I was out on the project Friday and ran into one of the contractor's supervisors ( I don't recall his name) But, he was one
of the guys who had met with Josh when he visited the site. he took me by the location. The spot he showed me was
roughly 250 ft to the left of the stream crossing pipe, on the downstream end as shown on the plan sheet. It's just off
the toe of the slope. The spot had already been cleaned up. The guy I spoke with told me that based on what they
actually removed, the loss was probably a little less than one cubic yard. He thought that it originally looked worse
because it was the runoff of some of the clay material they had brought in for the road fill. He said the thickest part of
the material they removed was 3-4 inches deep in one spot.
I didn't walk all the way into the site to confirm it but, it didn't look like any of the material had reached the stream. I'll
probably go back by the site again later this week. The climate website said that the project took 1.27 inches of rain
sometime this weekend between Saturday and Sunday.
Please let me know if you need more information.
Art C. King
Division Environmental Supervisor
NCDOT Highway Division 8
910 773 8015 office
acking ncdot.gov
121 Dot Drive
Carthage, NC 28327
From: Conchilla, Ryan <ryan.conchiIla@ncdenr.gov>
Sent: Friday, July 15, 2022 1:59 PM
To: King, Art C <acking@ncdot.gov>; James.C.Lastinger@usace.army.mil
Cc: Young, Joshua M <jmyoung@ncdot.gov>
Subject: RE: R-3421AB Cleanup pictures at Sta 231+00 LT-L- Section B
Art,
Can you locate the area of loss on the attached plan sheet with a short description of removal/repairs?
Ryan Conchilla, PWS
Environmental Specialist II
401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8)
Division of Water Resources, NC Department of Environmental Quality
Ryan.Conchilla@ncdenr.gov
From: King, Art C <acking@ncdot.gov>
Sent: Thursday, July 14, 2022 9:39 AM
To: James.C.Lastinger@usace.army.mil; Conchilla, Ryan <ryan.conchilla@ncdenr.gov>
Subject: FW: R-3421AB Cleanup pictures at Sta 231+00 LT-L- Section B
Gentlemen,
Below are the sediment loss clean up pictures for R-3421AB ; Sta 231+00 LT-L- Section B.
Please let me know if you have any questions.
Art C. King
Division Environmental Supervisor
NCDOT Highway Division 8
910 773 8015 office
ackinq .ncdot.gov
121 Dot Drive
Carthage, NC 28327
From: Owens, Lonnie H <Ihowens@ncdot.gov>
Sent: Thursday, July 14, 2022 9:30 AM
To: Young, Joshua M <jmyoung@ncdot.gov>; King, Art C <acking@ncdot.gov>
Cc: Cranford, Darren L <dlcranford@ncdot.gov>; Dunn, Thomas B <tbdunn@ncdot.gov>; Fine, Cary A
<cafi ne@ ncdot.gov>
Subject: Cleanup pictures at Sta 231+00 LT-L- Section B
L-1
���\�� � �../ �a-��-�»\\�.
6ft41M �
Ic
At
91
Ii
Sent from my iPad
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.