kernersville a "Stormwater Management Plan" including the design of the Structural BMP for review and approval by the Engineering Division. No certificates of occupancy shall be issued for any structure within the Blue Diamond property until the construction, completion and approval of the Structural BMP. Prior of submittal of the "Stormwater Management Plan" including the design of the structural BMP, the drainage easement for the 48" bypass line shall be recorded. Copy of the recorded easement shall be submitted to the Town of Kernersville. 4. Blue Diamond Investment Company, LLCowner of the Blue Diamond property and the applicants for this Major Variance request shall submit to the Town of Kernersville a recorded agreement or other legal mechanism to ensure that the above described three (3) conditions goes with the property if it is subdivided and /or sold in the future for review and approval by the Town of Kernersvil le. 5. If the North Carolina Environmental Management Commission does not approve this Major Variance, Blue Diamond Investment Company, LLCwill install stormwater BMP(s) on their property as required by the Town of Kernersville's Code of Ordinances (Chapter C- Environmental Ordinance, Article VI- Rparian Buffer Protection Ordinance For Lands Within The Pandleman Lake Watershed) according with the Commitment letter by Blue Diamond Investment Company, LLC dated September 30, 2013. Blue Diamond Investment Company, LLCshall have one hundred and eighty (180) daysto complete the construction of the BMP structure after the date of denial by the Environmental Commission. 6. Non - compliance with any of the five (5) conditions described above will result in a violation of the Town of Kernersville Rparian Buffer Protection Ordinance for Lands within the Pandleman Lake Watershed, resulting in a Notice of Violation and Civil or Criminal Penalties may apply. WATERSHED REVIEW COMMITTEE MEETING RIPARIAN BUFFER PROTECTION ORDINANCE FOR LANDS WITHIN THE RANDLEMAN LAKE WATERSHED MAJOR VARIANCE REQUEST Subject: Variance request for Town of Kernersville Riparian Buffer Protection Ordinance For Lands Within The Randleman Lake Watershed — Diffuse Flow Requirements Request for Variance for Stormwater Management Requirement in the Pre - Developed Condition Blue Diamond Property adjacent to the Proposed Veterans Administration Hospital site. Background: The Veterans Administration (VA) Hospital site lays downslope of the Blue Diamond Investments property. A stormwater bypass system must be constructed to convey stormwater runoff from the Blue Diamond property through the VA site, for consideration of earthwork operations and to keep runoff from Blue Diamond property separate from that of the VA site. The bypass system discharge point falls within the West Fork Deep River buffer which is a tributary within the Randleman Lake Water Supply Watershed. The Randleman Rules require that concentrated runoff from manmade conveyances be converted to diffuse flow before the runoff enters Zone 2 of the buffer, unless a stormwater management facility is installed to control nutrients and attenuate flow before the conveyance discharges through the riparian buffer. According with the North Carolina Best Management Practices Manual, the maximum flow from the contributing drainage basin that can be handled by a Level Spreader under the Diffuse Flow per Buffer Rule application is 2cfs; hence, there is not practical alternative to convert the flow coming from Blue Diamond property (around 29 cfs accounting for ultimate build -out of the property) during the 1 inch /hour storm to diffuse flow. Also, the State BMP Manual requires 50 linear feet of level spreader per cfs of flow to provide diffuse flow from a drainage area. At 1.0 in. /hr rainfall, more than 1500 linear feet of level spreader would be required for the flow from the bypass line and the maximum length of a Level Spreader allow by the BMP manual is 100 feet. With this limitation, the flow from the bypass line would have to be split into several discrete discharge points. Both the required linear footage of level spreader, and the number of required discharge points make converting the flow from this pipe to diffuse flow impractical. Therefore, a stormwater BMP must be installed outside the buffer to comply with the Randleman Riparian Buffer Rules. Given the characteristics of the Blue Diamond property and other upslope properties, Blue Diamond Investments is requesting a variance to delay installation of the BMP until such time as development of the Blue Diamond property begins. The Ordinance: In compliance with the Town of Kernersville Riparian Buffer Protection Ordinance For Lands Within The Randleman Lake Watershed, section 7 numeral E: "Diffuse flow" of runoff shall be maintained in the riparian buffer by dispersing concentrated flow prior to its entry into the buffer and reestablishing vegetation. Concentrated runoff from new ditches or man -made conveyances shall be converted to diffuse flow at non - erosive velocities before the runoff enters zone two of the riparian buffer. As set out in section 7. (D) And section 8. (B) Of the ordinance, The Zones of the Riparian Buffer and Table of Uses respectively, no new stormwater conveyances are allowed through the buffer except for those specified in the Table of Uses, Section 8. (B) Of the ordinance. So according with the Table of Uses, new or altered drainage ditches, roadside ditches and stormwater outfalls are allowed provided that a stormwater management facility is installed to control nutrients and attenuate flow before the conveyance discharges through the riparian buffer. Findings of Fact: 1. The Town of Kernersville's Code of Ordinances (Chapter C- Environmental Ordinance, Article VI — Riparian Buffer Protection Ordinance For Lands Within The Randleman Lake Watershed , Section 6 -1.9.13 Variances) provides for an applicant to request a Major Variance, which would be considered by the Town's Watershed Review Committee. Pursuant to the request for a Major Variance to the stream riparian buffer rule, the Watershed Review Committee has scheduled a review committee meeting on Tuesday January 21, 2014 at 3:OOpm to study and review this Major Variance request. 2. A Letter request for Variance for Stormwater Management in the Pre - Developed Condition for the Blue Diamond property was submitted to the Town of Kernersville by Stimmel Associates (Neal Tucker, PE) in behalf of Blue Diamond Investments along with the Town of Kernersville Major Variance Request application that includes: map location of Blue Diamond Investments property, VA Hospital site and the West Fork Deep River, the rip -rap ditch or channel section through the buffer, the storm drainage bypass line routed through the VA site, and drainage area map showing a conceptual design of a wet detention pond to serve the Blue Diamond Investment property. 3. In accordance with The Town of Kernersville's Code of Ordinances (Chapter C- Environmental Ordinance, Article VI- Riparian Buffer Protection Ordinance For Lands Within The Randleman Lake Watershed, Section 6 -1.9.13 Variances, Numeral 1- Requirements for Variances) and state regulations "15A NCAC 028.0250(12) Randleman Lake Water Supply Watershed: Protection and Maintenance of Existing Riparian Buffers- Variances ", the Town of Kernersville is required to prepare preliminary findings about the compliance with the variance requirements. Following are the findings and facts found by the Town: -There are practical difficulties or unnecessary hardships that prevent compliance with the riparian buffer protection requirement about Diffuse Flow as we explained in the Background section. The NC BMPs Manual requirements for linear footage of the level spreader and the several number of required discharge points for the large flow coming from the contributing drainage area is totally impractical. Therefore, a stormwater BMP must be installed outside the buffer to comply with the Randleman Riparian Buffer Rules. - The total basin area draining to the bypass system is approximately 48 acres. The Blue Diamond property (28.8 acres) is undeveloped, with 0% built upon area (BUA). The remaining drainage area (19.2 acres) upslope of the Blue Diamond property is very sparsely developed as large lot residential (Low Density Residential as for Town of Kernersville Land Use Plan). The upslope area currently has approximately 7% BUA. The aggregate BUA of all properties upslope of the VA site is 2.79 %. Runoff from this area flows overland through wooded areas and vegetated conveyances to the point where the bypass system through the VA site would intercept this water. The shortest flow path of stormwater from the nearest BUA is over /through at least 700 feet of vegetation/ undeveloped area. - A development plan has not been prepared for the Blue Diamond property and Blue Diamond Investments is requesting a variance just to delay installation of the BMP until such time as development of the Blue Diamond property begins. The compliance with the provision of the ordinance, which is the installation of the BMP on Blue Diamond undeveloped property, represents no make reasonable use of the property; moreover, the Variance to delay installation of the BMP device is the minimum possible deviation from the terms of the Riparian Buffer Protection Ordinance that shall make reasonable use of the Blue Diamond property. -The designed storm drainage bypass line outlet consist of a rip -rap channel (energy dissipater device) that is tying into the stream to protect stream bank and discharge point from erosion providing flow to the stream at non - erosive velocities. Conclusions: 1. Given the extremely low BUA of the upslope properties and the length of the vegetated conveyances, we believe that adequate treatment is already being provided within the natural system without having to build an engineered BMP prior to development of the property. Also, stream bank and discharge point erosion protection is provided with the outlet rip -rap channel. 2. We believe that water quality will not be compromised by deferring installation of the stormwater management BMP until development of the Blue Diamond property occurs, and that the intent of the Randleman Rules will be satisfied. 3. We believe that granting this variance request is justifiable for the following reasons: • It is a minor deviation from the requirements of the Randleman Rules, since it only requests that implementation of the stormwater management plan be deferred until development of the Blue Diamond property. • Deferring implementation of the stormwater management plan will not negatively impact surface waters. • The requirement for implementation of stormwater management prior to development of property is rare and could involve a high cost without representing improvement to water quality. • It is in harmony with the general purpose and intent of the State's riparian buffer protection requirements and the Town's Ordinance and preserves its spirit. • In granting the variance, the public safety and welfare have been assured, water quality has been protected, and substantial justice has been done If members of the Committee agree with my proposals for findings and conclusions, I propose the following decision and conditions: Decisions and Conditions: In accordance with The Town of Kernersville's Code of Ordinances (Chapter C- Environmental Ordinance, Article VI- Riparian Buffer Protection Ordinance For Lands Within The Randleman Lake Watershed, Section 6 -1.9.13 Variances), the application submitted on behalf of the "Blue Diamond Investments" for a major Variance to stream buffer rules— Diffuse Flow Requirements in the aforementioned Environmental Ordinance is recommended to be granted pursuant to the following conditions: 1. This major exception shall only apply to the applicant for the "Blue Diamond Investments ", to the specific property and for specific uses identified in the applicant's supporting information. 2. The BMP to be designed and built when the development of Blue Diamond property take place shall be able to treat the runoff for the total Blue Diamond property basin area draining to the bypass system (approximately 28.8 acres) for the maximum built upon area allow under the Town of Kernersville Environmental regulations. Blue Diamond can under their choice design and build the BMP structure to consider the existing runoff coming for the drainage area upslope of their property orjust by -pass that flow. 3. Prior to issuance of any watershed (Low density or High Density) or /and building permit for the Blue Diamond property (or part of this property), Blue Diamond or its successors and assigns forever shall submit to the Town of Kernersville a "Stormwater Management Plan" including the design of the Structural BMP for review and approval by the Engineering Division. No certificates of occupancy shall be issued for any structure within the Blue Diamond property until the construction, completion and approval of the Structural BMP. Prior of submittal of the "Stormwater Management Plan" including the design of the structural BMP, the drainage easement for the 48" bypass line shall be recorded. Copy of the recorded easement shall be submitted to the Town of Kernersville. 4. Blue Diamond Investment Company, LLC owner of the Blue Diamond property and the applicants for this Major Variance request shall submit to the Town of Kernersville a recorded agreement or other legal mechanism to ensure that the above described three (3) conditions goes with the property if it is subdivided and /or sold in the future for review and approval by the Town of Kernersville. 5. If the North Carolina Environmental Management Commission does not approve this Major Variance, Blue Diamond Investment Company, LLC will install stormwater BMP(s) on their property as required by the Town of Kernersville's Code of Ordinances (Chapter C- Environmental Ordinance, Article VI- Riparian Buffer Protection Ordinance For Lands Within The Randleman Lake Watershed) according with the Commitment letter by Blue Diamond Investment Company, LLC dated September 30, 2013. Blue Diamond Investment Company, LLC shall have one hundred and eighty (180) days to complete the construction of the BMP structure after the date of denial by the Environmental Commission. 6. Non - compliance with any of the five (5) conditions described above will result in a violation of the Town of Kernersville Riparian Buffer Protection Ordinance for Lands Within the Randleman Lake Watershed, resulting in a Notice of Violation and Civil or Criminal Penalties may apply. Variance Request Form (For Major and Minor Variances) Protection and Maintenance of Riparian Areas Rules F-1 Check the appropriate box below: X Major Variance F-1 Minor Variance X Town of Kernersville Unified Development Ordinance (UDO) - Chapter C, Article VI Riparian Buffer Protection Ordinance For Lands Within The Randleman Lake Watershed F-1 Town of Kernersville Unified Development Ordinance (UDO) - Chapter C, Article V Riparian Buffer Protection Ordinance For Lands Within The Jordan Watershed F-1 Town of Kernersville Unified Development Ordinance (UDO) - Chapter C, Article IV Stormwater Runoff El Town of Kernersville Unified Development Ordinance (UDO) - Chapter C, Article III Watershed Protection Part 1: General Information (Please include attachments if the room provided is insqf ,ficient.) 1. Applicant's name (the corporation, individual, etc, who owns the property): Blue Diamond 1nvestrnent Company, I LC 2. Print owner /Signing official (person legally responsible for the property and its compliance) Name: Jeff Hunter Title: Street address: 1349 -C South Park Drive City, State, Zip: Kernersville NC 27284 Telephone: (336 )_996 -5000 Fax: (a36)_996 -3858 3. Contact person who can answer questions about the proposed project: Name: Jeff Hunter Telephone: (336 ) 996 -5000 Fax: (336) 996 -3858 Email: jhunter@popecompanies.com 4. Project name (Subdivision, facility, or establishment name - consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): There is nospecific named project at this time for the Blue Diamond property. This application relates to a stormwater bypass line for the undeveloped Blue Diamond property that is required due to development of the VA Hospital Site. 5. Project location: Street address: _Address not assigned — Site is located at the intersection of Kernersville Medical Parkway and Macv Grove Road City, State, Zip: Kernersville, NC County: Forsyth -- Latitude /longitude: N36'05'36" W80'02'51" 6. Date property was purchased: De_ to% e r 20 iR 7. Stream to be impacted by the proposed activity: Stream name (for unnamed streams label as "UT" to the nearest named stream): West Fork Deep River 8. Which of the following permits /approvals will be required or have been received already for this project? (If permit received, submit copy with this request). Required: NIA_ NIA N/A N/A N/A N/A Received: Date received: Permit Type: 401 Certification/404 Permit Stormwater /Wastewater Permit NPDES Permit Non - discharge Permit Stormwater /Watershed Variance Erosion/Sedimentation Control Others (specify) Part 2: Proposed Activity (Please include attachments if the room provided is insufficient) 1. Description of proposed activity [Also, please attach a map of sufficient detail (such as a plat map or site plan in Adobe (pdf) format) to accurately delineate the boundaries of the land to be utilized in carrying out the activity, the location and dimension of any disturbance in the riparian buffers associated with the activity, and the extent of riparian buffers on the land. The request for variance is needed due to impacts to stream buffers alon the West Fork Deep River resulting from the construction of a stormwater bypass line and dischar e channel associated with the undeveloped property u slo e of the VA Hospital site. The bypass line will route stormwater runoff from future development through the VA Hospital site. There is insufficient space to provide for diffuse flow from the bypass line therefore direct discharge of stormwater to the stream is required. Conveyance of the concentrated stormwater in a non - erosive manner will require the channel to be lined with rip rap. See attached exhibits showing 1, ) the rip rap ditch section through the buffer, 2. the storm draina e bypass line routed through the VA site 3. draina e area map showing a conceptual design of a wet detention and to serve the Blue Diamond Investments property. In addition to the request for variance for the stream buffer-impact, the Property Owner is also Le questing a variance to defer construction of stormwater BMP's on the undeveloped property until such time as the property is developed. See attached letter to Russell Radford dated September 27, 2013, which more fully describes the variance request and background information related to timing of the BMP construction. Blue Diamond Investment Company understands that stormwater BMP's will be required at the time of development of the property. A letter of commitment to install stormwater management BMP's from Jeff Hunter with Pope Companies to Russell R_ adford is attached. Note that Pope Companies is a member of Blue Diamond Investment Company, LLC. 2. hill in the table below to identify the square footage of impact to Zones I & 2 in the protected riparian buffers and the required mitigation. (Fill in the impact portion of the table, even if mitigation is not required): *Zone I extends out 30 feet perpendicular from the inost landward limit of the top of bank or the rooted herbaceous vegetation; Zone 2 extends an additional 20 feet from the landward edge of Zone 1. 3. State reasons why this plan for the proposed activity cannot be practically accomplished, reduced or reconfigured to better minimize or eliminate disturbance to the riparian buffers: Rip rap is required in the discharge channel extending through the buffer to convey stormwater runoff in a non - erosive manner. The channel is aligned perpendicular to the buffer, therefore the impacts have been minimized to the extent practical. Buffer Impact Zone of Impact in Number Purpose for Required Impact Square Feet (indicate on The Impact Multiplier Mitigation Plan Sheet) (From tables) Zone 1 600 sf I Drainage Conveyance 3 NIA without BMP Zone 2 400 sf 2 Drainage Conveyance 1.5 NIA without BMP Total 1,000 sf NIA *Zone I extends out 30 feet perpendicular from the inost landward limit of the top of bank or the rooted herbaceous vegetation; Zone 2 extends an additional 20 feet from the landward edge of Zone 1. 3. State reasons why this plan for the proposed activity cannot be practically accomplished, reduced or reconfigured to better minimize or eliminate disturbance to the riparian buffers: Rip rap is required in the discharge channel extending through the buffer to convey stormwater runoff in a non - erosive manner. The channel is aligned perpendicular to the buffer, therefore the impacts have been minimized to the extent practical. 4. Description of any best management practices to be used to control impacts associated with the proposed activity (i.e., control of runoff from impervious surfaces to provide diffuse flow, re- planting vegetation or enhancement of existing vegetation, etc.); Diffuse flow into the buffer isn't practical with the amount of flow bein handled. A rip rap channel liner will be provided to protect the channel bottom and banks from erosion and to reduce flow velocity into the stream. 5. Please provide an explanation of the following: (1) The practical difficulties or hardships that would result from the strict application of this Rule. The practical difficulty in complying with the Rule are is that the quantity of runoff is too large to practicall convert to diffuse flow. The State BMP Manual requires 50 linear feet of levels reader per cfs of flow to provide diffuse flow from a drainage area. At 1.0 in. /hr rainfall 1,778 linear feet of levels reader would be required for the flow from the bypass line. Further, the maximum flow that can handled by a single level spreader per the State BMP Manual is 2 cfs. With this limitation, the flow from the bypass line would have to be split into 18 discrete discharge points. Both the required linear footage of level spreader, and the number of required discharge points make converting the flow from this pipe to diffuse flow impractical. In addition, a high flow bypass system would be required to divert flow from higher intensity storms away from the level spreader(s). This bypass system would have to be channelized through the buffer to the stream as currentl planned. (6) How these difficulties or hardships result from conditions that are unique to the property involved. The difficulties are not necessarily unique to this property. Any storm system handling flows of the magnitude that the subject system handles would face the same difficulties. (7) If economic hardship is the major consideration, then include a specific explanation of the economic hardships and the proportion of the hardship to the entire value of the project. Part 3: Stormwater 1. Provide all the Stormwater Management System Concept Plan documentation including a description of best management practices (BMPs) that will be used to control nutrients and sedimentation impacts associated with the proposed activity. Please ensure to include all applicable operation & maintenance agreements and worksheets drafts for the proposed BMPs. Also, include the BMPs on your plan sheets. —Not Applicable since variance request is related to the diffuse flow requirement in the ordinance without a stormwater BMP. Conceptual stormwater plan for future development is attached. 2. Attach a description of how diffuse flow will be maintained through the protected riparian buffers. Please ensure to include all applicable operation & maintenance agreements and worksheets drafts for the proposed diffuse flow measure(s). Also, include the diffuse flow measure(s) on your plan sheets. Diffuse flow will not be provided into the buffer. Part 4: Proposed Impacts and Mitigation Provide a description of how mitigation will be achieved at your site pursuant to Town of Kernersville Riparian Buffer Protection Rules for the corresponding Watershed. Mitigation will not be required with this variance. If buffer restoration is the method you are requesting, be sure to include a detailed planting plan to include plant type, date of plantings, the date of the one -time fertilization in the protected riparian buffers and a plan sheet showing the proposed location of the plantings. NIA If payment into a buffer restoration fund is how you plan to achieve your mitigation requirement, then include an acceptance letter from the mitigation bank you propose to use stating they have the mitigation credits available for the mitigation requested. NIA Part S: Deed Restrictions By your signature in Part 6 of this application, you certify that all structural stormwater BMPs required by this variance shall be located in recorded stormwater easements, that the easements will run with the land, that the easements canriot be changed or deleted without concurrence from the Town of Kernersville, and that the easements will be recorded prior to the sale of any lot. Part 6: Applicant's Certification 1, Jeff Hunter (print or type name of person listed in Part I, Item 2), certify that the information included on this permit application form is correct, that the project will be constructed in conformance with the approved plans and that the deed restrictions in accordance with Part 5 of this form will be recorded with all required permit conditions. Signature: Date: \ Title: Part 7: Plan Sheets 2n_ c., Be sure to include a copy of all of your completed application form, plan sheets and maps in Adobe (pdO format on a CD or floppy disk. Part 8: Checklist A complete application submittal consists of the following components. Incomplete submittals will be returned to the applicant. Initial below to indicate that the necessary information has been provided. Applicant's Item Initial JH JH o Original and two copies of the Variance Request Form and the attachments listed below JH • A vicinity map of the project (see Part 1, Item 5) JH & Narrative demonstration of the need for a variance (see Part 2). JH I /-V • A detailed narrative or graphic description of the Stormwater Management Concept Plan (see Part 3). See attachments for conceptual layout of stormwater BMP. N/A * 9 Calculations and references supporting nutrient removal frorn proposed l3MPs (see Part 3). N/A * e Location and details for all proposed structural stormwater 13MPs (see Part 3). N/A * e Drafts of the applicable Supplement Form(s) and O&M Form(s) for each BMP and/or narrative for each innovative BMP (see Part 3). N/A * * Three copies of plans and specification, including: - Development/Project name - Engineer and firm - Legend and north arrow - Scale (1 " =50° is preferred) - Revision number & date - Mean high water line (if applicable) - Dimensioned property/project boundary - Location map with named streets - Original contours, proposed contours, spot elevations, finished floor elevations. - Details of roads, parking, cul-de-sacs, sidewalks, and curb and gutter - Footprint of any proposed building or other structures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations - Drainage basins delineated - Perennial and intermittent streams, ponds, lakes, rivers and estuaries - location of forest vegetation along the streams, ponds, lakes, rivers and estuaries * Since the Variance request is being made for buffer impacts without providing stormwater management, a detailed stormwater management plan has not been done. The reasons for not providing a detailed stormwater plan for the undeveloped Blue Diamond Property at this time are outlined in a letter to Russell Radford dated September 25, 2013. A conceptual stormwater plan however has been prepared and is attached. Blue Diamond Investments VA HospitaISite © 2013. Gacg e Imagery Date: 4[5/2013 36°0539 .28`' Nom.80 °02'48:37"`W etev 933 ft eye alt .4642 if " r._ A 7 Buffer Impact #1 Zone 1 - 30' 600 sf 01 00 1— ' 90 u 1 -1' _1 Storm Drainage Bypass Line —9" 5S . _67,7 74 , NV 1N- 855.49' »Nl! OUT = 665,3_ - � = �_ki4kaftft • WRAP ENCROACHES ONTO ADJOINING OWNER RIM- 878.36' INV !N= 865..06' ' \ INV OUT 864.96' woos This exhibit was prepared from a drawing prepared by Littlejohn Engineering Associates. Annotations have been added by Stimmel Associates for exhibit purposes only. r NE SEWER EA '•: ENT D.B.3146, 4 17' -02:05 — PO 4 s1-r 7 4 % ' 1 fe ,, /7!I r "j 1 I / I ! � I 1 / 'fry j ve - �7J'a. t 1 K. a.a +i ' , J� /f .7 / / / / ROE I 1111! 40' 0P*22315 69503504/ ±3.50,`0 42' 0146149E 054059E41 MI • 500 �3 Z07' -444- -- 111,D,AL 710''.4AP 11 T T_ PIPE TABLE 5341 CODE FRO* ON 19 CODE 19 814. 9R4� % 9217 INCH33 1544013 LF. TrR 601 893.14 9018 69099 1.001 24' 215 POPE 8018 96019 0019 150.00 1.145 74' 62 0056-501 901 613.70 921 09524 1.0110 24' 46 66110 803 899,20 1302 69430 4.410 16' 111 HOPE 504 907.20 005 899.50 4.25% 15• 156 NDPE 405 915.54 004 90730 4.530 15' 190 02.05 560 923.00 005 91564 3.21% 15' 130 RCP 101 891.56 1010 891.00 0.551 36' 176 HDPE MIA 09050 COLA 09550 0.75% 35• 355 H0PE 101 89358 101 89210 1.0076 90' 109 903E 903 59459 002 89390 0.06% 50' 71 HDPE 104 091.95 CO3 894.89 1.1014 30' 26 RCP 1505 09533 004 84505 0346 50' 28 HOPE ��'. - 15, - 85543_ A,59,4.. .. -0 ,., .. HRPF 0060 903.61 C06 992.95 1.606 24' 53 HDPE 007 904.51 1064 903.71 1.006 54• 62 H2O(41 D6$v�5 119.95 110 3 8 ' 24 -'-'146.- 59750 •HOPE 109 905.74 009 905.32 0.7573 261 56 109E 110 906.40 109 905.04 0.75% 24' 75 HOPE 111 807.54 110 90654 0.75% 54• 134 1961 012 913.80 CI1 908.00 5.500 15' 105 RCP C15 911.50 112 914.04 1.0514 15' 55 RCP 902 09540 001 16950 2.363 15' 115 111)9[ -05 905 696.00 002 893.50 3.77% 12' 86 HOPE 101 591.62 001 89216 0.45X 10' 125 HOPE 005 09500 401 19272 0.450 19' 62 HOPE 401 915.72 COS 91010 3.898 13' 95 RCP 1101 914.50 401 913.92 2.236 15' 26 RCP 101 908.46 101 109.57 0.215 112 41 DPI 102 995.10 721 901.551 0.501 18' 41 NOPE 876 909.00 002 908.90 0.503 16' 31 HOPE 004 909.50 003 109.16 0.509 161 61 HOPE 1311 908.21 LEI 907.60 0.50X 24" 115 9049 432 909.55 101 309.12 0.50% 15' 26 HOPE AI 915.50 C12 114.00 1.2659 45' 125 RCP 102 890.05 1101 388.15 0.42% 26' 210 41072 -41 503 597.14 001 190.15 5.370 30' 732 HOPE 504 99995 003 847.34 2.043 33' 152 459E 505 90116 1604 900.09 4.0013 301 104 HOPE 1 506 90216 005 902.06 1.033 24' 70 HOPE 002 894.50 001 890.09 8.740 18' 52 104E -91 Storm Drainage Collection Lines 50 50 PIPE TABLE 09211 100000 '45- CRUX X 511E INCNE5 119100 1941 LOS 901.40 L01 894.60 5.10% 15' 153 HOPI L91 151.40 LO3 951.50 2.61% 15' 215 HOPE 505 909.97 004 907.50 1.27% 15' 119 ROPE 106 909.73 405 909.07 3.79% 12' HOPE X01 691.00 1102 890.15 0.410 206 WPC 403 84209 401 191.10 155% 18' 71 HOPE 5102 89491 102 692.99 1.50% 10' 151 WPC 101 904.35 103 995.50 673% 15' 152 IOPC 105 99575 104 904.45 1.94% 15• 57 HOP1 1101 901 002 89330 00501 927.50 103 995.97 0.51% 105 90115 1.009 001 92510 4.17% 15' 24' 10' 50 HOP1 RCP 502 967.60 401 90700 5.67% 24' 109E 105 910.10 101 901.90 1.119 15' 132 ROPE 004 915.4 725 910.20 1.95% 15' 903 RCP 505 916.90 724 41510 1961 15' 56 RCP 501 502 102 90110 910.20 807.70 103 501 101 901.70 97220 901.00 0.49.% 1.558 0.65% 15' 15• 16' 81 132 85 H9PE HOPE HOPE 703 90930 005 901.10 1.111 15' 132 HOPI 401 511.00 301 589.50 1.2679 15' 111 HOPE -05 3975 401 902 125 902 594.00 406.00 911.00 921.00 661.40 002 0D2 401 402 692.10 99200 901.00 911.10 170% 121 112 1,1110 15' 100 3.70% 15' 108 6DPE HW1E POPE 1.63% 15' 214 RCP 901 501.90 2.161 48" 61 RCP-%1 101 690.50 502 691.50 3.53% 15' 124 HOPI 001 901.55 X91 65160 4.418 15' 67 90°5 005 901.00 002 901.63 2.62% 15' 85 7011 901 541.50 101 19420 1.63% 15' 29 0X170 202 481.65 201 51855 1.15% 40' 150 RCP 203 090.10 202 811.95 1.19% 48' 162 RCP 104 901.10 203 89030 2.006 RCP 205 999.00 204 901.20 1.44% 56' 322 RCP 207 905.29 204 901.20 1.31% 56' 360 RCP 208 906.57 207 90630 1.13% 31' 24 RCP 7103 58500 7151 89590 0.51% 6' 195 119 -501 #j11 . 13,0956C14131103143,N AS 14042E0 BY 5101101 435000101. WI >• 14418 0 01511 49151 A The drawing was prepared by Littlejohn Engineering Associates. Annotations have been added by Stimmel Associates for exhibit purposes only. STRUCTURE TABLE CODE 026001911041 6111E 00411046 (85160 901 50904E CURB 3101 89900 665135,97 1689557.65 6011 HEADWALL 1/6 154699.4 1619421.13 9019 367607 1049 MIT 199.10 05494114 1699462.41 602 50151 CURB 811E1 999.70 855181.60 1686554.90 805 1054.E CURB BEET 992.69 05516145 166947/31 004 5195E 1009 MEET 910.50 655579.11 1669652.72 605 5015E CURB 81067 618.69 95537404 1689714.31 606 YARD INLET 929.01 955417.74 1690019.76 101 904050 0049 IsliT 951.60 694901.09 180968419 0074 HEADWALL 1/1 954619.14 1419471.67 C019 00000E CURB POET 899.00 054045.96 1691516.46 002 000119 1059 OUT 90600 954979.14 1609776.39 103 DOUBLE CURD 11617 99930 154421.11 1109810.90 104 IMOOE 1050 18,01 199.13 65490521 1649853.57 015 1011101 000 899.50 65168012 1699667.41 906 _....A195_1111.81..0 .. 613.95 - 654554.51_.1689920.51 136* 1041904 BOX 914.00 154964.91 1609963.50 101 J91Cl6R'1 1"' 113.90 351955.02 -1-69669.19:0- 11111 91041 04199 04501 913.50 65436130 1690131.27 COO 9645E 14114 54304 915 -60 65491596 15901.2.57 010 900.E CATCH 84504 913.40 554649.71 1910155.05 111 311010 00101 60581 911.50 554773.42 1590304.94 112 551111 1050 5.1,E1 916.09 051791.61 1690101.26 115 50410 CORE 0,171 615.09 65482567 1499155.18 DOI 814(5431 1/11 85465516 1609548.66 002 SINGLE CATCH USN 191.90 65473412 1619094.56 005 JUNCTION 560 119.95 551736.05 1100190.43 COI 313/11011 BOX 59750 85481552 1686164.51 302 50144004 008 59590 65470619 1409500.28 701 9 1959,E CORE MET 911.00 855059.59 1191130.13 FOR 5001E CURB 6101 911.95 65500159 1690117.41 801 9645E 0114 BASH 915.35 854561.12 169024102 502 94401E 191111 94.051 51113 86465102 1110210.56 103 309/1104 908 91415 05461325 1659191.02 904 ANGLE CATCH 14514 615.90 65455085 169512/92 NO1 51445E COES 91E1 915.40 854140.16 169029567 902 91491E 6.610 8011 61340 85461105 111530315 201 5725E CURB 5581 91959 85455111 169047117 801 HEADWALL 0/5 85415115 16196//01 402 9001E CURB MET 69190 85403034 1696844,27 405 555.0E 1018 18701 604.50 95/04459 1489964.53 504 9159,E CURB MET 00710 154151.95 1690016.76 405 10911014 BOX 91000 85425290 169025922 406 11.120 161E7 006.17 454529.51 169021176 001 HEADWALL 1/4 154201.55 1689704.12 102 DOUBLE MR 0.11 49990 654196.27 1689754.14 103 5600E CURS 114LE1 935.00 954243.90 1669171.17 001 511701E CURB INLET 910.95 154441.34 1669946.55 0175 3*000 011014 51515 91350 45452115 1691020,14 106 9151 CATCH BASH 91350 554539.26 1000046.54 101 5601E CURD 0011 89590 453924.98 1689060.69 152 51951E CUM INLET 898.00 951150.57 1649946.68 405 51961E CUM 0011 93360 153914.12 1090061.44 851 56014 CURB 110E1 907.50 65197906 1490177.19 405 51183E CUM Nil 909.19 053952.16 1690230.40 791 51901E COW 11427 902.00 653860.44 1890070.36 P01 14120 19111 904.11 154190.74 1690504.59 001 HEADWALL 4/8 555156.29 1090287.41 002 HEADWALL 9/4 15521517 1090281.64 STRUCTURE TABLE COOL 105CRIP51611 .09124[ NORTHING 5151911 504 9540855 5/4 154117,52 1690356.25 902 51041 CUB 50E11 511.00 85413326 1096444.92 801 514011 CUM 10,07 313.01 914104,57 1590557.25 904 534610 CURB MET 920.41 534260.61 1690711.58 005 THOLE CURB MET 95041 03418919 1690775.49 501 5400E 0008 PREI 911.0D 911204.19 119040139 552 51061E NAB NET 913.00 85327150 199051473 101 14079*11 8/3 854288.88 169025615 102 54005E CURB 0511 51100 654310.58 169053675 101 510616 151 80.01 91300 954317.55 169044417 001 HEADWALL 0/8 854420.12 1669670.15 UO2 90011 111047 61314 891.05 654487.71 1689158.12 9303 9860E 14101 641249 900.50 05/44510 1689670.11 101 101063E CURB MEP 910.55 955013.54 161907169 722 00061E CURB MET 91526 05506601 1119956.99 055 SINGLE 041111 84593 911.00 15515612 1690751.12 431 01705910 1/1 151459.14 168934397 002 P0015 001117 891,10 654410.17 1604440.91 161 01400E CUM 972 90590 055302.62 165939596 732 9445E CURB 94.11 965.15 555367.10 145911110 105 5110.6 CUR0 51411 90750 055424.23 108947199 961 TRENCH DRAM 19750 554650.8E 1649795.17 50 201 95409111 14,01 55407615 1049567.07 50 169 6014704 DOR 997.90 054154.62 104975140 47 105 1001104 BOA 91100 85432951 169016142 # 264 SINGLE CATCH 08510 970.60 85460104 1690636.00 A 105 0(109111 5/1 854040.56 169046740 # 201 99101E 011011 BASIN 51910 854199.00 1690614-50 I5V8.1s4E4l 7E01 151804E 039.50 854700.91 1659055.11 1. ( 2092 ELM 44/5 45465976 1609496.14 .515'g 17LSkaf0H00960fbli Ni 11 R071TFD3f511D37E "i590l0Ai(s. Tonn 93 5emelm6e Pat& Works De(Orna1 APPROYED 4014 CONSTRUCTION Conan uv Tonn'e Cone4.4Ni0n 8arrices Sap, 40 95680 9966916 prior l0 5.095911104301 Si e& Tenn Engin,. GRAPHIC SCALE SIZE PLAN 38100710E 1 DEVELOPER: DESIGN BUILDER: ARCHITECT: ENGINEERS /CONSULTANTS: - D8ins1-106 • OVERALL STORM DRAINAGE PLAN P1D E%Trde VA HEALTH CARE CENTER KERN ERSVILLE 916 aNVA- pmDer -TZ -X 036[ lot LS.Depal1111e1,3 ® aC1itlYAnYARaIAY InirstonSolem Hea1115c44e Development LLC 200 Port Avenue 9lh Flea New YOrE, 44910166 e0n1oCL'Mr.Edw0rd3. -i'. Lend Lease Telephone: 615 FGcoor4n 6159672686 NavolerR11B289.01 Lend Leasa lust COns1009on lnc. 2300 Yorkmonl Road �IMe 700 Charlotte, NC 25217 Telephone: 7043571959 1aoeomi.9 7033572857 renx..649269.We11 \µluUlJryS ##A,9h �.+ae +.•...o��. = `O °6t °r v 3141 H:8_I! ' 2,104;4%45.. 10 4t1 *s` wr311111117 \5\ p ��„ pp Perkins Eastman r:.Nleo o,c e1 F. 'I'II� `® uTTLEIOHN eNGIN BERING ASSOCIATES TES rnxkaelrnl x,e -wry a.e nl ...Kra-. r. ... „��„ .,a.0. lo1amlmra.rl,:cea 8ui5g Number - Waved. P03051 D4edOr Loo87n LERNERIVILLE. NORTH 0100 NA Drawn limber CG104 pall. 18 91 65 De18 Checked 1110912013 DB [445077 MAR Rev. of, 4 15 uMrra W\ If WSITE, �� -A, \ \L 111 / \� i DReiINA EAREAS i \� \_ / I ti = � /�� /// ♦ ��'� —� �. � � l 1 � 111 \ ����� ` `�/ II'� f � / �`==' = ;/',111r }�__ — �,_,�,~�,�_.�_I ✓,// / � �� -= ��,I\ \ � - -� —•- , -mss �� �g \�,wo `� \\ � � ,�_ .LI, -J .; � / 'i A�4y -� °� �.;s= �� f / �, \ \f / i% / ' �l /� 1� { i Rrt� �►'� \ • �, 1 P \\ -L�� � � i i - � -- r vet �'S, 7 b B / .+r't / / I �� })� ! / / I 1 — // I / bRAINAGE \ -i AREA A..q,1.+ 2684 ncRs f _ .> JI Vx y ✓T�'�''� �`1 \tit y lwaa / s\ 2 I , 1w� t� r� - \,! i• ���� 'L \� � / � � ` 1 1 /POND OPTION 6 .. 4�• ` - DA: 48.04 AC �' •���� i 'a, �� / /�/ IMPERVIOUS AREA. 45% Z,� " • ?(/ ! / SURFACE AREA: 60,47.7 SF POND FOO7PMNT: 93,676 SF _ _ - / 1� �r I "oaT 1v..: t _ p i i �OND T ,5 ��� \\ 1� ��S a3 ° �� � � — , � � ' _, _ // r � on.wNnGE n uMrrs� i / / / \ / � '&i m:� se" 1 Q !4 \' �• \ 7 A PA ,`� 't � `1(1?(RSdE SV14 E �' 1 INVI IV J.LALL PRE - DEVELOPED CONDITIONS ONSITE PERVIOUS AREA' 28.77 AC CURVE NUMBER: 61 IMPERVIOUS AREA: 0.07 AC CURVE NUMBER: 98 OFFSITE PERVIOUS AREA: 17.86 AC CURVE NUMBER: 61 IMPERVIOUS AREA: 1.34 AC CURVE NUMBER: 98 POSTDEVELOPEO CONDITIONS ONSITE PERVIOUS AREA: 8.65 AC CURVE NUMBER: 61 IMPERVIOUS AREA: 20.19 AC CURVE NUMBER: 98 OFFSITE PERVIOUS AREA: 5.76 AC CURVE NUMBER: 61 IMPERVIOUS AREA: 13.44 AC CURVE NUMBER: 98 TOTALS PERVIOUS AREA: 14.41 AC CURVE NUMBER: 61 IMPERVIOUS AREA: 33.63 AC CURVE NUMBER: 98 HYDROLOGIC SOILS GROUP: "B" WEIGHTED CURVE NUMBER: 87 Stimmel Stimmel Associates, PA Land —pa ArrhiIECINra Ciwl Engineering Land Planning 601 N- Trade S4ee1 5u1e 200 WnsIO� Salem. NC 27101 -2916n NCBEH U.T. R0, G—, Z uj h- 2 Z W Z a. W <( Z�W pWQ oa20 a (DoW LLB Z a J�0 w OO C] u. wy BLUE DIAMOND INVESTMENTS DATE', 9112!2013 RLVISIONS: JOB. NO: 13 -114 SHEET TITLE: DRAINAGE AREA MAP "- THIS IS A PRELIMINARY SITE PLAN BASED ON INCOMPLETE INFORMATION AND THEREFORE MAY NOT REFLECT FINAL. a IW 200 30o SCALE: r -1oa ® SHEET NO.: SITE LAYOUT. NO SITE RESEARCH HAS BEEN CONDUCTED. . D o CONDITIONS MAY CHANGE SIGNIFICANTLY. North SCALE: tar _ Q STIMEL ASSOCIATES, PA. All September 27, 2013 Town ofKerneroviUe P.O. Drawer 728 Kenneosvi||e' N{} 27285 Attn: Russell Radford, PE, Town Engineer Subject: Request for Variance for 8tormwaterNamgement Requirement |n the Pre-Developed Condition Blue Diamond Property adjacent to the Proposed Veterans Administration Hospital Dear Russell, |am writing this letter un behalf of Blue Diamond Investments h) request a variance inthe timing of installation nf stormwater management BMP' for the bject property. The Veterans the Blue Diamond Investments property, A stormwater bypass system must be constructed to convey stormwater runoff from the Blue Diamond property around or through the VA site, for consideration of earthwork operations and to keep runoff from Blue Diamond property separate from that of the VA site. The bypass system discharge point falls within the West Fork Deep River buffer which is a tributary within the Randleman Lake Water Supply Watershed. A rip rap energy dissipater will be provided at the discharge point. The Randleman Rules require that concentrated runoff from manmade conveyances be converted to diffuse flow before the runoff enters Zone 2 of the buffer, unless stormwater management is provided for the runoff. Sufficient space to convert discharge from the bypass system to diffuse flow is not available outside the buffer, therefore a stormwater BMP is required by the Rules, Given the characteristics of the Blue Diamond property and other upslope properties, Blue Diamond Investments is requesting a variance to delay installation of the BMP until such time as development of the Blue Diamond property begins, A development plan has not been prepared for the Blue Diamond property. Designing and building aatmnnwmter�B01P before development plan is in place causes the development to be designed around the BK0P, which may not yield the best and highest use of the property. The total basin area draining to the bypass system is approximately 48 acres. The Blue Diamond property (28.8 acres) is undeveloped, with O96 built upon area (BUA). The remaining drainage area (192 acres) upa|upeVf the Blue Diamond property is very sparsely developed aa large lot residential. The upo|ope area currently has approximately 796BUX The aggregate BUAof all properties upslupeof the \A\ site is2.7S96. Runoff from this area flows overland through wooded areas and vegetated conveyances to the point where the bypass system through the VA site would intercept thiis water, The shortest flow path from the nearest rooftop is at least 700 feet from the bypass system inlet point. Given the extremely low BUA of the upslope properties and the length of the vegetated conveyances, we believe that adequate treatment is already being provided within the natural system without having tu build on engineered BN1P prior bm development ofthe property. Untreated stormma[errunoff from the Blue Diamond property discharged into the buffer from the bypass system will have the same characteristics ae untreated runoff from the same area discharged into the buffer through the natural system. We believe that water quality will not be compromised by deferring installation of the stormm/ahsr management ByNP until development nfthe Blue Diamond property occurs, and that the intent of the Randleman Rules will be satisfied. emwTrade Winston Saltim, NO 27101-2916 p336,no.nmn F; 336.723,1069 Blue Diamond Property 3turmv«ober Management Variance Request September 27,2813 Page Blue Diamond Investments understands that utorm1mmahy management will hm required for their development. They are simply requesting that final design and construction of the stormwater BMP be deferred until development of their property begins. The specific time frame anticipated for development of the property to begin moving forward is unknown, however we believe that completion of the Kernersville Medical Parkway in the fourth quarter of 2013 will be a primary catalyst for development in this area. We believe that granting this variance request is justifiable for the following reasons: w It is a minor deviation from the requirements of the Randleman Rules, since Nonly requests that implementation mf the stormwater management plan be deferred until development of the Blue Diamond property, * Deferring implementation of the stormwater management plan will not negatively impact surface waters. � The requirement for implementation of the stormwater management plan prior to development of Blue Diamond property is not due to actions of Blue Diamond Investments, but rather due to development of the adjacent VA property. � The requirement for implementation, of stormwater management prior to development of property is rare, and in this case only applies to Blue Diamond Investments and not to the upslope residential property owners, which are also contributors ofrunoff to the bypass system. � |tis|n harmony with the general purpose and intent cf the State's riparian buffer protection requirements and the Town's Ordinance and preserves its spirit. � The public safety and welfare have been assured, water quality has been protected and substantial justice has been done, Thank you for your consideration of this variance request. Please contact maJ you require additional information. Sinoe**W, 1 Neal Tucker, PE Stimme|Ansooiab*s. PA Cc: Jeff Hunter, Pope Companies vnv CA SEAL AL COMPANIES INDUSTRIAL • COMMERCIAL • LAND DEVELOPMENT 1349 -0 SOUTH PARK DRIVE KERNERSVILLE, NC 27284 (336) 995 -5000 Fax (336) 996 -3858 VIA EMAIL: rradford@toknc.com September 30, 2013 Mr. Russell Radford Engineering Director Town of Kernersville 134 E. Mountain Street Kernersville, NC 27284 Re: Commitment to Install Stormwater Management BMP(s) Blue Diamond Investment Property Adjacent to the VA Hospital Dear Mr. Radford: This letter shall serve as a commitment by Blue Diamond Investment Company, LLC to install stormwater BMP(s) on the subject property as required by the Randleman Watershed Rules prior to the issuance of the Certificate of Occupancy for the VA Hospital, unless a Variance is granted by the NC Division of Water Resources and the NC Environmental Management Commission, to defer installation of the stormwater BMP(s) until such time as the subject property is developed. Sincerely, ident 3H/cs cc: Neal Tucker, Stimmel Associates, P.A. (via email: ntucker @stimmelpa.com)