HomeMy WebLinkAboutNCC222520_NOI Signed Certification_20220726Directions:
Print this form, complete, scan and upload to the electronic NOI.
Then, mail the original form to the NC DEMLR Stormwater Program (with $100 check if paying by check) at:
Division of Energy, Mineral & Land Resources Stormwater Program
S12 N. Salisbury Street, 6th Floor (Office 640K)
1612 Mail Service Center
Raleigh, INC 27699-1612
Per NC General Statute 143-215.6B (i), any person who knowingly makes any false statement, representation, or
certification in any application, record, report, plan, or other document filed or required to be maintained under this
Article or a rule implementing this Article ... shall be guilty of a Class 2 misdemeanor which may include a fine not to
exceed ten thousand dollars ($10,000).
Under pe Ity of law, I certify that (check all boxes to indicate your agreement):
I am the person responsible for the construction activities of this project, for satisfying the requirements of this
permit, and for any civil or criminal penalties incurred due to violations of this permit.
[� The information submitted in this NO[ is, to the best of my knowledge and belief, true, accurate, and complete
based on my inquiry of the person or persons who manage the system, or those persons directly responsible for
, gathering the information.
,,gathering
will abide by all conditions of the NCGO10000 General Permit and the approved Erosion and Sediment Control
Plan.
If the approved Erosion and Sediment Control Plan is not compliant with Part II (Stormwater Pollution
Prevention Plan) of the NCGO10000 General Permit, I will nonetheless ensure that all conditions of Part II of the
permit are met on the project at all times.
[ I hereby request coverage under the N_CG010000 General Permit and understand that coverage under this
permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Project Name (must match Ala): Liberty Storage Solutions - Manufacturing Building
Specific Lot Numbers (must match Alb):
Permittee (must match BV: Liberty Storage Solutions LLC
Legally Responsible Person (must match B2 & B3): Bobby Eaton
Title of Legally Responsible Person (must match B3b): Chief Operating Officer
Name & Title of Signed if Authorized Individual
Differs from Legally Responsible Person:
Phone Number:
ci L CIL
Signature �f Legally Responsible Person or Authorized Individual
Vld'�Q;U
Date
* IMPORTANT NOTE: this form must be signed by a responsible corporate officer that owns or operates the construction activity,
such as a president, secretary, treasurer, or vice president or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCGO10000 permit.