Loading...
HomeMy WebLinkAbout20150016 Ver 2_6-24-2022 info received email_20220624Annino, Amy M From: Dodd, Brady -FS <brady.dodd@usda.gov> Sent: Friday, June 24, 2022 10:57 AM To: Annino, Amy M; David Brown (david.w.brown@usace.army.mil); Leslie, Andrea J; Aiken, Stan E Subject: [External] RE: [External Email]DWR 20150016 V2 Davidson River Channel Relocation - Add Info Request Attachments: Davidson River Design 2022_StructureLocations.pdf Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Amy, please consider the attached pdf. document and the below statement to satisfy the permitting needs as requested. Thank you, Brady #2. Construction Sequence: 1. Working off-line, excavate new channel and install in -stream structures. Stockpile soil between new channel and existing channel. Stabilize banks with transplants and/or mat. 2. Remove soil at upstream end of new channel to allow stream to flow into new channel. 3. Plug existing stream with excavated soil from new channel. Stabilize plug and fill in existing stream channel with transplants and/or mat, seed and straw mulch. 4. Plant all disturbed area with seed, live stakes, and bare roots. From: Annino, Amy M <amy.annino@ncdenr.gov> Sent: Tuesday, June 14, 2022 5:07 PM To: Dodd, Brady -FS <brady.dodd@usda.gov>; David Brown (david.w.brown@usace.army.mil) <david.w.brown@usace.army.mil>; Leslie, Andrea J <andrea.leslie@ncwildlife.org>; Aiken, Stan E <sta n. a i ke n@ n cd e n r. gov> Subject: [External Email]DWR 20150016 V2 Davidson River Channel Relocation - Add Info Request [External Email] If this message comes from an unexpected sender or references a vague/unexpected topic; Use caution before clicking links or opening attachments. Please send any concerns or suspicious messages to: Spam.Abuse@usda.gov On May 18, 2022, the Division of Water Resources (Division) received your application requesting a 401 Water Quality Certification from the Division for the subject project. On May 20, 2022, the Division received the required fee. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. Please show the location of all proposed in -stream structures, riffles, and pools on the site plan for the new proposed channel. For each proposed structure type (cross vane, J-hook vane, toe wood), provide a proposed longitudinal profile and a proposed typical cross-section with dimensions. [15A NCAC 02H .0506 (b)] 1 2. Per condition II. 8 of Water Quality Certification 4255 all work in or adjacent to streams shall be constructed so that the flowing stream does not come in contact with the disturbed area. Please provide a construction sequence that details the method of diversion and/or dewatering to be utilized at the site and the sequence of construction events to be followed to ensure compliance with this condition. [15A NCAC 02H .0506(b)(1) and 15A NCAC 02H .0502(a) and (c)] Pursuant to Title 15A NCAC 02H .0502(e), the applicant shall furnish all of the above requested information for the proper consideration of the application. Please provide your response by July 15, 2022. If all of the requested information is not received, the Division will be unable to approve the application and it will be denied as incomplete. The denial of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Amy Annino Environmental Specialist — Asheville Regional Office Water Quality Regional Operations Section NCDEQ — Division of Water Resources 2090 U.S. Hwy. 70 Swannanoa, N.C. 28711 828 296 4656 office 984 232 1222 mobile amy.annino@ncdenr.gov si Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. This electronic message contains information generated by the USDA solely for the intended recipients. Any unauthorized interception of this message or the use or disclosure of the information it contains may violate the law and subject the violator to civil or criminal penalties. If you believe you have received this message in error, please notify the sender and delete the email immediately. 2 d�LL404 sLopmn fhREST J-Hook Vane and Toe Wood FLOODPLAi N \\\:; .•■••••••*• • AREA OF FILL (FLOODPLAIN CONSTRUCTION) 90.00 st.awiq Fog5 T L ANDSL1DE SLoPtNG LONGITUDINAL PROFILE - NEW CHANNEL CONSTRUCTION (Conceptual Drawing) Design Specifics: • Continue existing riffle into new channel until Sta. 1+00 at a 2-3% slope, • transition into run until Sta. 1+60, • transition into pool until Sta. 2+70, • transition into glide until Sta. 3+00, • riffle down to existing river channel pool at a 2-3% slope. Pool Dimensions: Pool length LPaol (includes run & glide): 64 - 80' Pool length ratio (Lpow/W ,): 1.94 - 2.43' Pool -to -pool spacing, p-p: 132 - 166' Pool -to -pool spacing ratio, (p-p/Waf): 4.0 - 5.0' Davidson River - Longitudinal Profile of New Channel 0 20 40 60 80 100 120 140 160 180 Stationing (feet) 00 220 240 260 280 ?(10 320 340 360 380 400 20 440 460 "p1) 50) 520 540 560 580 600 620 640 95.00 a 100.00 . TIE ikTO UPSTREAM 'Ai 105.'CHANNEL 110.00 -CROSS SECTION A -A f- Channel Bea -torn "DAM LOCATION J-Hook Vane and Toe Wood — — — Water Surface R.) n kft:ll TIE INTO DOWNSTREAM CHANNEL c 0 a.F 100.0 99.5 99.0 98.5 98.0 97.5 97.0 96.5 96.0 95.5 95.0 00 Typical Riffle Cross -Section BKF 10.0 20.0 30.0 40.0 Distance (ft) 50.0 60.0 70.0 100.0 99.0 98.0 97.0 96.0 95.0 0.0 Typical Pool Cross -Section B KF 10.0 20.0 30.0 40.0 ❑istance (ft) 50.0 60.0 70.0